ROADWORKS SUMMARY
Jubilee Gardens, BURY, BL0 9GS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Jubilee Gardens, BL0 9GS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Jubilee Gardens, BURY, BL0 9GS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Jubilee Gardens are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
1 Jan 2026
Details
View Map
Share
Follow
Footpath From Nuttall Lane East To Manchester Road Gollinroad

are carrying out Utility repair and maintenance works on Footpath From Nuttall Lane East To Manchester Road Gollinroad, Ramsbottom.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2024 at 17:00 and could run through until 1 January 2026. The works will impact the footpath only.

This roadwork event was last updated by on 2 Jan 2024 at 17:06.

Rochdale Borough Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Over Town Lane

Rochdale Borough Council are carrying out Utility asset works on Over Town Lane, Norden North, Rochdale.

These works are categorised as Major.

The works started on 2 April 2024 at 07:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Rochdale Borough Council on 11 Nov 2024 at 11:09.

Bury Metropolitan Borough Council logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Pilsworth Road

Bury Metropolitan Borough Council are carrying out Highway improvement works on Pilsworth Road, Bury.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 09:30 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bury Metropolitan Borough Council on 26 Nov 2024 at 11:01.

Lancashire County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Burnley Road

Lancashire County Council are carrying out Highway repair and maintenance works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 18 Oct 2024 at 09:02.

Cadent Gas logo
LONG TERM
Until
4 Dec 2024
Details
View Map
Share
Follow
Park Road

Cadent Gas are carrying out Utility asset works on Park Road, Rawtenstall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 15:40 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 10:22.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Booth Crescent

Cadent Gas are carrying out Utility asset works on Booth Crescent, Rawtenstall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 09:46 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 09:46.

Electricity North West (NorWeb) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Birch Street

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Birch Street, Bury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 21 Aug 2024 at 14:26.

Bury Metropolitan Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Helmshore Road

Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Helmshore Road, Ramsbottom.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bury Metropolitan Borough Council on 14 Aug 2024 at 09:19.

Cadent Gas logo
LONG TERM
Between
14 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Angouleme Way

Cadent Gas are proposing to carry out Utility asset works on Angouleme Way, Bury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 15:17.

Cadent Gas logo
LONG TERM
Between
14 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Angouleme Way

Cadent Gas are proposing to carry out Utility asset works on Angouleme Way, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:47.

Cadent Gas logo
LONG TERM
Between
14 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Market Street

Cadent Gas are proposing to carry out Utility asset works on Market Street, Bury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:49.

Cadent Gas logo
LONG TERM
Between
15 Nov and 19 Dec 2024
Details
View Map
Share
Follow
Murray Road

Cadent Gas are proposing to carry out Utility asset works on Murray Road, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:50.

United Utilities Water (formerly North West Water) logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Market Street

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Market Street, Bury.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 November 2024 at 13:48 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 25 Nov 2024 at 12:36.

Bury Metropolitan Borough Council logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Parkhills Road

Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Parkhills Road, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bury Metropolitan Borough Council on 14 May 2024 at 13:54.

Electricity North West (NorWeb) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bright Street

Electricity North West (NorWeb) are carrying out Utility repair and maintenance works on Bright Street, Bury.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 14:02 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 22 Nov 2024 at 14:28.

Electricity North West (NorWeb) logo
Finishing
Friday
Details
View Map
Share
Follow
Moorside Road

Electricity North West (NorWeb) are carrying out New service connection on Moorside Road, Edgworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 16:45 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 26 Nov 2024 at 08:38.

Bury Metropolitan Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Bond Street

Bury Metropolitan Borough Council are carrying out Highway improvement works on Bond Street, Bury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 10:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bury Metropolitan Borough Council on 25 Nov 2024 at 11:28.

Bury Metropolitan Borough Council logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Alfred Street

Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Alfred Street, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bury Metropolitan Borough Council on 1 Oct 2024 at 10:35.

United Utilities Water (formerly North West Water) logo
Monday
Details
View Map
Share
Elm Street

United Utilities Water (formerly North West Water) carried out Utility repair and maintenance works on Elm Street, Bury.

The road was closed for some or all of the period.

The works were originally planned between 26 Nov 2024 and 2 Dec 2024 and were actually completed between 26 Nov 2024 (12:59) and 27 Nov 2024 (06:59). The works impacted the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Nov 2024 at 07:02.

Cadent Gas logo
Between
28 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Walnut Avenue

Cadent Gas are proposing to carry out Utility asset works on Walnut Avenue, Haslingden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 14:55.

United Utilities Water (formerly North West Water) logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Horseshoe Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Horseshoe Lane, Bromley Cross, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Nov 2024 at 15:01.

United Utilities Water (formerly North West Water) logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Horseshoe Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Horseshoe Lane, Bromley Cross, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Oct 2024 at 12:13.

Electricity North West (NorWeb) logo
Between
4 and 12 Dec 2024
Details
View Map
Share
Follow
Kenyon Street

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Kenyon Street, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 19 Sep 2024 at 12:45.

