ROADWORKS SUMMARY
Whitefoot Lane, BROMLEY, BR1 5SD

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Whitefoot Lane, BR1 5SD and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Whitefoot Lane, BROMLEY, BR1 5SD

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Whitefoot Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Tideway Tunnel logo
LONG TERM
Until
30 Mar 2025
Details
View Map
Share
Follow
Norman Road

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Norman Road, Greenwich.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 July 2020 at 08:00 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 20 Jul 2023 at 12:25.

Thames Tideway Tunnel logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Deptford Church Street

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Deptford Church Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 July 2020 at 09:00 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 13 Nov 2024 at 10:58.

Thames Tideway Tunnel logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Yeoman Street

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Yeoman Street, London.

These works are categorised as Major.

The works started on 17 July 2020 at 09:00 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 23 Aug 2024 at 10:23.

Thames Tideway Tunnel logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Croft Street

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Croft Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2020 at 08:00 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 23 Aug 2024 at 11:18.

Thames Water logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Vulcan Road

Thames Water are carrying out roadworks on Vulcan Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2021 at 10:00 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Jun 2024 at 13:32.

London Borough Of Southwark logo
LONG TERM
Until
1 Jan 2025
Details
View Map
Share
Follow
Croft Street

London Borough Of Southwark are carrying out Highway improvement works on Croft Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2022 at 00:00 and could run through until 1 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Mar 2024 at 23:15.

London Borough Of Southwark logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Bianca Road

London Borough Of Southwark are carrying out Highway improvement works on Bianca Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 May 2022 at 00:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Jun 2024 at 05:53.

Thames Water logo
LONG TERM
Between
31 Oct 2022 and 30 Jan 2025
Details
View Map
Share
Follow
Millennium Way

Thames Water are proposing to carry out Utility asset works on Millennium Way, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2022 and could run through until 30 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Oct 2022 at 04:47.

Transport for London (TfL) logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Millennium Way

Transport for London (TfL) are carrying out Highway improvement works on Millennium Way, Greenwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 31 March 2023 at 18:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2024 at 12:33.

Thames Water logo
LONG TERM
Between
24 Jul 2023 and 13 Jan 2025
Details
View Map
Share
Follow
Willersley Avenue

Thames Water are proposing to carry out New service connection on Willersley Avenue, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2023 and could run through until 13 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 18:23.

Transport for London (TfL) logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Tunnel Avenue

Transport for London (TfL) are carrying out Highway improvement works on Tunnel Avenue, Greenwich.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 December 2023 at 06:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2024 at 12:26.

Thames Water logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Mount Rise

Thames Water are carrying out Disconnection or alteration of supply on Mount Rise, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:47.

Thames Water logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Grassmount

Thames Water are carrying out Disconnection or alteration of supply on Grassmount, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:46.

Thames Water logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Forestholme Close

Thames Water are carrying out Disconnection or alteration of supply on Forestholme Close, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:50.

Thames Water logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Taymount Rise

Thames Water are carrying out Disconnection or alteration of supply on Taymount Rise, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:49.

Network Rail logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Sydenham Road

Network Rail are carrying out Works for Rail Purposes on Sydenham Road, Croydon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 February 2024 at 10:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Aug 2024 at 13:45.

UK Power Networks Eastern & London logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Sydenham Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Sydenham Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 10:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2024 at 11:20.

Transport for London (TfL) logo
LONG TERM
Until
4 Mar 2025
Details
View Map
Share
Follow
Blackwall Tunnel Southern Approach

Transport for London (TfL) are carrying out Highway improvement works on Blackwall Tunnel Southern Approach, Greenwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 05:00 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2024 at 15:10.

Thames Water logo
LONG TERM
Between
15 Apr 2024 and 23 Jan 2025
Details
View Map
Share
Follow
Monnow Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Monnow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 23 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 13 Mar 2023 at 13:34.

Thames Water logo
LONG TERM
Until
11 Dec 2024
Details
View Map
Share
Follow
Thorncombe Road

Thames Water are carrying out Disconnection or alteration of supply on Thorncombe Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 May 2024 at 10:00 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 May 2024 at 09:54.

Thames Water logo
LONG TERM
Until
11 Dec 2024
Details
View Map
Share
Follow
Glengarry Road

Thames Water are carrying out Disconnection or alteration of supply on Glengarry Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 May 2024 at 10:00 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 09:25.

Thames Tideway Tunnel logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Norman Road

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Norman Road, Greenwich.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 May 2024 at 08:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 12 Aug 2024 at 13:53.

London Borough Of Southwark logo
LONG TERM
Until
5 Mar 2025
Details
View Map
Share
Follow
Borland Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Borland Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 08:00 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 10 Jun 2024 at 07:54.

London Borough Of Southwark logo
LONG TERM
Until
12 Mar 2025
Details
View Map
Share
Follow
Limesford Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Limesford Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 07:00 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 10 Jun 2024 at 07:53.

UK Power Networks Eastern & London logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Jews Walk

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Jews Walk, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 15:35.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Galleywall Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Galleywall Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 09:45 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jun 2024 at 08:46.

Thames Water logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Rembrandt Road

Thames Water are carrying out Disconnection or alteration of supply on Rembrandt Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 10:30 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 14:06.

Thames Water logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Murillo Road

Thames Water are carrying out Disconnection or alteration of supply on Murillo Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 10:30 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 14:07.

Thames Water logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Manor Park

Thames Water are carrying out Disconnection or alteration of supply on Manor Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 10:30 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 14:09.

Thames Water logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Weardale Road

Thames Water are carrying out Disconnection or alteration of supply on Weardale Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 10:30 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Jul 2024 at 10:38.

London Borough Of Southwark logo
LONG TERM
Between
2 Jul 2024 and 27 Jan 2026
Details
View Map
Share
Follow
Sceaux Gardens

London Borough Of Southwark are proposing to carry out Highway improvement works on Sceaux Gardens, London.

These works are categorised as Major.

The works will start on or after 2 July 2024 and could run through until 27 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 30 Jul 2024 at 16:30.

London Borough Of Southwark logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Warndon Street

London Borough Of Southwark are carrying out Highway improvement works on Warndon Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2024 at 00:00 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 22 Jul 2024 at 09:36.

London Borough Of Southwark logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Dulwich Village

London Borough Of Southwark are carrying out Highway repair and maintenance works on Dulwich Village, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 08:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 08:07.

London Borough Of Southwark logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Court Lane

London Borough Of Southwark are carrying out Highway repair and maintenance works on Court Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 08:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 08:07.

London Borough Of Southwark logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Calton Avenue

London Borough Of Southwark are carrying out Highway repair and maintenance works on Calton Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 08:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 08:07.

Transport for London (TfL) logo
LONG TERM
Between
15 Jul 2024 and 13 Jul 2025
Details
View Map
Share
Follow
New Cross Road

Transport for London (TfL) are proposing to carry out roadworks on New Cross Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 13 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 10:48.

Thames Water logo
LONG TERM
Between
29 Jul 2024 and 15 Sep 2025
Details
View Map
Share
Follow
Hatherley Crescent

Thames Water are proposing to carry out New service connection on Hatherley Crescent, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 15 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 18:10.

Thames Water logo
LONG TERM
Between
29 Jul 2024 and 14 Jan 2025
Details
View Map
Share
Follow
Palace Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Palace Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 14 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Jun 2024 at 14:26.

Thames Water logo
LONG TERM
Between
29 Jul 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Ivydale Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Ivydale Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 15 Jan 2024 at 09:00.

London Borough Of Lewisham logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Lewisham High Street

London Borough Of Lewisham are carrying out Highway improvement works on Lewisham High Street, Hither Green, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 11 Nov 2024 at 10:39.

Thames Water logo
LONG TERM
Between
12 Aug 2024 and 1 Dec 2025
Details
View Map
Share
Follow
Faraday Avenue

Thames Water are proposing to carry out New service connection on Faraday Avenue, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 1 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 18:06.

Thames Tideway Tunnel logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Deptford Church Street

Thames Tideway Tunnel are carrying out Highway improvement works on Deptford Church Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 August 2024 at 22:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 13 Nov 2024 at 10:52.

Thames Tideway Tunnel logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Creek Road

Thames Tideway Tunnel are carrying out roadworks on Creek Road, Deptford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 August 2024 at 22:00 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 13 Nov 2024 at 11:59.

