ROADWORKS SUMMARY
Greenhill Street, BRADFORD, BD3 8BG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Greenhill Street, BD3 8BG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Greenhill Street, BRADFORD, BD3 8BG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Greenhill Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Yorkshire Water logo
LONG TERM
Between
8 Jan 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Ring Road Bramley To Spring Valley Crescent

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Ring Road Bramley To Spring Valley Crescent, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 4 Aug 2023 at 13:47.

Yorkshire Water logo
LONG TERM
Between
8 Jan 2024 and 31 Oct 2025
Details
View Map
Share
Follow
Ring Road Bramley

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Ring Road Bramley, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 4 Aug 2023 at 11:50.

Leeds City Council logo
LONG TERM
Between
6 Jan and 20 Dec 2025
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 December 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 9 Oct 2024 at 12:19.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Ripley Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Ripley Street, West Bowling, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Nov 2024 at 11:56.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Tanton Crescent

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Tanton Crescent, Clayton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:11.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Bolling Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Bolling Road, West Bowling, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 15:43.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Thorpe Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Thorpe Road, Thornton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:12.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Brooklands Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Brooklands Avenue, Thornton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 15:44.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
North Cliffe Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on North Cliffe Lane, Thornton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 15:50.

LONG TERM
Between
4 Feb and 30 Oct 2025
Details
View Map
Share
Follow
Tintern Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Tintern Avenue, Fairweather Green, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:13.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Sunningdale

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Sunningdale, Fairweather Green, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:10.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Killinghall Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Killinghall Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:23.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Firethorn Close

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Firethorn Close, Girlington, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 15:46.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Selborne Terrace

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Selborne Terrace, Manningham, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:08.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Walden Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Walden Drive, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:14.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Walden Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Walden Drive, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:15.

Northern Gas Networks logo
LONG TERM
Between
1 Apr 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Low Moorside Court

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Moorside Court, New Farnley, Leeds.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 14 Mar 2024 at 09:46.

Northern Gas Networks logo
LONG TERM
Between
1 Apr 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Gainsborough Fields

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gainsborough Fields, New Farnley, Leeds.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 April 2025 and could run through until 31 March 2026. The works will impact the carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 14 Mar 2024 at 09:46.

LONG TERM
Until
10 Sep 2025
Details
View Map
Share
Follow
Little Horton Lane

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Little Horton Lane, Little Horton, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2025 at 08:00 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 1 Apr 2025 at 09:36.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Moorbottom

Kirklees Council are proposing to carry out Highway improvement works on Moorbottom, Moorbottom, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 26 Mar 2025 at 16:42.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Westgate

Kirklees Council are proposing to carry out Highway improvement works on Westgate, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 26 Mar 2025 at 16:38.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Hill Street

Kirklees Council are proposing to carry out Highway improvement works on Hill Street, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 31 Mar 2025 at 09:55.

LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Hill Street

Kirklees Council are carrying out Highway improvement works on Hill Street, Cleckheaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:00 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 13 May 2025 at 12:04.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Grange Road

Kirklees Council are proposing to carry out Highway improvement works on Grange Road, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 31 Mar 2025 at 10:40.

LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Grange Road

Kirklees Council are carrying out Highway improvement works on Grange Road, Cleckheaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:00 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 13 May 2025 at 12:03.

LONG TERM
Between
12 May and 30 Sep 2025
Details
View Map
Share
Follow
Station Lane

Kirklees Council are proposing to carry out Highway improvement works on Station Lane, Birkenshaw, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 31 Mar 2025 at 10:19.

Leeds City Council logo
LONG TERM
Until
7 Dec 2026
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are carrying out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:00 and could run through until 7 December 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Leeds City Council on 20 May 2025 at 08:12.

Yorkshire Water logo
LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
Leeds Old Road

Yorkshire Water are carrying out Utility asset works on Leeds Old Road, Thornbury, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 May 2025 at 08:00 and could run through until 5 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Yorkshire Water on 19 Aug 2025 at 15:00.

Yorkshire Water logo
LONG TERM
Between
19 May and 21 Sep 2025
Details
View Map
Share
Follow
Leeds Old Road

Yorkshire Water are proposing to carry out Utility asset works on Leeds Old Road, Thornbury, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 September 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 3 Feb 2025 at 14:24.

Yorkshire Water logo
LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Intake Road

Yorkshire Water are carrying out Utility asset works on Intake Road, Fagley, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2025 at 13:03.

LONG TERM
Between
8 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Blenheim Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Blenheim Road, Manningham, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 14:21.

LONG TERM
Between
8 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Branksome Court

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Branksome Court, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Apr 2025 at 08:24.

Northern Gas Networks logo
LONG TERM
Between
13 Jun 2025 and 1 Jul 2026
Details
View Map
Share
Follow
Calverley Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Calverley Lane, Horsforth, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 1 July 2026. The works will impact the carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 17 Feb 2025 at 16:07.

LONG TERM
Between
16 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Rooley Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Rooley Lane, Bradford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 16:19.

LONG TERM
Between
16 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Barnes Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Barnes Road, Girlington, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Apr 2025 at 13:51.

LONG TERM
Between
16 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Rayner Mount

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Rayner Mount, Allerton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Apr 2025 at 16:28.

LONG TERM
Between
16 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Duchy Crescent

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Duchy Crescent, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 15:57.

LONG TERM
Between
16 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Shay Grove

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Shay Grove, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Apr 2025 at 16:24.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Bierley Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Bierley Lane, Bierley, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 14:49.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Westbury Road

City Of Bradford Metropolitan District Council are proposing to carry out Utility asset works on Westbury Road, Horton Bank Top, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 Apr 2025 at 11:52.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Manchester Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Manchester Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 11:24.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Smiddles Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Smiddles Lane, Little Horton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 11:15.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Great Horton Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Great Horton Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 15:42.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Quebec Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Quebec Street, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 1 May 2025 at 16:01.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Westgate

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Westgate, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 11:17.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Wigan Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Wigan Street, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 1 May 2025 at 15:55.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Allerton Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Allerton Road, Allerton, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 14:59.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Pearson Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Pearson Lane, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 14:51.

Leeds City Council logo
LONG TERM
Between
23 Jun 2025 and 1 May 2026
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 May 2026. The works will impact the verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 11 Jun 2025 at 09:06.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Toller Lane Roundabout

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Toller Lane Roundabout, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 14:42.

Leeds City Council logo
LONG TERM
Between
23 Jun 2025 and 1 May 2026
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 May 2026. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Leeds City Council on 11 Jun 2025 at 09:03.

Leeds City Council logo
LONG TERM
Until
1 May 2026
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are carrying out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 08:00 and could run through until 1 May 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Leeds City Council on 4 Jul 2025 at 14:35.

Leeds City Council logo
LONG TERM
Until
1 May 2026
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are carrying out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 08:00 and could run through until 1 May 2026. The works will impact the verge and footpath.

This roadwork event was last updated by Leeds City Council on 4 Jul 2025 at 14:36.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Oak Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Oak Lane, Manningham, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 14:58.

