ROADWORKS SUMMARY
Denmead Road, BOURNEMOUTH, BH6 5QH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Denmead Road, BH6 5QH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Denmead Road, BOURNEMOUTH, BH6 5QH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Denmead Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Jan 2024 and 11 Apr 2025
Details
View Map
Share
Follow
Haverstock Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Haverstock Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2024 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 25 Jul 2023 at 14:52.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Jan 2024 and 11 Apr 2025
Details
View Map
Share
Follow
West Way

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on West Way, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2024 and could run through until 11 April 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 25 Jul 2023 at 14:50.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
1 Feb 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Castle Lane West - Side Section 169 To 219

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Castle Lane West - Side Section 169 To 219, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2024 and could run through until 30 April 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 21 Dec 2023 at 14:16.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
18 Mar 2024 and 13 Jun 2025
Details
View Map
Share
Follow
Castle Lane West - Side Section 169 To 219

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Castle Lane West - Side Section 169 To 219, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2024 and could run through until 13 June 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 21 Dec 2023 at 14:48.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
9 Sep 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Madeira Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Works for Rail Purposes on Madeira Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 31 Jul 2024 at 16:28.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
9 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Madeira Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Madeira Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 31 Jul 2024 at 16:46.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
9 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Christchurch Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Christchurch Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 10 Sep 2024 at 08:54.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
9 Sep 2024 and 5 Sep 2025
Details
View Map
Share
Follow
Castle Lane West

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Castle Lane West, Bournemouth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 5 September 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 19 Jul 2024 at 15:22.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
23 Sep and 13 Dec 2024
Details
View Map
Share
Branksome Wood Road

Bournemouth, Christchurch And Poole Council were proposing to carry out Highway improvement works on Branksome Wood Road, Bournemouth.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2024 and run through until 13 December 2024. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 20 Sep 2024 at 08:42.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
30 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Queens Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Queens Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 11:30.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Paisley Road

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Paisley Road, Bournemouth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 07:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Dec 2024 at 09:01.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
30 Sep 2024 and 25 Oct 2025
Details
View Map
Share
Follow
Seafield Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Seafield Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 25 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Aug 2024 at 09:51.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
30 Sep 2024 and 19 Oct 2025
Details
View Map
Share
Seafield Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Seafield Road, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 19 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Sep 2024 at 10:32.

Southern Gas Networks logo
LONG TERM
Between
21 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Queens Park Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Queens Park Avenue, Bournemouth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2024 at 13:30.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
26 Oct 2024 and 22 Nov 2025
Details
View Map
Share
Gloucester Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Gloucester Road, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 October 2024 and run through until 22 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Aug 2024 at 11:18.

Southern Gas Networks logo
LONG TERM
Until
6 Feb 2025
Details
View Map
Share
Follow
Queens Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Queens Road, Bournemouth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 November 2024 at 15:50 and could run through until 6 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 15:56.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Watcombe Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Watcombe Road, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Aug 2024 at 09:03.

Southern Gas Networks logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Christchurch Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Christchurch Road, Bournemouth.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 08:07 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 16:08.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
4 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Watcombe Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Watcombe Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Aug 2024 at 09:50.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Victoria Avenue, Bournemouth.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:35 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 15:14.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
7 Nov 2024 and 5 Dec 2025
Details
View Map
Share
Southbourne Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Southbourne Road, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 November 2024 and run through until 5 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Aug 2024 at 12:25.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
11 Nov 2024 and 14 Feb 2025
Details
View Map
Share
Follow
Queens Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Queens Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 11:20.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Lymington Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lymington Road, Christchurch.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2024 at 13:29.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Lymington Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lymington Road, Christchurch.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2024 at 16:34.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Lymington Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lymington Road, Christchurch.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2024 at 15:27.

