ROADWORKS SUMMARY
Rushton Avenue, BRADFORD, BD3 7HZ
Introduction
View current and future planned roadworks and road closures for Rushton Avenue, BD3 7HZ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Rushton Avenue, BRADFORD, BD3 7HZ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Rushton Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
7 Dec 2026
Leeds City Council are carrying out Highway improvement works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 08:00 and could run through until 7 December 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Leeds City Council on 20 May 2025 at 08:12.
12 Mar 2027
Kirklees Council are carrying out Highway improvement works on Bradford Road, Oakenshaw, Bradford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 October 2025 at 07:00 and could run through until 12 March 2027. The works will impact the carriageway and verge.
This roadwork event was last updated by Kirklees Council on 7 Sep 2026 at 10:22.
Sunday
Yorkshire Water are carrying out Utility repair and maintenance works on Hollingwood Lane, Bradford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 January 2026 at 08:00 and could run through until 20 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 17 Jun 2026 at 14:40.
20 Apr and 14 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Fagley Road, Fagley, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 April 2026 and could run through until 14 December 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Mar 2026 at 10:20.
18 Dec 2026
Leeds City Council are carrying out Highway improvement works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 April 2026 at 05:00 and could run through until 18 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 28 Apr 2026 at 11:42.
27 Aug 2027
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Thornton Road, Thornton, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 July 2026 at 07:00 and could run through until 27 August 2027. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Aug 2026 at 11:19.
29 Oct 2027
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Thornton Road, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 July 2026 at 07:00 and could run through until 29 October 2027. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Aug 2026 at 11:20.
24 Dec 2027
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Thornton Road, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 July 2026 at 07:00 and could run through until 24 December 2027. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Aug 2026 at 11:21.
26 Nov 2027
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Thornton Road, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 July 2026 at 07:00 and could run through until 26 November 2027. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Aug 2026 at 11:22.
24 Dec 2027
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Thornton Road, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 July 2026 at 07:00 and could run through until 24 December 2027. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Aug 2026 at 11:23.
30 Oct 2026
Leeds City Council are carrying out Remedial works on Valley Road, Pudsey.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 July 2026 at 08:30 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 13 Jul 2026 at 08:45.
23 Sep 2026
Yorkshire Water are carrying out Utility asset works on Manchester Road, Bradford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2026 at 14:30 and could run through until 23 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 16 Sep 2026 at 14:45.
27 Jul and 30 Nov 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Clayton Road, Clayton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 July 2026 and could run through until 30 November 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Jun 2026 at 14:29.
16 Oct 2026
Northern Gas Networks are carrying out Utility repair and maintenance works on Dewsbury Road, Gomersal, Cleckheaton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 July 2026 at 13:59 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 29 Jul 2026 at 13:59.
3 Oct 2026
National Highways are carrying out Highway improvement works on Wakefield Road, Gildersome, Morley.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 August 2026 at 20:30 and could run through until 3 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 4 Aug 2026 at 07:52.
7 Aug and 22 Oct 2026
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Kirkstall Lane, Kirkstall, Leeds.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 August 2026 and run through until 22 October 2026. The works were due to impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 25 Aug 2026 at 11:11.
Sunday
Yorkshire Water are carrying out Utility asset works on Ripley Street, West Bowling, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 August 2026 at 08:30 and could run through until 20 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 18 Aug 2026 at 12:34.
Today
Yorkshire Water are carrying out Utility repair and maintenance works on Harrogate Road, Rawdon, Leeds.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 August 2026 at 08:10 and could run through until 16 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 10 Sep 2026 at 14:08.
12 Aug and 12 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Francis Street, East Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2026 and could run through until 12 December 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 May 2026 at 08:14.
12 Aug and 12 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Heaton Street, East Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2026 and could run through until 12 December 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 May 2026 at 08:15.
12 Aug and 12 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Canal Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2026 and could run through until 12 December 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 May 2026 at 10:26.
12 Aug and 12 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Canal Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2026 and could run through until 12 December 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 May 2026 at 10:27.
17 Aug and 23 Oct 2026
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Lawns Lane, Farnley, Leeds.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 August 2026 and run through until 23 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Aug 2026 at 16:30.
Monday
Northern Powergrid (Yorkshire) are carrying out Utility asset works on Woodhall Road, Calverley, Pudsey.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 August 2026 at 09:30 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Sep 2026 at 09:59.