Yorkshire Water logo
LONG TERM
Until
28 Oct 2025
Details
View Map
Share
Follow
Ward Street

Yorkshire Water are carrying out Utility repair and maintenance works on Ward Street, Great Horton, Bradford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 June 2025 at 15:53 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 29 Jul 2025 at 13:46.

Northern Gas Networks logo
LONG TERM
Until
18 Sep 2025
Details
View Map
Share
Follow
Stanningley Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Stanningley Road, Leeds.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 June 2025 at 08:00 and could run through until 18 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Jun 2025 at 08:19.

LONG TERM
Between
25 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Toller Lane Roundabout

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Toller Lane Roundabout, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 15:41.

Yorkshire Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Bradford Road

Yorkshire Water are carrying out Utility repair and maintenance works on Bradford Road, Brighouse.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 June 2025 at 09:00 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 21 Aug 2025 at 12:14.

LONG TERM
Between
26 Jun 2025 and 1 Apr 2026
Details
View Map
Share
Lower Wyke Green

City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Lower Wyke Green, Lower Wyke, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 June 2025 and run through until 1 April 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Apr 2025 at 15:44.

LONG TERM
Between
26 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Westbury Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Westbury Road, Horton Bank Top, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Apr 2025 at 15:27.

LONG TERM
Between
30 Jun and 30 Sep 2025
Details
View Map
Share
Follow
Otley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Otley Road, Charlestown, Baildon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 09:46.

LONG TERM
Between
7 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Landscove Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Landscove Avenue, Holme Wood, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Apr 2025 at 15:10.

LONG TERM
Between
7 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Heysham Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Heysham Drive, Holme Wood, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Apr 2025 at 14:25.

LONG TERM
Between
7 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Leeds Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Leeds Road, Thornbury, Bradford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Oct 2024 at 14:30.

LONG TERM
Between
9 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Little Horton Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Little Horton Lane, Little Horton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Apr 2025 at 16:13.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Birch Close

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Birch Close, West Bowling, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Apr 2025 at 16:00.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Fenby Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Fenby Avenue, Dudley Hill, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Apr 2025 at 15:50.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Prospect Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Prospect Street, East Bowling, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 10:22.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Wakefield Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Wakefield Road, Bradford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:27.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
New Otley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on New Otley Road, Barkerend, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Apr 2025 at 15:59.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Otley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Otley Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:30.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Killinghall Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Killinghall Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:28.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Dudley Hill Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Dudley Hill Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:29.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Harrogate Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Harrogate Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Apr 2025 at 14:44.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Undercliffe Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Undercliffe Road, Eccleshill, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 10:22.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Leeds Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Leeds Road, Eccleshill, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 10:22.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Bradford Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Bradford Road, Idle, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:55.

LONG TERM
Between
10 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Albion Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Albion Road, Idle, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 08:25.

LONG TERM
Between
11 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Killinghall Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Killinghall Road, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 14:19.

LONG TERM
Between
11 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Fagley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Fagley Road, Fagley, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 15:25.

LONG TERM
Between
14 Jul and 21 Sep 2025
Details
View Map
Share
Follow
Whitehall Road

Kirklees Council are proposing to carry out Highway improvement works on Whitehall Road, Wyke, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 20 Mar 2025 at 12:44.

LONG TERM
Until
21 Sep 2025
Details
View Map
Share
Follow
Whitehall Road

Kirklees Council are carrying out Highway improvement works on Whitehall Road, Wyke, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 July 2025 at 09:30 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 14 Jul 2025 at 09:31.

LONG TERM
Between
14 Jul and 21 Sep 2025
Details
View Map
Share
Follow
Westfield Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Westfield Lane, Wyke, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 29 May 2025 at 08:08.

LONG TERM
Until
21 Sep 2025
Details
View Map
Share
Follow
Westfield Lane

Kirklees Council are carrying out Highway repair and maintenance works on Westfield Lane, Wyke, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 July 2025 at 09:30 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 14 Jul 2025 at 09:31.

LONG TERM
Between
14 Jul and 21 Sep 2025
Details
View Map
Share
Westfield Lane

Kirklees Council were proposing to carry out Highway repair and maintenance works on Westfield Lane, Wyke, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 21 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 29 Apr 2025 at 13:50.

Yorkshire Water logo
LONG TERM
Between
14 Jul and 24 Oct 2025
Details
View Map
Share
Follow
Hollingwood Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hollingwood Lane, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 8 May 2025 at 13:33.

LONG TERM
Between
14 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
North Brook Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on North Brook Street, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Apr 2025 at 16:29.

Yorkshire Water logo
LONG TERM
Between
14 Jul 2025 and 1 Mar 2026
Details
View Map
Share
Follow
Quakers Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Quakers Lane, Rawdon, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 March 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 12 May 2025 at 11:20.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Verdun Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Verdun Road, Buttershaw, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Apr 2025 at 16:12.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
St Helena Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on St Helena Road, Wibsey, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Apr 2025 at 14:12.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Royds Hall Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Royds Hall Avenue, Odsal, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:23.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Reevy Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Reevy Road, Wibsey, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Apr 2025 at 14:16.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Reevy Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Reevy Road, Wibsey, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:33.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
St Helena Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on St Helena Road, Wibsey, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Apr 2025 at 14:16.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Torre Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Torre Road, Horton Bank Top, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:33.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Speeton Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Speeton Avenue, Horton Bank Top, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:12.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Ned Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Ned Lane, Holme Wood, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:23.

LONG TERM
Between
15 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Tyersal Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Tyersal Lane, Tyersal, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:33.

LONG TERM
Between
18 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Altar Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Altar Drive, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 4 Apr 2025 at 13:50.

Northern Gas Networks logo
LONG TERM
Between
21 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Whitcliffe Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Whitcliffe Road, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 27 Feb 2025 at 08:49.

Northern Gas Networks logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Whitcliffe Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Whitcliffe Road, Cleckheaton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 July 2025 at 09:35 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Sep 2025 at 16:01.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Wyke Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wyke Lane, Wyke, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 17 Sep 2024 at 13:34.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Wyke Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wyke Lane, Wyke, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 18 Sep 2024 at 13:05.

LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Bradford Road

Kirklees Council are proposing to carry out Permanent reinstatement on Bradford Road, Oakenshaw, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 1 Jul 2025 at 09:50.

LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Bradford Road

Kirklees Council are carrying out Permanent reinstatement on Bradford Road, Oakenshaw, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 07:00 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 28 Aug 2025 at 13:32.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Mill Carr Hill Road

Kirklees Council are proposing to carry out Permanent reinstatement on Mill Carr Hill Road, Oakenshaw, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 17 Jun 2025 at 09:29.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Mill Carr Hill Road

Kirklees Council are carrying out Permanent reinstatement on Mill Carr Hill Road, Oakenshaw, Bradford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 07:00 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 5 Aug 2025 at 14:45.

LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Cliff Hollins Lane

Kirklees Council are carrying out Permanent reinstatement on Cliff Hollins Lane, Oakenshaw, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 07:00 and could run through until 8 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Kirklees Council on 28 Aug 2025 at 14:40.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
21 Jul and 19 Sep 2025
Details
View Map
Share
Follow
Henconner Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Henconner Lane, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 9 Jun 2025 at 10:05.

