ROADWORKS SUMMARY
Birdhouse Lane, ORPINGTON, BR6 7LJ
Introduction
View current and future planned roadworks and road closures for Birdhouse Lane, BR6 7LJ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Birdhouse Lane, ORPINGTON, BR6 7LJ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Birdhouse Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
28 Mar 2025
Thames Water are carrying out Utility repair and maintenance works on Steeple Heights Drive, Biggin Hill.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 March 2024 at 11:32 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Mar 2024 at 14:54.
24 Jan 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Homestead Road, Chelsfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 September 2024 at 10:50 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 15:15.
21 Oct and 20 Dec 2024
UK Power Networks South Eastern are proposing to carry out Utility asset works on Chevening Road, Chipstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks South Eastern on 22 Jul 2024 at 06:40.
1 Nov 2024 and 1 May 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on High Street, Limpsfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 November 2024 and run through until 1 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 14:24.
20 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Worlds End Lane, Orpington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 09:10 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 14:22.
Sunday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rookery Road, Downe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 15 December 2024. The works will impact the carriageway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 15:12.
Sunday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on New Road Hill, Downe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 15 December 2024. The works will impact the carriageway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 15:12.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on High Street, Westerham.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 14:45 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 07:18.
18 Nov and 18 Dec 2024
Surrey County Council are proposing to carry out Works for road purposes on Westerham Road, Limpsfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 20 Aug 2024 at 12:36.
18 Dec 2024
Surrey County Council are carrying out Works for road purposes on Westerham Road, Limpsfield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 18 Nov 2024 at 09:25.
20 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Rookery Road, Downe.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway and footpath.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:59.
20 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on New Road Hill, Downe.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway and footpath.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 09:03.
Friday
Thames Water are carrying out Utility repair and maintenance works on Grays Road, Biggin Hill.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 November 2024 at 19:05 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Dec 2024 at 14:59.
23 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Oxenden Wood Road, Chelsfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 December 2024 at 09:45 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 09:53.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on Hartfield Crescent, West Wickham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 08:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 08:49.
2 and 20 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on Pickhurst Lane, West Wickham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 17:22.
Monday
Thames Water are carrying out Utility repair and maintenance works on Chart Lane, Brasted.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 December 2024 at 10:04 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 12:55.
Today
Thames Water are carrying out Utility repair and maintenance works on Oakley Drive, Bromley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 December 2024 at 14:01 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Dec 2024 at 10:28.
Tuesday
London Borough Of Bromley are carrying out Highway improvement works on Chelsfield Lane, Orpington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 09:00 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 9 Dec 2024 at 09:01.
Sunday
Southern Gas Networks are carrying out Utility repair and maintenance works on Turpington Lane, Bromley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 16:30 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 12:00.
Tomorrow
Thames Water are proposing to carry out Utility repair and maintenance works on Costells Meadow, Westerham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Sep 2024 at 10:20.
Thames Water carried out Utility repair and maintenance works on Costells Meadow, Westerham.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 10 Dec 2024 and 12 Dec 2024 and were actually completed between 10 Dec 2024 (19:00) and 11 Dec 2024 (01:00). The works impacted the carriageway only.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 09:31.
Sunday
London Borough Of Bromley are proposing to carry out Highway improvement works on Lovibonds Avenue, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 25 Sep 2024 at 09:05.
16 and 18 Dec 2024
Trooli are proposing to carry out Utility asset works on Rectory Lane, Brasted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Trooli on 26 Sep 2024 at 10:54.
16 and 18 Dec 2024
UK Power Networks South Eastern were proposing to carry out New service connection on Burlings Lane, Knockholt.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 29 Oct 2024 at 15:20.
16 and 20 Dec 2024
UK Power Networks South Eastern were proposing to carry out New service connection on Burlings Lane, Knockholt.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 14:58.
16 and 19 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Limpsfield Road, Warlingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 14 Nov 2024 at 07:03.