London Borough Of Southwark logo
LONG TERM
Between
30 Aug and 18 Dec 2024
Details
View Map
Share
Follow
Warndon Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Warndon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 August 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 30 Aug 2024 at 11:01.

UK Power Networks Eastern & London logo
LONG TERM
Until
9 Dec 2024
Details
View Map
Share
Follow
Westwood Hill

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Westwood Hill, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2024 at 12:30 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 15:36.

Thames Water logo
LONG TERM
Between
9 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Northstead Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Northstead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 15:10.

Thames Water logo
LONG TERM
Between
9 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Northstead Road

Thames Water are proposing to carry out roadworks on Northstead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 15:29.

Thames Water logo
LONG TERM
Between
9 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Kingsmead Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kingsmead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 15:11.

Thames Water logo
LONG TERM
Between
9 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Kingsmead Road

Thames Water are proposing to carry out roadworks on Kingsmead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 15:28.

Thames Water logo
LONG TERM
Between
9 Sep and 13 Dec 2024
Details
View Map
Share
Follow
Vesta Road

Thames Water are proposing to carry out Utility asset works on Vesta Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 11:25.

Thames Water logo
LONG TERM
Between
9 Sep and 13 Dec 2024
Details
View Map
Share
Follow
Ashby Road

Thames Water are proposing to carry out Utility asset works on Ashby Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 11:20.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 8 Sep 2025
Details
View Map
Share
Follow
New Cross Road

Transport for London (TfL) are proposing to carry out roadworks on New Cross Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 8 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2024 at 12:38.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 8 Sep 2025
Details
View Map
Share
New Cross Road

Transport for London (TfL) were proposing to carry out roadworks on New Cross Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2024 and run through until 8 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2024 at 11:30.

UK Power Networks Eastern & London logo
LONG TERM
Until
9 Dec 2024
Details
View Map
Share
Follow
Kirkdale

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Kirkdale, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 14:00 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 15:35.

Southern Gas Networks logo
LONG TERM
Until
12 Dec 2024
Details
View Map
Share
Follow
Tunnel Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Tunnel Avenue, Greenwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 September 2024 at 07:30 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 09:02.

Thames Water logo
LONG TERM
Between
4 Oct and 11 Dec 2024
Details
View Map
Share
Hillsboro Road

Thames Water were proposing to carry out roadworks on Hillsboro Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 October 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 15:10.

Transport for London (TfL) logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Blackwall Tunnel Southern Approach

Transport for London (TfL) are carrying out Highway repair and maintenance works on Blackwall Tunnel Southern Approach, Greenwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 20:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:28.

Transport for London (TfL) logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Siebert Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Siebert Road, Blackheath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 11:33.

Transport for London (TfL) logo
LONG TERM
Today
Details
View Map
Share
Siebert Road

Transport for London (TfL) carried out Highway repair and maintenance works on Siebert Road, Blackheath.

These works were categorised as Major.

Two-way signals were in place for some or all of the period.

The works were originally planned between 7 Oct 2024 and 22 Nov 2024 and were actually completed between 7 Oct 2024 (20:00) and 22 Nov 2024 (05:00). The works impacted the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 09:11.

Transport for London (TfL) logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Woolwich Church Street

Transport for London (TfL) are carrying out Highway improvement works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 21:00 and could run through until 24 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 06:37.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 1 Dec 2024
Details
View Map
Share
Follow
Redriff Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Redriff Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 24 Jul 2024 at 12:31.

Thames Water logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Dunvegan Road

Thames Water are carrying out Utility repair and maintenance works on Dunvegan Road, Eltham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 October 2024 at 20:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 16:29.

Southern Gas Networks logo
LONG TERM
Between
14 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Selwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selwood Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 09:41.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Compton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Compton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2024 at 14:19.

UK Power Networks Eastern & London logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Howard Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Howard Road, Penge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 10:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 10:12.

Thames Tideway Tunnel logo
LONG TERM
Until
21 Dec 2024
Details
View Map
Share
Follow
Hapenny Hatch Footpath

Thames Tideway Tunnel are carrying out Highway improvement works on Hapenny Hatch Footpath, Greenwich.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 14 October 2024 at 08:00 and could run through until 21 December 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Tideway Tunnel on 4 Nov 2024 at 06:39.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Westferry Road

Thames Water are carrying out Statutory Infrastructure Works on Westferry Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 10:29.

London Borough Of Southwark logo
LONG TERM
Between
15 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 26 Sep 2024 at 11:51.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 16 Dec 2024
Details
View Map
Share
Follow
Cromwell Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cromwell Avenue, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2024 at 12:59.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 16 Dec 2024
Details
View Map
Share
Follow
Cromwell Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cromwell Avenue, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2024 at 13:32.

Southern Gas Networks logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Parchmore Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Parchmore Road, Thornton Heath, Croydon.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 20:45 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:44.

UK Power Networks Eastern & London logo
LONG TERM
Between
23 Oct and 13 Dec 2024
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jul 2024 at 08:44.

Southern Gas Networks logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2024 at 09:20.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Croydon Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2024 and run through until 22 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 09:13.

Southern Gas Networks logo
LONG TERM
Until
5 Dec 2024
Details
View Map
Share
Follow
Wickham Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Wickham Street, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 17:30 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 08:43.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2024 at 10:49.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 08:00 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 08:35.

Thames Water logo
LONG TERM
Between
28 Oct 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Truslove Road

Thames Water are proposing to carry out Utility asset works on Truslove Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 09:24.

Thames Water logo
LONG TERM
Until
27 Jan 2025
Details
View Map
Share
Follow
Truslove Road

Thames Water are carrying out Utility asset works on Truslove Road, Knight's Hill, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 10:30 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 10:59.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Oct and 8 Dec 2024
Details
View Map
Share
Follow
Grove Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grove Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Aug 2024 at 10:39.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 08:37.

Southern Gas Networks logo
LONG TERM
Until
3 Dec 2024
Details
View Map
Share
Follow
Sandringham Drive

Southern Gas Networks are carrying out Utility repair and maintenance works on Sandringham Drive, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 17:30 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 10:11.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Sandringham Drive

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Sandringham Drive, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2024 and run through until 27 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 15:15.

London Borough Of Southwark logo
Finishing
Today
Details
View Map
Share
Follow
Manor Grove

London Borough Of Southwark are proposing to carry out Highway improvement works on Manor Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Oct 2024 at 09:43.

London Borough Of Southwark logo
Finishing
Today
Details
View Map
Share
Manor Grove

London Borough Of Southwark were proposing to carry out Highway improvement works on Manor Grove, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 October 2024 and run through until 22 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 6 Nov 2024 at 12:28.

Southern Gas Networks logo
LONG TERM
Until
30 Dec 2024
Details
View Map
Share
Follow
Cromwell Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Cromwell Avenue, Bromley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 13:00 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 13:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Villiers Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Villiers Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2024 at 10:49.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Villiers Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Villiers Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:23.

UK Power Networks Eastern & London logo
LONG TERM
Until
9 Dec 2024
Details
View Map
Share
Follow
Villiers Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Villiers Road, Beckenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 13:00 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Nov 2024 at 14:01.

London Borough Of Southwark logo
LONG TERM
Between
4 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:14.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Victoria Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Way, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 10:31.

Finishing
Tuesday
Details
View Map
Share
Follow
Rotherhithe New Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Rotherhithe New Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Oct 2024 at 13:16.

Finishing
Tuesday
Details
View Map
Share
Rotherhithe New Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Rotherhithe New Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 26 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 14 Nov 2024 at 08:41.

UK Power Networks Eastern & London logo
LONG TERM
Until
3 Mar 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Avenue Road, Beckenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 09:00 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Nov 2024 at 09:11.

Thames Water logo
Between
5 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Barry Road

Thames Water are proposing to carry out roadworks on Barry Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jun 2024 at 11:56.

Thames Water logo
LONG TERM
Between
5 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Lordship Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Jun 2024 at 12:15.

Thames Water logo
LONG TERM
Between
5 Nov 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Friern Road

Thames Water are proposing to carry out Utility asset works on Friern Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 10:29.

Thames Water logo
LONG TERM
Between
5 Nov 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Friern Road

Thames Water are proposing to carry out Utility asset works on Friern Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 15:18.

Thames Water logo
LONG TERM
Between
5 Nov 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Friern Road

Thames Water are proposing to carry out Utility asset works on Friern Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 15:22.

Thames Water logo
LONG TERM
Until
10 Feb 2025
Details
View Map
Share
Follow
Friern Road

Thames Water are carrying out Utility asset works on Friern Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 11:30 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 11:31.