Yorkshire Water logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Greenacre Park

Yorkshire Water are carrying out Utility repair and maintenance works on Greenacre Park, Rawdon, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 July 2025 at 08:00 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 28 Aug 2025 at 17:03.

Northern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Low Moor Side Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Moor Side Lane, New Farnley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 12 Mar 2025 at 09:43.

LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Leeds Road

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Leeds Road, Thornbury, Bradford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2025 at 07:30 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 28 Jul 2025 at 08:41.

LONG TERM
Between
28 Jul and 3 Oct 2025
Details
View Map
Share
Follow
Shetcliffe Lane

City Of Bradford Metropolitan District Council are proposing to carry out Section 50 on Shetcliffe Lane, Bierley, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 28 Jul 2025 at 10:55.

LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Shetcliffe Lane

City Of Bradford Metropolitan District Council are carrying out Section 50 on Shetcliffe Lane, Bierley, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 08:00 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 28 Jul 2025 at 14:56.

Energy Assets Networks (formerly Utility Distribution Networks) logo
LONG TERM
Between
28 Jul and 3 Oct 2025
Details
View Map
Share
Shetcliffe Lane

Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out Utility asset works on Shetcliffe Lane, Bierley, Bradford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 9 Jul 2025 at 10:59.

Energy Assets Networks (formerly Utility Distribution Networks) logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Shetcliffe Lane

Energy Assets Networks (formerly Utility Distribution Networks) are carrying out Utility asset works on Shetcliffe Lane, Bierley, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 10:49 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 28 Jul 2025 at 10:49.

LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Leeds Road

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Leeds Road, Thornbury, Bradford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 07:30 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 28 Jul 2025 at 08:45.

LONG TERM
Between
29 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Toller Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Toller Lane, Heaton, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 31 Jul 2025 at 09:20.

LONG TERM
Between
29 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Leylands Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Leylands Lane, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Jul 2025 at 08:56.

Yorkshire Water logo
LONG TERM
Until
21 Sep 2025
Details
View Map
Share
Follow
Thornbury Road

Yorkshire Water are carrying out Utility asset works on Thornbury Road, Thornbury, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 12:30 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 19 Aug 2025 at 15:52.

LONG TERM
Between
31 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Toller Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Toller Lane, Heaton, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 31 Jul 2025 at 10:44.

Northern Gas Networks logo
LONG TERM
Between
4 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Westcliffe Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westcliffe Road, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Feb 2025 at 10:21.

Northern Gas Networks logo
LONG TERM
Until
20 Nov 2025
Details
View Map
Share
Follow
Westcliffe Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Westcliffe Road, Cleckheaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 August 2025 at 10:45 and could run through until 20 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Aug 2025 at 10:54.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Eden Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Eden Close, Wyke, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 18 Sep 2024 at 13:05.

Northern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Ripley Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ripley Street, West Bowling, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Jul 2025 at 14:43.

Northern Gas Networks logo
LONG TERM
Between
4 Aug and 26 Sep 2025
Details
View Map
Share
Hunters Park Avenue

Northern Gas Networks carried out Utility repair and maintenance works on Hunters Park Avenue, Clayton, Bradford.

These works were categorised as Major.

Multi-way signals were in place for some or all of the period.

The works were originally planned between 4 Aug 2025 and 26 Sep 2025 and were actually completed between 4 Aug 2025 (07:55) and 3 Sep 2025 (12:49). The works impacted the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Sep 2025 at 12:49.

LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Fagley Road

Grain Communications (formerly Solway Communications) are carrying out Utility asset works on Fagley Road, Fagley, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 August 2025 at 08:00 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 2 Sep 2025 at 14:49.

Leeds City Council logo
LONG TERM
Between
4 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Ring Road Farsley

Leeds City Council are proposing to carry out Highway improvement works on Ring Road Farsley, Farsley, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 30 Jul 2025 at 13:20.

Leeds City Council logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Ring Road Farsley

Leeds City Council are carrying out Highway improvement works on Ring Road Farsley, Farsley, Pudsey.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 August 2025 at 09:30 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 18 Aug 2025 at 08:50.

LONG TERM
Between
4 Aug 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Oak Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Oak Lane, Manningham, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 15:44.

Northern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Robin Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Robin Lane, Pudsey.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2025 at 08:00 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Aug 2025 at 09:07.

Northern Gas Networks logo
LONG TERM
Between
8 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Stanningley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanningley Road, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Apr 2025 at 11:52.

Yorkshire Water logo
LONG TERM
Between
11 Aug and 23 Nov 2025
Details
View Map
Share
Follow
Hollingwood Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hollingwood Lane, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Jun 2025 at 08:56.

Yorkshire Water logo
LONG TERM
Between
11 Aug and 21 Sep 2025
Details
View Map
Share
Follow
Greenacre Park Avenue

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Avenue, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 21 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 9 May 2025 at 10:32.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Hill Top Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Hill Top Road, Armley, Leeds.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 09:30 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Aug 2025 at 15:40.

LONG TERM
Between
13 Aug and 17 Sep 2025
Details
View Map
Share
Follow
Parkside Road

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Parkside Road, West Bowling, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 15 May 2025 at 12:02.

LONG TERM
Between
17 Aug 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Lower Wyke Green

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Lower Wyke Green, Lower Wyke, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 August 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Apr 2025 at 16:21.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Wickets Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wickets Close, Odsal, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 6 May 2025 at 15:03.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Wickets Close

Northern Gas Networks are carrying out Utility repair and maintenance works on Wickets Close, Odsal, Bradford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:00 and could run through until 5 September 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 18 Aug 2025 at 09:24.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Upper Castle Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Castle Street, West Bowling, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Apr 2025 at 10:26.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Upper Castle Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Castle Street, West Bowling, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Apr 2025 at 10:36.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 3 Oct 2025
Details
View Map
Share
Upper Castle Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Upper Castle Street, West Bowling, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Aug 2025 at 07:56.

Northern Gas Networks logo
LONG TERM
Until
6 Oct 2025
Details
View Map
Share
Follow
Upper Castle Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Upper Castle Street, West Bowling, Bradford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2025 at 14:00 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Aug 2025 at 14:42.

Northern Gas Networks logo
Until
12 Sep 2025
Details
View Map
Share
Follow
Pasture Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Pasture Lane, Clayton, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 09:00 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Aug 2025 at 09:19.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Bowling Old Lane

Northern Gas Networks were proposing to carry out Utility asset works on Bowling Old Lane, West Bowling, Bradford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Aug 2025 at 12:47.

Energy Assets Pipelines logo
LONG TERM
Between
18 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Listerhills Road

Energy Assets Pipelines are proposing to carry out Utility asset works on Listerhills Road, Listerhills, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Energy Assets Pipelines on 20 Jun 2025 at 14:23.

Energy Assets Pipelines logo
LONG TERM
Between
18 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Listerhills Road

Energy Assets Pipelines are proposing to carry out Utility asset works on Listerhills Road, Listerhills, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Energy Assets Pipelines on 9 Jul 2025 at 16:14.