19 Aug and 23 Oct 2026
City Of Bradford Metropolitan District Council are proposing to carry out Works for road purposes on Apperley Road, Apperley Bridge, Bradford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Jun 2026 at 15:34.
19 Aug and 23 Oct 2026
City Of Bradford Metropolitan District Council are proposing to carry out Works for road purposes on Apperley Lane, Apperley Bridge, Bradford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Jun 2026 at 15:34.
Monday
Northern Powergrid (Yorkshire) are carrying out Utility asset works on Ascot Drive, Horton Bank Top, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 September 2026 at 09:00 and could run through until 21 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Sep 2026 at 10:28.
30 Sep 2026
Northern Powergrid (Yorkshire) are carrying out Utility asset works on Bradford Road, Drighlington, Bradford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 September 2026 at 11:55 and could run through until 30 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Sep 2026 at 11:56.
30 Sep 2026
Northern Powergrid (Yorkshire) are carrying out Utility asset works on Bradford And Wakefield Road, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 September 2026 at 11:55 and could run through until 30 September 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Sep 2026 at 11:59.
30 Sep 2026
Northern Powergrid (Yorkshire) are carrying out Utility asset works on Westgate Hill Street, Bradford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 08:00 and could run through until 30 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Sep 2026 at 14:55.
2 Oct 2026
Leeds City Council are carrying out Highway repair and maintenance works on Cross Lane, Upper Wortley, Leeds.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 09:30 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Leeds City Council on 1 Sep 2026 at 09:31.
Tuesday
Kirklees Council are proposing to carry out Section 50 on Hunsworth Lane, Hunsworth, Cleckheaton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 22 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 3 Sep 2026 at 13:20.
Tuesday
Kirklees Council are carrying out Section 50 on Hunsworth Lane, Hunsworth, Cleckheaton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 September 2026 at 08:00 and could run through until 22 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 8 Sep 2026 at 09:29.
1 Sep and 1 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on High Bank Lane, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 1 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Jun 2026 at 14:29.
1 Sep and 1 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Moorhead Lane, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 1 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Jun 2026 at 14:29.
1 Sep and 1 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Back Birklands Road North, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 1 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 5 Jun 2026 at 07:47.
1 Sep and 1 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Prospect Avenue, Windhill, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 1 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Jun 2026 at 08:36.
1 Sep and 1 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Market Square, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 1 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Jun 2026 at 14:54.
1 Sep and 1 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Oastler Road, Saltaire, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 1 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Jun 2026 at 08:41.
1 Sep and 1 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Silson Lane, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2026 and could run through until 1 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 4 Jun 2026 at 08:42.
8 Oct 2026
Northern Gas Networks are carrying out Utility repair and maintenance works on Moor Lane, Gomersal, Cleckheaton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2026 at 11:00 and could run through until 8 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Sep 2026 at 11:16.
7 Sep and 4 Oct 2026
Yorkshire Water are proposing to carry out Utility asset works on Bowling Old Lane, West Bowling, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2026 and could run through until 4 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 25 Aug 2026 at 15:53.
Friday
Northern Gas Networks are carrying out Utility repair and maintenance works on Otley Road, Shipley.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2026 at 15:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 15 Sep 2026 at 08:14.
10 Sep and 8 Oct 2026
Yorkshire Water are proposing to carry out Utility asset works on Bowling Old Lane, West Bowling, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 September 2026 and could run through until 8 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 8 Sep 2026 at 15:23.
8 Oct 2026
Yorkshire Water are carrying out Utility asset works on Bowling Old Lane, West Bowling, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 September 2026 at 08:00 and could run through until 8 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 10 Sep 2026 at 09:15.
28 May 2027
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Baptist Place, Bradford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 09:00 and could run through until 28 May 2027. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 09:42.
28 May 2027
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Westgate, Bradford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 09:00 and could run through until 28 May 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 09:43.
14 Sep 2026 and 28 May 2027
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Lumb Lane, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2026 and could run through until 28 May 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 4 Aug 2026 at 11:32.
28 May 2027
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Lumb Lane, Manningham, Bradford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 09:00 and could run through until 28 May 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 09:45.
25 Oct 2026
Yorkshire Water are carrying out Utility asset works on Woodhall Avenue, Thornbury, Bradford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 08:00 and could run through until 25 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 08:54.
Friday
Yorkshire Water are carrying out Utility asset works on Killinghall Drive, Undercliffe, Bradford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 08:30 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 09:26.
28 Sep 2026
Yorkshire Water are carrying out Utility asset works on North Park Road, Heaton, Bradford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 08:30 and could run through until 28 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 09:28.