Electricity North West (NorWeb) logo
Between
4 and 24 Dec 2024
Details
View Map
Share
Follow
Birch Street

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Birch Street, Bury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Sep 2024 at 16:02.

BT logo
Between
6 and 10 Dec 2024
Details
View Map
Share
Follow
Back 552-568 Bacup Road

BT are proposing to carry out Utility repair and maintenance works on Back 552-568 Bacup Road, Waterfoot, Rossendale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Sep 2024 at 15:08.

Rochdale Borough Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Queens Park Road

Rochdale Borough Council are proposing to carry out Remedial works on Queens Park Road, Back O Th Moss & Ashworth, Heywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Rochdale Borough Council on 12 Nov 2024 at 09:43.

Bury Metropolitan Borough Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Rhiwlas Drive

Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Rhiwlas Drive, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bury Metropolitan Borough Council on 18 Nov 2024 at 12:31.

Electricity North West (NorWeb) logo
Between
13 and 19 Dec 2024
Details
View Map
Share
Follow
Firwood Grove

Electricity North West (NorWeb) are proposing to carry out New service connection on Firwood Grove, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Sep 2024 at 15:13.

Lancashire County Council logo
LONG TERM
Between
16 Dec 2024 and 23 Jan 2025
Details
View Map
Share
Follow
Holcombe Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Holcombe Road, Haslingden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 23 Sep 2024 at 16:18.

Bury Metropolitan Borough Council logo
LONG TERM
Between
16 Dec 2024 and 14 Feb 2025
Details
View Map
Share
Follow
Rowlands Road

Bury Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Rowlands Road, Ramsbottom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bury Metropolitan Borough Council on 16 Oct 2024 at 14:11.

Cadent Gas logo
Between
16 and 26 Dec 2024
Details
View Map
Share
Follow
Mile Lane

Cadent Gas are proposing to carry out Utility asset works on Mile Lane, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 26 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 08:29.

Electricity North West (NorWeb) logo
Between
16 and 23 Dec 2024
Details
View Map
Share
Follow
Hurst Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Hurst Street, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 12 Nov 2024 at 11:58.

Electricity North West (NorWeb) logo
Between
16 and 23 Dec 2024
Details
View Map
Share
Follow
Hurst Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Hurst Street, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Oct 2024 at 10:58.

Bury Metropolitan Borough Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Killon Street

Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Killon Street, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bury Metropolitan Borough Council on 14 May 2024 at 13:47.

Cadent Gas logo
Between
16 and 27 Dec 2024
Details
View Map
Share
Follow
Mile Lane

Cadent Gas are proposing to carry out Utility asset works on Mile Lane, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 12:00.

Cadent Gas logo
Between
16 and 27 Dec 2024
Details
View Map
Share
Follow
Mile Lane

Cadent Gas are proposing to carry out Utility asset works on Mile Lane, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 10:38.

Cadent Gas logo
Between
16 and 26 Dec 2024
Details
View Map
Share
Follow
Mile Lane

Cadent Gas are proposing to carry out Utility asset works on Mile Lane, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 26 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 11:33.

Electricity North West (NorWeb) logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Moorside Road

Electricity North West (NorWeb) are proposing to carry out New service connection on Moorside Road, Edgworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 23 Oct 2024 at 16:21.

Lancashire County Council logo
LONG TERM
Between
23 Dec 2024 and 5 Mar 2025
Details
View Map
Share
Follow
Burnley Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Burnley Road, Rawtenstall, Rossendale.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 30 Sep 2024 at 13:18.

Bury Metropolitan Borough Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Bond Street

Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Bond Street, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bury Metropolitan Borough Council on 4 Nov 2024 at 15:15.

Bury Metropolitan Borough Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Spring Street

Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Spring Street, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bury Metropolitan Borough Council on 1 Nov 2024 at 13:57.

Bury Metropolitan Borough Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Rhiwlas Drive

Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Rhiwlas Drive, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bury Metropolitan Borough Council on 4 Nov 2024 at 15:16.

Bury Metropolitan Borough Council logo
Between
30 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Gigg Lane

Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Gigg Lane, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bury Metropolitan Borough Council on 7 Oct 2024 at 12:30.

Blackburn With Darwen Borough Council logo
LONG TERM
Between
5 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Broadhead Road

Blackburn With Darwen Borough Council are proposing to carry out Highway improvement works on Broadhead Road, Edgworth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 3 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 5 Nov 2024 at 14:26.

Bury Metropolitan Borough Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Radcliffe Moor Road

Bury Metropolitan Borough Council are proposing to carry out Section 50 on Radcliffe Moor Road, Radcliffe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bury Metropolitan Borough Council on 19 Nov 2024 at 15:04.

Lancashire County Council logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Bank Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Bank Street, Rawtenstall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 20 Oct 2024 at 14:44.

Cadent Gas logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Fairfields

Cadent Gas were proposing to carry out Utility asset works on Fairfields, Egerton, Bolton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 12:30.