Energy Assets Pipelines logo
LONG TERM
Between
18 Aug and 24 Oct 2025
Details
View Map
Share
Listerhills Road

Energy Assets Pipelines were proposing to carry out Utility asset works on Listerhills Road, Listerhills, Bradford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Energy Assets Pipelines on 25 Jul 2025 at 09:46.

Energy Assets Pipelines logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Listerhills Road

Energy Assets Pipelines are carrying out Utility asset works on Listerhills Road, Listerhills, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 13:15 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Energy Assets Pipelines on 22 Aug 2025 at 13:21.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 24 Sep 2025
Details
View Map
Share
Follow
Canada Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Canada Crescent, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Jun 2025 at 17:57.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 24 Sep 2025
Details
View Map
Share
Follow
Canada Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Canada Crescent, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Jun 2025 at 13:12.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 24 Sep 2025
Details
View Map
Share
Follow
Park Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Jun 2025 at 18:02.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 24 Sep 2025
Details
View Map
Share
Follow
Park Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Jun 2025 at 13:46.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Batter Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Jun 2025 at 13:02.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Batter Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Jun 2025 at 18:00.

Northern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Harrogate Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Harrogate Road, Rawdon, Leeds.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 9 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 24 Jun 2025 at 12:38.

Yorkshire Water logo
LONG TERM
Until
25 Sep 2025
Details
View Map
Share
Follow
Greenacre Park Avenue

Yorkshire Water are carrying out Utility repair and maintenance works on Greenacre Park Avenue, Rawdon, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 16:45 and could run through until 25 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 26 Aug 2025 at 08:38.

Northern Powergrid (Yorkshire) logo
Until
12 Sep 2025
Details
View Map
Share
Follow
Broad Lane

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Broad Lane, Bramley, Leeds.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 08:00 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Sep 2025 at 13:23.

Northern Gas Networks logo
Until
15 Sep 2025
Details
View Map
Share
Follow
Vine Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Vine Street, Cleckheaton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 11:00 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Aug 2025 at 11:54.

Northern Gas Networks logo
Between
22 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Holdsworth Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Holdsworth Street, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 5 Feb 2025 at 17:07.

Northern Gas Networks logo
Between
22 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Holdsworth Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Holdsworth Street, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 27 Feb 2025 at 10:24.

Northern Gas Networks logo
Until
12 Sep 2025
Details
View Map
Share
Follow
Holdsworth Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Holdsworth Street, Cleckheaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 11:00 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 22 Aug 2025 at 11:39.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Market Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Market Street, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 11:37.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Market Square

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Market Square, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 15:47.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Victoria Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Victoria Street, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 09:47.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Salts Mill Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Salts Mill Road, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 11:39.

Energy Assets Pipelines logo
LONG TERM
Between
25 Aug and 24 Oct 2025
Details
View Map
Share
Listerhills Road

Energy Assets Pipelines were proposing to carry out Utility asset works on Listerhills Road, Listerhills, Bradford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Energy Assets Pipelines on 19 Jun 2025 at 11:39.

Leeds City Council logo
LONG TERM
Between
25 Aug 2025 and 2 May 2026
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 2 May 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 11 Jun 2025 at 09:01.

Leeds City Council logo
LONG TERM
Until
2 May 2026
Details
View Map
Share
Follow
Bradford Road

Leeds City Council are carrying out Highway improvement works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 05:00 and could run through until 2 May 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Leeds City Council on 26 Aug 2025 at 10:49.

Northern Gas Networks logo
LONG TERM
Between
26 Aug 2025 and 14 Jan 2026
Details
View Map
Share
Planetrees Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Planetrees Road, Laisterdyke, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 14 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Aug 2025 at 10:57.

Northern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Back Wellands Terrace North

Northern Gas Networks are carrying out New service connection on Back Wellands Terrace North, Bradford Moor, Bradford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 09:48 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Sep 2025 at 08:33.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Layton Park Avenue

Northern Gas Networks are carrying out Utility repair and maintenance works on Layton Park Avenue, Rawdon, Leeds.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 10:45 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Sep 2025 at 08:00.

Northern Gas Networks logo
LONG TERM
Between
26 Aug and 1 Oct 2025
Details
View Map
Share
Follow
Larkfield Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Drive, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 08:12.

Northern Gas Networks logo
LONG TERM
Between
26 Aug and 1 Oct 2025
Details
View Map
Share
Follow
Larkfield Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Crescent, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 08:28.

Northern Gas Networks logo
LONG TERM
Between
26 Aug and 1 Oct 2025
Details
View Map
Share
Batter Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 1 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 11:30.

Leeds City Council logo
LONG TERM
Between
27 Aug 2025 and 2 May 2026
Details
View Map
Share
Follow
Stanningley Bypass

Leeds City Council are proposing to carry out Highway improvement works on Stanningley Bypass, Stanningley, Pudsey.

These works are categorised as Major.

The works will start on or after 27 August 2025 and could run through until 2 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 25 Jul 2025 at 12:54.

Northern Gas Networks logo
Until
25 Sep 2025
Details
View Map
Share
Follow
Stunsteads Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Stunsteads Road, Cleckheaton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 09:00 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Sep 2025 at 09:07.

Today
Details
View Map
Share
Allerton Road

City Of Bradford Metropolitan District Council carried out Highway improvement works on Allerton Road, Allerton, Bradford.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 29 Aug 2025 and 3 Sep 2025 and were actually completed between 29 Aug 2025 (19:00) and 3 Sep 2025 (02:30). The works impacted the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Sep 2025 at 08:55.

Northern Powergrid (Yorkshire) logo
LONG TERM
Until
2 Oct 2025
Details
View Map
Share
Follow
Woodhall Road

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Woodhall Road, Calverley, Pudsey.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 August 2025 at 13:00 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 1 Sep 2025 at 13:29.

Northern Powergrid (Yorkshire) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
St Catherines Hill

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on St Catherines Hill, Bramley, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 August 2025 at 09:40 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Aug 2025 at 10:56.

LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Market Street

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Market Street, Shipley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 August 2025 at 08:30 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Sep 2025 at 11:12.

Between
1 and 30 Sep 2025
Details
View Map
Share
Follow
Moorbottom

Kirklees Council are proposing to carry out Highway improvement works on Moorbottom, Moorbottom, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 11 Aug 2025 at 10:13.

Between
1 and 30 Sep 2025
Details
View Map
Share
Follow
Westgate

Kirklees Council are proposing to carry out Highway improvement works on Westgate, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 11 Aug 2025 at 10:13.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Prospect Terrace

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Prospect Terrace, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 23 Jun 2025 at 14:21.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Prospect Terrace

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Prospect Terrace, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Jul 2025 at 11:43.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Prospect Terrace

Yorkshire Water are carrying out Utility repair and maintenance works on Prospect Terrace, Cleckheaton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:55 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 1 Sep 2025 at 09:18.

Finishing
Sunday
Details
View Map
Share
Follow
Lowood Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Lowood Lane, Birstall, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 7 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 23 Jun 2025 at 14:13.

