Introduction

View current and future planned roadworks and road closures for Larkspur Close, BR6 9TH and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Larkspur Close, ORPINGTON, BR6 9TH
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Larkspur Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
29 Jul 2024 and 15 Sep 2025
Thames Water were proposing to carry out New service connection on Hatherley Crescent, Sidcup.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 July 2024 and run through until 15 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:28.
12 Aug 2024 and 1 Dec 2025
Thames Water were proposing to carry out New service connection on Faraday Avenue, Sidcup.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 August 2024 and run through until 1 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:28.
26 Jan 2025 and 28 Jan 2026
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 January 2025 and run through until 28 January 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 08:21.
12 May and 15 Sep 2025
Thames Water were proposing to carry out New service connection on Old Farm Avenue, Sidcup.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 15 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:27.
27 May 2025 and 2 Feb 2026
Thames Water are proposing to carry out Utility asset works on Leaves Green Road, Keston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 2 February 2026. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 15 May 2025 at 18:53.
2 Feb 2026
Thames Water are carrying out Utility asset works on Leaves Green Road, Keston.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 11:30 and could run through until 2 February 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 27 May 2025 at 11:49.
8 Oct 2025
Thames Water are carrying out roadworks on Blackness Lane, Keston.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 May 2025 at 08:00 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 May 2025 at 08:47.
2 Jun and 19 Dec 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Cray Avenue, St Mary Cray.
These works are categorised as Major.
The works will start on or after 2 June 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks South Eastern on 7 Oct 2024 at 17:33.
17 Oct 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Southborough Lane, Bromley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 June 2025 at 13:00 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 24 Jul 2025 at 15:59.
7 Jul and 17 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rushmore Hill, Chelsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 14 Apr 2025 at 19:00.
15 Sep 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Rushmore Hill, Chelsfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 July 2025 at 11:20 and could run through until 15 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 12:48.
18 Jul and 12 Sep 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Main Road, St Pauls Cray.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 12 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 09:05.
14 Sep 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on London Road, Swanley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 July 2025 at 08:51 and could run through until 14 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 15:04.
14 Sep 2025
Southern Gas Networks are carrying out roadworks on St Georges Road, Swanley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 July 2025 at 10:39 and could run through until 14 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 08:53.
23 Jul and 30 Sep 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Selborne Avenue, Bexley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 July 2025 and run through until 30 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Jul 2025 at 11:07.
Friday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Breakspears Drive, St Pauls Cray.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 18 Jul 2025 at 08:52.
Friday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on St Paul's Wood Hill, St Pauls Cray.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 July 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Jul 2025 at 14:16.
30 Jul and 6 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valentine Avenue, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 17 Jun 2025 at 16:29.
19 Sep 2025
UK Power Networks South Eastern are carrying out Statutory Infrastructure Works on Main Road, St Pauls Cray.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 August 2025 at 14:45 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 4 Aug 2025 at 14:48.
Today
London Borough Of Bromley are carrying out Highway improvement works on Grange Road, Orpington.
These works are categorised as Major.
The works started on 8 August 2025 at 09:18 and could run through until 3 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2025 at 11:08.
Tomorrow
London Borough Of Bromley are carrying out Highway improvement works on Elmstead Lane, Chislehurst.
The works started on 13 August 2025 at 10:58 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 3 Sep 2025 at 09:39.
14 Sep 2025
London Borough Of Bromley are carrying out Highway improvement works on Kemnal Road, Chislehurst.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 August 2025 at 08:00 and could run through until 14 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2025 at 11:24.
25 Aug and 12 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Manse Way, Swanley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Aug 2025 at 12:58.
Friday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Breakspears Drive, St Pauls Cray.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Jul 2025 at 14:08.
25 Aug and 22 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Farm Avenue, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 15:56.
Today
London Borough Of Bromley are carrying out Highway improvement works on Gillmans Road, Orpington.
The works started on 27 August 2025 at 15:35 and could run through until 3 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 3 Sep 2025 at 09:39.
Tomorrow
London Borough Of Bromley are carrying out Highway improvement works on Crown Lane, Bromley.
The works started on 28 August 2025 at 15:32 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2025 at 15:47.
