ROADWORKS SUMMARY
Tong Street, BRADFORD, BD4 6NL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Tong Street, BD4 6NL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Tong Street, BRADFORD, BD4 6NL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Tong Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Leeds City Council logo
LONG TERM
Until
7 Dec 2026
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are carrying out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:00 and could run through until 7 December 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Leeds City Council on 20 May 2025 at 08:12.

LONG TERM
Until
12 Mar 2027
Details
View Map
Share
Follow
Bradford Road

Kirklees Council are carrying out Highway improvement works on Bradford Road, Oakenshaw, Bradford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 October 2025 at 07:00 and could run through until 12 March 2027. The works will impact the carriageway and verge.

This roadwork event was last updated by Kirklees Council on 7 Sep 2026 at 10:22.

Yorkshire Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Hollingwood Lane

Yorkshire Water are carrying out Utility repair and maintenance works on Hollingwood Lane, Bradford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 January 2026 at 08:00 and could run through until 20 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 17 Jun 2026 at 14:40.

LONG TERM
Between
20 Apr and 14 Dec 2026
Details
View Map
Share
Follow
Fagley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Fagley Road, Fagley, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 April 2026 and could run through until 14 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Mar 2026 at 10:20.

Leeds City Council logo
LONG TERM
Until
18 Dec 2026
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are carrying out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 April 2026 at 05:00 and could run through until 18 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 28 Apr 2026 at 11:42.

LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Westgate

Kirklees Council are carrying out Highway repair and maintenance works on Westgate, Cleckheaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 May 2026 at 09:00 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 17 Jun 2026 at 12:04.

LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Staincliffe Hall Road

Kirklees Council are carrying out Highway repair and maintenance works on Staincliffe Hall Road, Staincliffe, Batley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 June 2026 at 10:30 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 22 Jun 2026 at 11:32.

LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Deighton Lane

Kirklees Council are carrying out Highway repair and maintenance works on Deighton Lane, Healey, Batley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 June 2026 at 10:30 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 22 Jun 2026 at 11:31.

LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Cross Bank Road

Kirklees Council are carrying out Highway repair and maintenance works on Cross Bank Road, Carlinghow, Batley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 June 2026 at 09:30 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 22 Jun 2026 at 09:36.

LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Bradford Road

Kirklees Council are carrying out Highway improvement works on Bradford Road, Littletown, Liversedge.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 May 2026 at 08:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 3 Sep 2026 at 09:36.

LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Listing Lane

Kirklees Council are carrying out Highway improvement works on Listing Lane, Littletown, Liversedge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 June 2026 at 08:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 27 Jul 2026 at 08:14.

LONG TERM
Until
24 Dec 2027
Details
View Map
Share
Follow
Thornton Road

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Thornton Road, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 July 2026 at 07:00 and could run through until 24 December 2027. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Aug 2026 at 11:21.

LONG TERM
Until
26 Nov 2027
Details
View Map
Share
Follow
Thornton Road

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Thornton Road, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 July 2026 at 07:00 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Aug 2026 at 11:22.

LONG TERM
Until
24 Dec 2027
Details
View Map
Share
Follow
Thornton Road

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Thornton Road, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 July 2026 at 07:00 and could run through until 24 December 2027. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Aug 2026 at 11:23.

Northern Gas Networks logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Huddersfield Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Huddersfield Road, Liversedge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 July 2026 at 08:00 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Aug 2026 at 09:12.

Leeds City Council logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Valley Road

Leeds City Council are carrying out Remedial works on Valley Road, Pudsey.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 July 2026 at 08:30 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 13 Jul 2026 at 08:45.

Yorkshire Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Manchester Road

Yorkshire Water are carrying out Utility asset works on Manchester Road, Bradford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 14:30 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Sep 2026 at 15:12.

LONG TERM
Between
27 Jul and 30 Nov 2026
Details
View Map
Share
Follow
Clayton Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Clayton Road, Clayton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2026 and could run through until 30 November 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jun 2026 at 14:29.

Northern Gas Networks logo
LONG TERM
Until
16 Oct 2026
Details
View Map
Share
Follow
Dewsbury Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Dewsbury Road, Gomersal, Cleckheaton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 July 2026 at 13:59 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Jul 2026 at 13:59.

National Highways logo
LONG TERM
Until
3 Oct 2026
Details
View Map
Share
Follow
Wakefield Road

National Highways are carrying out Highway improvement works on Wakefield Road, Gildersome, Morley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 August 2026 at 20:30 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 4 Aug 2026 at 07:52.

Northern Gas Networks logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Whitehall Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Whitehall Road, Wyke, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 August 2026 at 10:00 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Sep 2026 at 08:18.

Yorkshire Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Ripley Street

Yorkshire Water are carrying out Utility asset works on Ripley Street, West Bowling, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 August 2026 at 08:30 and could run through until 20 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Aug 2026 at 12:34.

LONG TERM
Between
12 Aug and 12 Dec 2026
Details
View Map
Share
Follow
Francis Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Francis Street, East Bowling, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2026 and could run through until 12 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 May 2026 at 08:14.

LONG TERM
Between
12 Aug and 12 Dec 2026
Details
View Map
Share
Follow
Heaton Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Heaton Street, East Bowling, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2026 and could run through until 12 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 May 2026 at 08:15.