Finishing
Sunday
Details
View Map
Share
Follow
Lowood Lane

Kirklees Council are carrying out Highway repair and maintenance works on Lowood Lane, Birstall, Batley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 7 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 1 Sep 2025 at 09:04.

Northern Powergrid (Yorkshire) logo
Finishing
Friday
Details
View Map
Share
Follow
Back Dirkhill Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Back Dirkhill Road, Great Horton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Jun 2025 at 10:17.

Northern Powergrid (Yorkshire) logo
Finishing
Friday
Details
View Map
Share
Back Dirkhill Road

Northern Powergrid (Yorkshire) were proposing to carry out New service connection on Back Dirkhill Road, Great Horton, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Sep 2025 at 08:52.

Quickline Commucations logo
Finishing
Sunday
Details
View Map
Share
Allerton Lane

Quickline Commucations were proposing to carry out Utility asset works on Allerton Lane, Allerton, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 7 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 17 Jul 2025 at 13:22.

Northern Gas Networks logo
Between
1 and 10 Sep 2025
Details
View Map
Share
Follow
Back Wellands Terrace North

Northern Gas Networks are proposing to carry out New service connection on Back Wellands Terrace North, Bradford Moor, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Jun 2025 at 13:41.

Finishing
Tomorrow
Details
View Map
Share
Follow
Barnes Road

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Barnes Road, Girlington, Bradford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 19:00 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 Sep 2025 at 07:51.

Northern Powergrid (Yorkshire) logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Gain Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Gain Lane, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Aug 2025 at 13:50.

Northern Powergrid (Yorkshire) logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Gain Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Gain Lane, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Aug 2025 at 09:03.

Northern Powergrid (Yorkshire) logo
Until
30 Sep 2025
Details
View Map
Share
Follow
Gain Lane

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Gain Lane, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 10:30 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Sep 2025 at 12:19.

LONG TERM
Between
1 Sep 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Bolton Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Bolton Road, Bradford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 30 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Oct 2024 at 14:15.

Northern Gas Networks logo
LONG TERM
Until
7 Oct 2025
Details
View Map
Share
Follow
Canada Crescent

Northern Gas Networks are carrying out Utility repair and maintenance works on Canada Crescent, Rawdon, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:30 and could run through until 7 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Sep 2025 at 09:15.

Northern Gas Networks logo
LONG TERM
Until
7 Oct 2025
Details
View Map
Share
Follow
Park Avenue

Northern Gas Networks are carrying out Utility repair and maintenance works on Park Avenue, Rawdon, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:30 and could run through until 7 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Sep 2025 at 09:14.

Northern Gas Networks logo
LONG TERM
Until
6 Nov 2025
Details
View Map
Share
Follow
Batter Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:30 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Sep 2025 at 09:11.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Back Kensington Street

Yorkshire Water are carrying out Utility repair and maintenance works on Back Kensington Street, Girlington, Bradford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 12:30 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2025 at 13:52.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Kerry Street

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Kerry Street, Horsforth, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2025 and run through until 8 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Jun 2025 at 14:32.

Quickline Commucations logo
Finishing
Tomorrow
Details
View Map
Share
Greenlea Road

Quickline Commucations were proposing to carry out Utility repair and maintenance works on Greenlea Road, Apperley Bridge, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2025 and run through until 4 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 1 Sep 2025 at 14:50.

Northern Gas Networks logo
Between
3 and 17 Sep 2025
Details
View Map
Share
Follow
Low Moor Side

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Moor Side, New Farnley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Mar 2025 at 09:40.

Yorkshire Water logo
Tuesday
Details
View Map
Share
Wellstone Rise

Yorkshire Water carried out Utility repair and maintenance works on Wellstone Rise, Swinnow, Leeds.

The road was closed for some or all of the period.

The works were originally planned between 3 Sep 2025 and 9 Sep 2025 and were actually completed on 3 Sep 2025 between 11:53 and 12:31. The works impacted the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2025 at 12:44.

Northern Powergrid (Yorkshire) logo
Finishing
Tuesday
Details
View Map
Share
Follow
St Catherines Hill

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on St Catherines Hill, Bramley, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 10:40 and could run through until 9 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Sep 2025 at 11:39.

Yorkshire Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Victoria Gardens

Yorkshire Water are carrying out Utility repair and maintenance works on Victoria Gardens, Horsforth, Leeds.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 08:15 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Sep 2025 at 11:37.

Yorkshire Water logo
Between
4 and 21 Sep 2025
Details
View Map
Share
Follow
Killinghall Road

Yorkshire Water are proposing to carry out Utility asset works on Killinghall Road, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Feb 2025 at 15:20.

Yorkshire Water logo
Between
4 and 21 Sep 2025
Details
View Map
Share
Follow
Killinghall Road

Yorkshire Water are proposing to carry out Utility asset works on Killinghall Road, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 25 Mar 2025 at 13:47.

Yorkshire Water logo
Between
4 and 21 Sep 2025
Details
View Map
Share
Follow
Barkerend Road

Yorkshire Water are proposing to carry out roadworks on Barkerend Road, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 09:12.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
4 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Woodhall Road

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Woodhall Road, Calverley, Pudsey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Aug 2025 at 08:34.

Between
6 and 15 Sep 2025
Details
View Map
Share
Follow
Toller Lane Roundabout

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Toller Lane Roundabout, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Aug 2025 at 11:28.

Northern Gas Networks logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Prospect Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Prospect Road, Cleckheaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Feb 2025 at 10:24.

Yorkshire Water logo
Between
8 and 19 Sep 2025
Details
View Map
Share
Follow
Lower Green Avenue

Yorkshire Water are proposing to carry out Utility asset works on Lower Green Avenue, Scholes, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 21 Jul 2025 at 11:34.

LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Shetcliffe Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Shetcliffe Lane, Bierley, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 25 Jun 2025 at 15:49.

Energy Assets Pipelines logo
Between
8 and 12 Sep 2025
Details
View Map
Share
Preston Street

Energy Assets Pipelines were proposing to carry out roadworks on Preston Street, Listerhills, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 12 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Energy Assets Pipelines on 24 Jun 2025 at 13:27.

Energy Assets Pipelines logo
Between
8 and 12 Sep 2025
Details
View Map
Share
Follow
Preston Street

Energy Assets Pipelines are proposing to carry out roadworks on Preston Street, Listerhills, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Energy Assets Pipelines on 24 Jun 2025 at 14:32.

Yorkshire Water logo
Between
8 and 21 Sep 2025
Details
View Map
Share
Follow
Charles Avenue

Yorkshire Water are proposing to carry out Utility asset works on Charles Avenue, Thornbury, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Feb 2025 at 11:09.

Yorkshire Water logo
Between
8 and 21 Sep 2025
Details
View Map
Share
Follow
Charles Avenue

Yorkshire Water are proposing to carry out Utility asset works on Charles Avenue, Thornbury, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 19 Feb 2025 at 16:15.