16 and 19 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Limpsfield Road, Warlingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 25 Nov 2024 at 14:22.
17 and 20 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Limpsfield Road, Warlingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 29 Nov 2024 at 08:54.
17 and 20 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Limpsfield Road, Warlingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 2 Dec 2024 at 07:49.
18 and 20 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on Pickhurst Lane, West Wickham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 10:02.
18 and 20 Dec 2024
Southern Gas Networks were proposing to carry out New service connection on Pickhurst Lane, West Wickham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 10:33.
18 and 20 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on Pickhurst Lane, West Wickham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 15:15.
18 and 20 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on Pickhurst Lane, West Wickham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 08:34.
2 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxenden Wood Road, Chelsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 09:56.
2 and 27 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlds End Lane, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 12:16.
2 and 27 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlds End Lane, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 15:15.
2 Jan and 21 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlds End Lane, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 17:18.
2 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, West Wickham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 13:52.
2 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, West Wickham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 08:23.
2 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mead Way, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 08:23.
2 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southborough Lane, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Jul 2024 at 10:46.
2 Jan and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crown Lane, Bromley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Jul 2024 at 10:46.
6 Jan and 3 Mar 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Kent Hatch Road, Limpsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 17 Oct 2024 at 14:34.
6 Jan and 3 Mar 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Golf House Road, Limpsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 17 Oct 2024 at 14:38.
6 and 8 Jan 2025
Kent County Council are proposing to carry out Highway improvement works on Shelleys Lane, Knockholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Kent County Council on 20 Nov 2024 at 09:15.
6 and 10 Jan 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Polesteeple Hill, Biggin Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 25 Sep 2024 at 09:05.
6 and 9 Jan 2025
Thames Water were proposing to carry out Highway improvement works on Cudham Lane South, Cudham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 13:24.
6 and 9 Jan 2025
Thames Water were proposing to carry out Highway improvement works on Cudham Lane South, Cudham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 13:28.
6 and 9 Jan 2025
Thames Water are proposing to carry out Highway improvement works on Cudham Lane South, Cudham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 14:05.
6 Jan and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Linslade Road, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 12:31.
6 and 10 Jan 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Wood Lodge Lane, West Wickham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 25 Sep 2024 at 09:05.
8 and 10 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Jail Lane, Biggin Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Oct 2024 at 17:18.
8 and 10 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Jail Lane, Biggin Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 10:43.
9 and 13 Jan 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Berrys Green Road, Cudham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 30 Oct 2024 at 09:29.
13 and 17 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Burlings Lane, Knockholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 21 Nov 2024 at 06:05.
13 Jan and 13 Jul 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on The Green, Warlingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 4 Sep 2024 at 10:59.
13 Jan and 13 Jul 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Limpsfield Road, Warlingham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 13 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 4 Sep 2024 at 11:07.
13 and 17 Jan 2025
Thames Water were proposing to carry out New service connection on Jail Lane, Biggin Hill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 10:14.
13 Jan and 29 Jul 2025
UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Cray Avenue, St Mary Cray.
These works were categorised as Major.
The works were originally planned to start 13 January 2025 and run through until 29 July 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 25 Sep 2024 at 11:40.
14 and 16 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on New Barn Lane, Cudham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 10:22.
14 and 16 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on New Barn Lane, Cudham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 3 Dec 2024 at 08:49.
17 and 25 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Limpsfield Road, Warlingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 5 Dec 2024 at 07:31.
20 Jan and 21 Mar 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Kent Hatch Road, Limpsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Oct 2024 at 16:28.
20 Jan and 21 Mar 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Golf House Road, Limpsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Oct 2024 at 16:28.
20 Jan and 10 Mar 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Oxenden Wood Road, Chelsfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 15:00.
20 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxenden Wood Road, Chelsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 14:26.
20 Jan and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlds End Lane, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 16:52.
20 Jan and 26 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waring Drive, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 09:28.