15 Sep 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Salisbury Avenue, Swanley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 August 2025 at 09:18 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 09:32.
Today
London Borough Of Bromley are carrying out Highway improvement works on Petersham Drive, St Pauls Cray.
The works started on 28 August 2025 at 13:11 and could run through until 3 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 3 Sep 2025 at 09:39.
Today
London Borough Of Bromley are carrying out Highway improvement works on Sevenoaks Way, St Pauls Cray.
The works started on 28 August 2025 at 11:42 and could run through until 3 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 3 Sep 2025 at 09:39.
Today
London Borough Of Bromley are carrying out Highway improvement works on Knoll Rise, Orpington.
The works started on 29 August 2025 at 11:06 and could run through until 3 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2025 at 09:41.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Station Approach, Hayes.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 August 2025 at 10:24 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Aug 2025 at 15:11.
14 Sep 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on London Road, Moreton Industrial Estate, Swanley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 August 2025 at 09:17 and could run through until 14 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 09:34.
14 Sep 2025
Southern Gas Networks are carrying out roadworks on Beechenlea Lane, Swanley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 August 2025 at 09:17 and could run through until 14 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 09:35.
Friday
Thames Water are carrying out Utility repair and maintenance works on High Elms Road, Downe.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 August 2025 at 14:55 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Sep 2025 at 11:06.
Today
South East Water are proposing to carry out New service connection on Telston Lane, Otford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South East Water on 2 Jun 2025 at 06:51.
1 Sep and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Halstead Lane, Knockholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Jun 2025 at 12:23.
1 Sep and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Halstead Lane, Knockholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Jun 2025 at 17:24.
1 Sep and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Knockholt Road, Halstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 27 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Jun 2025 at 12:23.
1 Sep and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Knockholt Road, Halstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 27 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Jun 2025 at 17:23.
Saturday
Thames Water were proposing to carry out Utility asset works on Ashmore Lane, Keston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 6 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Aug 2025 at 15:25.
1 and 28 Sep 2025
Thames Water are proposing to carry out Utility asset works on Ashmore Lane, Keston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Aug 2025 at 08:45.
28 Sep 2025
Thames Water are carrying out Utility asset works on Ashmore Lane, Keston.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 11:00 and could run through until 28 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Sep 2025 at 11:21.
1 Sep and 26 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Edmund Road, Orpington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 26 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 10:15.
1 and 15 Sep 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Anglesea Road, St Mary Cray.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 15 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 10:16.
1 Sep and 26 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Chelsfield Road, Orpington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 26 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 10:16.
Friday
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Elmstead Lane, Chislehurst.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by T-Mobile (UK) on 18 Jun 2025 at 14:28.
Friday
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Elmstead Lane, Chislehurst.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by T-Mobile (UK) on 26 Aug 2025 at 18:42.
Friday
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Elmstead Lane, Chislehurst.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by T-Mobile (UK) on 28 Aug 2025 at 11:42.
Friday
T-Mobile (UK) are carrying out Utility repair and maintenance works on Elmstead Lane, Chislehurst.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 09:30 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by T-Mobile (UK) on 1 Sep 2025 at 11:12.
Saturday
National Highways are proposing to carry out Works for road purposes on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 6 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 12 Feb 2025 at 14:04.
Saturday
National Highways are carrying out Works for road purposes on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 22:00 and could run through until 6 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 2 Sep 2025 at 07:23.
1 Sep 2025 and 31 Jan 2026
Thames Water were proposing to carry out New service connection on Betterton Drive, Sidcup.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 31 January 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:26.
1 Sep and 6 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Valentine Avenue, Bexley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 6 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 May 2025 at 11:34.
1 Sep and 6 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valentine Avenue, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 14:39.
19 Sep 2025
Thames Water are carrying out Utility repair and maintenance works on Chipperfield Road, St Pauls Cray.
The works should not impact the carriageway.
The works started on 2 September 2025 at 13:30 and could run through until 19 September 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 3 Sep 2025 at 09:39.
Friday
Cellnex OT UK were proposing to carry out Utility asset works on Blackbrook Lane, Bickley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2025 and run through until 5 September 2025. The works were due to impact the verge only.
