ROADWORKS SUMMARY
Lewes Road, NEWHAVEN, BN9 9AL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Lewes Road, BN9 9AL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Lewes Road, NEWHAVEN, BN9 9AL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Lewes Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

UK Power Networks South Eastern logo
Finishing
Friday
Details
View Map
Share
Follow
St Martin's Lane

UK Power Networks South Eastern are carrying out Utility repair and maintenance works on St Martin's Lane, Lewes.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 December 2024 at 07:02 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Dec 2024 at 07:23.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Spital Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Spital Road, Lewes.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 07:00 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 08:54.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
De Montfort Road

Southern Gas Networks are carrying out Utility repair and maintenance works on De Montfort Road, Lewes.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 07:00 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 09:41.

Southern Gas Networks logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Steyning Avenue

Southern Gas Networks are proposing to carry out Remedial works on Steyning Avenue, Peacehaven.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Sep 2024 at 13:59.

Southern Gas Networks logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Steyning Avenue

Southern Gas Networks were proposing to carry out Remedial works on Steyning Avenue, Peacehaven.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 13:04.

East Sussex County Council logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Sutton Avenue

East Sussex County Council are proposing to carry out Highway improvement works on Sutton Avenue, Peacehaven.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 23 Sep 2024 at 07:59.

UK Power Networks South Eastern logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Ashcombe Lane

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Ashcombe Lane, Kingston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Oct 2024 at 08:23.

East Sussex County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Firle Bostal

East Sussex County Council are proposing to carry out roadworks on Firle Bostal, Firle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 23 Oct 2024 at 12:48.

East Sussex County Council logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Sutton Avenue

East Sussex County Council are proposing to carry out Highway improvement works on Sutton Avenue, Peacehaven.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 23 Sep 2024 at 08:37.

East Sussex County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
The Drove

East Sussex County Council are proposing to carry out Highway repair and maintenance works on The Drove, Newhaven.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by East Sussex County Council on 25 Oct 2024 at 09:33.

South East Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Blatchington Road

South East Water are proposing to carry out New service connection on Blatchington Road, Seaford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 9 Dec 2024 at 11:51.

South East Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Blatchington Road

South East Water are proposing to carry out New service connection on Blatchington Road, Seaford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 26 Sep 2024 at 12:29.

South East Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Blatchington Road

South East Water are proposing to carry out New service connection on Blatchington Road, Seaford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 17 Sep 2024 at 15:51.

Southern Gas Networks logo
Between
3 and 12 Feb 2025
Details
View Map
Share
Follow
Vernon Avenue

Southern Gas Networks are proposing to carry out New service connection on Vernon Avenue, Peacehaven.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 15:28.

South East Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Firle Road

South East Water are proposing to carry out New service connection on Firle Road, Peacehaven.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 28 Oct 2024 at 11:13.

South East Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Firle Road

South East Water were proposing to carry out New service connection on Firle Road, Peacehaven.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by South East Water on 29 Oct 2024 at 15:05.

East Sussex County Council logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Pelham Terrace

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Pelham Terrace, Lewes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 5 Nov 2024 at 11:11.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Broad Street North

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Broad Street North, Seaford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 14:59.

East Sussex County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Friars Walk

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Friars Walk, Lewes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 12 Nov 2024 at 09:10.

East Sussex County Council logo
Between
17 Feb and 15 Mar 2025
Details
View Map
Share
Newhaven Road

East Sussex County Council were proposing to carry out Highway improvement works on Newhaven Road, Kingston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 15 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 25 Oct 2024 at 08:15.

UK Power Networks South Eastern logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Ashcombe Lane

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Ashcombe Lane, Kingston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Nov 2024 at 13:54.

UK Power Networks South Eastern logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Ashcombe Lane

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Ashcombe Lane, Kingston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 29 Oct 2024 at 11:10.

UK Power Networks South Eastern logo
Between
17 and 25 Feb 2025
Details
View Map
Share
Follow
Ashcombe Lane

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Ashcombe Lane, Kingston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Oct 2024 at 09:35.

East Sussex County Council logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Pelham Terrace

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Pelham Terrace, Lewes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 26 Nov 2024 at 12:14.

East Sussex County Council logo
Between
17 Feb and 15 Mar 2025
Details
View Map
Share
Newhaven Road

East Sussex County Council were proposing to carry out Highway improvement works on Newhaven Road, Swanborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 15 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 25 Oct 2024 at 08:15.

East Sussex County Council logo
Between
17 Feb and 15 Mar 2025
Details
View Map
Share
Newhaven Road

East Sussex County Council were proposing to carry out Highway improvement works on Newhaven Road, Iford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 15 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 25 Oct 2024 at 08:15.

East Sussex County Council logo
Between
17 Feb and 15 Mar 2025
Details
View Map
Share
Newhaven Road

East Sussex County Council were proposing to carry out Highway improvement works on Newhaven Road, Northease.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 15 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 25 Oct 2024 at 08:15.

East Sussex County Council logo
Between
17 Feb and 15 Mar 2025
Details
View Map
Share
Newhaven Road

East Sussex County Council were proposing to carry out Highway improvement works on Newhaven Road, Rodmell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 15 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 25 Oct 2024 at 08:15.

Southern Gas Networks logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Sutton Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sutton Park Road, Seaford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 12:29.

Southern Gas Networks logo
Between
24 Feb and 4 Mar 2025
Details
View Map
Share
Follow
South Street

Southern Gas Networks are proposing to carry out New service connection on South Street, Lewes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 08:41.

BT logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Park Road

BT are proposing to carry out Utility repair and maintenance works on Park Road, Rottingdean, Brighton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 3 Dec 2024 at 09:43.

East Sussex County Council logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Mill Lane

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Rodmell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 13 Nov 2024 at 11:16.

BT logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Park Road

BT were proposing to carry out Utility repair and maintenance works on Park Road, Rottingdean, Brighton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 5 Dec 2024 at 13:32.

UK Power Networks South Eastern logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
White Hill

UK Power Networks South Eastern are proposing to carry out Utility asset works on White Hill, Lewes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Sep 2024 at 12:54.

Southern Gas Networks logo
LONG TERM
Between
10 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Firle Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Firle Road, Seaford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 08:16.

Southern Gas Networks logo
Between
17 Mar and 13 Apr 2025
Details
View Map
Share
Follow
Brighton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brighton Road, Newhaven.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 13 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 07:41.

Southern Gas Networks logo
LONG TERM
Between
17 Mar and 20 Apr 2025
Details
View Map
Share
Follow
Brighton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brighton Road, Newhaven.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 20 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 13:53.


Roadworks Map near to Lewes Road, NEWHAVEN, BN9 9AL

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 06:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Lewes Road, NEWHAVEN, BN9 9AL (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.