Bournemouth, Christchurch And Poole Council logo
Between
17 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Morley Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Morley Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 20 Nov 2024 at 10:19.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Queens Road

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Queens Road, Bournemouth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 14:00 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 19 Nov 2024 at 07:46.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
18 Nov 2024 and 18 Feb 2025
Details
View Map
Share
Follow
Leven Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Leven Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 15 Nov 2024 at 16:13.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Until
18 Feb 2025
Details
View Map
Share
Follow
Leven Avenue

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Leven Avenue, Bournemouth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 14:00 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 19 Nov 2024 at 07:46.

Scottish Hydro Electric Power Dis logo
Until
13 Dec 2024
Details
View Map
Share
Follow
Meyrick Park Crescent

Scottish Hydro Electric Power Dis are carrying out New service connection on Meyrick Park Crescent, Bournemouth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:04 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Nov 2024 at 08:24.

Scottish Hydro Electric Power Dis logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Meyrick Park Crescent

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Meyrick Park Crescent, Bournemouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Aug 2024 at 13:25.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Leybourne Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Leybourne Avenue, Bournemouth.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 12:38 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 12:44.

Bournemouth, Christchurch And Poole Council logo
Between
24 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Warwick Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Warwick Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 26 Nov 2024 at 10:57.

Bournemouth, Christchurch And Poole Council logo
Between
24 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Hannington Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Hannington Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 26 Nov 2024 at 10:56.

Bournemouth, Christchurch And Poole Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Gloucester Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Gloucester Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Oct 2024 at 14:26.

Scottish Hydro Electric Power Dis logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Cranleigh Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Cranleigh Road, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Aug 2024 at 11:37.

Scottish Hydro Electric Power Dis logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Watcombe Road

Scottish Hydro Electric Power Dis are carrying out Utility asset works on Watcombe Road, Bournemouth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 07:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Nov 2024 at 08:06.

Scottish Hydro Electric Power Dis logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Seafield Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Seafield Road, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 09:53.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Smugglers Lane South

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Smugglers Lane South, Christchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 12:14.

Southern Gas Networks logo
LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
Queens Park Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Queens Park Avenue, Bournemouth.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 10:38 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 10:42.

Scottish Hydro Electric Power Dis logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Alumhurst Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Alumhurst Road, Bournemouth.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Nov 2024 at 13:44.

Scottish Hydro Electric Power Dis logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Alumhurst Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Alumhurst Road, Bournemouth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Nov 2024 at 09:29.

Bournemouth, Christchurch And Poole Council logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Christchurch Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Christchurch Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Dec 2024 at 14:21.

Bournemouth, Christchurch And Poole Council logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Christchurch Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Christchurch Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Dec 2024 at 16:38.

Bournemouth, Christchurch And Poole Council logo
Between
9 and 21 Dec 2024
Details
View Map
Share
Follow
Somerset Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Somerset Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Oct 2024 at 14:28.

Bournemouth, Christchurch And Poole Council logo
Between
9 and 21 Dec 2024
Details
View Map
Share
Follow
Somerset Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Somerset Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 4 Oct 2024 at 13:00.

Bournemouth, Christchurch And Poole Council logo
Between
9 and 21 Dec 2024
Details
View Map
Share
Follow
Rosebery Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Rosebery Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Oct 2024 at 14:39.

Bournemouth, Christchurch And Poole Council logo
Between
9 and 21 Dec 2024
Details
View Map
Share
Follow
Rosebery Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Rosebery Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 4 Oct 2024 at 16:07.

BT logo
Between
17 and 20 Dec 2024
Details
View Map
Share
Bridge Street

BT were proposing to carry out Utility asset works on Bridge Street, Christchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Nov 2024 at 12:05.

Scottish Hydro Electric Power Dis logo
Between
2 and 15 Jan 2025
Details
View Map
Share
Follow
Alumhurst Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Alumhurst Road, Bournemouth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Dec 2024 at 08:27.

Bournemouth, Christchurch And Poole Council logo
Between
5 and 31 Jan 2025
Details
View Map
Share
Follow
Parkwood Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Parkwood Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 22 Nov 2024 at 13:29.