Friday
Yorkshire Water are carrying out Utility asset works on Aireside Road, Shipley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2026 at 09:30 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 09:30.
15 Sep and 12 Dec 2026
City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Wilton Street, Little Horton, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2026 and run through until 12 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:08.
15 Sep and 12 Dec 2026
City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Drake Street, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2026 and run through until 12 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:08.
15 Sep and 12 Dec 2026
City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Hey Street, Listerhills, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2026 and run through until 12 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:08.
15 Sep and 12 Dec 2026
City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Syedna Way, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2026 and run through until 12 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:03.
15 Sep and 12 Dec 2026
City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Rosse Street, Girlington, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2026 and run through until 12 December 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:15.
Tuesday
Yorkshire Water are carrying out Utility repair and maintenance works on Saltaire Road, Shipley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2026 at 13:43 and could run through until 22 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 16 Sep 2026 at 15:09.
Saturday
City Of Bradford Metropolitan District Council are proposing to carry out roadworks on Aldermanbury, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2026 and could run through until 19 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Jul 2026 at 18:38.
Friday
Leeds City Council were proposing to carry out Highway repair and maintenance works on Stanningley Bypass, Stanningley, Pudsey.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 September 2026 and run through until 18 September 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 7 Sep 2026 at 14:49.
Friday
Leeds City Council are carrying out Highway repair and maintenance works on Stanningley Bypass, Stanningley, Pudsey.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2026 at 20:30 and could run through until 18 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 7 Sep 2026 at 15:58.
21 Sep and 16 Oct 2026
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Beacon Road, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Sep 2026 at 14:32.
21 Sep and 16 Oct 2026
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Beacon Road, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Sep 2026 at 15:59.
21 Sep and 11 Oct 2026
City Of Bradford Metropolitan District Council are proposing to carry out roadworks on Valley Road, Shipley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 11 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 8 Sep 2026 at 14:26.
21 Sep and 11 Oct 2026
City Of Bradford Metropolitan District Council are proposing to carry out roadworks on Otley Road, Shipley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 11 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 Sep 2026 at 15:02.
21 Sep and 11 Oct 2026
City Of Bradford Metropolitan District Council are proposing to carry out roadworks on Otley Road, Shipley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 11 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 8 Sep 2026 at 14:26.
21 Sep and 11 Oct 2026
City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Otley Road, Shipley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 September 2026 and run through until 11 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 1 Sep 2026 at 11:27.
21 and 25 Sep 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Victoria Mount, Horsforth, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 23 Jun 2026 at 13:51.
21 Sep and 18 Oct 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Green Lane, Yeadon, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 September 2026 and could run through until 18 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 11:47.
22 Sep and 26 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Morris Lane, Kirkstall, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2026 and could run through until 26 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 16 Sep 2026 at 12:04.
22 and 24 Sep 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on North Street, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 11:32.
23 and 27 Sep 2026
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Cliffe Terrace, Baildon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 September 2026 and run through until 27 September 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 15:08.
24 Sep and 24 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on North Bank Road, Cottingley, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 24 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Jul 2026 at 15:31.
24 Sep and 24 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Westfield Lane, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 24 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Jul 2026 at 15:29.
24 Sep and 24 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Wycliffe Gardens, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2026 and could run through until 24 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Jul 2026 at 15:30.
25 Sep and 12 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Canal Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2026 and could run through until 12 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 6 Jul 2026 at 16:17.
28 Sep and 2 Oct 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Greenroyd Avenue, Hunsworth, Cleckheaton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 May 2026 at 15:30.
28 Sep and 2 Oct 2026
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Round Street, West Bowling, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 September 2026 and run through until 2 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 15:53.
28 Sep and 30 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Grange Drive, Allerton, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 13 Aug 2026 at 11:31.
28 Sep and 2 Oct 2026
Leeds City Council are proposing to carry out Highway repair and maintenance works on Bath Lane, Bramley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 21 Aug 2026 at 09:39.
28 Sep and 2 Oct 2026
Leeds City Council are proposing to carry out Highway repair and maintenance works on Bath Lane, Bramley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 25 Aug 2026 at 11:53.
28 Sep and 7 Dec 2026
Yorkshire Water are proposing to carry out Utility asset works on South Drive, Farsley, Pudsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 23 Jul 2026 at 12:31.
28 Sep and 2 Oct 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Gresham Avenue, Bolton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 18 Aug 2026 at 09:58.