20 and 24 Jan 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Station Square, Petts Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 4 Nov 2024 at 11:44.
21 and 23 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Barnet Wood Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Nov 2024 at 09:41.
27 Jan and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Spring Gardens, Chelsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 09:41.
27 Jan and 10 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Meadway, Chelsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 09:41.
27 and 29 Jan 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Addington Road, West Wickham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 4 Nov 2024 at 11:44.
29 Jan and 2 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Parkfield Way, Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 09:39.
3 and 5 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Church Road, Sundridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Oct 2024 at 13:16.
3 and 7 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Burlings Lane, Knockholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 26 Nov 2024 at 06:01.
3 Feb and 21 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Windham Avenue, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 11:16.
3 and 21 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rowdown Crescent, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 12:34.
3 and 21 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on King Henry's Drive, Croydon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 10:03.
3 and 7 Feb 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Hawes Lane, West Wickham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 3 Oct 2024 at 14:20.
3 Feb and 23 May 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Cray Avenue, St Mary Cray.
These works are categorised as Major.
The works will start on or after 3 February 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 09:05.
3 Feb and 3 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Parkfield Way, Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 14:59.
10 and 18 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Belvedere Road, Biggin Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 17:22.
10 and 18 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Belvedere Road, Biggin Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 10:02.
10 and 14 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Belvedere Road, Biggin Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 15:15.
10 Feb and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Woodlands, Chelsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 09:41.
10 Feb and 3 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, West Wickham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 12:00.
15 Feb and 2 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shire Lane, Farnborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 2 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 10:26.
15 and 23 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shire Lane, Farnborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 14:26.
17 and 21 Feb 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Chevening Road, Chipstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 10:29.
17 and 21 Feb 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Chevening Road, Chipstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 31 Oct 2024 at 14:54.
17 and 21 Feb 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Chevening Road, Chipstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 11 Nov 2024 at 07:00.
17 and 20 Feb 2025
Thames Water were proposing to carry out New service connection on Jail Lane, Biggin Hill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 08:10.
17 and 20 Feb 2025
Thames Water were proposing to carry out New service connection on Jail Lane, Biggin Hill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 20 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Dec 2024 at 12:09.
17 and 19 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Featherbed Lane, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 07:01.
17 and 25 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Starts Hill Road, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 17:22.
17 and 21 Feb 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Lovibonds Avenue, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 15 Oct 2024 at 09:12.
17 Feb and 3 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Approach, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 08:42.
24 Feb and 7 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Church Road, Brasted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 06:09.
24 and 28 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Main Road, Knockholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 11:32.
24 and 26 Feb 2025
Thames Water are proposing to carry out New service connection on Stonehouse Lane, Halstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 11:27.
24 Feb and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stowell Avenue, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 07:12.
24 and 28 Feb 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Worlds End Lane, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 18 Nov 2024 at 17:22.
24 Feb and 31 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waring Drive, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 14:26.
24 Feb and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxenden Wood Road, Chelsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 09:23.
24 and 26 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Barnet Wood Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 17:22.
25 Feb and 24 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Spring Gardens, Chelsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 15:19.
25 Feb and 31 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Meadway, Chelsfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 15:04.
26 and 28 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Rock Hill, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Nov 2024 at 14:02.
4 and 7 Mar 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Farnborough Hill, Farnborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 9 Dec 2024 at 15:31.
10 and 14 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Main Road, Knockholt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 11:35.
10 and 12 Mar 2025
Thames Water are proposing to carry out Remedial works on Washneys Road, Orpington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Dec 2024 at 12:03.
10 and 14 Mar 2025
BT are proposing to carry out Utility asset works on Willett Way, Petts Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 6 Dec 2024 at 09:54.
Roadworks Map near to Birdhouse Lane, ORPINGTON, BR6 7LJ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Birdhouse Lane, ORPINGTON, BR6 7LJ (3 Events)
(Scheduled Dates)
(miles)
(Scheduled: 8 Dec 2024 - 11 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data