This roadwork event was last updated by Cellnex OT UK on 10 Jun 2025 at 14:53.
Tomorrow
Cellnex OT UK are proposing to carry out Utility asset works on Blackbrook Lane, Bickley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 4 September 2025. The works will impact the verge only.
This roadwork event was last updated by Cellnex OT UK on 19 Jun 2025 at 13:39.
Sunday
Cellnex OT UK were proposing to carry out Utility asset works on Blackbrook Lane, Bickley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 September 2025 and run through until 7 September 2025. The works were due to impact the verge only.
This roadwork event was last updated by Cellnex OT UK on 18 Jul 2025 at 11:18.
6 Sep and 14 Nov 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Sandy Lane, St Pauls Cray.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 September 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 2 Sep 2025 at 11:41.
8 and 10 Sep 2025
South East Water are proposing to carry out New service connection on Pilgrims Way West, Dunton Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 13 Jun 2025 at 11:17.
8 and 17 Sep 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on The Drive, Orpington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 1 Sep 2025 at 12:28.
8 and 12 Sep 2025
T-Mobile (UK) were proposing to carry out Utility asset works on Wested Lane, Crockenhill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 September 2025 and run through until 12 September 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by T-Mobile (UK) on 7 Jul 2025 at 09:35.
8 and 12 Sep 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Beechenlea Lane, Swanley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 12 May 2025 at 06:03.
8 and 11 Sep 2025
UK Power Networks South Eastern were proposing to carry out Utility asset works on Beechenlea Lane, Swanley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 September 2025 and run through until 11 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 27 Aug 2025 at 12:06.
8 Sep and 2 Dec 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Sandy Lane, St Pauls Cray.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 2 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 09:05.
8 and 21 Sep 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Royal Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 1 Sep 2025 at 15:48.
8 Sep and 5 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bursdon Close, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 12:39.
8 Sep and 5 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Farm Avenue, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 10:37.
8 Sep and 5 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wyncham Avenue, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 13:13.
8 Sep and 5 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodlands Avenue, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Jul 2025 at 10:31.
8 and 22 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valliers Wood Road, Sidcup.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Jul 2025 at 12:19.
9 Sep and 9 Oct 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Croydon Road, Keston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 28 Jul 2025 at 17:13.
15 Sep and 31 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chelsfield Hill, Chelsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 15:40.
15 Sep and 31 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Road, Chelsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 15:40.
15 Sep and 6 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlds End Lane, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Aug 2025 at 15:40.
15 and 23 Sep 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Layhams Road, West Wickham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 23 September 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 2 Jun 2025 at 09:48.
15 Sep and 13 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Gravel Pit Way, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Jun 2025 at 13:23.
15 Sep and 13 Oct 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Gravel Pit Way, Orpington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 13 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Jun 2025 at 08:36.
15 Sep and 13 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Juglans Road, Orpington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Jun 2025 at 16:17.
15 Sep and 13 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Orpington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Jun 2025 at 13:23.
15 Sep and 13 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Homefield Rise, Orpington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Jun 2025 at 13:23.
15 and 19 Sep 2025
T-Mobile (UK) are proposing to carry out Utility asset works on Wested Lane, Crockenhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by T-Mobile (UK) on 7 Jul 2025 at 10:50.
15 and 19 Sep 2025
T-Mobile (UK) are proposing to carry out Utility asset works on Wested Lane, Crockenhill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by T-Mobile (UK) on 26 Aug 2025 at 07:10.
15 Sep and 19 Dec 2025
Thames Water were proposing to carry out New service connection on Bursdon Close, Sidcup.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 19 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:27.
15 Sep and 10 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hurst Road, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 12:00.
15 and 26 Sep 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hurstwood Avenue, Bexley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Jul 2025 at 11:14.
15 Sep and 12 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Braundton Avenue, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 12:02.
19 and 22 Sep 2025
National Highways are proposing to carry out Works for road purposes on Morants Court Road, Dunton Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 3 Jun 2025 at 13:28.
22 and 24 Sep 2025
South East Water are proposing to carry out New service connection on Telston Lane, Otford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South East Water on 27 Jun 2025 at 05:54.