LONG TERM
Between
12 Aug and 12 Dec 2026
Details
View Map
Share
Follow
Canal Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Canal Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2026 and could run through until 12 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 May 2026 at 10:26.

LONG TERM
Between
12 Aug and 12 Dec 2026
Details
View Map
Share
Follow
Canal Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Canal Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2026 and could run through until 12 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 May 2026 at 10:27.

Northern Gas Networks logo
LONG TERM
Between
17 Aug and 23 Oct 2026
Details
View Map
Share
Lawns Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Lawns Lane, Farnley, Leeds.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 August 2026 and run through until 23 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Aug 2026 at 16:30.

Northern Powergrid (Yorkshire) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Woodhall Road

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Woodhall Road, Calverley, Pudsey.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 August 2026 at 09:30 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Sep 2026 at 09:59.

Northern Powergrid (Yorkshire) logo
Finishing
Monday
Details
View Map
Share
Follow
Ascot Drive

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Ascot Drive, Horton Bank Top, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2026 at 09:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Sep 2026 at 10:28.

Northern Powergrid (Yorkshire) logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Bradford Road

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Bradford Road, Drighlington, Bradford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2026 at 11:55 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Sep 2026 at 11:56.

Northern Powergrid (Yorkshire) logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Bradford And Wakefield Road

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Bradford And Wakefield Road, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2026 at 11:55 and could run through until 30 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Sep 2026 at 11:59.

Northern Powergrid (Yorkshire) logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Westgate Hill Street

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Westgate Hill Street, Bradford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Sep 2026 at 14:55.

Leeds City Council logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Cross Lane

Leeds City Council are carrying out Highway repair and maintenance works on Cross Lane, Upper Wortley, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 09:30 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 1 Sep 2026 at 09:31.

Finishing
Tuesday
Details
View Map
Share
Follow
Hunsworth Lane

Kirklees Council are proposing to carry out Section 50 on Hunsworth Lane, Hunsworth, Cleckheaton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 3 Sep 2026 at 13:20.

Finishing
Tuesday
Details
View Map
Share
Follow
Hunsworth Lane

Kirklees Council are carrying out Section 50 on Hunsworth Lane, Hunsworth, Cleckheaton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 08:00 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 8 Sep 2026 at 09:29.

LONG TERM
Between
7 Sep and 31 Dec 2026
Details
View Map
Share
Follow
Westgate

Kirklees Council are proposing to carry out Highway improvement works on Westgate, Cleckheaton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 31 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 28 Aug 2026 at 11:12.

LONG TERM
Between
7 Sep and 31 Dec 2026
Details
View Map
Share
Westgate

Kirklees Council were proposing to carry out Highway improvement works on Westgate, Cleckheaton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 September 2026 and run through until 31 December 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 26 Aug 2026 at 16:01.

Northern Gas Networks logo
LONG TERM
Until
8 Oct 2026
Details
View Map
Share
Follow
Moor Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Moor Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 11:00 and could run through until 8 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Sep 2026 at 11:16.

Yorkshire Water logo
Between
7 Sep and 4 Oct 2026
Details
View Map
Share
Follow
Bowling Old Lane

Yorkshire Water are proposing to carry out Utility asset works on Bowling Old Lane, West Bowling, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 4 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 25 Aug 2026 at 15:53.

Leeds City Council logo
LONG TERM
Between
7 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Kellett Lane

Leeds City Council are proposing to carry out Highway improvement works on Kellett Lane, Lower Wortley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 27 Aug 2026 at 12:16.

Leeds City Council logo
LONG TERM
Between
7 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Ryedale Holt

Leeds City Council are proposing to carry out Highway improvement works on Ryedale Holt, Lower Wortley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 25 Aug 2026 at 14:40.

Leeds City Council logo
LONG TERM
Between
7 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Ryedale Avenue

Leeds City Council are proposing to carry out Highway improvement works on Ryedale Avenue, Lower Wortley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Leeds City Council on 26 Aug 2026 at 09:18.

Yorkshire Water logo
Between
10 Sep and 8 Oct 2026
Details
View Map
Share
Follow
Bowling Old Lane

Yorkshire Water are proposing to carry out Utility asset works on Bowling Old Lane, West Bowling, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2026 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Sep 2026 at 15:23.

Yorkshire Water logo
Until
8 Oct 2026
Details
View Map
Share
Follow
Bowling Old Lane

Yorkshire Water are carrying out Utility asset works on Bowling Old Lane, West Bowling, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 08:00 and could run through until 8 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Sep 2026 at 09:15.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Bradford Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Bradford Road, Littletown, Liversedge.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 13:44 and could run through until 18 September 2026. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Northern Gas Networks on 14 Sep 2026 at 14:42.

LONG TERM
Between
14 Sep and 13 Nov 2026
Details
View Map
Share
Follow
Knowler Hill

Kirklees Council are proposing to carry out Highway improvement works on Knowler Hill, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 13 Jul 2026 at 09:52.

LONG TERM
Between
14 Sep and 13 Nov 2026
Details
View Map
Share
Follow
Bradford Road

Kirklees Council are proposing to carry out Highway improvement works on Bradford Road, Littletown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 15 Jul 2026 at 09:40.

LONG TERM
Between
14 Sep and 13 Nov 2026
Details
View Map
Share
Follow
Bradford Road

Kirklees Council are proposing to carry out Highway improvement works on Bradford Road, Rawfolds, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 15 Jul 2026 at 09:41.