London Borough Of Southwark logo
LONG TERM
Between
5 Nov 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Camberwell Station Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Camberwell Station Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 22 Jul 2024 at 14:26.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Lee High Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lee High Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 14:28.

London Borough Of Southwark logo
LONG TERM
Until
15 Jan 2025
Details
View Map
Share
Follow
Camberwell Station Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Camberwell Station Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 November 2024 at 08:00 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 09:04.

Electricity Network Company logo
Finishing
Today
Details
View Map
Share
Follow
South Street

Electricity Network Company are proposing to carry out Utility asset works on South Street, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 22 November 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Electricity Network Company on 28 Aug 2024 at 11:05.

London Borough Of Bromley logo
LONG TERM
Until
21 Dec 2024
Details
View Map
Share
Follow
South Eden Park Road

London Borough Of Bromley are carrying out Highway improvement works on South Eden Park Road, Beckenham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:30 and could run through until 21 December 2024. The works will impact the footpath only.

This roadwork event was last updated by London Borough Of Bromley on 11 Nov 2024 at 09:23.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Farnley Road

Thames Water were proposing to carry out roadworks on Farnley Road, South Norwood, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 28 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 08:58.

Electricity Network Company logo
Finishing
Monday
Details
View Map
Share
Follow
South Street

Electricity Network Company are proposing to carry out Utility asset works on South Street, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Electricity Network Company on 26 Sep 2024 at 15:14.

Electricity Network Company logo
Finishing
Monday
Details
View Map
Share
Follow
South Street

Electricity Network Company are carrying out Utility asset works on South Street, Bromley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:00 and could run through until 25 November 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Electricity Network Company on 11 Nov 2024 at 09:11.

Thames Water logo
LONG TERM
Between
11 Nov 2024 and 4 Apr 2025
Details
View Map
Share
Follow
St Mildreds Road

Thames Water are proposing to carry out Utility asset works on St Mildreds Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Jul 2024 at 12:32.

Thames Water logo
LONG TERM
Between
11 Nov 2024 and 4 Apr 2025
Details
View Map
Share
St Mildreds Road

Thames Water were proposing to carry out Utility asset works on St Mildreds Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 4 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 08:47.

Thames Water logo
LONG TERM
Between
11 Nov 2024 and 4 Apr 2025
Details
View Map
Share
Follow
St Mildreds Road

Thames Water are proposing to carry out Utility asset works on St Mildreds Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 12:11.

Thames Water logo
LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
St Mildreds Road

Thames Water are carrying out Utility asset works on St Mildreds Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 11:30 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:54.

Thames Water logo
LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
Westhorne Avenue

Thames Water are carrying out Utility asset works on Westhorne Avenue, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 12:24 and could run through until 4 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:24.

Thames Water logo
LONG TERM
Until
12 Dec 2024
Details
View Map
Share
Follow
Hillsboro Road

Thames Water are carrying out roadworks on Hillsboro Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 14:00 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 14:02.

Thames Water logo
LONG TERM
Until
4 Feb 2025
Details
View Map
Share
Follow
Wickham Street

Thames Water are carrying out Utility asset works on Wickham Street, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 11:20 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 11:25.

LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Raymouth Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Nov 2024 at 08:56.

Thames Water logo
LONG TERM
Between
11 Nov 2024 and 4 Mar 2025
Details
View Map
Share
Redriff Road

Thames Water were proposing to carry out Utility asset works on Redriff Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 4 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:18.

Thames Water logo
LONG TERM
Between
11 Nov 2024 and 4 Mar 2025
Details
View Map
Share
Surrey Quays Road

Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 4 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:22.

Royal Borough Of Greenwich logo
Between
12 Nov and 9 Dec 2024
Details
View Map
Share
Follow
John Harrison Way

Royal Borough Of Greenwich are proposing to carry out Highway improvement works on John Harrison Way, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 12 Aug 2024 at 13:49.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Honor Oak Park

Thames Water are carrying out Utility repair and maintenance works on Honor Oak Park, Crofton Park, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 09:30 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 16:26.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Honor Oak Park

Thames Water are carrying out Utility repair and maintenance works on Honor Oak Park, Crofton Park, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 09:30 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 10:27.

LONG TERM
Between
13 Nov and 22 Dec 2024
Details
View Map
Share
New Cross Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on New Cross Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2024 and run through until 22 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 1 Nov 2024 at 14:42.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Hawes Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Hawes Lane, West Wickham.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 15:30 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 11:33.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Links Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Links Road, West Wickham.

The works started on 15 November 2024 at 12:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 09:08.

Thames Water logo
LONG TERM
Between
15 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Northstead Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Northstead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 13:33.

BT logo
Finishing
Sunday
Details
View Map
Share
Thurlow Park Road

BT were proposing to carry out Utility asset works on Thurlow Park Road, West Dulwich, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 November 2024 and run through until 24 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Oct 2024 at 16:01.

BT logo
Finishing
Sunday
Details
View Map
Share
Follow
Thurlow Park Road

BT are proposing to carry out Utility asset works on Thurlow Park Road, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Nov 2024 at 12:52.

BT logo
Finishing
Sunday
Details
View Map
Share
Follow
Avenue Park Road

BT are proposing to carry out Utility asset works on Avenue Park Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Oct 2024 at 07:45.

BT logo
Finishing
Sunday
Details
View Map
Share
Follow
Birkbeck Hill

BT are proposing to carry out Utility asset works on Birkbeck Hill, Thurlow Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Oct 2024 at 07:44.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Lee High Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Lee High Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jul 2024 at 15:45.

Southern Gas Networks logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Baston Manor Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Baston Manor Road, Hayes.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 16:15.

Southern Gas Networks logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Baston Manor Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Baston Manor Road, Hayes.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 10:30.

London Borough Of Bromley logo
Finishing
Today
Details
View Map
Share
Follow
Hawes Lane

London Borough Of Bromley are carrying out Highway improvement works on Hawes Lane, West Wickham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 18 Nov 2024 at 09:24.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Hayes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hayes Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2024 at 13:15.

Southern Gas Networks logo
LONG TERM
Between
18 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Sandford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandford Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 17:05.

Southern Gas Networks logo
Until
16 Dec 2024
Details
View Map
Share
Follow
Summer Hill

Southern Gas Networks are carrying out Utility repair and maintenance works on Summer Hill, Chislehurst.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:30 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 12:22.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Wiverton Road

Southern Gas Networks are proposing to carry out New service connection on Wiverton Road, Sydenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 09:38.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Wiverton Road

Southern Gas Networks are carrying out New service connection on Wiverton Road, Sydenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:30 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 10:01.

Thames Water logo
Finishing
Today
Details
View Map
Share
Lansdowne Hill

Thames Water were proposing to carry out New service connection on Lansdowne Hill, Knight's Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 09:18.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Corbylands Road

Southern Gas Networks are proposing to carry out New service connection on Corbylands Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2024 at 08:32.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Glenton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glenton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 12:19.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Glenton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glenton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 11:04.

London Borough Of Southwark logo
LONG TERM
Between
18 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 23 Oct 2024 at 10:46.

London Borough Of Southwark logo
LONG TERM
Between
18 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Ilderton Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 12:55.

London Borough Of Southwark logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are carrying out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 00:00 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 09:58.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 22 Dec 2024
Details
View Map
Share
Follow
Tallis Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tallis Grove, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 12:44.

Southern Gas Networks logo
Until
2 Dec 2024
Details
View Map
Share
Follow
Tallis Grove

Southern Gas Networks are carrying out Utility repair and maintenance works on Tallis Grove, Charlton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:08.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 22 Dec 2024
Details
View Map
Share
Follow
Bramhope Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bramhope Lane, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 12:45.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Orchard Way

Southern Gas Networks are carrying out Utility repair and maintenance works on Orchard Way, Croydon.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 00:01 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 10:35.

London Borough Of Lewisham logo
Today
Details
View Map
Share
Verdant Lane

London Borough Of Lewisham carried out Highway improvement works on Verdant Lane, London.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 19 Nov 2024 and 22 Nov 2024 and were actually completed between 19 Nov 2024 (20:00) and 22 Nov 2024 (05:00). The works impacted the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 22 Nov 2024 at 07:08.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Glenton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glenton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 12:39.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Glenton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glenton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 14:26.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Nov 2024 and 17 Mar 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Mar 2024 at 14:38.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Ravensbourne Avenue

Thames Water are carrying out Utility repair and maintenance works on Ravensbourne Avenue, Bromley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 09:45 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 11:11.