22 and 24 Sep 2025
Thames Water were proposing to carry out Utility repair and maintenance works on High Elms Road, Downe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 24 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Jul 2025 at 12:08.
22 Sep and 19 Dec 2025
Thames Water are proposing to carry out Utility asset works on Leaves Green, Keston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Aug 2025 at 08:45.
22 Sep and 19 Dec 2025
Thames Water are proposing to carry out Utility asset works on Leaves Green, Keston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Aug 2025 at 16:35.
22 Sep and 13 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tower Road, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 May 2025 at 19:23.
22 Sep and 13 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Gravel Pit Way, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Jul 2025 at 09:40.
22 Sep and 13 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Gravel Pit Way, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 12:31.
22 Sep and 13 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Gravel Pit Way, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 14:55.
22 and 26 Sep 2025
Southern Gas Networks are proposing to carry out New service connection on Eynsford Road, Eynsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 06:16.
22 Sep and 26 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Derry Downs, St Mary Cray.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 26 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 10:17.
22 and 30 Sep 2025
Southern Gas Networks are proposing to carry out New service connection on Durant Road, Hextable.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Jun 2025 at 06:22.
22 and 28 Sep 2025
Southern Gas Networks are proposing to carry out New service connection on Durant Road, Hextable.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Aug 2025 at 09:44.
22 Sep and 5 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valentine Avenue, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 15:57.
22 Sep and 20 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakley Drive, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Jun 2025 at 16:43.
22 Sep and 20 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakley Drive, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:07.
23 and 26 Sep 2025
Thames Water were proposing to carry out New service connection on Church Road, Halstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Jun 2025 at 16:21.
26 and 29 Sep 2025
National Highways are proposing to carry out Works for road purposes on Morants Court Road, Dunton Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 3 Jun 2025 at 13:27.
29 Sep and 2 Oct 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Warren Road, Chelsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2025 at 10:40.
29 Sep and 2 Oct 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Balfour Road, Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2025 at 10:39.
29 Sep and 7 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westmoreland Road, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 Jun 2025 at 13:23.
29 Sep and 7 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westmoreland Road, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 08:36.
29 Sep and 7 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westmoreland Road, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 22 Jul 2025 at 08:27.
29 Sep and 7 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Masons Hill, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 Jun 2025 at 13:23.
29 Sep and 7 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Masons Hill, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 08:36.
29 Sep and 7 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Masons Hill, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 22 Jul 2025 at 08:27.
29 Sep and 7 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 Jun 2025 at 13:23.
29 Sep and 7 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 08:36.
29 Sep and 7 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 22 Jul 2025 at 08:27.
30 Sep and 3 Oct 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Beechenlea Lane, Swanley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 27 Aug 2025 at 15:13.
2 Oct and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Prince Imperial Road, Chislehurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 16:09.
6 and 9 Oct 2025
Thames Water were proposing to carry out New service connection on Church Road, Halstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 9 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Jun 2025 at 14:02.
6 and 24 Oct 2025
UK Power Networks South Eastern are proposing to carry out Utility repair and maintenance works on Cudham Lane North, Cudham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 22 Jan 2025 at 08:52.
6 and 24 Oct 2025
UK Power Networks South Eastern are proposing to carry out Utility repair and maintenance works on Cudham Lane North, Cudham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Feb 2025 at 14:58.
6 and 24 Oct 2025
UK Power Networks South Eastern are proposing to carry out Utility repair and maintenance works on Cudham Lane North, Cudham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 23 Feb 2025 at 19:35.
13 and 15 Oct 2025
South East Water are proposing to carry out New service connection on Telston Lane, Otford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South East Water on 27 Jun 2025 at 11:53.
13 and 17 Oct 2025
Thames Water are proposing to carry out New service connection on Imperial Way, Chislehurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Jul 2025 at 08:38.
13 and 17 Oct 2025
Thames Water are proposing to carry out New service connection on Imperial Way, Chislehurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Aug 2025 at 13:39.
13 and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Farm Road West, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Jul 2025 at 12:40.
20 and 25 Oct 2025
Southern Gas Networks are proposing to carry out New service connection on Pilgrims Way West, Otford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 06:12.
20 and 23 Oct 2025
South East Water are proposing to carry out Utility repair and maintenance works on Twitton Lane, Otford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 12 Aug 2025 at 07:16.