Northern Gas Networks logo
LONG TERM
Between
14 Sep and 30 Oct 2026
Details
View Map
Share
Follow
Lower Wyke Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lower Wyke Lane, Lower Wyke, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 May 2026 at 15:08.

Northern Powergrid (Yorkshire) logo
Finishing
Friday
Details
View Map
Share
Follow
Rooms Lane

Northern Powergrid (Yorkshire) are carrying out New service connection on Rooms Lane, Morley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Sep 2026 at 09:12.

LONG TERM
Until
28 May 2027
Details
View Map
Share
Follow
Baptist Place

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Baptist Place, Bradford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:00 and could run through until 28 May 2027. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 09:42.

LONG TERM
Until
28 May 2027
Details
View Map
Share
Follow
Westgate

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Westgate, Bradford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:00 and could run through until 28 May 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 09:43.

LONG TERM
Between
14 Sep 2026 and 28 May 2027
Details
View Map
Share
Follow
Lumb Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Lumb Lane, Manningham, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 28 May 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 4 Aug 2026 at 11:32.

LONG TERM
Until
28 May 2027
Details
View Map
Share
Follow
Lumb Lane

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Lumb Lane, Manningham, Bradford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 09:00 and could run through until 28 May 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 09:45.

Yorkshire Water logo
LONG TERM
Until
25 Oct 2026
Details
View Map
Share
Follow
Woodhall Avenue

Yorkshire Water are carrying out Utility asset works on Woodhall Avenue, Thornbury, Bradford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 25 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 08:54.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Killinghall Drive

Yorkshire Water are carrying out Utility asset works on Killinghall Drive, Undercliffe, Bradford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:30 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 09:26.

Yorkshire Water logo
Until
28 Sep 2026
Details
View Map
Share
Follow
North Park Road

Yorkshire Water are carrying out Utility asset works on North Park Road, Heaton, Bradford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:30 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 09:28.

LONG TERM
Between
15 Sep and 12 Dec 2026
Details
View Map
Share
Wilton Street

City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Wilton Street, Little Horton, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2026 and run through until 12 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:08.

LONG TERM
Between
15 Sep and 12 Dec 2026
Details
View Map
Share
Drake Street

City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Drake Street, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2026 and run through until 12 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:08.

LONG TERM
Between
15 Sep and 12 Dec 2026
Details
View Map
Share
Hey Street

City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Hey Street, Listerhills, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2026 and run through until 12 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:08.

LONG TERM
Between
15 Sep and 12 Dec 2026
Details
View Map
Share
Syedna Way

City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Syedna Way, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2026 and run through until 12 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:03.

LONG TERM
Between
15 Sep and 12 Dec 2026
Details
View Map
Share
Rosse Street

City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Rosse Street, Girlington, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2026 and run through until 12 December 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:15.

Finishing
Saturday
Details
View Map
Share
Follow
Aldermanbury

City Of Bradford Metropolitan District Council are proposing to carry out roadworks on Aldermanbury, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2026 and could run through until 19 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Jul 2026 at 18:38.

Leeds City Council logo
Finishing
Friday
Details
View Map
Share
Stanningley Bypass

Leeds City Council were proposing to carry out Highway repair and maintenance works on Stanningley Bypass, Stanningley, Pudsey.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 7 Sep 2026 at 14:49.

Leeds City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Stanningley Bypass

Leeds City Council are carrying out Highway repair and maintenance works on Stanningley Bypass, Stanningley, Pudsey.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2026 at 20:30 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 7 Sep 2026 at 15:58.

Northern Powergrid (Yorkshire) logo
Between
21 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Beacon Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Beacon Road, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Sep 2026 at 14:32.

Northern Powergrid (Yorkshire) logo
Between
21 Sep and 16 Oct 2026
Details
View Map
Share
Follow
Beacon Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Beacon Road, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Sep 2026 at 15:59.

Northern Powergrid (Yorkshire) logo
Between
24 and 30 Sep 2026
Details
View Map
Share
Follow
East View

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on East View, Lightcliffe, Brighouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 30 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Aug 2026 at 16:37.

LONG TERM
Between
24 Sep and 24 Dec 2026
Details
View Map
Share
Follow
Westfield Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Westfield Lane, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 24 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Jul 2026 at 15:29.

LONG TERM
Between
25 Sep and 12 Dec 2026
Details
View Map
Share
Follow
Canal Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Canal Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 12 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 6 Jul 2026 at 16:17.

Northern Gas Networks logo
Between
28 Sep and 6 Oct 2026
Details
View Map
Share
Follow
Lea Road

Northern Gas Networks are proposing to carry out New service connection on Lea Road, Birstall, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Jul 2026 at 10:46.

Yorkshire Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Cambridge Road

Yorkshire Water are proposing to carry out New service connection on Cambridge Road, Birstall, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 28 Aug 2026 at 11:49.

Yorkshire Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Cambridge Road

Yorkshire Water are proposing to carry out New service connection on Cambridge Road, Birstall, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 28 Aug 2026 at 13:07.

Northern Powergrid (Yorkshire) logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Greenroyd Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Greenroyd Avenue, Hunsworth, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 May 2026 at 15:30.

Yorkshire Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Round Street

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Round Street, West Bowling, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2026 and run through until 2 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 15:53.