London Borough Of Lewisham logo
Finishing
Sunday
Details
View Map
Share
Follow
Beckenham Hill Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Beckenham Hill Road, Bellingham, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 10 Jul 2024 at 08:54.

London Borough Of Lewisham logo
Finishing
Sunday
Details
View Map
Share
Follow
Beckenham Hill Road

London Borough Of Lewisham are carrying out Highway improvement works on Beckenham Hill Road, Bellingham, Bromley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 20:00 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 22 Nov 2024 at 07:02.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Vestry Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Vestry Road, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 14:30 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 17:35.

London Borough Of Southwark logo
LONG TERM
Between
22 Nov 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Hatcham Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Hatcham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 12:26.

London Borough Of Southwark logo
LONG TERM
Between
22 Nov 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Hatcham Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Hatcham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 18 Nov 2024 at 15:16.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Sefton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sefton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 16:00.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Sefton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sefton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 16:23.

Southern Gas Networks logo
Between
25 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Cobden Road

Southern Gas Networks are proposing to carry out New service connection on Cobden Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 16:11.

Southern Gas Networks logo
Between
25 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Cobden Road

Southern Gas Networks are proposing to carry out New service connection on Cobden Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 14:46.

Thames Water logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Nursery Road

Thames Water were proposing to carry out Utility repair and maintenance works on Nursery Road, Thornton Heath, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 13:58.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Pinewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2024 at 13:15.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Pinewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2024 at 13:34.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Pinewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2024 at 08:41.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Gipsy Hill

Thames Water are proposing to carry out New service connection on Gipsy Hill, Gipsy Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 12:41.

Transport for London (TfL) logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Nov 2024 at 11:00.

Transport for London (TfL) logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Hardel Rise

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hardel Rise, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 10:48.

Transport for London (TfL) logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Tulse Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tulse Hill, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 10:46.

UK Power Networks Eastern & London logo
Between
25 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Arklow Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Arklow Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 15:01.

UK Power Networks Eastern & London logo
Between
25 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Arklow Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Arklow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 08:41.

UK Power Networks Eastern & London logo
Between
25 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Arklow Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Arklow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 09:29.

UK Power Networks Eastern & London logo
Between
25 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Arklow Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Arklow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 16:08.

UK Power Networks Eastern & London logo
Between
25 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Arklow Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Arklow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 10:44.

Southern Gas Networks logo
Between
25 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Victoria Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Way, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 14:46.

Thames Water logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Calvert Road

Thames Water are proposing to carry out Utility repair and maintenance works on Calvert Road, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 05:44.

Thames Water logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Calvert Road

Thames Water are proposing to carry out Utility repair and maintenance works on Calvert Road, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 08:12.

Hertfordshire County Council logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Crane Mead

Hertfordshire County Council are proposing to carry out Section 50 on Crane Mead, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Nov 2024 at 13:59.

Hertfordshire County Council logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Crane Mead

Hertfordshire County Council were proposing to carry out Section 50 on Crane Mead, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Nov 2024 at 14:04.

Between
25 Nov and 14 Dec 2024
Details
View Map
Share
Follow
Rotherhithe New Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Rotherhithe New Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 20 Nov 2024 at 15:32.

LONG TERM
Between
25 Nov 2024 and 5 Apr 2025
Details
View Map
Share
Follow
Manilla Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Manilla Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 5 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 30 Oct 2024 at 16:56.

LONG TERM
Between
25 Nov 2024 and 5 Apr 2025
Details
View Map
Share
Follow
Manilla Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Manilla Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 5 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 14 Nov 2024 at 11:50.

London Borough Of Bromley logo
Between
26 and 29 Nov 2024
Details
View Map
Share
Follow
Station Square

London Borough Of Bromley are proposing to carry out Highway improvement works on Station Square, Petts Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 11 Nov 2024 at 11:39.

London Borough Of Lambeth logo
Between
27 and 30 Nov 2024
Details
View Map
Share
Follow
Leigham Court Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Leigham Court Road, Streatham Wells, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 19 Nov 2024 at 08:00.

London Borough Of Southwark logo
Between
27 and 30 Nov 2024
Details
View Map
Share
Follow
Turney Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Turney Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Nov 2024 at 10:41.

London Borough Of Southwark logo
Between
27 and 30 Nov 2024
Details
View Map
Share
Follow
Calton Avenue

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Calton Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Nov 2024 at 10:41.

London Borough Of Southwark logo
Between
27 and 30 Nov 2024
Details
View Map
Share
Follow
Court Lane

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Court Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Nov 2024 at 10:41.

London Borough Of Southwark logo
Between
27 and 30 Nov 2024
Details
View Map
Share
Follow
Dulwich Village

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Dulwich Village, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Nov 2024 at 10:34.

London Borough Of Croydon logo
Between
30 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Portland Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Portland Road, South Norwood, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 5 Sep 2024 at 14:34.

Thames Water logo
Between
30 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Lee High Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Lee High Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jul 2024 at 15:46.

Between
30 Nov and 8 Dec 2024
Details
View Map
Share
Greenwich Church Street

Abovenet Communications UK were proposing to carry out Utility asset works on Greenwich Church Street, Greenwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2024 and run through until 8 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 1 Oct 2024 at 10:05.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Selwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selwood Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 16:02.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Selwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selwood Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 16:24.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Selwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selwood Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 06:46.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Pickhurst Lane

Southern Gas Networks are proposing to carry out New service connection on Pickhurst Lane, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 17:22.

Thames Water logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Clifford Road

Thames Water are proposing to carry out New service connection on Clifford Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 09:34.

Thames Water logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Clifford Road

Thames Water are proposing to carry out New service connection on Clifford Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 13:13.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Wendover Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wendover Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2024 at 13:15.

UK Power Networks Eastern & London logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Blandford Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Blandford Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 09:17.

Thames Water logo
Between
2 and 8 Dec 2024
Details
View Map
Share
Follow
Anerley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Anerley Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 12:00.

London Borough Of Bromley logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Westbury Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Westbury Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 19 Nov 2024 at 08:04.

Thames Water logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Avondale Road

Thames Water are proposing to carry out Utility repair and maintenance works on Avondale Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 12:33.

Thames Water logo
LONG TERM
Between
2 Dec 2024 and 12 May 2025
Details
View Map
Share
Follow
Hollies Avenue

Thames Water are proposing to carry out New service connection on Hollies Avenue, Sidcup.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 18:27.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Hill View Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill View Drive, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 16:22.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Hill View Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill View Drive, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 11:49.

London Borough Of Lewisham logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Lausanne Road

London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Lausanne Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 12 Nov 2024 at 10:37.

UK Power Networks Eastern & London logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Southwark Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Southwark Park Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 09:48.

Thames Water logo
LONG TERM
Between
2 Dec 2024 and 13 Feb 2025
Details
View Map
Share
Surrey Quays Road

Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 13 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:53.

Thames Water logo
LONG TERM
Between
2 Dec 2024 and 13 Feb 2025
Details
View Map
Share
Redriff Road

Thames Water were proposing to carry out Utility asset works on Redriff Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 13 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:49.

Thames Water logo
Between
3 and 20 Dec 2024
Details
View Map
Share
Northstead Road

Thames Water were proposing to carry out roadworks on Northstead Road, St Martin's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 07:47.

Thames Water logo
Between
3 and 20 Dec 2024
Details
View Map
Share
Northstead Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Northstead Road, St Martin's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 13:51.

Thames Water logo
Between
3 and 20 Dec 2024
Details
View Map
Share
Kingsmead Road

Thames Water were proposing to carry out roadworks on Kingsmead Road, St Martin's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 07:47.

Thames Water logo
Between
3 and 20 Dec 2024
Details
View Map
Share
Kingsmead Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Kingsmead Road, St Martin's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 13:51.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Seward Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Seward Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2024 at 11:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Seward Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Seward Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:23.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Seward Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Seward Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 08:48.

Southern Gas Networks logo
Between
4 and 19 Dec 2024
Details
View Map
Share
Croydon Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 13:51.

Thames Water logo
Between
4 and 19 Dec 2024
Details
View Map
Share
Follow
Bell Green

Thames Water are proposing to carry out New service connection on Bell Green, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:16.

Thames Water logo
Between
4 and 19 Dec 2024
Details
View Map
Share
Follow
Bell Green

Thames Water are proposing to carry out New service connection on Bell Green, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:19.