Bournemouth, Christchurch And Poole Council logo
Between
5 and 31 Jan 2025
Details
View Map
Share
Follow
Queensland Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Queensland Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 18 Sep 2024 at 12:16.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Southwood Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southwood Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 15:16.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Southbourne Overcliff Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southbourne Overcliff Drive, Bournemouth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 15:06.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
6 Jan and 28 Jul 2025
Details
View Map
Share
Follow
Madeira Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Works for Rail Purposes on Madeira Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 30 Oct 2024 at 11:53.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
6 Jan and 28 Jul 2025
Details
View Map
Share
Follow
Madeira Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Madeira Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 30 Oct 2024 at 11:53.

Southern Gas Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Beresford Road

Southern Gas Networks are proposing to carry out New service connection on Beresford Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 15:03.

Southern Gas Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Beresford Road

Southern Gas Networks are proposing to carry out New service connection on Beresford Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 15:04.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
6 Jan and 30 Mar 2025
Details
View Map
Share
Follow
Ashley Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Ashley Road, Bournemouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 26 Apr 2024 at 07:00.

Bournemouth, Christchurch And Poole Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Somerset Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Somerset Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 18 Sep 2024 at 11:59.

Bournemouth, Christchurch And Poole Council logo
Between
6 and 18 Jan 2025
Details
View Map
Share
Follow
Warwick Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Warwick Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Oct 2024 at 14:30.

Bournemouth, Christchurch And Poole Council logo
Between
6 and 18 Jan 2025
Details
View Map
Share
Follow
Warwick Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Warwick Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 4 Oct 2024 at 15:29.

Bournemouth, Christchurch And Poole Council logo
Between
6 and 18 Jan 2025
Details
View Map
Share
Follow
Morley Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Morley Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Oct 2024 at 14:34.

Bournemouth, Christchurch And Poole Council logo
Between
6 and 18 Jan 2025
Details
View Map
Share
Follow
Morley Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Morley Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 4 Oct 2024 at 16:05.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
St Augustin's Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Augustin's Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 15:43.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
St Augustin's Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Augustin's Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 11:52.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Seafield Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Seafield Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Dec 2024 at 12:20.

Electricity Network Company logo
LONG TERM
Between
6 Jan and 18 Mar 2025
Details
View Map
Share
Follow
Petersfield Road

Electricity Network Company are proposing to carry out Utility asset works on Petersfield Road, Bournemouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 22 Oct 2024 at 16:29.

Electricity Network Company logo
LONG TERM
Between
6 Jan and 18 Mar 2025
Details
View Map
Share
Follow
Petersfield Road

Electricity Network Company are proposing to carry out Utility asset works on Petersfield Road, Bournemouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 29 Oct 2024 at 09:26.

Bournemouth, Christchurch And Poole Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Ashridge Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Ashridge Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 19 Jul 2024 at 16:25.

Bournemouth, Christchurch And Poole Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Ferncroft Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Ferncroft Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 19 Jul 2024 at 16:24.

Bournemouth, Christchurch And Poole Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Pinewood Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Pinewood Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 22 Jul 2024 at 10:00.

Bournemouth, Christchurch And Poole Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Wimborne Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Wimborne Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 18 Jul 2024 at 12:32.

Bournemouth, Christchurch And Poole Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Northbourne Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Northbourne Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 22 Jul 2024 at 10:02.

Bournemouth, Christchurch And Poole Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Avebury Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on Avebury Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 22 Jul 2024 at 10:05.

Bournemouth, Christchurch And Poole Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
New Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway repair and maintenance works on New Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 22 Jul 2024 at 10:07.

Electricity Network Company logo
Between
7 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Petersfield Road

Electricity Network Company are proposing to carry out Utility asset works on Petersfield Road, Bournemouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 13 Nov 2024 at 15:02.

Southern Gas Networks logo
Between
8 and 31 Jan 2025
Details
View Map
Share
Follow
Poole Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Poole Road, Bournemouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 10:48.

Electricity Network Company logo
LONG TERM
Between
9 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Riverside Avenue

Electricity Network Company are proposing to carry out Utility asset works on Riverside Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 22 Oct 2024 at 16:27.