Leeds City Council logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Bath Lane

Leeds City Council are proposing to carry out Highway repair and maintenance works on Bath Lane, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 21 Aug 2026 at 09:39.

Leeds City Council logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Bath Lane

Leeds City Council are proposing to carry out Highway repair and maintenance works on Bath Lane, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 25 Aug 2026 at 11:53.

Yorkshire Water logo
LONG TERM
Between
28 Sep and 7 Dec 2026
Details
View Map
Share
Follow
South Drive

Yorkshire Water are proposing to carry out Utility asset works on South Drive, Farsley, Pudsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Jul 2026 at 12:31.

Yorkshire Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Gresham Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Gresham Avenue, Bolton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 18 Aug 2026 at 09:58.

Northern Powergrid (Yorkshire) logo
Between
29 Sep and 5 Oct 2026
Details
View Map
Share
Follow
Adwalton Green

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Adwalton Green, Drighlington, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Jun 2026 at 12:17.

Between
29 Sep and 5 Oct 2026
Details
View Map
Share
Wilton Street

City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Wilton Street, Little Horton, Bradford.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2026 and run through until 5 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:08.

Yorkshire Water logo
Between
30 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Wormald Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Wormald Street, Millbridge, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 9 Jul 2026 at 11:59.

Yorkshire Water logo
Between
30 Sep and 2 Oct 2026
Details
View Map
Share
Follow
The Oval

Yorkshire Water are proposing to carry out New service connection on The Oval, Hightown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 2 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 13 Jul 2026 at 14:25.

Yorkshire Water logo
LONG TERM
Between
1 Oct 2026 and 30 Jun 2027
Details
View Map
Share
Follow
Bagley Lane

Yorkshire Water are proposing to carry out Utility asset works on Bagley Lane, Farsley, Pudsey.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 30 June 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 9 Jun 2026 at 12:17.

Yorkshire Water logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Lime Tree Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Lime Tree Avenue, Staincliffe, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 22 Jun 2026 at 11:32.

Yorkshire Water logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Rectory Drive

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Rectory Drive, Birstall, Batley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 October 2026 and run through until 9 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 15:07.

Yorkshire Water logo
LONG TERM
Between
5 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Syke Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Syke Lane, Lightcliffe, Brighouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 23 Jul 2026 at 07:11.

Yorkshire Water logo
LONG TERM
Between
5 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Syke Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Syke Lane, Lightcliffe, Brighouse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 14:18.

Yorkshire Water logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Bowling Hall Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bowling Hall Road, East Bowling, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 22 Jul 2026 at 08:13.

Leeds City Council logo
Between
5 and 23 Oct 2026
Details
View Map
Share
Follow
Roker Lane

Leeds City Council are proposing to carry out Highway repair and maintenance works on Roker Lane, Pudsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 1 Jul 2026 at 11:26.

Between
5 and 7 Oct 2026
Details
View Map
Share
Hey Street

City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Hey Street, Listerhills, Bradford.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 October 2026 and run through until 7 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:08.

Leeds City Council logo
Between
5 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Stanningley Bypass

Leeds City Council are proposing to carry out Highway improvement works on Stanningley Bypass, Stanningley, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 23 Jul 2026 at 10:25.

LONG TERM
Between
5 Oct and 24 Dec 2026
Details
View Map
Share
Follow
Greenfield Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Greenfield Avenue, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 24 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 Jul 2026 at 16:11.

Northern Powergrid (Yorkshire) logo
Between
6 and 12 Oct 2026
Details
View Map
Share
Follow
Lodge Hill Walk

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Lodge Hill Walk, New Farnley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Jun 2026 at 12:25.

Between
6 and 8 Oct 2026
Details
View Map
Share
Drake Street

City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Drake Street, Bradford.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2026 and run through until 8 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:08.

Between
6 and 20 Oct 2026
Details
View Map
Share
Follow
Hillside Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Hillside Road, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 20 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 Aug 2026 at 12:02.

LONG TERM
Between
7 Oct and 31 Dec 2026
Details
View Map
Share
Follow
Westgate

Kirklees Council are proposing to carry out Highway improvement works on Westgate, Cleckheaton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 31 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 9 Sep 2026 at 21:02.

Yorkshire Water logo
Between
7 and 9 Oct 2026
Details
View Map
Share
Follow
Lidget Place

Yorkshire Water are proposing to carry out New service connection on Lidget Place, Lidget Green, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 21 Jul 2026 at 12:52.

Northern Gas Networks logo
LONG TERM
Between
12 Oct and 20 Nov 2026
Details
View Map
Share
Follow
Bartle Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bartle Lane, Great Horton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 20 November 2026. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 17 Jun 2026 at 12:15.

Northern Powergrid (Yorkshire) logo
Between
13 and 21 Oct 2026
Details
View Map
Share
Follow
Vicarage Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Vicarage Avenue, Gildersome, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 21 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Jun 2026 at 12:39.

Northern Powergrid (Yorkshire) logo
Between
13 and 21 Oct 2026
Details
View Map
Share
Follow
Carr Hill Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Carr Hill Road, Calverley, Pudsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2026 and could run through until 21 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Jun 2026 at 11:19.

Yorkshire Water logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Transvaal Terrace

Yorkshire Water are proposing to carry out New service connection on Transvaal Terrace, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Jul 2026 at 11:09.