28 Sep and 14 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Back Norman Mount, Kirkstall, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 14 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Sep 2026 at 14:11.
28 Sep and 13 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Caroline Street, Saltaire, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Aug 2026 at 14:42.
28 Sep and 16 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dallam Avenue, Saltaire, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 Jul 2026 at 15:23.
29 Sep and 5 Oct 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Adwalton Green, Drighlington, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 5 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Jun 2026 at 12:17.
29 Sep and 5 Oct 2026
City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Wilton Street, Little Horton, Bradford.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2026 and run through until 5 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:08.
29 Sep and 12 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Mount, Kirkstall, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Aug 2026 at 16:18.
29 Sep and 6 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Back Norman Mount, Kirkstall, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 08:38.
29 Sep and 6 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on De Lacy Mount, Kirkstall, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 6 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 11:01.
29 Sep and 7 Oct 2026
Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Vesper Way, Kirkstall, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Jun 2026 at 14:34.
1 Oct 2026 and 30 Jun 2027
Yorkshire Water are proposing to carry out Utility asset works on Bagley Lane, Farsley, Pudsey.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2026 and could run through until 30 June 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 9 Jun 2026 at 12:17.
5 and 9 Oct 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bowling Hall Road, East Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 22 Jul 2026 at 08:13.
5 and 23 Oct 2026
Leeds City Council are proposing to carry out Highway repair and maintenance works on Roker Lane, Pudsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 1 Jul 2026 at 11:26.
5 and 7 Oct 2026
City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Hey Street, Listerhills, Bradford.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 October 2026 and run through until 7 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:08.
5 and 23 Oct 2026
City Of Bradford Metropolitan District Council are proposing to carry out Works for road purposes on Allerton Lane, Allerton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 4 Jun 2026 at 11:36.
5 Oct and 1 Nov 2026
Leeds City Council are proposing to carry out Highway improvement works on Stanningley Bypass, Stanningley, Pudsey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 23 Jul 2026 at 10:25.
5 Oct and 24 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Greenfield Avenue, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 24 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 Jul 2026 at 16:11.
5 and 9 Oct 2026
Yorkshire Water are proposing to carry out New service connection on Masefield Street, Guiseley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 3 Jul 2026 at 10:30.
5 and 9 Oct 2026
Yorkshire Water were proposing to carry out New service connection on Masefield Street, Guiseley, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 October 2026 and run through until 9 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 11:27.
6 and 12 Oct 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Lodge Hill Walk, New Farnley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Jun 2026 at 12:25.
6 and 8 Oct 2026
City Of Bradford Metropolitan District Council were proposing to carry out Highway improvement works on Drake Street, Bradford.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2026 and run through until 8 October 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 10:08.
6 and 20 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Row, Kirkstall, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Aug 2026 at 16:14.
6 and 13 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman View, Kirkstall, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2026 and could run through until 13 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Aug 2026 at 16:15.
6 and 13 Oct 2026
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Norman View, Kirkstall, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2026 and run through until 13 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Sep 2026 at 11:01.
6 and 13 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Grove, Kirkstall, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2026 and could run through until 13 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 10:31.
6 and 20 Oct 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Hillside Road, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2026 and could run through until 20 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 Aug 2026 at 12:02.
7 and 9 Oct 2026
Yorkshire Water are proposing to carry out New service connection on Lidget Place, Lidget Green, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 21 Jul 2026 at 12:52.
7 and 13 Oct 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Back Nunnington View, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2026 and could run through until 13 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Aug 2026 at 14:11.
12 Oct and 20 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bartle Lane, Great Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 20 November 2026. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 17 Jun 2026 at 12:15.
12 and 16 Oct 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Canford Grove, Allerton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Aug 2026 at 11:26.
12 and 23 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Mount, Kirkstall, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 15 Sep 2026 at 14:03.
12 and 19 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Back Norman Mount, Kirkstall, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 15 Sep 2026 at 14:04.
12 and 16 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on De Lacy Mount, Kirkstall, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 15 Sep 2026 at 14:05.
12 and 19 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Back De Lacy Mount, Kirkstall, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 15 Sep 2026 at 14:04.
13 and 21 Oct 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Vicarage Avenue, Gildersome, Morley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 21 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Jun 2026 at 12:39.
13 and 28 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tordoff Terrace, Kirkstall, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Aug 2026 at 13:32.
13 and 20 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Street, Kirkstall, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 10:53.