BT logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Bradford Road

BT are proposing to carry out Utility repair and maintenance works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Jun 2025 at 15:38.

BT logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Bradford Road

BT are proposing to carry out Utility repair and maintenance works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 25 Jun 2025 at 14:55.

Yorkshire Water logo
LONG TERM
Between
8 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Greenacre Park Rise

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Rise, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 9 May 2025 at 10:44.

Northern Gas Networks logo
LONG TERM
Between
10 Sep and 11 Nov 2025
Details
View Map
Share
Follow
Castle Ings Gardens

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Castle Ings Gardens, New Farnley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Mar 2025 at 08:56.

Yorkshire Water logo
Between
10 and 16 Sep 2025
Details
View Map
Share
Duchy Avenue

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Duchy Avenue, Heaton, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 September 2025 and run through until 16 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 30 Jun 2025 at 11:31.

LONG TERM
Between
14 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Victoria Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Victoria Street, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Aug 2025 at 16:03.

LONG TERM
Between
14 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Salts Mill Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Salts Mill Road, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Aug 2025 at 16:02.

Northern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Mount Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Mount Street, Cleckheaton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Sep 2025 at 12:57.

Northern Gas Networks logo
Between
15 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Blenheim Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Blenheim Road, Manningham, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Aug 2025 at 16:26.

LONG TERM
Between
15 Sep and 5 Dec 2025
Details
View Map
Share
Follow
Bolton Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Bolton Road, Bradford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 5 Mar 2025 at 11:04.

Yorkshire Water logo
Between
15 and 23 Sep 2025
Details
View Map
Share
Oastler Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Oastler Road, Saltaire, Shipley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 23 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 14 Aug 2025 at 07:45.

Yorkshire Water logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Kerry Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Kerry Street, Horsforth, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 30 Jul 2025 at 12:33.

Yorkshire Water logo
LONG TERM
Between
15 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Greenacre Park Rise

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Rise, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 22 May 2025 at 15:14.

LONG TERM
Between
18 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Thorn Close

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Thorn Close, Wrose, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 13:46.

LONG TERM
Between
18 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Grosvenor Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Grosvenor Road, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 14:36.

LONG TERM
Between
18 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Back Bradford Road Nw

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Back Bradford Road Nw, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 14:35.

LONG TERM
Between
18 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Sandals Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Sandals Road, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 14:36.

LONG TERM
Between
18 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Kirklands Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Kirklands Lane, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 14:42.

Northern Gas Networks logo
Between
19 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Blenheim Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Blenheim Road, Manningham, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 11:59.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Poplar Crescent

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Poplar Crescent, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:02.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Back Birklands Road South

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Back Birklands Road South, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:07.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Thornacre Crescent

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Thornacre Crescent, Wrose, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 13:59.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Westfield Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Westfield Lane, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 13:33.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Spring Hill

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Spring Hill, Wrose, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:16.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Glenaire

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Glenaire, Windhill, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:05.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Glenfield

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Glenfield, Windhill, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 13:58.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Temple Rhydding Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Temple Rhydding Drive, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:15.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Highfield Crescent

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Highfield Crescent, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:15.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Lens Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Lens Drive, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:20.

Between
20 and 28 Sep 2025
Details
View Map
Share
Follow
Great Horton Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Great Horton Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Aug 2025 at 10:43.

LONG TERM
Between
22 Sep and 12 Dec 2025
Details
View Map
Share
Follow
Abb Scott Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Abb Scott Lane, Buttershaw, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Aug 2025 at 12:28.

Northern Gas Networks logo
Between
22 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Ripley Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ripley Street, West Bowling, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Sep 2025 at 12:58.

Northern Gas Networks logo
Between
22 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Spring Mill Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Spring Mill Street, West Bowling, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Sep 2025 at 12:56.

Yorkshire Water logo
LONG TERM
Between
22 Sep and 26 Oct 2025
Details
View Map
Share
Follow
Warley Drive

Yorkshire Water are proposing to carry out Utility asset works on Warley Drive, Bradford Moor, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 18 Feb 2025 at 08:28.

Yorkshire Water logo
LONG TERM
Between
22 Sep and 26 Oct 2025
Details
View Map
Share
Follow
Warley Drive

Yorkshire Water are proposing to carry out Utility asset works on Warley Drive, Bradford Moor, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 19 Feb 2025 at 15:21.

LONG TERM
Between
25 Sep 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Bolton Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Bolton Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 25 Jun 2025 at 16:10.

LONG TERM
Between
25 Sep 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Holdsworth Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Holdsworth Street, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 25 Jun 2025 at 17:13.

Northern Gas Networks logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Oakleigh Terrace

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakleigh Terrace, Clayton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 May 2025 at 13:49.

Northern Gas Networks logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Oakleigh Terrace

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakleigh Terrace, Clayton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 10:49.

Northern Gas Networks logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Oakleigh Terrace

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakleigh Terrace, Clayton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 12:58.

Energy Assets Pipelines logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Norcroft Street

Energy Assets Pipelines were proposing to carry out roadworks on Norcroft Street, Listerhills, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Energy Assets Pipelines on 24 Jun 2025 at 13:30.

Energy Assets Pipelines logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Norcroft Street

Energy Assets Pipelines are proposing to carry out roadworks on Norcroft Street, Listerhills, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Energy Assets Pipelines on 24 Jun 2025 at 14:36.

Yorkshire Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Bonn Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bonn Road, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 25 Jul 2025 at 11:15.

Yorkshire Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Bonn Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bonn Road, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 25 Jul 2025 at 13:11.

Northern Gas Networks logo
Between
29 Sep and 8 Oct 2025
Details
View Map
Share
Prune Park Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Prune Park Lane, Bradford.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 24 Jul 2025 at 10:10.

LONG TERM
Between
29 Sep and 29 Oct 2025
Details
View Map
Share
Follow
Wood Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Wood Street, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 26 Aug 2025 at 11:25.

Northern Gas Networks logo
Between
30 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Larkfield Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Drive, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Jun 2025 at 18:03.

Northern Gas Networks logo
Between
30 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Larkfield Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Drive, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Jun 2025 at 13:41.

Northern Gas Networks logo
Between
30 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Larkfield Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Crescent, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Jun 2025 at 17:56.

Northern Gas Networks logo
Between
30 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Larkfield Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Crescent, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Jun 2025 at 13:43.

LONG TERM
Between
1 Oct and 11 Nov 2025
Details
View Map
Share
New Cross Street

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on New Cross Street, West Bowling, Bradford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 11 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 30 May 2025 at 14:37.

LONG TERM
Between
1 Oct and 11 Nov 2025
Details
View Map
Share
Follow
New Cross Street

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on New Cross Street, West Bowling, Bradford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 30 May 2025 at 15:21.

LONG TERM
Between
1 Oct and 11 Nov 2025
Details
View Map
Share
New Cross Street

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on New Cross Street, West Bowling, Bradford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 11 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 30 May 2025 at 11:38.

Yorkshire Water logo
Between
1 and 9 Oct 2025
Details
View Map
Share
Follow
Swinnow Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Swinnow Lane, Swinnow, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 21 Jul 2025 at 14:39.