Thames Water logo
Between
4 and 10 Dec 2024
Details
View Map
Share
Follow
Wellmeadow Road

Thames Water are proposing to carry out New service connection on Wellmeadow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 14:00.

Thames Water logo
Between
4 and 10 Dec 2024
Details
View Map
Share
Follow
Wellmeadow Road

Thames Water are proposing to carry out New service connection on Wellmeadow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2024 at 10:39.

Thames Water logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Overhill Road

Thames Water are proposing to carry out Remedial works on Overhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 08:19.

Thames Water logo
Between
4 and 9 Dec 2024
Details
View Map
Share
Follow
Tulse Hill

Thames Water are proposing to carry out New service connection on Tulse Hill, St Martin's, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 08:22.

Thames Water logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Albyn Road

Thames Water are proposing to carry out Utility asset works on Albyn Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 09:54.

Thames Water logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Follow
Albyn Road

Thames Water are proposing to carry out Utility asset works on Albyn Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 16:19.

Thames Water logo
Between
4 and 7 Dec 2024
Details
View Map
Share
Follow
Albyn Road

Thames Water are proposing to carry out Utility asset works on Albyn Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 10:23.

London Borough Of Southwark logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Notley Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Notley Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 17 Oct 2024 at 14:18.

London Borough Of Southwark logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Notley Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Notley Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 17 Oct 2024 at 14:25.

Thames Water logo
Between
5 and 20 Dec 2024
Details
View Map
Share
Follow
Northstead Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Northstead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 10:56.

Thames Water logo
Between
5 and 20 Dec 2024
Details
View Map
Share
Follow
Kingsmead Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kingsmead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 10:56.

Thames Water logo
Between
5 and 10 Dec 2024
Details
View Map
Share
Tulse Hill

Thames Water were proposing to carry out Utility asset works on Tulse Hill, St Martin's, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 December 2024 and run through until 10 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 14:02.

Southern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Compton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Compton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 16:01.

Southern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Compton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Compton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 16:25.

National Highways logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Sidcup By Pass

National Highways are proposing to carry out Works for road purposes on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 16 Sep 2024 at 14:14.

National Highways logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Sidcup By Pass

National Highways are proposing to carry out Works for road purposes on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 22 Oct 2024 at 13:02.

Thames Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Lansdowne Hill

Thames Water were proposing to carry out New service connection on Lansdowne Hill, Knight's Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Sep 2024 at 08:39.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Torridon Road

Thames Water are proposing to carry out Utility asset works on Torridon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:35.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Dowanhill Road

Thames Water are proposing to carry out Utility asset works on Dowanhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:03.

Thames Water logo
Between
9 and 15 Dec 2024
Details
View Map
Share
Follow
Lee High Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Lee High Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 14:31.

Southern Gas Networks logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
The Gardens

Southern Gas Networks are proposing to carry out New service connection on The Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 18:08.

Southern Gas Networks logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
The Gardens

Southern Gas Networks are proposing to carry out New service connection on The Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 15:14.

Southern Gas Networks logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
The Gardens

Southern Gas Networks are proposing to carry out New service connection on The Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 12:04.

London Borough Of Southwark logo
LONG TERM
Between
9 Dec 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 10 Oct 2024 at 11:34.

London Borough Of Southwark logo
LONG TERM
Between
9 Dec 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Nov 2024 at 15:20.

UK Power Networks Eastern & London logo
Between
9 and 31 Dec 2024
Details
View Map
Share
Follow
Edward Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Edward Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 08:33.

UK Power Networks Eastern & London logo
Between
9 and 31 Dec 2024
Details
View Map
Share
Follow
Edward Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Edward Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 16:10.

UK Power Networks Eastern & London logo
Between
9 and 31 Dec 2024
Details
View Map
Share
Follow
Edward Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Edward Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 10:48.

London Borough Of Southwark logo
LONG TERM
Between
9 Dec 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 15 Oct 2024 at 08:35.

London Borough Of Southwark logo
LONG TERM
Between
9 Dec 2024 and 30 Apr 2025
Details
View Map
Share
Hornshay Street

London Borough Of Southwark were proposing to carry out Highway improvement works on Hornshay Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 30 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Sep 2024 at 12:03.

London Borough Of Southwark logo
LONG TERM
Between
9 Dec 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Sep 2024 at 12:19.

London Borough Of Southwark logo
LONG TERM
Between
9 Dec 2024 and 30 Apr 2025
Details
View Map
Share
Hornshay Street

London Borough Of Southwark were proposing to carry out Highway improvement works on Hornshay Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 30 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 18 Sep 2024 at 15:32.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Lansdowne Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lansdowne Lane, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Sep 2024 at 14:12.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Lansdowne Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lansdowne Lane, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 14:41.

UK Power Networks Eastern & London logo
LONG TERM
Between
9 Dec 2024 and 9 Feb 2025
Details
View Map
Share
Follow
Grove Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grove Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Aug 2024 at 10:38.

LONG TERM
Between
9 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Raymouth Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Sep 2024 at 14:31.

Virgin Media logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Jasper Road

Virgin Media are proposing to carry out Utility asset works on Jasper Road, Gipsy Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 9 Sep 2024 at 08:41.

Virgin Media logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Jasper Road

Virgin Media were proposing to carry out Utility asset works on Jasper Road, Gipsy Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 21 Nov 2024 at 12:56.

Virgin Media logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Jasper Road

Virgin Media are proposing to carry out Utility asset works on Jasper Road, Gipsy Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 21 Nov 2024 at 14:07.

Thames Water logo
Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
Framlingham Crescent

Thames Water are proposing to carry out New service connection on Framlingham Crescent, Mottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 10:16.

Thames Water logo
Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
Framlingham Crescent

Thames Water are proposing to carry out New service connection on Framlingham Crescent, Mottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 11:49.

London Borough Of Southwark logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Evelina Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Evelina Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 18 Nov 2024 at 14:55.

London Borough Of Southwark logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Evelina Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Evelina Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 11:45.

London Borough Of Southwark logo
LONG TERM
Between
10 Dec 2024 and 25 Jan 2025
Details
View Map
Share
Ilderton Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 25 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 10:44.

Network Rail logo
Between
14 and 16 Dec 2024
Details
View Map
Share
Follow
Trundleys Road

Network Rail are proposing to carry out Works for Rail Purposes on Trundleys Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Oct 2024 at 09:14.

Network Rail logo
Between
14 and 16 Dec 2024
Details
View Map
Share
Follow
Trundleys Road

Network Rail are proposing to carry out Works for Rail Purposes on Trundleys Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Nov 2024 at 15:58.

Southern Gas Networks logo
Between
16 and 23 Dec 2024
Details
View Map
Share
Follow
Salehurst Road

Southern Gas Networks are proposing to carry out New service connection on Salehurst Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Sep 2024 at 11:13.

Southern Gas Networks logo
Between
16 and 23 Dec 2024
Details
View Map
Share
Follow
Salehurst Road

Southern Gas Networks are proposing to carry out New service connection on Salehurst Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Sep 2024 at 11:31.

Southern Gas Networks logo
Between
16 and 23 Dec 2024
Details
View Map
Share
Follow
Salehurst Road

Southern Gas Networks are proposing to carry out New service connection on Salehurst Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 13:34.

Thames Water logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Follow
Brownhill Road

Thames Water are proposing to carry out New service connection on Brownhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 17:38.

Thames Water logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Follow
Brownhill Road

Thames Water are proposing to carry out New service connection on Brownhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 16:39.

Southern Gas Networks logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Pickhurst Lane

Southern Gas Networks are proposing to carry out New service connection on Pickhurst Lane, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 11:17.

Southern Gas Networks logo
Between
2 and 17 Jan 2025
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 13:52.

Southern Gas Networks logo
Between
2 and 17 Jan 2025
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 08:23.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Mead Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mead Way, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 08:23.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Southborough Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southborough Lane, Bromley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Jul 2024 at 10:46.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Crown Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crown Lane, Bromley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Jul 2024 at 10:46.

Southern Gas Networks logo
Between
2 and 31 Jan 2025
Details
View Map
Share
Follow
Pinewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 08:52.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 09:38.

Southern Gas Networks logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Montrose Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Montrose Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 14:55.

Southern Gas Networks logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Montrose Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Montrose Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 15:56.

Southern Gas Networks logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Cavendish Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cavendish Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 14:53.

Southern Gas Networks logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Cavendish Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cavendish Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 14:50.

