ROADWORKS SUMMARY
Rushall Lane, POOLE, BH16 6AJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Rushall Lane, BH16 6AJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Rushall Lane, POOLE, BH16 6AJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Rushall Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 Sep 2024 and 23 Sep 2025
Details
View Map
Share
Follow
Hilton Close

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Hilton Close, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 23 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:36.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Normandy Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Normandy Way, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 14:23.

Wessex Water logo
LONG TERM
Between
31 Mar and 3 Oct 2025
Details
View Map
Share
French Road

Wessex Water were proposing to carry out roadworks on French Road, Poole.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 14 Mar 2025 at 14:44.

Southern Gas Networks logo
LONG TERM
Until
15 Jul 2025
Details
View Map
Share
Follow
Sopwith Crescent

Southern Gas Networks are carrying out Utility repair and maintenance works on Sopwith Crescent, Poole.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 April 2025 at 10:30 and could run through until 15 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 08:25.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
14 Apr and 4 Jul 2025
Details
View Map
Share
Follow
Ringwood Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Ringwood Road, Poole.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 9 Apr 2025 at 16:18.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Ringwood Road

Bournemouth, Christchurch And Poole Council are carrying out Highway improvement works on Ringwood Road, Poole.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 07:30 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 20 May 2025 at 09:28.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Springdale Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Springdale Avenue, Poole.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 May 2025 at 17:58 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 10:06.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 May 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Rossmore Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Rossmore Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 30 April 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:41.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 May 2025 and 30 Apr 2026
Details
View Map
Share
Follow
St Georges Avenue

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on St Georges Avenue, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 30 April 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:40.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 May 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Old Wareham Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Old Wareham Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 30 April 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:42.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 May 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Rosemary Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Rosemary Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 30 April 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:44.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 May 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Cynthia Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Cynthia Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 30 April 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:43.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 May 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Albion Close

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Albion Close, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 30 April 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:44.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 May 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Mannings Heath Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Mannings Heath Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 30 April 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:42.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 May 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Haskells Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Haskells Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 30 April 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 5 Sep 2024 at 12:43.

Bournemouth, Christchurch And Poole Council logo
LONG TERM
Between
2 May 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Ringwood Road

Bournemouth, Christchurch And Poole Council are proposing to carry out Highway improvement works on Ringwood Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2025 and could run through until 30 April 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Bournemouth, Christchurch And Poole Council on 30 Aug 2024 at 15:03.

Wessex Water logo
LONG TERM
Between
8 May and 24 Jun 2025
Details
View Map
Share
Cavan Crescent

Wessex Water were proposing to carry out roadworks on Cavan Crescent, Poole.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 May 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 14 Mar 2025 at 14:53.

Southern Gas Networks logo
Until
20 Jun 2025
Details
View Map
Share
Follow
Wayne Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Wayne Road, Poole.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 09:21.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Poole Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Poole Road, Upton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 09:15 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 10:15.

Wessex Water logo
Until
27 Jun 2025
Details
View Map
Share
Follow
Preston Road

Wessex Water are carrying out Utility repair and maintenance works on Preston Road, Poole.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 18:00 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 2 Jun 2025 at 10:53.

Wessex Water logo
Finishing
Friday
Details
View Map
Share
Follow
Piccadilly Lane

Wessex Water are carrying out Utility repair and maintenance works on Piccadilly Lane, Shapwick.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 10:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 3 Jun 2025 at 11:28.

Wessex Water logo
Finishing
Friday
Details
View Map
Share
Follow
Piccadilly Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Piccadilly Lane, Shapwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 8 Apr 2025 at 16:20.

Wessex Water logo
Finishing
Friday
Details
View Map
Share
Follow
Piccadilly Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Piccadilly Lane, Shapwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 9 May 2025 at 09:32.

Wessex Water logo
LONG TERM
Between
9 Jun and 24 Oct 2025
Details
View Map
Share
Follow
Cavan Crescent

Wessex Water are proposing to carry out Utility repair and maintenance works on Cavan Crescent, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 18 Mar 2025 at 11:23.

Wessex Water logo
LONG TERM
Between
9 Jun and 24 Oct 2025
Details
View Map
Share
French Road

Wessex Water were proposing to carry out Utility repair and maintenance works on French Road, Poole.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 14 Mar 2025 at 15:07.

Wessex Water logo
LONG TERM
Between
9 Jun and 24 Oct 2025
Details
View Map
Share
Follow
French Road

Wessex Water are proposing to carry out Utility repair and maintenance works on French Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 14 Mar 2025 at 14:53.

Wessex Water logo
LONG TERM
Between
9 Jun and 24 Oct 2025
Details
View Map
Share
Follow
French Road

Wessex Water are proposing to carry out Utility repair and maintenance works on French Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 19 Mar 2025 at 14:28.