Yorkshire Water logo
Between
19 and 24 Oct 2026
Details
View Map
Share
Heaton Grove

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Heaton Grove, Cleckheaton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2026 and run through until 24 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2026 at 08:44.

Yorkshire Water logo
Between
19 and 24 Oct 2026
Details
View Map
Share
Heaton Avenue

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Heaton Avenue, Cleckheaton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2026 and run through until 24 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2026 at 08:11.

Yorkshire Water logo
Between
19 and 24 Oct 2026
Details
View Map
Share
Bramhope Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Bramhope Road, Cleckheaton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2026 and run through until 24 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2026 at 08:18.

Northern Gas Networks logo
Between
19 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Cloverdale

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cloverdale, Shelf, Halifax.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 14:51.

Yorkshire Water logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
Back Apsley Crescent

Yorkshire Water are proposing to carry out New service connection on Back Apsley Crescent, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 24 Jul 2026 at 11:22.

Yorkshire Water logo
Between
20 and 22 Oct 2026
Details
View Map
Share
Follow
Howard Street

Yorkshire Water are proposing to carry out New service connection on Howard Street, Little Horton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 22 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 24 Jul 2026 at 13:38.

Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Balmfield Crescent

Kirklees Council are proposing to carry out Highway repair and maintenance works on Balmfield Crescent, Roberttown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 6 Aug 2026 at 11:21.

Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Balmfield

Kirklees Council are proposing to carry out Highway repair and maintenance works on Balmfield, Roberttown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 6 Aug 2026 at 11:14.

Northern Gas Networks logo
LONG TERM
Between
26 Oct and 27 Nov 2026
Details
View Map
Share
Follow
Carr House Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Carr House Lane, Shelf, Halifax.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 14:52.

Northern Gas Networks logo
LONG TERM
Between
26 Oct and 27 Nov 2026
Details
View Map
Share
Follow
Cooper Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cooper Lane, Shelf, Halifax.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 15:00.

Yorkshire Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Ringwood Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Ringwood Road, Little Horton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 24 Jul 2026 at 15:43.

Leeds City Council logo
Between
26 Oct and 14 Nov 2026
Details
View Map
Share
Follow
Ring Road Lower Wortley

Leeds City Council are proposing to carry out Highway repair and maintenance works on Ring Road Lower Wortley, Lower Wortley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 14 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 3 Sep 2026 at 13:15.

Leeds City Council logo
Between
26 Oct and 14 Nov 2026
Details
View Map
Share
Follow
Whitehall Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Whitehall Road, Lower Wortley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 14 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 3 Sep 2026 at 09:09.

Northern Gas Networks logo
Between
26 Oct and 20 Nov 2026
Details
View Map
Share
Follow
Tyersal Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tyersal Crescent, Tyersal, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2026 at 10:13.

Northern Gas Networks logo
Between
26 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Pudsey Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pudsey Road, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 11 Sep 2026 at 11:52.

Northern Gas Networks logo
Between
26 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Pudsey Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pudsey Road, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 14 Sep 2026 at 09:03.

Northern Powergrid (Yorkshire) logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Festival Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Festival Avenue, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Sep 2026 at 16:12.

Northern Powergrid (Yorkshire) logo
Between
27 Oct and 2 Nov 2026
Details
View Map
Share
Follow
Norwood Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Norwood Avenue, Birkenshaw, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 Jul 2026 at 14:06.

Northern Powergrid (Yorkshire) logo
Between
28 Oct and 5 Nov 2026
Details
View Map
Share
Follow
Fairfield Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Fairfield Avenue, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 5 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Jul 2026 at 08:12.

Yorkshire Water logo
Between
29 and 31 Oct 2026
Details
View Map
Share
Follow
Horsfall Street

Yorkshire Water are proposing to carry out Remedial works on Horsfall Street, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2026 at 09:36.

Yorkshire Water logo
Between
29 and 31 Oct 2026
Details
View Map
Share
Follow
Horsfall Street

Yorkshire Water are proposing to carry out Remedial works on Horsfall Street, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2026 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Sep 2026 at 08:58.

Northern Gas Networks logo
LONG TERM
Between
1 Nov 2026 and 2 Feb 2027
Details
View Map
Share
Follow
Snowden Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Snowden Crescent, Bramley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2026 and could run through until 2 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Mar 2026 at 12:28.

Yorkshire Water logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Hartshead Lane

Yorkshire Water are proposing to carry out New service connection on Hartshead Lane, Hartshead, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 24 Aug 2026 at 11:24.

Yorkshire Water logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Hartshead Lane

Yorkshire Water are proposing to carry out New service connection on Hartshead Lane, Hartshead, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2026 at 15:06.

Yorkshire Water logo
Between
2 and 20 Nov 2026
Details
View Map
Share
Follow
Walkley Lane

Yorkshire Water are proposing to carry out Utility asset works on Walkley Lane, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 6 Aug 2026 at 12:03.

Yorkshire Water logo
Between
2 and 20 Nov 2026
Details
View Map
Share
Follow
Walkley Lane

Yorkshire Water are proposing to carry out Utility asset works on Walkley Lane, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 24 Aug 2026 at 11:45.

Yorkshire Water logo
Between
2 and 20 Nov 2026
Details
View Map
Share
Follow
Walkley Lane

Yorkshire Water are proposing to carry out Utility asset works on Walkley Lane, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2026 at 08:19.