Southern Gas Networks logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Rutland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rutland Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 14:58.

Southern Gas Networks logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Rutland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rutland Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 14:33.

London Borough Of Bromley logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Wood Lodge Lane

London Borough Of Bromley are proposing to carry out Highway improvement works on Wood Lodge Lane, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 25 Sep 2024 at 09:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Nov 2024 at 10:55.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 10:12.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 09:54.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Oct 2024 at 09:31.

Thames Water logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Sidcup Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Sidcup Hill, Sidcup.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 13:37.

Thames Water logo
LONG TERM
Between
6 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Westhorne Avenue

Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jul 2024 at 12:31.

Thames Water logo
LONG TERM
Between
6 Jan and 7 Apr 2025
Details
View Map
Share
Westhorne Avenue

Thames Water were proposing to carry out Utility asset works on Westhorne Avenue, Eltham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 08:57.

Thames Water logo
LONG TERM
Between
6 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Westhorne Avenue

Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 12:09.

Thames Water logo
LONG TERM
Between
6 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Westhorne Avenue

Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 15:26.

Southern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Kelvington Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kelvington Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:54.

Southern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Athenlay Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Athenlay Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:43.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Comerford Road

Thames Water are proposing to carry out Utility asset works on Comerford Road, Crofton Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:33.

Transport for London (TfL) logo
Between
6 and 22 Jan 2025
Details
View Map
Share
Follow
Well Hall Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Well Hall Road, Eltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 16:36.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Boyne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Boyne Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Nov 2024 at 09:30.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Boyne Road

Thames Water were proposing to carry out Utility repair and maintenance works on Boyne Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Nov 2024 at 08:40.

London Borough Of Bexley logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Honiton Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Honiton Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 Oct 2024 at 14:39.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Deptford Broadway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Deptford Broadway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 17:33.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
New Cross Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Cross Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 17:35.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
New Cross Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Cross Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 14:34.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Parkfield Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 16:09.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Parkfield Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 15:36.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Alpha Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Alpha Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Aug 2024 at 12:21.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Amersham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Amersham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:13.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Amersham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Amersham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 15:44.

Southern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Wyndcliff Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wyndcliff Road, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 14:13.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Grove Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grove Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Nov 2024 at 11:52.

Thames Water logo
LONG TERM
Between
6 Jan and 25 Mar 2025
Details
View Map
Share
Redriff Road

Thames Water were proposing to carry out Utility asset works on Redriff Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 25 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:33.

Thames Water logo
LONG TERM
Between
6 Jan and 25 Mar 2025
Details
View Map
Share
Follow
Redriff Road

Thames Water are proposing to carry out Utility asset works on Redriff Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:34.

Thames Water logo
LONG TERM
Between
6 Jan and 25 Mar 2025
Details
View Map
Share
Surrey Quays Road

Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 25 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:36.

Thames Water logo
LONG TERM
Between
6 Jan and 25 Mar 2025
Details
View Map
Share
Follow
Surrey Quays Road

Thames Water are proposing to carry out Utility asset works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:37.

London Borough Of Bexley logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Blackfen Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Blackfen Road, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 16 Oct 2024 at 10:12.

Thames Water logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Melon Road

Thames Water are proposing to carry out New service connection on Melon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 13:58.

Thames Water logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Melon Road

Thames Water were proposing to carry out New service connection on Melon Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 16:01.

Thames Water logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Melon Road

Thames Water are proposing to carry out New service connection on Melon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 12:01.

UK Power Networks Eastern & London logo
Between
8 and 17 Jan 2025
Details
View Map
Share
Follow
Red Lion Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Red Lion Lane, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 10:41.

Thames Water logo
Between
10 and 13 Jan 2025
Details
View Map
Share
Follow
Pawsons Road

Thames Water are proposing to carry out Utility repair and maintenance works on Pawsons Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 10:33.

Thames Water logo
Between
10 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Southwark Park Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Southwark Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2023 at 12:08.

London Borough Of Southwark logo
LONG TERM
Between
11 Jan and 15 Feb 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:14.

Thames Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Thorndon Close

Thames Water are proposing to carry out New service connection on Thorndon Close, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 10:56.

Thames Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Thorndon Close

Thames Water were proposing to carry out New service connection on Thorndon Close, St Pauls Cray.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 11:40.

Transport for London (TfL) logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 07:52.

Transport for London (TfL) logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 14:29.

Thames Water logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Crystal Palace Park Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Crystal Palace Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 11:33.

Thames Water logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Lawrie Park Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 11:49.

Southern Gas Networks logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Sydney Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Sydney Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 14:34.

Southern Gas Networks logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Sydney Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Sydney Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 15:14.

Southern Gas Networks logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Sydney Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Sydney Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:34.

Southern Gas Networks logo
Between
13 and 20 Jan 2025
Details
View Map
Share
Follow
Slades Drive

Southern Gas Networks are proposing to carry out New service connection on Slades Drive, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 08:23.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Slades Drive

Southern Gas Networks are proposing to carry out New service connection on Slades Drive, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:34.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Slades Drive

Southern Gas Networks are proposing to carry out New service connection on Slades Drive, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 17:22.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Welbeck Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Welbeck Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 13:19.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Welbeck Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Welbeck Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 11:00.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Chatsworth Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Chatsworth Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 13:00.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Chatsworth Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chatsworth Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 10:56.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Collindale Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Collindale Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 08:28.

Thames Water logo
LONG TERM
Between
13 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Westhorne Avenue

Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 12:10.

Thames Water logo
LONG TERM
Between
13 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Westhorne Avenue

Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 15:27.

Thames Water logo
LONG TERM
Between
13 Jan and 28 Mar 2025
Details
View Map
Share
Westhorne Avenue

Thames Water were proposing to carry out Utility asset works on Westhorne Avenue, Eltham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2024 at 10:25.

Thames Water logo
LONG TERM
Between
13 Jan and 28 Mar 2025
Details
View Map
Share
Westhorne Avenue

Thames Water were proposing to carry out Utility asset works on Westhorne Avenue, Eltham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 09:11.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Sun Lane

Southern Gas Networks are proposing to carry out New service connection on Sun Lane, Blackheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 06:16.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Sun Lane

Southern Gas Networks are proposing to carry out New service connection on Sun Lane, Blackheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 14:14.

Transport for London (TfL) logo
Between
14 and 29 Jan 2025
Details
View Map
Share
Follow
Rochester Way Relief Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Rochester Way Relief Road, Eltham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 29 January 2025. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:42.

Transport for London (TfL) logo
Between
14 and 29 Jan 2025
Details
View Map
Share
Follow
Rochester Way Relief Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Rochester Way Relief Road, Eltham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 29 January 2025. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:02.

Transport for London (TfL) logo
Between
16 and 18 Jan 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 08:26.

Transport for London (TfL) logo
Between
16 and 18 Jan 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 14:10.

Transport for London (TfL) logo
Between
16 and 18 Jan 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 07:49.

Transport for London (TfL) logo
Between
16 and 18 Jan 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:33.

Southern Gas Networks logo
Between
17 and 19 Jan 2025
Details
View Map
Share
Follow
Selhurst New Road

Southern Gas Networks are proposing to carry out roadworks on Selhurst New Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 10:03.

Southern Gas Networks logo
Between
17 and 19 Jan 2025
Details
View Map
Share
Follow
Selhurst New Road

Southern Gas Networks are proposing to carry out roadworks on Selhurst New Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:30.

London Borough Of Southwark logo
Between
17 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Penarth Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 21 Oct 2024 at 21:09.

London Borough Of Bromley logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Station Square

London Borough Of Bromley are proposing to carry out Highway improvement works on Station Square, Petts Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 4 Nov 2024 at 11:44.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Brickfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brickfield Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 14:21.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Burnt Oak Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burnt Oak Lane, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 13:36.

Southern Gas Networks logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Chatsworth Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chatsworth Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 13:40.

UK Power Networks Eastern & London logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Macquarie Way

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Macquarie Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Nov 2024 at 10:10.

UK Power Networks Eastern & London logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Macquarie Way

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Macquarie Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 13:22.

Thames Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Barnet Wood Road

Thames Water are proposing to carry out Utility repair and maintenance works on Barnet Wood Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 15:48.

Transport for London (TfL) logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 08:26.

Transport for London (TfL) logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:40.

Transport for London (TfL) logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 08:14.

Transport for London (TfL) logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:36.

Transport for London (TfL) logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 07:51.

Transport for London (TfL) logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:37.