Electricity Network Company logo
LONG TERM
Between
9 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Riverside Avenue

Electricity Network Company are proposing to carry out Utility asset works on Riverside Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 29 Oct 2024 at 16:38.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Southbourne Coast Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Section 50 on Southbourne Coast Road, Bournemouth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 22 Nov 2024 at 14:33.

Southern Gas Networks logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Pine Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 15:34.

Southern Gas Networks logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Southbourne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southbourne Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 15:36.

Wessex Water logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Fountain Way

Wessex Water are proposing to carry out Utility repair and maintenance works on Fountain Way, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 3 Dec 2024 at 16:14.

Wessex Water logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Bargates

Wessex Water are proposing to carry out Utility repair and maintenance works on Bargates, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 3 Dec 2024 at 16:12.

Cityfibre Metro Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Lymington Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Lymington Road, Christchurch.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Oct 2024 at 09:50.

Cityfibre Metro Networks logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Lymington Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Lymington Road, Christchurch.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Sep 2024 at 11:40.

Cityfibre Metro Networks logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Lymington Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Lymington Road, Christchurch.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Oct 2024 at 09:05.

Cityfibre Metro Networks logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Wortley Road Car Park

Cityfibre Metro Networks are proposing to carry out Utility asset works on Wortley Road Car Park, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Sep 2024 at 11:41.

Cityfibre Metro Networks logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Wortley Road Car Park

Cityfibre Metro Networks are proposing to carry out Utility asset works on Wortley Road Car Park, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 7 Oct 2024 at 09:27.

Bournemouth, Christchurch And Poole Council logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Redhill Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Redhill Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 8 Oct 2024 at 13:37.

Scottish Hydro Electric Power Dis logo
Between
20 and 25 Jan 2025
Details
View Map
Share
Follow
Carbery Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Carbery Lane, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Oct 2024 at 14:19.

Southern Gas Networks logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Stourwood Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stourwood Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 15:51.

Bournemouth, Christchurch And Poole Council logo
Between
20 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Queensland Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Queensland Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Oct 2024 at 14:41.

Bournemouth, Christchurch And Poole Council logo
Between
20 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Queensland Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Queensland Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 4 Oct 2024 at 16:10.

Bournemouth, Christchurch And Poole Council logo
Between
20 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Hannington Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Hannington Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Oct 2024 at 14:32.

Bournemouth, Christchurch And Poole Council logo
Between
20 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Hannington Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Hannington Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 4 Oct 2024 at 16:01.

Southern Gas Networks logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Fairfield

Southern Gas Networks are proposing to carry out New service connection on Fairfield, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 10:20.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
20 Jan and 29 Aug 2025
Details
View Map
Share
Follow
Redhill Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Redhill Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 19 Jul 2024 at 15:30.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
20 Jan and 29 Aug 2025
Details
View Map
Share
Follow
Redhill Drive

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Redhill Drive, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 19 Jul 2024 at 15:46.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
20 Jan and 29 Aug 2025
Details
View Map
Share
Follow
Whitelegg Way

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Whitelegg Way, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 19 Jul 2024 at 15:38.

Southern Gas Networks logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Stourwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stourwood Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 16:16.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Gresham Road

Scottish Hydro Electric Power Dis are proposing to carry out roadworks on Gresham Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Nov 2024 at 09:34.

Electricity Network Company logo
LONG TERM
Between
29 Jan and 2 Apr 2025
Details
View Map
Share
Follow
Riverside Avenue

Electricity Network Company are proposing to carry out Utility asset works on Riverside Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 2 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 13 Nov 2024 at 14:58.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
30 Jan and 23 Apr 2025
Details
View Map
Share
Alumhurst Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Alumhurst Road, Bournemouth.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 January 2025 and run through until 23 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 10:25.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
3 Feb and 25 Apr 2025
Details
View Map
Share
Follow
Gervis Place

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Gervis Place, Bournemouth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 25 Jul 2024 at 13:08.

Scottish Hydro Electric Power Dis logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Follow
Carbery Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Carbery Lane, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Oct 2024 at 15:04.