Yorkshire Water logo
Between
2 and 20 Nov 2026
Details
View Map
Share
Follow
Walkley Lane

Yorkshire Water are proposing to carry out Utility asset works on Walkley Lane, Heckmondwike.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 7 Sep 2026 at 14:09.

Northern Powergrid (Yorkshire) logo
Between
2 and 6 Nov 2026
Details
View Map
Share
Follow
Fern Croft

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Fern Croft, Hightown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 7 Aug 2026 at 09:19.

Northern Gas Networks logo
LONG TERM
Between
2 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Park Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Road, Low Moor, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Sep 2026 at 13:45.

Northern Gas Networks logo
LONG TERM
Between
2 Nov and 11 Dec 2026
Details
View Map
Share
Follow
Park Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Road, Low Moor, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Sep 2026 at 12:15.

Northern Powergrid (Yorkshire) logo
Between
3 and 11 Nov 2026
Details
View Map
Share
Follow
Harefield Drive

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Harefield Drive, Birstall, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 11 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Jul 2026 at 15:34.

BT logo
Between
3 and 5 Nov 2026
Details
View Map
Share
Follow
Bolton Road

BT are proposing to carry out Utility asset works on Bolton Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2026 and could run through until 5 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Aug 2026 at 08:16.

Northern Powergrid (Yorkshire) logo
Between
4 and 10 Nov 2026
Details
View Map
Share
Follow
Back Springfield Mount

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Back Springfield Mount, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Sep 2026 at 14:43.

Northern Powergrid (Yorkshire) logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
New Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on New Lane, Moorside, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 Jun 2026 at 11:36.

Northern Powergrid (Yorkshire) logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Beverley Drive

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Beverley Drive, Wyke, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 9 Sep 2026 at 10:45.

Northern Gas Networks logo
LONG TERM
Between
9 Nov 2026 and 3 Feb 2027
Details
View Map
Share
Follow
Carr House Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Carr House Road, Shelf, Halifax.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 3 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 14:57.

Leeds City Council logo
Between
9 and 17 Nov 2026
Details
View Map
Share
Follow
Valley Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Valley Road, Pudsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 13 Aug 2026 at 14:40.

Northern Gas Networks logo
Between
10 Nov and 7 Dec 2026
Details
View Map
Share
Follow
Lawns Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lawns Lane, Farnley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 14:44.

Northern Gas Networks logo
Between
11 and 26 Nov 2026
Details
View Map
Share
Follow
Lawns Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lawns Lane, Farnley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 26 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 14:44.

Northern Gas Networks logo
LONG TERM
Between
11 Nov and 15 Dec 2026
Details
View Map
Share
Follow
Whitehall Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Whitehall Road, Lower Wortley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 15 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 14:45.

Northern Powergrid (Yorkshire) logo
Between
11 and 17 Nov 2026
Details
View Map
Share
Follow
Kent Crescent

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Kent Crescent, Pudsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2026 and could run through until 17 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Jul 2026 at 11:13.

Northern Powergrid (Yorkshire) logo
Between
12 and 18 Nov 2026
Details
View Map
Share
Follow
Gerard Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Gerard Avenue, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2026 and could run through until 18 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Aug 2026 at 12:11.

Yorkshire Water logo
Between
16 Nov and 10 Dec 2026
Details
View Map
Share
Follow
Low Cliff Walk

Yorkshire Water are proposing to carry out Utility asset works on Low Cliff Walk, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 10 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 24 Aug 2026 at 11:15.

Yorkshire Water logo
Between
16 Nov and 10 Dec 2026
Details
View Map
Share
Follow
Low Cliff Walk

Yorkshire Water are proposing to carry out Utility asset works on Low Cliff Walk, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 10 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2026 at 08:22.

Yorkshire Water logo
Between
16 Nov and 10 Dec 2026
Details
View Map
Share
Follow
Low Cliff Walk

Yorkshire Water are proposing to carry out Utility asset works on Low Cliff Walk, Heckmondwike.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 10 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 7 Sep 2026 at 14:11.

Yorkshire Water logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Back Horton Grange Road Se

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Back Horton Grange Road Se, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Aug 2026 at 11:53.

Yorkshire Water logo
Between
16 and 19 Nov 2026
Details
View Map
Share
Follow
Bagley Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bagley Lane, Farsley, Pudsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 19 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 9 Jul 2026 at 11:24.

Northern Powergrid (Yorkshire) logo
Between
17 and 24 Nov 2026
Details
View Map
Share
Follow
Armley Grange View

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Armley Grange View, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2026 and could run through until 24 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Aug 2026 at 14:10.

Between
20 Nov and 8 Dec 2026
Details
View Map
Share
Heaton Road

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Heaton Road, Heaton, Bradford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2026 and run through until 8 December 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 27 Aug 2026 at 16:19.

Between
20 Nov and 8 Dec 2026
Details
View Map
Share
Follow
Heaton Road

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Heaton Road, Heaton, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 27 Aug 2026 at 16:20.

Between
20 Nov and 8 Dec 2026
Details
View Map
Share
Follow
Heaton Road

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Heaton Road, Heaton, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 4 Sep 2026 at 09:05.

Northern Powergrid (Yorkshire) logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Caldene Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Caldene Avenue, Low Moor, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Jul 2026 at 16:06.

Yorkshire Water logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Greenhill Lane

Yorkshire Water are proposing to carry out New service connection on Greenhill Lane, Bradford Moor, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 15:36.