Thames Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
St Georges Way

Thames Water are proposing to carry out Utility repair and maintenance works on St Georges Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 09:36.

Thames Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
St Georges Way

Thames Water are proposing to carry out Utility repair and maintenance works on St Georges Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:46.

London Borough Of Bromley logo
LONG TERM
Between
22 Jan and 4 Mar 2025
Details
View Map
Share
Follow
South Eden Park Road

London Borough Of Bromley are proposing to carry out Highway improvement works on South Eden Park Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 4 March 2025. The works will impact the footpath only.

This roadwork event was last updated by London Borough Of Bromley on 30 Oct 2024 at 12:11.

Thames Water logo
LONG TERM
Between
23 Jan and 11 Apr 2025
Details
View Map
Share
Follow
Harland Road

Thames Water are proposing to carry out Utility asset works on Harland Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2024 at 08:51.

Thames Water logo
LONG TERM
Between
23 Jan and 11 Apr 2025
Details
View Map
Share
Follow
Harland Road

Thames Water are proposing to carry out Utility asset works on Harland Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Aug 2024 at 08:21.

Thames Water logo
LONG TERM
Between
23 Jan and 11 Apr 2025
Details
View Map
Share
Follow
Harland Road

Thames Water are proposing to carry out Utility asset works on Harland Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 14:15.

Southern Gas Networks logo
LONG TERM
Between
24 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Sherwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sherwood Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 16:02.

Southern Gas Networks logo
LONG TERM
Between
24 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Falconwood Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Falconwood Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 16:03.

Thames Water logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Follow
Silk Mills Path

Thames Water are proposing to carry out Utility repair and maintenance works on Silk Mills Path, Ladywell, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 13:20.

London Borough Of Bromley logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Addington Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Addington Road, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 4 Nov 2024 at 11:44.

Transport for London (TfL) logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 08:24.

Transport for London (TfL) logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Sidcup By Pass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:39.

Thames Water logo
Between
27 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Lakeview Road

Thames Water are proposing to carry out Utility asset works on Lakeview Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 09:25.

Thames Water logo
Between
27 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Lakeview Road

Thames Water are proposing to carry out Utility asset works on Lakeview Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 15:49.

Thames Water logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
William Barefoot Drive

Thames Water are proposing to carry out Utility repair and maintenance works on William Barefoot Drive, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 08:32.

Southern Gas Networks logo
Between
27 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Collindale Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Collindale Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 13:16.

Southern Gas Networks logo
Between
27 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Hill Crest

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill Crest, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 13:20.

London Borough Of Lambeth logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Lowden Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Lowden Road, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 18 Nov 2024 at 14:12.

London Borough Of Lambeth logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Lowden Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Lowden Road, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 22 Nov 2024 at 09:32.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Charlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 13:41.

London Borough Of Southwark logo
LONG TERM
Between
27 Jan and 10 Mar 2025
Details
View Map
Share
Ilderton Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 10 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 12:48.

Southern Gas Networks logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Layard Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Layard Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:57.

UK Power Networks Eastern & London logo
Between
27 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Lower Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lower Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 12:19.

T-Mobile (UK) logo
LONG TERM
Between
28 Jan and 15 Apr 2025
Details
View Map
Share
Follow
Grosvenor Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Grosvenor Road, South Norwood, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 15 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by T-Mobile (UK) on 21 Nov 2024 at 11:37.

Southern Gas Networks logo
LONG TERM
Between
29 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Old Farm Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Farm Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 11:13.

Thames Water logo
Between
29 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Tulse Hill

Thames Water are proposing to carry out New service connection on Tulse Hill, St Martin's, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 10:27.

Southern Gas Networks logo
LONG TERM
Between
29 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Red Post Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Red Post Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:19.

London Borough Of Southwark logo
Between
29 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Dog Kennel Hill

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Dog Kennel Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 14:46.

Southern Gas Networks logo
LONG TERM
Between
30 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Station Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 11:14.

Southern Gas Networks logo
Between
30 Jan and 24 Feb 2025
Details
View Map
Share
Follow
The Green

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Green, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 14:56.

Southern Gas Networks logo
LONG TERM
Between
31 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Normanhurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Normanhurst Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:51.

Southern Gas Networks logo
LONG TERM
Between
31 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Nuthurst Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nuthurst Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:52.

London Borough Of Lewisham logo
LONG TERM
Between
1 Feb and 30 May 2025
Details
View Map
Share
Lewisham High Street

London Borough Of Lewisham were proposing to carry out Highway improvement works on Lewisham High Street, Hither Green, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 February 2025 and run through until 30 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 11 Nov 2024 at 09:39.

Network Rail logo
Between
1 and 3 Feb 2025
Details
View Map
Share
Follow
Charlton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Charlton Lane, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Nov 2024 at 06:36.

London Borough Of Bromley logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Hawes Lane

London Borough Of Bromley are proposing to carry out Highway improvement works on Hawes Lane, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 3 Oct 2024 at 14:20.

London Borough Of Bromley logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Hillside Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Hillside Road, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 3 Oct 2024 at 14:37.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Carolina Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carolina Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 14:33.

London Borough Of Bromley logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Westbury Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Westbury Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 18 Nov 2024 at 13:55.

London Borough Of Bromley logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Lennard Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Lennard Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 3 Oct 2024 at 14:20.

London Borough Of Bromley logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Kent House Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Kent House Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 3 Oct 2024 at 14:20.

Thames Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Arran Road

Thames Water are proposing to carry out Utility repair and maintenance works on Arran Road, Catford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 15:57.

London Borough Of Southwark logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Melford Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Melford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 09:11.

London Borough Of Southwark logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Melford Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Melford Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 6 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 16:12.

Southern Gas Networks logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Cheltenham Road

Southern Gas Networks are proposing to carry out New service connection on Cheltenham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 13:19.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Casino Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Casino Avenue, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:19.

London Borough Of Southwark logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Follow
Grove Vale

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Grove Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 08:44.

London Borough Of Bexley logo
Between
5 and 8 Feb 2025
Details
View Map
Share
Blackfen Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Blackfen Road, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 5 Nov 2024 at 11:17.

Southern Gas Networks logo
LONG TERM
Between
5 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Bellegrove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bellegrove Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:55.

Southern Gas Networks logo
Between
5 and 18 Feb 2025
Details
View Map
Share
Follow
Wickham Street

Southern Gas Networks are proposing to carry out Utility asset works on Wickham Street, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:55.

BT logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Bridle Road

BT are proposing to carry out Utility asset works on Bridle Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Nov 2024 at 10:09.

Southern Gas Networks logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
The Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, West Wickham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 12:00.

Southern Gas Networks logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Ecclesbourne Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Ecclesbourne Road, Thornton Heath, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:43.

Thames Water logo
Between
10 and 18 Feb 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 17:22.

Thames Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
St Julian's Farm Road

Thames Water are proposing to carry out Utility repair and maintenance works on St Julian's Farm Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 14:06.

Thames Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
St Julian's Farm Road

Thames Water were proposing to carry out Utility repair and maintenance works on St Julian's Farm Road, Knight's Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 13:16.

Southern Gas Networks logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Kingsmead Road

Southern Gas Networks are proposing to carry out New service connection on Kingsmead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 12:07.

Southern Gas Networks logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Kingsmead Road

Southern Gas Networks are proposing to carry out New service connection on Kingsmead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 13:05.

Thames Water logo
Between
10 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Barry Road

Thames Water are proposing to carry out Utility repair and maintenance works on Barry Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Aug 2024 at 12:20.

Thames Water logo
Between
10 Feb and 10 Mar 2025
Details
View Map
Share
Barry Road

Thames Water were proposing to carry out roadworks on Barry Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2024 at 08:17.

Thames Water logo
LONG TERM
Between
10 Feb and 9 Jun 2025
Details
View Map
Share
Follow
Lordship Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Aug 2024 at 12:13.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 20 Apr 2025
Details
View Map
Share
Follow
Elderslie Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elderslie Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 08:45.

Thames Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Micheldever Road

Thames Water are proposing to carry out Utility repair and maintenance works on Micheldever Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 14:14.

London Borough Of Lambeth logo
Between
10 and 22 Feb 2025
Details
View Map
Share
Follow
Lowden Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Lowden Road, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 15 Nov 2024 at 15:05.

London Borough Of Lambeth logo
Between
10 and 22 Feb 2025
Details
View Map
Share
Follow
Lowden Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Lowden Road, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 20 Nov 2024 at 13:19.