LONG TERM
Between
6 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Abb Scott Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Abb Scott Lane, Buttershaw, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Aug 2025 at 14:42.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Bradford Road

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Bradford Road, Stanningley, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Jun 2025 at 09:44.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Ring Road Farsley

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Ring Road Farsley, Farsley, Pudsey.

These works are categorised as Major.

The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Jun 2025 at 09:45.

Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Baildon Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Baildon Road, Baildon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 5 Aug 2025 at 11:19.

Yorkshire Water logo
Between
6 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Greenacre Park Mews

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Mews, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 9 May 2025 at 10:30.

Northern Gas Networks logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Oakleigh Terrace

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakleigh Terrace, Clayton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Aug 2025 at 15:40.

Yorkshire Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Prospect Street

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Prospect Street, Farsley, Pudsey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 22 Jul 2025 at 12:37.

Yorkshire Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Prospect Street

Yorkshire Water were proposing to carry out New service connection on Prospect Street, Farsley, Pudsey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Jul 2025 at 11:05.

Northern Gas Networks logo
Between
13 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Larkfield Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Drive, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Aug 2025 at 11:18.

Northern Gas Networks logo
Between
13 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Larkfield Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Crescent, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Aug 2025 at 11:17.

Yorkshire Water logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Greenacre Park Mews

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Mews, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 22 May 2025 at 15:23.

Northern Gas Networks logo
LONG TERM
Between
15 Oct and 25 Nov 2025
Details
View Map
Share
Follow
Castle Ings Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Castle Ings Drive, New Farnley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 25 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Mar 2025 at 13:53.

Between
16 Oct and 5 Nov 2025
Details
View Map
Share
Follow
The Greenway

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on The Greenway, Barkerend, Bradford.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 16 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 17 Jul 2025 at 13:23.

Northern Gas Networks logo
Between
17 and 31 Oct 2025
Details
View Map
Share
Follow
Armley Grange Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Armley Grange Drive, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Apr 2025 at 11:13.

Yorkshire Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Hudson Crescent

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hudson Crescent, Great Horton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Jul 2025 at 12:28.

Northern Powergrid (Yorkshire) logo
Between
20 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Church Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Church Lane, Pudsey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 27 Aug 2025 at 20:12.

Northern Powergrid (Yorkshire) logo
Between
20 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Church Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Church Lane, Pudsey.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Sep 2025 at 12:18.

Northern Powergrid (Yorkshire) logo
Between
20 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Church Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Church Lane, Pudsey.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Sep 2025 at 13:07.

Yorkshire Water logo
Between
20 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Thornbury Grove

Yorkshire Water are proposing to carry out Utility asset works on Thornbury Grove, Thornbury, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Feb 2025 at 11:14.

Yorkshire Water logo
Between
20 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Thornbury Grove

Yorkshire Water are proposing to carry out Utility asset works on Thornbury Grove, Thornbury, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 3 Mar 2025 at 16:51.

Yorkshire Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Valley Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Valley Road, Shipley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 25 Jul 2025 at 13:43.

Between
20 and 25 Oct 2025
Details
View Map
Share
Follow
Kingsway

City Of Bradford Metropolitan District Council are proposing to carry out Section 50 on Kingsway, Wrose, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 Aug 2025 at 12:13.

Between
20 and 25 Oct 2025
Details
View Map
Share
Follow
Kingsway

City Of Bradford Metropolitan District Council are proposing to carry out Section 50 on Kingsway, Wrose, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 28 Aug 2025 at 10:11.

Yorkshire Water logo
Between
20 and 29 Oct 2025
Details
View Map
Share
Oastler Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Oastler Road, Saltaire, Shipley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 27 Aug 2025 at 10:01.

Northern Gas Networks logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Otley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Otley Road, Charlestown, Baildon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Apr 2025 at 16:30.

Northern Gas Networks logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Kirklands Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kirklands Lane, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Apr 2025 at 16:01.

Northern Gas Networks logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Kirklands Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kirklands Lane, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Aug 2025 at 15:04.

Northern Powergrid (Yorkshire) logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Follow
Allerton Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Allerton Lane, Allerton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 Jul 2025 at 15:58.

Northern Powergrid (Yorkshire) logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Follow
Allerton Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Allerton Lane, Allerton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Jul 2025 at 09:00.

Northern Gas Networks logo
Between
22 Oct and 11 Nov 2025
Details
View Map
Share
Follow
Kirklands Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kirklands Lane, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Apr 2025 at 11:43.

Northern Gas Networks logo
Between
23 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Spen Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Spen Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 12 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 13 Aug 2025 at 09:32.

Northern Gas Networks logo
LONG TERM
Between
23 Oct and 24 Dec 2025
Details
View Map
Share
Follow
Ring Road Lower Wortley

Northern Gas Networks are proposing to carry out Utility asset works on Ring Road Lower Wortley, Lower Wortley, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 24 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 12 May 2025 at 12:01.

Northern Gas Networks logo
Between
25 Oct and 2 Nov 2025
Details
View Map
Share
Follow
City Road

Northern Gas Networks are proposing to carry out New service connection on City Road, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 1 Sep 2025 at 09:03.

Leeds City Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Branch Road

Leeds City Council are proposing to carry out Highway repair and maintenance works on Branch Road, Farnley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 4 Jul 2025 at 11:23.

Quickline Commucations logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Allerton Lane

Quickline Commucations are proposing to carry out Utility asset works on Allerton Lane, Allerton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 17 Jul 2025 at 16:08.

Quickline Commucations logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Allerton Lane

Quickline Commucations are proposing to carry out Utility asset works on Allerton Lane, Allerton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 18 Jul 2025 at 09:16.

Northern Gas Networks logo
Between
27 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Armley Grange Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Armley Grange Drive, Armley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2025 at 14:38.

Northern Gas Networks logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Rosebery Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rosebery Road, Manningham, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 6 Aug 2025 at 16:02.

Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Kingsway

City Of Bradford Metropolitan District Council are proposing to carry out Section 50 on Kingsway, Wrose, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 Aug 2025 at 10:29.

Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Kingsway

City Of Bradford Metropolitan District Council are proposing to carry out Section 50 on Kingsway, Wrose, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 Aug 2025 at 14:17.

Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Kingsway

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Kingsway, Wrose, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 Aug 2025 at 15:16.

Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Kingsway

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Kingsway, Wrose, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 1 Sep 2025 at 08:04.

Yorkshire Water logo
Between
29 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Back Clarence Road

Yorkshire Water are proposing to carry out New service connection on Back Clarence Road, Horsforth, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 7 Aug 2025 at 13:53.

Yorkshire Water logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Nelson Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Nelson Street, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 13 Aug 2025 at 11:59.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Henconner Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Henconner Lane, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Jun 2025 at 13:28.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Henconner Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Henconner Lane, Bramley, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 23 Jun 2025 at 11:47.

Yorkshire Water logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Broadway

Yorkshire Water are proposing to carry out Utility asset works on Broadway, Horsforth, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 9 Jul 2025 at 13:45.