Yorkshire Water logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Greenhill Lane

Yorkshire Water are proposing to carry out New service connection on Greenhill Lane, Bradford Moor, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 18:41.

Yorkshire Water logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Cunliffe Terrace

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Cunliffe Terrace, Manningham, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2026 at 15:39.

Yorkshire Water logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Cunliffe Terrace

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Cunliffe Terrace, Manningham, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Sep 2026 at 21:17.

Yorkshire Water logo
LONG TERM
Between
25 Nov 2026 and 29 Jan 2027
Details
View Map
Share
Follow
Knowles Hill Road

Yorkshire Water are proposing to carry out Utility asset works on Knowles Hill Road, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2026 and could run through until 29 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 24 Aug 2026 at 11:16.

Yorkshire Water logo
LONG TERM
Between
25 Nov 2026 and 29 Jan 2027
Details
View Map
Share
Follow
Knowles Hill Road

Yorkshire Water are proposing to carry out Utility asset works on Knowles Hill Road, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2026 and could run through until 29 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2026 at 08:23.

Yorkshire Water logo
LONG TERM
Between
25 Nov 2026 and 29 Jan 2027
Details
View Map
Share
Follow
Knowles Hill Road

Yorkshire Water are proposing to carry out Utility asset works on Knowles Hill Road, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2026 and could run through until 29 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 7 Sep 2026 at 14:14.

Between
26 Nov and 10 Dec 2026
Details
View Map
Share
Follow
Whetley Lane

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Whetley Lane, Manningham, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2026 and could run through until 10 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 25 Aug 2026 at 14:50.

Between
26 Nov and 10 Dec 2026
Details
View Map
Share
Follow
Whetley Lane

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Whetley Lane, Manningham, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2026 and could run through until 10 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 25 Aug 2026 at 15:15.

Yorkshire Water logo
LONG TERM
Between
30 Nov 2026 and 8 Feb 2027
Details
View Map
Share
Follow
Chinewood Avenue

Yorkshire Water are proposing to carry out Utility asset works on Chinewood Avenue, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 8 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 11:58.

Yorkshire Water logo
Between
30 Nov and 18 Dec 2026
Details
View Map
Share
Follow
York Grove

Yorkshire Water are proposing to carry out Utility asset works on York Grove, Upper Batley, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 14:10.

Yorkshire Water logo
Between
30 Nov and 18 Dec 2026
Details
View Map
Share
Follow
York Grove

Yorkshire Water are proposing to carry out Utility asset works on York Grove, Upper Batley, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 14:29.

Yorkshire Water logo
LONG TERM
Between
30 Nov 2026 and 5 Jan 2027
Details
View Map
Share
Follow
York Road

Yorkshire Water are proposing to carry out Utility asset works on York Road, Upper Batley, Batley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 5 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Sep 2026 at 07:26.

Yorkshire Water logo
LONG TERM
Between
30 Nov 2026 and 5 Jan 2027
Details
View Map
Share
Follow
York Road

Yorkshire Water are proposing to carry out Utility asset works on York Road, Upper Batley, Batley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 5 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 14:30.

Yorkshire Water logo
LONG TERM
Between
30 Nov 2026 and 7 Apr 2027
Details
View Map
Share
Follow
Woodlands Road

Yorkshire Water are proposing to carry out Utility asset works on Woodlands Road, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 7 April 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 14:12.

Yorkshire Water logo
LONG TERM
Between
30 Nov 2026 and 8 Jan 2027
Details
View Map
Share
Follow
Moat Hill

Yorkshire Water are proposing to carry out Utility asset works on Moat Hill, Birstall, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 8 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 08:40.

Yorkshire Water logo
Between
30 Nov and 2 Dec 2026
Details
View Map
Share
Follow
Gillroyd Parade

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Gillroyd Parade, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 2 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2026 at 11:07.

Northern Powergrid (Yorkshire) logo
Between
1 and 8 Dec 2026
Details
View Map
Share
Follow
Lynfield Drive

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Lynfield Drive, Hightown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Aug 2026 at 09:09.

Northern Powergrid (Yorkshire) logo
Between
1 and 8 Dec 2026
Details
View Map
Share
Follow
Lynfield Drive

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Lynfield Drive, Hightown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 7 Sep 2026 at 09:18.

Northern Powergrid (Yorkshire) logo
Between
1 and 8 Dec 2026
Details
View Map
Share
Follow
Lynfield Drive

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Lynfield Drive, Hightown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 7 Sep 2026 at 13:16.

Yorkshire Water logo
LONG TERM
Between
2 Dec 2026 and 29 Jan 2027
Details
View Map
Share
Follow
Ashfield Road

Yorkshire Water are proposing to carry out Utility asset works on Ashfield Road, Birstall, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 29 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 08:42.

Yorkshire Water logo
LONG TERM
Between
2 Dec 2026 and 5 Feb 2027
Details
View Map
Share
Larch Close

Yorkshire Water were proposing to carry out Utility asset works on Larch Close, Birstall, Batley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2026 and run through until 5 February 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 7 Sep 2026 at 13:19.

Between
2 and 4 Dec 2026
Details
View Map
Share
Follow
Nelson Street

City Of Bradford Metropolitan District Council are proposing to carry out roadworks on Nelson Street, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 4 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 14:03.