20 and 24 Oct 2025
UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Rushmore Hill, Knockholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks South Eastern on 28 Jul 2025 at 06:23.
20 and 22 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on High Elms Road, Downe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Jul 2025 at 08:36.
20 and 22 Oct 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Vine Road, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2025 at 10:45.
20 and 24 Oct 2025
UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Bower Lane, Eynsford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 11 Aug 2025 at 15:01.
20 Oct and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Avalon Road, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Jul 2025 at 09:06.
20 Oct and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Avalon Road, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 13:39.
20 Oct and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Prince Imperial Road, Chislehurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 12:48.
20 Oct and 4 Nov 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Old Farm Road East, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 4 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:09.
21 and 24 Oct 2025
UK Power Networks South Eastern are proposing to carry out Utility repair and maintenance works on Snag Lane, Cudham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 24 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 22 Jan 2025 at 08:52.
21 and 24 Oct 2025
UK Power Networks South Eastern are proposing to carry out Utility repair and maintenance works on Snag Lane, Cudham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 24 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Feb 2025 at 14:58.
21 and 24 Oct 2025
UK Power Networks South Eastern are proposing to carry out Utility repair and maintenance works on Snag Lane, Cudham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 24 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 23 Feb 2025 at 19:35.
22 Oct and 11 Nov 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Main Road, Knockholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 11 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 1 Aug 2025 at 06:48.
22 and 24 Oct 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Edgebury, Chislehurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 2 Sep 2025 at 10:46.
22 and 24 Oct 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Carisbrooke Avenue, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 8 Jul 2025 at 09:31.
23 and 27 Oct 2025
South East Water are proposing to carry out Utility repair and maintenance works on Pilgrims Way West, Otford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 6 Aug 2025 at 06:49.
23 and 27 Oct 2025
South East Water are proposing to carry out Utility repair and maintenance works on Pilgrims Way West, Otford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South East Water on 13 Aug 2025 at 06:00.
23 and 27 Oct 2025
Southern Gas Networks are proposing to carry out New service connection on Pilgrims Way West, Otford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Jul 2025 at 09:21.
23 and 27 Oct 2025
Southern Gas Networks are proposing to carry out New service connection on Pilgrims Way West, Otford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Jul 2025 at 11:23.
23 and 28 Oct 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Sevenoaks Road, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 28 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 3 Jul 2025 at 10:43.
24 Oct and 5 Nov 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Top Dartford Road, Hextable.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 8 May 2025 at 06:50.
24 Oct and 5 Nov 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Top Dartford Road, Hextable.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 12 Jun 2025 at 14:28.
24 Oct and 5 Nov 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Top Dartford Road, Hextable.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 13 Jun 2025 at 06:14.
27 and 31 Oct 2025
Southern Gas Networks are proposing to carry out New service connection on Pilgrims Way West, Otford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 Jun 2025 at 08:09.
27 and 31 Oct 2025
UK Power Networks South Eastern are proposing to carry out Utility repair and maintenance works on Cudham Lane South, Cudham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 22 Jan 2025 at 08:52.
27 and 31 Oct 2025
UK Power Networks South Eastern are proposing to carry out Utility repair and maintenance works on Cudham Lane South, Cudham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Feb 2025 at 14:58.
27 and 31 Oct 2025
UK Power Networks South Eastern are proposing to carry out Utility repair and maintenance works on Cudham Lane South, Cudham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 23 Feb 2025 at 19:35.
27 and 30 Oct 2025
Thames Water are proposing to carry out New service connection on Church Road, Halstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Jun 2025 at 06:35.
27 Oct and 10 Nov 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on The Drive, Orpington.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 6 Aug 2025 at 13:37.
27 Oct and 19 Dec 2025
Thames Water were proposing to carry out New service connection on Riverside Road, Sidcup.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 19 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:25.
27 and 29 Oct 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Brendon Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 30 Jun 2025 at 12:50.
27 and 29 Oct 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Ermington Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 30 Jun 2025 at 12:51.
27 and 29 Oct 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Agaton Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 30 Jun 2025 at 12:41.