Yorkshire Water logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Rawdon Road

Yorkshire Water are proposing to carry out Utility asset works on Rawdon Road, Horsforth, Leeds.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 9 Jul 2025 at 13:41.

Northern Gas Networks logo
Between
6 and 28 Nov 2025
Details
View Map
Share
Follow
Footpath Fronting 21-33 Beech Walk

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Footpath Fronting 21-33 Beech Walk, Birkenshaw, Bradford.

These works are categorised as Major.

The works will start on or after 6 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Aug 2025 at 09:26.

Between
6 and 23 Nov 2025
Details
View Map
Share
Follow
Whitehall Road East

Kirklees Council are proposing to carry out Highway repair and maintenance works on Whitehall Road East, Birkenshaw, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 21 Aug 2025 at 14:51.

Cityfibre Metro Networks logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Miles Hill Crescent

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Miles Hill Crescent, Bierley, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Aug 2025 at 09:00.

Cityfibre Metro Networks logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Miles Hill Crescent

Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Miles Hill Crescent, Bierley, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 29 Aug 2025 at 14:41.

Northern Powergrid (Yorkshire) logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Back Dirkhill Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Back Dirkhill Road, Great Horton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Sep 2025 at 11:50.

Yorkshire Water logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Nelson Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Nelson Street, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 21 Aug 2025 at 12:04.

Yorkshire Water logo
Between
10 and 23 Nov 2025
Details
View Map
Share
Follow
Thornbury Crescent

Yorkshire Water are proposing to carry out Utility asset works on Thornbury Crescent, Thornbury, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Feb 2025 at 11:13.

Yorkshire Water logo
Between
10 and 23 Nov 2025
Details
View Map
Share
Follow
Thornbury Crescent

Yorkshire Water are proposing to carry out Utility asset works on Thornbury Crescent, Thornbury, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 11:39.

Northern Gas Networks logo
LONG TERM
Between
11 Nov 2025 and 8 Jan 2026
Details
View Map
Share
Follow
Low Moor Side Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Moor Side Lane, New Farnley, Leeds.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 8 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Aug 2025 at 14:51.

Yorkshire Water logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Farringdon Grove

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Farringdon Grove, Buttershaw, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 26 Aug 2025 at 19:33.

Yorkshire Water logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Farringdon Grove

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Farringdon Grove, Buttershaw, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 26 Aug 2025 at 19:36.

Northern Gas Networks logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Wapping Road

Northern Gas Networks are proposing to carry out Utility asset works on Wapping Road, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Aug 2025 at 13:39.

Northern Gas Networks logo
Between
17 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Wapping Road

Northern Gas Networks are proposing to carry out Utility asset works on Wapping Road, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Aug 2025 at 14:51.

Northern Gas Networks logo
LONG TERM
Between
19 Nov 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Low Moor Side

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Moor Side, New Farnley, Leeds.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 23 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Mar 2025 at 12:07.

Yorkshire Water logo
Between
24 Nov and 3 Dec 2025
Details
View Map
Share
Oastler Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Oastler Road, Saltaire, Shipley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 November 2025 and run through until 3 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 27 Aug 2025 at 11:02.

Yorkshire Water logo
Between
1 and 10 Dec 2025
Details
View Map
Share
Follow
Oastler Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Oastler Road, Saltaire, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 27 Aug 2025 at 15:20.

Yorkshire Water logo
Between
1 and 10 Dec 2025
Details
View Map
Share
Follow
Oastler Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Oastler Road, Saltaire, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 28 Aug 2025 at 16:11.

Yorkshire Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Knott Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Knott Lane, Rawdon, Leeds.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2025 at 11:41.

Yorkshire Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Knott Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Knott Lane, Rawdon, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2025 at 11:43.

LONG TERM
Between
1 Dec 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Wood Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Wood Street, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 May 2025 at 11:34.


Roadworks Map near to Greenhill Street, BRADFORD, BD3 8BG (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Sep 2025 13:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Greenhill Street, BRADFORD, BD3 8BG (45 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
ROCHESTER STREET, BRADFORD MOOR 
(0.1 miles)
City Of Bradford Metropolitan District Council
Disconnection or alteration of supply - Footway - No carriageway incursion
Planned
Scheduled: 1 Sep 2025 - 8 Sep 2025
0.1
Details
Share
Follow
2
MAJOR
  
LEEDS ROAD, THORNBURY 
(0.2 miles)
City Of Bradford Metropolitan District Council
Highway improvement works - Footway, Carriageway - Lane closure
In Progress
Since: 27 Jul 2025 07:30
(Scheduled: 27 Jul 2025 - 3 Sep 2025)
0.2
Details
Share
Follow
3
Northern Gas Networks logo
URGENT
  
BACK STEADMAN TERRACE WEST, BRADFORD MOOR 
(0.2 miles)
Northern Gas Networks
Disconnection or alteration of supply - Carriageway - Some carriageway incursion
In Progress
Since: 1 Sep 2025 09:00
(Scheduled: 1 Sep 2025 - 5 Sep 2025)
0.2
Details
Share
Follow
4
Northern Gas Networks logo
MAJOR
  
PLANETREES ROAD, LAISTERDYKE 
(0.2 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Road closure
Cancelled
(Scheduled: 26 Aug 2025 - 14 Jan 2026)
0.2
Details
Share
5
Northern Gas Networks logo
MAJOR
  
BACK WELLANDS TERRACE NORTH, BRADFORD MOOR 
(0.3 miles)
Northern Gas Networks
New service connection - Footway, Carriageway - Road closure
In Progress
Since: 26 Aug 2025 09:48
(Scheduled: 26 Aug 2025 - 9 Sep 2025)
0.3
Details
Share
Follow
6
Northern Gas Networks logo
MAJOR
  
BACK WELLANDS TERRACE NORTH, BRADFORD MOOR 
(0.3 miles)
Northern Gas Networks
New service connection - Footway, Carriageway - Road closure
Planned
Scheduled: 1 Sep 2025 - 10 Sep 2025
0.3
Details
Share
Follow
7
Yorkshire Water logo
MAJOR
  
THORNBURY ROAD, THORNBURY 
(0.3 miles)
Yorkshire Water
Utility asset works - Footway, Carriageway - Multi-way signals
In Progress
Since: 4 Aug 2025 12:30
(Scheduled: 30 Jul 2025 - 21 Sep 2025)
0.3
Details
Share
Follow
8
Northern Powergrid (Yorkshire) logo
URGENT
  
BIRKSLAND STREET 
(0.3 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
1 Sep 2025 03:12 - 2 Sep 2025 14:30
0.3
Details
Share
9
Yorkshire Water logo
URGENT
  
BACK SANDFORD ROAD NW, BRADFORD MOOR 
(0.3 miles)
Yorkshire Water
Utility repair and maintenance works - Carriageway - Some carriageway incursion
Complete
28 Aug 2025 08:17 - 11:27
0.3
Details
Share
10
Yorkshire Water logo
URGENT
  
GLEDHILL ROAD 
(0.3 miles)
Yorkshire Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
1 Sep 2025 13:02 - 13:30
0.3
Details
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.