Scottish Hydro Electric Power Dis logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Follow
Carbery Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Carbery Lane, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Oct 2024 at 13:24.

Bournemouth, Christchurch And Poole Council logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Gloucester Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Gloucester Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 18 Sep 2024 at 12:46.

Bournemouth, Christchurch And Poole Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Gloucester Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Gloucester Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 14 Nov 2024 at 11:03.

Scottish Hydro Electric Power Dis logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Bargates

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Bargates, Christchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 09:54.

Scottish Hydro Electric Power Dis logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Bargates

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Bargates, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Nov 2024 at 09:30.

Southern Gas Networks logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Queens Park West Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Queens Park West Drive, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:36.

Southern Gas Networks logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Maurice Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maurice Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:39.

Bournemouth, Christchurch And Poole Council logo
Between
3 and 19 Feb 2025
Details
View Map
Share
Follow
Redhill Drive

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Redhill Drive, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 8 Oct 2024 at 13:35.

Electricity Network Company logo
Between
4 and 17 Feb 2025
Details
View Map
Share
Follow
Castle Lane East

Electricity Network Company are proposing to carry out Utility asset works on Castle Lane East, Bournemouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 18 Nov 2024 at 11:07.

South West Water logo
Between
4 and 10 Feb 2025
Details
View Map
Share
Mossley Avenue

South West Water were proposing to carry out Utility repair and maintenance works on Mossley Avenue, Poole.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 24 Oct 2024 at 11:14.

Hampshire County Council logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Salisbury Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Salisbury Road, Sopley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 18 Nov 2024 at 15:22.

Hampshire County Council logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Salisbury Road

Hampshire County Council are proposing to carry out Highway repair and maintenance works on Salisbury Road, Sopley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 19 Nov 2024 at 16:30.

Scottish Hydro Electric Power Dis logo
Between
8 and 15 Feb 2025
Details
View Map
Share
Follow
Kinson Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Kinson Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 14:21.

Scottish Hydro Electric Power Dis logo
Between
8 and 15 Feb 2025
Details
View Map
Share
Follow
Acres Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Acres Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 14:20.

Scottish Hydro Electric Power Dis logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Fountain Way

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Fountain Way, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Aug 2024 at 16:42.

Scottish Hydro Electric Power Dis logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Fountain Way

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Fountain Way, Christchurch.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 09:54.

Scottish Hydro Electric Power Dis logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Fountain Way

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Fountain Way, Christchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Nov 2024 at 08:38.

Southern Gas Networks logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Queens Park Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Queens Park Gardens, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 13:27.

Southern Gas Networks logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Queens Park West Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Queens Park West Drive, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 10:17.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Lymington Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lymington Road, Christchurch.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 16:05.

Southern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Woodbury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodbury Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 14:03.

Southern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Woodbury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodbury Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:13.

Southern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Woodbury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodbury Avenue, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 11:50.

Southern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Seabourne Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Seabourne Road, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 11:47.

Bournemouth, Christchurch And Poole Council logo
Between
17 and 22 Feb 2025
Details
View Map
Share
Follow
Parkwood Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Parkwood Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Oct 2024 at 14:43.

Southern Gas Networks logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Queens Park West Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Queens Park West Drive, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 15:55.

Southern Gas Networks logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Queens Park West Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Queens Park West Drive, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 15:47.

Southern Gas Networks logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Maurice Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maurice Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 15:54.

Southern Gas Networks logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Maurice Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maurice Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 15:48.

South West Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Mossley Avenue

South West Water are proposing to carry out Utility repair and maintenance works on Mossley Avenue, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 28 Oct 2024 at 07:58.

South West Water logo
Between
18 and 24 Feb 2025
Details
View Map
Share
Follow
Dark Lane

South West Water are proposing to carry out Utility repair and maintenance works on Dark Lane, Hinton St Michael.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 23 Oct 2024 at 14:34.

Bournemouth, Christchurch And Poole Council logo
Between
24 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Wolverton Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Wolverton Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 8 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 3 Oct 2024 at 14:23.

