ROADWORKS SUMMARY
High Street, WIMBORNE, BH21 5PS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for High Street, BH21 5PS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to High Street, WIMBORNE, BH21 5PS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for High Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Dorset Council logo
LONG TERM
Until
5 Nov 2027
Details
View Map
Share
Follow
Mill Lane

Dorset Council are carrying out Highway improvement works on Mill Lane, Cranborne.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 May 2026 at 00:00 and could run through until 5 November 2027. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 8 May 2026 at 13:35.

Dorset Council logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Batterley Drove

Dorset Council are carrying out Highway improvement works on Batterley Drove, Cranborne.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 August 2026 at 09:31 and could run through until 30 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Dorset Council on 11 Sep 2026 at 14:21.

Southern Gas Networks logo
LONG TERM
Until
5 Nov 2026
Details
View Map
Share
Follow
Verwood Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Verwood Road, Three Legged Cross.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 10:00 and could run through until 5 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2026 at 10:23.

South West Water logo
Today
Details
View Map
Share
High Street

South West Water carried out Utility repair and maintenance works on High Street, Damerham.

The road was closed for some or all of the period.

The works were originally planned between 10 Sep 2026 and 16 Sep 2026 and were actually completed between 10 Sep 2026 (08:15) and 16 Sep 2026 (16:00). The works impacted the carriageway only.

This roadwork event was last updated by South West Water on 16 Sep 2026 at 16:02.

Dorset Council logo
Finishing
Monday
Details
View Map
Share
Follow
Lane From Hill House Access To Junction With C24

Dorset Council are proposing to carry out Highway improvement works on Lane From Hill House Access To Junction With C24, Hinton Martell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 18 Aug 2026 at 10:20.

Dorset Council logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Batterley Drove

Dorset Council are proposing to carry out Highway improvement works on Batterley Drove, Cranborne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 6 Aug 2026 at 10:16.

National Grid Electricity Transmission logo
Between
7 and 31 Oct 2026
Details
View Map
Share
Follow
Black Moor Road

National Grid Electricity Transmission are proposing to carry out Utility asset works on Black Moor Road, Verwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 31 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 25 Aug 2026 at 09:33.

National Grid Electricity Transmission logo
Between
13 and 31 Oct 2026
Details
View Map
Share
Black Moor Road

National Grid Electricity Transmission were proposing to carry out Utility asset works on Black Moor Road, Verwood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2026 and run through until 31 October 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 24 Aug 2026 at 13:45.

National Grid Electricity Transmission logo
Between
27 and 30 Oct 2026
Details
View Map
Share
Follow
Rockbourne Road

National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Rockbourne Road, Sandleheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 30 October 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by National Grid Electricity Transmission on 16 Sep 2026 at 11:09.

Southern Gas Networks logo
Between
16 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Ringwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ringwood Road, Verwood.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 4 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Aug 2026 at 10:15.

National Grid Electricity Transmission logo
Between
24 and 27 Nov 2026
Details
View Map
Share
Follow
Rockbourne Road

National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Rockbourne Road, Sandleheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2026 and could run through until 27 November 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by National Grid Electricity Transmission on 16 Sep 2026 at 11:10.

Wessex Water logo
Between
30 Nov and 2 Dec 2026
Details
View Map
Share
Follow
Broomfield Drive

Wessex Water are proposing to carry out Utility repair and maintenance works on Broomfield Drive, Alderholt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 2 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 23 Jun 2026 at 10:21.

Dorset Council logo
Between
3 and 17 Dec 2026
Details
View Map
Share
Hare Lane

Dorset Council were proposing to carry out Highway improvement works on Hare Lane, Cranborne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2026 and run through until 17 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Dorset Council on 9 Sep 2026 at 09:00.

Dorset Council logo
Between
3 and 17 Dec 2026
Details
View Map
Share
Castle Street

Dorset Council were proposing to carry out Highway improvement works on Castle Street, Cranborne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2026 and run through until 17 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Dorset Council on 9 Sep 2026 at 09:00.


Roadworks Map near to High Street, WIMBORNE, BH21 5PS

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Sep 2026 18:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to High Street, WIMBORNE, BH21 5PS (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.