Thames Water logo
Between
10 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Southwark Park Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Southwark Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2023 at 12:08.

London Borough Of Enfield logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Westbury Road

London Borough Of Enfield were proposing to carry out Highway improvement works on Westbury Road, Penge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 February 2025 and run through until 13 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 11 Nov 2024 at 08:13.

Thames Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Sidcup Road Service Road Westbound

Thames Water are proposing to carry out Utility repair and maintenance works on Sidcup Road Service Road Westbound, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 16:33.

Thames Water logo
Between
12 and 17 Feb 2025
Details
View Map
Share
Follow
Tulse Hill

Thames Water are proposing to carry out New service connection on Tulse Hill, St Martin's, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 14:36.

Transport for London (TfL) logo
Between
12 and 15 Feb 2025
Details
View Map
Share
Follow
Rochester Way Relief Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2024 at 09:15.

Transport for London (TfL) logo
Between
12 and 15 Feb 2025
Details
View Map
Share
Follow
Rochester Way Relief Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 18:15.

Thames Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Brookbank Road

Thames Water are proposing to carry out Utility repair and maintenance works on Brookbank Road, Ladywell, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 09:44.

Thames Water logo
Between
12 and 18 Feb 2025
Details
View Map
Share
Follow
Humber Road

Thames Water are proposing to carry out Utility repair and maintenance works on Humber Road, Blackheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 07:00.

London Borough Of Bexley logo
Between
13 and 15 Feb 2025
Details
View Map
Share
Follow
Blackfen Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Blackfen Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 14 Nov 2024 at 13:36.

Thames Water logo
Between
13 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Lewisham Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lewisham Road, Lewisham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 09:17.

Southern Gas Networks logo
Between
13 and 19 Feb 2025
Details
View Map
Share
Follow
Wellington Gardens

Southern Gas Networks are proposing to carry out roadworks on Wellington Gardens, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 08:21.

Southern Gas Networks logo
Between
13 and 19 Feb 2025
Details
View Map
Share
Follow
Charlton Church Lane

Southern Gas Networks are proposing to carry out New service connection on Charlton Church Lane, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 08:15.

Thames Water logo
Between
13 and 28 Feb 2025
Details
View Map
Share
Surrey Quays Road

Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2024 at 15:40.

Thames Water logo
Between
14 and 19 Feb 2025
Details
View Map
Share
Follow
Tulse Hill

Thames Water are proposing to carry out New service connection on Tulse Hill, St Martin's, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 12:38.

London Borough Of Southwark logo
LONG TERM
Between
14 Feb and 12 Apr 2025
Details
View Map
Share
Follow
Green Dale

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Green Dale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 5 Nov 2024 at 08:51.

Southern Gas Networks logo
Between
15 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Hook Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hook Lane, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 12:10.

Transport for London (TfL) logo
Between
15 and 17 Feb 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Nov 2024 at 12:30.

Transport for London (TfL) logo
Between
15 and 17 Feb 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Nov 2024 at 12:31.

Transport for London (TfL) logo
Between
15 and 17 Feb 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 14:27.

Transport for London (TfL) logo
Between
15 and 17 Feb 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 14:28.

Transport for London (TfL) logo
Between
15 and 17 Feb 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 12:08.

Thames Water logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Westferry Road

Thames Water are proposing to carry out New service connection on Westferry Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 09:13.

Transport for London (TfL) logo
Between
16 Feb and 6 Mar 2025
Details
View Map
Share
Bromley Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Bromley Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 February 2025 and run through until 6 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 10:51.

Transport for London (TfL) logo
Between
16 Feb and 6 Mar 2025
Details
View Map
Share
Bromley Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Bromley Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 February 2025 and run through until 6 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 10:51.

Transport for London (TfL) logo
Between
16 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Bromley Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bromley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 16:02.

Thames Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Southcote Road

Thames Water are proposing to carry out Utility repair and maintenance works on Southcote Road, South Norwood, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 12:44.

Thames Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Pawsons Road

Thames Water are proposing to carry out Utility repair and maintenance works on Pawsons Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 15:46.

UK Power Networks Eastern & London logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Churchfields Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Churchfields Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 17:06.

UK Power Networks Eastern & London logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Churchfields Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Churchfields Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 10:00.

Thames Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Scotts Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Scotts Avenue, Shortlands.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 13:03.

Southern Gas Networks logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Springfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 10:06.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 3 Apr 2025
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 09:39.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 3 Apr 2025
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 10:08.

UK Power Networks Eastern & London logo
LONG TERM
Between
17 Feb and 11 Sep 2025
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 12:21.

Southern Gas Networks logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Culverley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Culverley Road, Catford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 14:48.

Southern Gas Networks logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Engleheart Road

Southern Gas Networks are proposing to carry out New service connection on Engleheart Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 10:56.

Southern Gas Networks logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Engleheart Road

Southern Gas Networks are proposing to carry out New service connection on Engleheart Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 11:48.

Transport for London (TfL) logo
Between
17 and 22 Feb 2025
Details
View Map
Share
Follow
Rochester Way Relief Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:50.

Transport for London (TfL) logo
Between
17 and 22 Feb 2025
Details
View Map
Share
Follow
Rochester Way Relief Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 18:14.

London Borough Of Southwark logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:21.

UK Power Networks Eastern & London logo
Between
17 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Gomm Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Gomm Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Oct 2024 at 10:56.

UK Power Networks Eastern & London logo
Between
19 and 27 Feb 2025
Details
View Map
Share
Follow
Auckland Hill

UK Power Networks Eastern & London are proposing to carry out New service connection on Auckland Hill, Gipsy Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 07:48.


Roadworks Map near to Whitefoot Lane, BROMLEY, BR1 5SD

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 22 Nov 2024 11:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Whitefoot Lane, BROMLEY, BR1 5SD (23 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
UK Power Networks Eastern & London logo
URGENT
  
BROCKMAN RISE 
(0.2 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 19 Nov 2024 00:10
(Scheduled: 19 Nov 2024 - 28 Nov 2024)
0.2
Details
Share
Follow
2
London Borough Of Lewisham logo
URGENT
  
OLDSTEAD ROAD 
(0.2 miles)
London Borough Of Lewisham
Highway repair and maintenance works - Footway - Some carriageway incursion
Complete
20 Nov 2024 10:21 - 10:22
0.2
Details
Share
3
London Borough Of Lewisham logo
URGENT
  
OLDSTEAD ROAD 
(0.2 miles)
London Borough Of Lewisham
Highway repair and maintenance works - Footway - Some carriageway incursion
Complete
20 Nov 2024 12:59 - 13:18
0.2
Details
Share
4
London Borough Of Lewisham logo
URGENT
  
OLDSTEAD ROAD 
(0.2 miles)
London Borough Of Lewisham
Highway repair and maintenance works - Footway - Some carriageway incursion
Complete
20 Nov 2024 12:46 - 12:57
0.2
Details
Share
5
Southern Gas Networks logo
MAJOR
  
THORNSBEACH ROAD, CATFORD 
(0.4 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 4 Nov 2024 - 6 Apr 2025)
0.4
Details
Share
6
London Borough Of Lewisham logo
BAUDWIN ROAD 
(0.4 miles)
London Borough Of Lewisham
Highway repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 12 Nov 2024 10:17
(Scheduled: 11 Nov 2024 - 25 Nov 2024)
0.4
Details
Share
Follow
7
UK Power Networks Eastern & London logo
WOODBANK ROAD 
(0.6 miles)
UK Power Networks Eastern & London
Optional permit (no fee) e.g. for traffic management etc - Footway - No carriageway incursion
Planned
Scheduled: 18 Nov 2024 - 22 Nov 2024
0.6
Details
Share
Follow
8
UK Power Networks Eastern & London logo
WOODBANK ROAD 
(0.6 miles)
UK Power Networks Eastern & London
New service connection - Footway - No carriageway incursion
Complete
18 Nov 2024 10:23 - 21 Nov 2024 21:06
0.6
Details
Share
9
Southern Gas Networks logo
MAJOR
  
BELLINGHAM ROAD, CATFORD 
(0.6 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 4 Nov 2024 - 6 Apr 2025
0.6
Details
Share
Follow
10
Southern Gas Networks logo
MAJOR
  
BELLINGHAM ROAD, CATFORD 
(0.6 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 4 Nov 2024 08:10
(Scheduled: 4 Nov 2024 - 6 Apr 2025)
0.6
Details
Share
Follow
  • ...