Wessex Water logo
LONG TERM
Between
9 Jun and 24 Oct 2025
Details
View Map
Share
Follow
Cavan Crescent

Wessex Water are proposing to carry out Utility repair and maintenance works on Cavan Crescent, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 14 Mar 2025 at 15:41.

Wessex Water logo
LONG TERM
Between
9 Jun and 24 Oct 2025
Details
View Map
Share
Follow
Cavan Crescent

Wessex Water are proposing to carry out Utility repair and maintenance works on Cavan Crescent, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 17 Mar 2025 at 10:11.

Dorset Council logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Lytchett Way

Dorset Council are proposing to carry out Highway improvement works on Lytchett Way, Upton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 15 Apr 2025 at 14:30.

Dorset Council logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Lytchett Way

Dorset Council are proposing to carry out Highway improvement works on Lytchett Way, Upton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 7 Mar 2025 at 09:50.

Dorset Council logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Bay Close

Dorset Council are proposing to carry out Highway improvement works on Bay Close, Upton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 15 Apr 2025 at 14:30.

Dorset Council logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Bay Close

Dorset Council are proposing to carry out Highway improvement works on Bay Close, Upton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 7 Mar 2025 at 09:50.

Cityfibre Metro Networks logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Poole Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Poole Road, Upton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 13 May 2025 at 13:46.

Cityfibre Metro Networks logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Poole Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Poole Road, Upton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 9 May 2025 at 15:05.

Wessex Water logo
Between
16 and 27 Jun 2025
Details
View Map
Share
Follow
French Road

Wessex Water are proposing to carry out Utility repair and maintenance works on French Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 14 Mar 2025 at 15:45.

Wessex Water logo
Between
16 and 27 Jun 2025
Details
View Map
Share
Follow
French Road

Wessex Water are proposing to carry out Utility repair and maintenance works on French Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 17 Mar 2025 at 10:10.

Cityfibre Metro Networks logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Poole Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Poole Road, Upton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 13 Mar 2025 at 14:55.

Wessex Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
High Street

Wessex Water are proposing to carry out Utility repair and maintenance works on High Street, Sturminster Marshall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 13 Mar 2025 at 14:00.

Wessex Water logo
LONG TERM
Between
17 Jun and 8 Aug 2025
Details
View Map
Share
Marshal Road

Wessex Water were proposing to carry out roadworks on Marshal Road, Poole.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 June 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 14 Mar 2025 at 14:57.

Southern Gas Networks logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 May 2025 at 14:23.

BT logo
Between
27 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Greenhill Road

BT are proposing to carry out Utility asset works on Greenhill Road, Colehill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 1 July 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 24 Mar 2025 at 11:38.

BT logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Greenhill Road

BT were proposing to carry out Utility asset works on Greenhill Road, Colehill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 2 July 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 9 Apr 2025 at 09:02.

Wessex Water logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Whitecliff Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Whitecliff Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 30 Apr 2025 at 12:43.

Wessex Water logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Whitecliff Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Whitecliff Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 2 May 2025 at 10:30.

Southern Gas Networks logo
LONG TERM
Between
30 Jun and 29 Aug 2025
Details
View Map
Share
Follow
Constitution Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Constitution Hill Road, Poole.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Apr 2025 at 15:57.

Wessex Water logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
French Road

Wessex Water are proposing to carry out Utility repair and maintenance works on French Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 17 Mar 2025 at 10:08.

Wessex Water logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
French Road

Wessex Water are proposing to carry out Utility repair and maintenance works on French Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 14 Mar 2025 at 15:25.

Wessex Water logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
French Road

Wessex Water are proposing to carry out Utility repair and maintenance works on French Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 14 Mar 2025 at 15:42.

Gigaclear logo
Between
1 and 3 Jul 2025
Details
View Map
Share
High Street

Gigaclear were proposing to carry out Utility asset works on High Street, Spetisbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 3 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Gigaclear on 4 Apr 2025 at 14:06.

Southern Gas Networks logo
LONG TERM
Between
20 Jul and 4 Sep 2025
Details
View Map
Share
Constitution Hill Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Constitution Hill Road, Poole.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 July 2025 and run through until 4 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 09:22.

Wessex Water logo
LONG TERM
Between
21 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Marshal Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Marshal Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 14 Mar 2025 at 15:25.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 4 Sep 2025
Details
View Map
Share
Follow
North Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on North Road, Poole.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 4 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 13:10.

Southern Gas Networks logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Harbour View Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harbour View Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 13:25.

BT logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Greenhill Road

BT are proposing to carry out Utility asset works on Greenhill Road, Colehill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 8 May 2025 at 11:25.

Dorset Council logo
LONG TERM
Between
21 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Burts Hill

Dorset Council are proposing to carry out Highway improvement works on Burts Hill, Colehill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Dorset Council on 3 Jun 2025 at 16:06.

