ROADWORKS SUMMARY
Peatons Lane, POOLE, BH16 6HW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Peatons Lane, BH16 6HW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Peatons Lane, POOLE, BH16 6HW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Peatons Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Normandy Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Normandy Way, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 14:23.

Wessex Water logo
LONG TERM
Between
31 Mar and 3 Oct 2025
Details
View Map
Share
French Road

Wessex Water were proposing to carry out roadworks on French Road, Poole.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 14 Mar 2025 at 14:44.

Wessex Water logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Cavan Crescent

Wessex Water are carrying out Utility repair and maintenance works on Cavan Crescent, Poole.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 June 2025 at 08:00 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 9 Jun 2025 at 13:44.

Wessex Water logo
LONG TERM
Between
9 Jun and 24 Oct 2025
Details
View Map
Share
Follow
Cavan Crescent

Wessex Water are proposing to carry out Utility repair and maintenance works on Cavan Crescent, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wessex Water on 17 Mar 2025 at 10:11.

Wessex Water logo
LONG TERM
Between
9 Jun and 24 Oct 2025
Details
View Map
Share
Follow
Cavan Crescent

Wessex Water are proposing to carry out Utility repair and maintenance works on Cavan Crescent, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wessex Water on 14 Mar 2025 at 15:41.

Wessex Water logo
LONG TERM
Until
27 Oct 2025
Details
View Map
Share
Follow
French Road

Wessex Water are carrying out Utility repair and maintenance works on French Road, Poole.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2025 at 08:00 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 10 Jun 2025 at 15:08.

Wessex Water logo
LONG TERM
Between
9 Jun and 24 Oct 2025
Details
View Map
Share
Follow
French Road

Wessex Water are proposing to carry out Utility repair and maintenance works on French Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wessex Water on 14 Mar 2025 at 14:53.

Wessex Water logo
LONG TERM
Between
9 Jun and 24 Oct 2025
Details
View Map
Share
French Road

Wessex Water were proposing to carry out Utility repair and maintenance works on French Road, Poole.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 14 Mar 2025 at 15:07.

Wessex Water logo
LONG TERM
Between
28 Aug and 9 Oct 2025
Details
View Map
Share
Denison Road

Wessex Water were proposing to carry out roadworks on Denison Road, Poole.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 August 2025 and run through until 9 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 14 Mar 2025 at 15:02.

Wessex Water logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Denison Road

Wessex Water are carrying out Utility repair and maintenance works on Denison Road, Poole.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 1 Sep 2025 at 09:05.

Dorset Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Church Street To White Mill Bridge - Lane

Dorset Council are carrying out Highway improvement works on Church Street To White Mill Bridge - Lane, Sturminster Marshall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 08:13 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 16 Sep 2025 at 13:50.

Southern Gas Networks logo
Between
8 Sep and 3 Oct 2025
Details
View Map
Share
Lower Blandford Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lower Blandford Road, Poole.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 3 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2025 at 10:55.

Southern Gas Networks logo
Between
8 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Lower Blandford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lower Blandford Road, Poole.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 3 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 15:52.

Southern Gas Networks logo
Until
10 Oct 2025
Details
View Map
Share
Follow
Allens Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Allens Road, Upton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 September 2025 at 10:45 and could run through until 10 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 11:07.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Lower Blandford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lower Blandford Road, Poole.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 12:39.

Dorset Council logo
Until
17 Oct 2025
Details
View Map
Share
Follow
A35 Fox Pound To Park Corner

Dorset Council are carrying out Highway improvement works on A35 Fox Pound To Park Corner, Morden Park Corner.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 09:35 and could run through until 17 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Dorset Council on 22 Sep 2025 at 09:40.

Wessex Water logo
Between
22 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Denison Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Denison Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 17 Mar 2025 at 10:02.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Wareham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Wareham Road, Corfe Mullen.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 September 2025 at 09:30 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Sep 2025 at 11:21.

