ROADWORKS SUMMARY
Lower Steppes, SWANAGE, BH19 3EZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Lower Steppes, BH19 3EZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Lower Steppes, SWANAGE, BH19 3EZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Lower Steppes are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 26 Feb 2025
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Swanage.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 26 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 13:44.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 26 Feb 2025
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Swanage.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 26 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 10:30.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 21 Mar 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Swanage.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 14:25.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 21 Mar 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Swanage.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 10:30.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 21 Mar 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Swanage.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2024 at 11:00.

Dorset Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
High Street

Dorset Council are proposing to carry out Highway improvement works on High Street, Swanage.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 2 Jul 2024 at 09:35.

Southern Gas Networks logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Priests Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Priests Road, Swanage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 12:00.

BT logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Three Acre Lane

BT are proposing to carry out Utility asset works on Three Acre Lane, Langton Matravers.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 10 Dec 2024 at 16:00.

BT logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Three Acre Lane

BT are proposing to carry out Utility asset works on Three Acre Lane, Langton Matravers.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 10 Oct 2024 at 14:40.

Southern Gas Networks logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Priests Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Priests Road, Swanage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 16:10.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Steer Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Steer Road, Swanage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 12:00.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Steer Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Steer Road, Swanage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 16:10.

Southern Gas Networks logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Swanage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 12:30.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Swanage.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 12:20.

Southern Gas Networks logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Townsend Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Townsend Road, Swanage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 16:00.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 2 May 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out roadworks on High Street, Swanage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 13:45.

Southern Gas Networks logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Priests Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Priests Road, Swanage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 11:55.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 2 May 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Swanage.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 11:55.

Southern Gas Networks logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Priests Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Priests Road, Swanage.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 16:00.


Roadworks Map near to Lower Steppes, SWANAGE, BH19 3EZ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 06:23
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Lower Steppes, SWANAGE, BH19 3EZ (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Southern Gas Networks logo
MAJOR
  
BENLEASE WAY 
(0.8 miles)
Southern Gas Networks
Optional permit (no fee) e.g. for traffic management etc - Footway, Carriageway - Give and take
In Progress
Since: 31 Oct 2024 09:16
(Scheduled: 28 Oct 2024 - 16 Apr 2025)
0.8
Details
Share
Follow
2
Scottish Hydro Electric Power Dis logo
URGENT
  
MARSH WAY 
(1.0 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footpath - Some carriageway incursion
In Progress
Since: 17 Dec 2024 09:55
(Scheduled: 17 Dec 2024 - 23 Dec 2024)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.