27 and 29 Oct 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Dulverton Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 30 Jun 2025 at 12:36.
28 and 30 Oct 2025
South East Water are proposing to carry out Utility repair and maintenance works on Twitton Lane, Otford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 14 Aug 2025 at 09:23.
30 Oct and 1 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Reynard Close, Bickley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Jul 2025 at 12:41.
3 and 5 Nov 2025
South East Water are proposing to carry out Utility repair and maintenance works on Twitton Lane, Otford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 14 Aug 2025 at 12:54.
3 Nov and 1 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southborough Lane, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Jul 2025 at 08:27.
4 and 6 Nov 2025
UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Rushmore Hill, Knockholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2025 and could run through until 6 November 2025. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks South Eastern on 22 Aug 2025 at 06:49.
5 and 7 Nov 2025
South East Water are proposing to carry out Utility repair and maintenance works on Twitton Lane, Otford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 15 Aug 2025 at 05:54.
6 and 8 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Crescent Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2025 and could run through until 8 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 7 Aug 2025 at 10:59.
6 and 8 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Station Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2025 and could run through until 8 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 7 Aug 2025 at 10:30.
7 and 9 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Pound Lane, Knockholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 9 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 24 Jul 2025 at 14:53.
7 and 9 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Maypole Road, Chelsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 9 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Aug 2025 at 12:31.
8 and 11 Nov 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Sandy Lane, St Pauls Cray.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2025 and could run through until 11 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Aug 2025 at 08:46.
10 and 12 Nov 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Reynard Close, Bickley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 November 2025 and run through until 12 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Jul 2025 at 11:32.
17 and 20 Nov 2025
Thames Water are proposing to carry out New service connection on Blueberry Lane, Knockholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Sep 2025 at 07:05.
17 Nov and 8 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lakeswood Road, Petts Wood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Jul 2025 at 08:44.
17 Nov and 8 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crescent Drive, Petts Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Jul 2025 at 12:56.
17 Nov and 8 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Frankswood Avenue, Petts Wood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Jul 2025 at 12:56.
19 and 21 Nov 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Reynard Close, Bickley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2025 and run through until 21 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Jul 2025 at 13:28.
21 and 23 Nov 2025
Cellnex OT UK were proposing to carry out Utility asset works on Blackbrook Lane, Bickley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 November 2025 and run through until 23 November 2025. The works were due to impact the verge only.
This roadwork event was last updated by Cellnex OT UK on 31 Jul 2025 at 08:38.
21 and 23 Nov 2025
Cellnex OT UK are proposing to carry out Utility asset works on Blackbrook Lane, Bickley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2025 and could run through until 23 November 2025. The works will impact the verge only.
This roadwork event was last updated by Cellnex OT UK on 12 Aug 2025 at 08:46.
24 and 28 Nov 2025
Thames Water are proposing to carry out roadworks on Birchwood Road, Petts Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Aug 2025 at 16:35.
1 and 15 Dec 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Court Road, Orpington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 December 2025 and run through until 15 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 5 Aug 2025 at 09:36.
1 and 15 Dec 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Charterhouse Road, Orpington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 December 2025 and run through until 15 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 5 Aug 2025 at 09:36.
1 and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lakeswood Road, Petts Wood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Jul 2025 at 12:56.
1 and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodhurst Avenue, Petts Wood.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Jul 2025 at 12:56.
1 and 5 Dec 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Spekehill, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 27 Aug 2025 at 09:48.
1 and 5 Dec 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Larchwood Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 27 Aug 2025 at 09:47.
Roadworks Map near to Larkspur Close, ORPINGTON, BR6 9TH (Loading...)













- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Larkspur Close, ORPINGTON, BR6 9TH (26 Events)
(Scheduled Dates)
(miles)
(Scheduled: 1 Sep 2025 - 9 Sep 2025)
(Scheduled: 27 Aug 2025 - 3 Sep 2025)
(Scheduled: 3 Sep 2025 - 5 Sep 2025)
(Scheduled: 1 Sep 2025 - 3 Sep 2025)
(Scheduled: 3 Sep 2025 - 4 Sep 2025)
(Scheduled: 29 Aug 2025 - 3 Sep 2025)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data