Southern Gas Networks logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
West Street

Southern Gas Networks are proposing to carry out New service connection on West Street, Winterborne Kingston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 09:00.

Southern Gas Networks logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
West Street

Southern Gas Networks are proposing to carry out New service connection on West Street, Winterborne Kingston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2025 at 10:05.

Dorset Council logo
Between
1 and 17 Oct 2025
Details
View Map
Share
Follow
A35 Fox Pound To Park Corner

Dorset Council are proposing to carry out Highway improvement works on A35 Fox Pound To Park Corner, Morden Park Corner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 17 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Dorset Council on 16 May 2025 at 10:10.

Dorset Council logo
Between
1 and 15 Oct 2025
Details
View Map
Share
Follow
Jennys Lane

Dorset Council are proposing to carry out Highway improvement works on Jennys Lane, Lytchett Matravers.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 2 Sep 2025 at 11:20.

Dorset Council logo
Between
1 and 15 Oct 2025
Details
View Map
Share
Follow
Jennys Lane

Dorset Council are proposing to carry out Highway improvement works on Jennys Lane, Lytchett Matravers.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 5 Aug 2025 at 09:35.

Dorset Council logo
Between
1 and 15 Oct 2025
Details
View Map
Share
Follow
Dolmans Hill

Dorset Council are proposing to carry out Highway improvement works on Dolmans Hill, Lytchett Matravers.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 2 Sep 2025 at 11:20.

Dorset Council logo
Between
1 and 15 Oct 2025
Details
View Map
Share
Follow
Dolmans Hill

Dorset Council are proposing to carry out Highway improvement works on Dolmans Hill, Lytchett Matravers.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 5 Aug 2025 at 09:35.

Scottish Hydro Electric Power Dis logo
Between
6 and 31 Oct 2025
Details
View Map
Share
Carters Avenue

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Carters Avenue, Poole.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 31 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Jun 2025 at 11:57.

Southern Gas Networks logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Footways Between Dacombe Drive And Close And Briarswood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Footways Between Dacombe Drive And Close And Briarswood Road, Lytchett Minster.

These works are categorised as Major.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 11:57.

Southern Gas Networks logo
LONG TERM
Between
6 Oct 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Upton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upton Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 15:15.

Southern Gas Networks logo
LONG TERM
Between
6 Oct 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Upton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upton Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 12:04.

Southern Gas Networks logo
LONG TERM
Between
6 Oct 2025 and 20 Feb 2026
Details
View Map
Share
Pergin Crescent

Southern Gas Networks were proposing to carry out roadworks on Pergin Crescent, Poole.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 20 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Aug 2025 at 13:21.

Southern Gas Networks logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Dunyeats Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dunyeats Road, Poole.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:39.

BT logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Dullar Lane

BT are proposing to carry out Utility asset works on Dullar Lane, Sturminster Marshall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 22 Sep 2025 at 16:25.

Scottish Hydro Electric Power Dis logo
Between
24 Oct and 7 Nov 2025
Details
View Map
Share
Dawkins Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Dawkins Road, Poole.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 October 2025 and run through until 7 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Jun 2025 at 15:48.

Southern Gas Networks logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Ridgeway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ridgeway, Poole.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:38.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Heights Approach

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heights Approach, Upton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 15:45.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
17 Nov 2025 and 29 May 2026
Details
View Map
Share
Blandford Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Blandford Road, Poole.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 29 May 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Jun 2025 at 15:51.


Roadworks Map near to Peatons Lane, POOLE, BH16 6HW (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 23 Sep 2025 03:13
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Peatons Lane, POOLE, BH16 6HW (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Scottish Hydro Electric Power Dis logo
URGENT
  
LIME KILN ROAD 
(0.5 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 16 Sep 2025 21:22
(Scheduled: 16 Sep 2025 - 23 Sep 2025)
0.5
Details
Share
Follow
2
Wessex Water logo
PURBECK CLOSE 
(0.7 miles)
Wessex Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 19 Sep 2025 - 23 Sep 2025
0.7
Details
Share
Follow