Bournemouth, Christchurch And Poole Council logo
Between
24 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Wolverton Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Wolverton Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 8 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 4 Oct 2024 at 11:53.

South West Water logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Hinton Road

South West Water were proposing to carry out Utility repair and maintenance works on Hinton Road, Bournemouth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by South West Water on 21 Nov 2024 at 14:22.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
3 Mar and 28 Apr 2025
Details
View Map
Share
Follow
Old Christchurch Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Old Christchurch Road, Bournemouth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 25 Jun 2024 at 12:36.


Roadworks Map near to Denmead Road, BOURNEMOUTH, BH6 5QH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 4 Dec 2024 09:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Denmead Road, BOURNEMOUTH, BH6 5QH (26 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Southern Gas Networks logo
EMERGENCY
  
CHRISTCHURCH ROAD 
(0.4 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 14 Oct 2024 18:24
(Scheduled: 14 Oct 2024 - 6 Dec 2024)
0.4
Details
Share
Follow
2
Scottish Hydro Electric Power Dis logo
MAJOR
  
SEAFIELD ROAD 
(0.4 miles)
Scottish Hydro Electric Power Dis
Utility asset works - Carriageway - Road closure
Planned
Scheduled: 30 Sep 2024 - 25 Oct 2025
0.4
Details
Share
Follow
3
Scottish Hydro Electric Power Dis logo
MAJOR
  
SEAFIELD ROAD 
(0.4 miles)
Scottish Hydro Electric Power Dis
Utility asset works - Carriageway - Road closure
Cancelled
(Scheduled: 30 Sep 2024 - 19 Oct 2025)
0.4
Details
Share
4
Scottish Hydro Electric Power Dis logo
MAJOR
  
SEAFIELD ROAD 
(0.4 miles)
Scottish Hydro Electric Power Dis
Utility asset works - Carriageway - Road closure
Cancelled
(Scheduled: 25 Nov 2024 - 20 Dec 2024)
0.4
Details
Share
5
Scottish Hydro Electric Power Dis logo
MAJOR
  
WATCOMBE ROAD 
(0.5 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Carriageway - Road closure
Cancelled
(Scheduled: 28 Oct 2024 - 6 Dec 2024)
0.5
Details
Share
6
Scottish Hydro Electric Power Dis logo
MAJOR
  
WATCOMBE ROAD 
(0.5 miles)
Scottish Hydro Electric Power Dis
Utility asset works - Carriageway - Road closure
In Progress
Since: 25 Nov 2024 07:00
(Scheduled: 25 Nov 2024 - 20 Dec 2024)
0.5
Details
Share
Follow
7
Scottish Hydro Electric Power Dis logo
MAJOR
  
WATCOMBE ROAD 
(0.5 miles)
Scottish Hydro Electric Power Dis
Utility asset works - Carriageway - Road closure
Planned
Scheduled: 4 Nov 2024 - 13 Dec 2024
0.5
Details
Share
Follow
8
Scottish Hydro Electric Power Dis logo
MAJOR
  
CRANLEIGH ROAD 
(0.5 miles)
Scottish Hydro Electric Power Dis
Utility asset works - Carriageway - Road closure
Cancelled
(Scheduled: 25 Nov 2024 - 20 Dec 2024)
0.5
Details
Share
9
Electricity Network Company logo
MAJOR
  
PETERSFIELD ROAD 
(0.6 miles)
Electricity Network Company
Utility asset works - Footway - Multi-way signals
Planned
Scheduled: 25 Nov 2024 - 20 Dec 2024
0.6
Details
Share
Follow
10
Electricity Network Company logo
MAJOR
  
PETERSFIELD ROAD 
(0.6 miles)
Electricity Network Company
Utility asset works - Footway - Multi-way signals
Planned
Scheduled: 25 Nov 2024 - 20 Dec 2024
0.6
Details
Share
Follow
  • ...