Northern Powergrid (Yorkshire) logo
Between
2 and 10 Dec 2026
Details
View Map
Share
Follow
Newlaithes Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Newlaithes Road, Horsforth, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 10 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Aug 2026 at 15:52.

Yorkshire Water logo
LONG TERM
Between
7 Dec 2026 and 7 Jan 2027
Details
View Map
Share
Follow
Sunny Bank Road

Yorkshire Water are proposing to carry out Utility asset works on Sunny Bank Road, Upper Batley, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 7 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Sep 2026 at 11:48.

Yorkshire Water logo
Between
7 and 18 Dec 2026
Details
View Map
Share
Follow
York Drive

Yorkshire Water are proposing to carry out Utility asset works on York Drive, Upper Batley, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Sep 2026 at 12:03.

Northern Gas Networks logo
LONG TERM
Between
7 Dec 2026 and 15 Jan 2027
Details
View Map
Share
Follow
Cooper Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cooper Lane, Shelf, Halifax.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 15 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 14:57.

Leeds City Council logo
Between
7 and 11 Dec 2026
Details
View Map
Share
Follow
Claremont Place

Leeds City Council are proposing to carry out Highway repair and maintenance works on Claremont Place, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 17 Aug 2026 at 15:47.

Leeds City Council logo
Between
7 and 11 Dec 2026
Details
View Map
Share
Follow
Pudsey Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Pudsey Road, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 11 Sep 2026 at 12:39.

Northern Powergrid (Yorkshire) logo
Between
9 and 15 Dec 2026
Details
View Map
Share
Follow
Hollins Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Hollins Avenue, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2026 and could run through until 15 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Aug 2026 at 11:22.

Yorkshire Water logo
LONG TERM
Between
9 Dec 2026 and 5 Feb 2027
Details
View Map
Share
Follow
Lamplands

Yorkshire Water are proposing to carry out Utility asset works on Lamplands, Upper Batley, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2026 and could run through until 5 February 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 4 Sep 2026 at 11:57.

Northern Powergrid (Yorkshire) logo
Between
14 and 18 Dec 2026
Details
View Map
Share
Follow
Sherwood Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Sherwood Avenue, Gomersal, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Sep 2026 at 09:38.

Yorkshire Water logo
Between
14 and 18 Dec 2026
Details
View Map
Share
Follow
Back Waverley Terrace Ne

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Back Waverley Terrace Ne, Lidget Green, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 15:29.

Leeds City Council logo
Between
14 and 18 Dec 2026
Details
View Map
Share
Follow
Claremont Street

Leeds City Council are proposing to carry out Highway repair and maintenance works on Claremont Street, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 17 Aug 2026 at 15:51.


Roadworks Map near to Tong Street, BRADFORD, BD4 6NL

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Sep 2026 05:30
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Tong Street, BRADFORD, BD4 6NL (12 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Yorkshire Water logo
MOORCROFT TERRACE 
(0.1 miles)
Yorkshire Water
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 16 Sep 2026 - 18 Sep 2026
0.1
Details
Share
Follow
2
Northern Gas Networks logo
URGENT
  
TONG STREET, TONG 
(0.3 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 11 Sep 2026 09:30
(Scheduled: 11 Sep 2026 - 17 Sep 2026)
0.3
Details
Share
Follow
3
Northern Powergrid (Yorkshire) logo
URGENT
  
LANDSCOVE AVENUE, HOLME WOOD 
(0.5 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 15 Sep 2026 13:00
(Scheduled: 15 Sep 2026 - 21 Sep 2026)
0.5
Details
Share
Follow
4
BT logo
WESTGATE HILL STREET 
(0.6 miles)
BT
Utility repair and maintenance works - Verge - Some carriageway incursion
Planned
Scheduled: 16 Sep 2026 - 18 Sep 2026
0.6
Details
Share
Follow
5
Yorkshire Water logo
URGENT
  
BROADSTONE WAY, HOLME WOOD 
(0.7 miles)
Yorkshire Water
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 12 Sep 2026 08:43
(Scheduled: 12 Sep 2026 - 18 Sep 2026)
0.7
Details
Share
Follow
6
Yorkshire Water logo
URGENT
  
SOUTHCROFT GATE, BIRKENSHAW 
(0.7 miles)
Yorkshire Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
15 Sep 2026 12:12 - 14:32
0.7
Details
Share
7
BT logo
WESTGATE HILL STREET 
(0.8 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 16 Sep 2026 - 18 Sep 2026
0.8
Details
Share
Follow
8
Yorkshire Water logo
URGENT
  
BRENDON COURT, HOLME WOOD 
(0.9 miles)
Yorkshire Water
Utility repair and maintenance works - Carriageway - Road closure
Complete
10 Sep 2026 09:02 - 13:40
0.9
Details
Share
9
Northern Powergrid (Yorkshire) logo
MAJOR
  
WESTGATE HILL STREET 
(0.9 miles)
Northern Powergrid (Yorkshire)
Utility asset works - Footway, Carriageway - Two-way signals
In Progress
Since: 1 Sep 2026 08:00
(Scheduled: 27 Aug 2026 - 30 Sep 2026)
0.9
Details
Share
Follow
10
SHERBURN GROVE, BIRKENSHAW 
(0.9 miles)
Kirklees Council
Highway repair and maintenance works - Verge - Give and take
Planned
Scheduled: 10 Sep 2026 - 16 Sep 2026
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.