Wessex Water logo
LONG TERM
Between
21 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Marshal Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Marshal Road, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 17 Mar 2025 at 10:07.

Dorset Council logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Wareham Road

Dorset Council are proposing to carry out Highway improvement works on Wareham Road, Lytchett Matravers.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Dorset Council on 3 Jun 2025 at 15:15.

Southern Gas Networks logo
LONG TERM
Between
24 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Hanham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hanham Road, Wimborne Minster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 10:51.

Southern Gas Networks logo
LONG TERM
Between
24 Jul and 29 Aug 2025
Details
View Map
Share
Follow
East Borough

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on East Borough, Wimborne Minster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 10:51.

Wessex Water logo
Between
28 Jul and 2 Aug 2025
Details
View Map
Share
Follow
High Street

Wessex Water are proposing to carry out Utility repair and maintenance works on High Street, Sturminster Marshall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 25 Mar 2025 at 12:45.

Wessex Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
High Street

Wessex Water are proposing to carry out Utility repair and maintenance works on High Street, Sturminster Marshall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 8 Apr 2025 at 16:11.

Wessex Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
High Street

Wessex Water are proposing to carry out Utility repair and maintenance works on High Street, Sturminster Marshall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 10 Apr 2025 at 09:46.

Wessex Water logo
LONG TERM
Between
31 Jul and 5 Sep 2025
Details
View Map
Share
Apsley Crescent

Wessex Water were proposing to carry out roadworks on Apsley Crescent, Poole.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 July 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 14 Mar 2025 at 14:59.

Dorset Council logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Wareham Road

Dorset Council are proposing to carry out Highway improvement works on Wareham Road, Lytchett Matravers.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Dorset Council on 3 Jun 2025 at 15:15.

Dorset Council logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Follow
Burts Hill

Dorset Council are proposing to carry out Highway improvement works on Burts Hill, Colehill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Dorset Council on 3 Jun 2025 at 16:06.

Dorset Council logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Knoll Lane

Dorset Council are proposing to carry out Highway improvement works on Knoll Lane, Corfe Mullen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 9 May 2025 at 15:10.

Dorset Council logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Follow
Burts Hill

Dorset Council are proposing to carry out Highway improvement works on Burts Hill, Wimborne Minster.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Dorset Council on 3 Jun 2025 at 16:15.

Dorset Council logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Follow
Allenview Road

Dorset Council are proposing to carry out Highway improvement works on Allenview Road, Wimborne Minster.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Dorset Council on 3 Jun 2025 at 16:15.

Scottish Hydro Electric Power Dis logo
Between
6 and 8 Aug 2025
Details
View Map
Share
Northleigh Lane

Scottish Hydro Electric Power Dis were proposing to carry out Remedial works on Northleigh Lane, Colehill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 August 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 May 2025 at 11:18.

Dorset Council logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Burts Hill

Dorset Council were proposing to carry out Highway improvement works on Burts Hill, Wimborne Minster.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 15 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Dorset Council on 1 May 2025 at 11:15.

Dorset Council logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Allenview Road

Dorset Council were proposing to carry out Highway improvement works on Allenview Road, Wimborne Minster.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 15 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Dorset Council on 1 May 2025 at 11:15.

BT logo
Between
25 and 27 Aug 2025
Details
View Map
Share
Follow
Greenhill Road

BT are proposing to carry out Utility asset works on Greenhill Road, Colehill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 27 August 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 22 May 2025 at 09:40.

Dorset Council logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Wareham Road

Dorset Council are proposing to carry out Highway improvement works on Wareham Road, Lytchett Matravers.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dorset Council on 3 Jun 2025 at 15:05.

Wessex Water logo
Between
26 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Apsley Crescent

Wessex Water are proposing to carry out Utility repair and maintenance works on Apsley Crescent, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 17 Mar 2025 at 10:06.

BT logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Greenhill Road

BT were proposing to carry out Utility asset works on Greenhill Road, Colehill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 28 August 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 28 May 2025 at 16:01.

Wessex Water logo
Between
26 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Apsley Crescent

Wessex Water are proposing to carry out Utility repair and maintenance works on Apsley Crescent, Poole.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 14 Mar 2025 at 15:35.

BT logo
Between
27 and 29 Aug 2025
Details
View Map
Share
Follow
Greenhill Road

BT are proposing to carry out Utility asset works on Greenhill Road, Colehill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 28 May 2025 at 16:02.

Wessex Water logo
LONG TERM
Between
28 Aug and 9 Oct 2025
Details
View Map
Share
Denison Road

Wessex Water were proposing to carry out roadworks on Denison Road, Poole.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 August 2025 and run through until 9 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 14 Mar 2025 at 15:02.


Roadworks Map near to Rushall Lane, POOLE, BH16 6AJ (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 20:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Rushall Lane, POOLE, BH16 6AJ (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.