Cadent Gas logo
Between
6 and 22 Jan 2025
Details
View Map
Share
Follow
Fairfields

Cadent Gas are proposing to carry out Utility asset works on Fairfields, Egerton, Bolton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:39.

Bury Metropolitan Borough Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Alfred Street

Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Alfred Street, Bury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bury Metropolitan Borough Council on 1 Oct 2024 at 11:50.

Cadent Gas logo
Between
8 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Walnut Avenue

Cadent Gas are proposing to carry out Utility asset works on Walnut Avenue, Haslingden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 14:08.

Bury Metropolitan Borough Council logo
LONG TERM
Between
13 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Rowlands Road

Bury Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Rowlands Road, Ramsbottom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bury Metropolitan Borough Council on 28 Oct 2024 at 11:10.

Electricity North West (NorWeb) logo
Between
15 and 22 Jan 2025
Details
View Map
Share
Follow
Hurst Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Hurst Street, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 5 Nov 2024 at 15:52.

Electricity North West (NorWeb) logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Silver Street

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Silver Street, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Nov 2024 at 15:51.

BT logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Chapel Street

BT are proposing to carry out Utility asset works on Chapel Street, Haslingden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 6 Nov 2024 at 11:59.

Bury Metropolitan Borough Council logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Helmshore Road

Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Helmshore Road, Ramsbottom.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bury Metropolitan Borough Council on 21 Nov 2024 at 09:26.

Electricity North West (NorWeb) logo
Between
4 and 10 Feb 2025
Details
View Map
Share
Follow
Silver Street

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Silver Street, Bury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Nov 2024 at 11:57.

Bury Metropolitan Borough Council logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Alfred Street

Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Alfred Street, Bury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bury Metropolitan Borough Council on 1 Oct 2024 at 11:57.

Bury Metropolitan Borough Council logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Alfred Street

Bury Metropolitan Borough Council are proposing to carry out Highway improvement works on Alfred Street, Bury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bury Metropolitan Borough Council on 1 Oct 2024 at 10:51.

Electricity North West (NorWeb) logo
Between
24 Feb and 4 Mar 2025
Details
View Map
Share
Springside Road

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Springside Road, Bury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 4 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Nov 2024 at 12:26.


Roadworks Map near to Jubilee Gardens, BURY, BL0 9GS

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 21:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Jubilee Gardens, BURY, BL0 9GS (9 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
United Utilities Water (formerly North West Water) logo
HILLSIDE ROAD 
(0.4 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Give and take
In Progress
Since: 26 Nov 2024 12:38
(Scheduled: 26 Nov 2024 - 28 Nov 2024)
0.4
Details
Share
Follow
2
MAJOR
  
FOOTPATH FROM NUTTALL LANE EAST TO MANCHESTER ROAD GOLLINROAD 
(0.4 miles)
Utility repair and maintenance works - Footpath - Road closure
In Progress
Since: 2 Jan 2024 17:00
(Scheduled: 1 Jan 2024 - 1 Jan 2026)
0.4
Details
Share
Follow
3
United Utilities Water (formerly North West Water) logo
STONE CLOSE 
(0.6 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 28 Nov 2024 - 2 Dec 2024
0.6
Details
Share
Follow
4
Bury Metropolitan Borough Council logo
MAJOR
  
HELMSHORE ROAD 
(0.6 miles)
Bury Metropolitan Borough Council
Highway improvement works - Carriageway - Two-way signals
Planned
Scheduled: 11 Nov 2024 - 29 Nov 2024
0.6
Details
Share
Follow
5
United Utilities Water (formerly North West Water) logo
URGENT
  
QUARRY STREET 
(0.7 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 22 Nov 2024 08:27
(Scheduled: 22 Nov 2024 - 28 Nov 2024)
0.7
Details
Share
Follow
6
Hutchinson 3G logo
FIR STREET 
(0.8 miles)
Hutchinson 3G
Utility asset works - Verge - Some carriageway incursion
In Progress
Since: 25 Nov 2024 08:00
(Scheduled: 25 Nov 2024 - 27 Nov 2024)
0.8
Details
Share
Follow
7
Bury Metropolitan Borough Council logo
LONGSIGHT ROAD 
(0.8 miles)
Bury Metropolitan Borough Council
Disconnection or alteration of supply - Footway - Multi-way signals
Planned
Scheduled: 26 Nov 2024 - 29 Nov 2024
0.8
Details
Share
Follow
8
United Utilities Water (formerly North West Water) logo
URGENT
  
ASHBORNE DRIVE 
(0.9 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
21 Nov 2024 10:35 - 27 Nov 2024 10:49
0.9
Details
Share
9
Bury Metropolitan Borough Council logo
LONGSIGHT ROAD 
(0.9 miles)
Bury Metropolitan Borough Council
Disconnection or alteration of supply - Footway - Two-way signals
Planned
Scheduled: 26 Nov 2024 - 29 Nov 2024
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.