13 and 21 Oct 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Carr Hill Road, Calverley, Pudsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2026 and could run through until 21 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Jun 2026 at 11:19.
19 Oct and 13 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cloverdale, Shelf, Halifax.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 14:51.
19 Oct and 6 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oaks Drive, Allerton, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 6 November 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 13 Aug 2026 at 11:33.
19 and 23 Oct 2026
Yorkshire Water are proposing to carry out New service connection on Back Apsley Crescent, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 24 Jul 2026 at 11:22.
19 Oct and 2 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Row, Kirkstall, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Sep 2026 at 12:24.
19 and 26 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman View, Kirkstall, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 15 Sep 2026 at 11:48.
19 and 26 Oct 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Grove, Kirkstall, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Sep 2026 at 12:28.
19 and 23 Oct 2026
Northern Gas Networks are proposing to carry out New service connection on Thackley Old Road, Windhill, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 18 Aug 2026 at 11:39.
20 and 22 Oct 2026
Yorkshire Water are proposing to carry out New service connection on Howard Street, Little Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2026 and could run through until 22 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 24 Jul 2026 at 13:38.
20 Oct and 3 Nov 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Silson Lane, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2026 and could run through until 3 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Sep 2026 at 13:59.
20 and 26 Oct 2026
Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Rufford Avenue, Yeadon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2026 and could run through until 26 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Jun 2026 at 15:00.
21 and 23 Oct 2026
Yorkshire Water are proposing to carry out New service connection on Duchy Avenue, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2026 and could run through until 23 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 24 Jul 2026 at 11:43.
21 Oct and 3 Nov 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Moorhead Lane, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2026 and could run through until 3 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Sep 2026 at 13:58.
26 Oct and 27 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Carr House Lane, Shelf, Halifax.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 14:52.
26 Oct and 27 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cooper Lane, Shelf, Halifax.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 15:00.
26 and 30 Oct 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Ringwood Road, Little Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 24 Jul 2026 at 15:43.
26 Oct and 14 Nov 2026
Leeds City Council are proposing to carry out Highway repair and maintenance works on Ring Road Lower Wortley, Lower Wortley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 14 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 3 Sep 2026 at 13:15.
26 Oct and 14 Nov 2026
Leeds City Council are proposing to carry out Highway repair and maintenance works on Whitehall Road, Lower Wortley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 14 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 3 Sep 2026 at 09:09.
26 Oct and 20 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tyersal Crescent, Tyersal, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 28 Aug 2026 at 10:13.
26 Oct and 1 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pudsey Road, Bramley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 11 Sep 2026 at 11:52.
26 Oct and 1 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pudsey Road, Bramley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 14 Sep 2026 at 09:03.
26 Oct and 10 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tordoff Terrace, Kirkstall, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Sep 2026 at 12:20.
26 Oct and 2 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Norman Street, Kirkstall, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Sep 2026 at 12:22.
26 and 30 Oct 2026
Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Festival Avenue, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Sep 2026 at 16:12.
27 Oct and 2 Nov 2026
Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Norwood Avenue, Birkenshaw, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2026 and could run through until 2 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 Jul 2026 at 14:06.
28 and 30 Oct 2026
Yorkshire Water are proposing to carry out New service connection on Long Row, Horsforth, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 24 Jul 2026 at 11:12.
1 Nov 2026 and 2 Feb 2027
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Snowden Crescent, Bramley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2026 and could run through until 2 February 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 23 Mar 2026 at 12:28.
2 Nov and 11 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Road, Low Moor, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 15 Sep 2026 at 13:45.
2 Nov and 11 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Road, Low Moor, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 15 Sep 2026 at 12:15.
3 and 5 Nov 2026
BT are proposing to carry out Utility asset works on Bolton Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2026 and could run through until 5 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by BT on 11 Aug 2026 at 08:16.
3 and 9 Nov 2026
Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Spen Approach, West Park, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2026 and could run through until 9 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 26 Jun 2026 at 11:02.
4 and 10 Nov 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Back Springfield Mount, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2026 and could run through until 10 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Sep 2026 at 16:41.
5 and 13 Nov 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Victoria Mount, Horsforth, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Aug 2026 at 10:24.
8 and 12 Nov 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Rose Terrace, Horsforth, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2026 and could run through until 12 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Sep 2026 at 15:05.
8 Nov 2026 and 17 Jan 2027
Leeds City Council are proposing to carry out Highway repair and maintenance works on Victoria Avenue, Yeadon, Leeds.
These works are categorised as Major.
The works will start on or after 8 November 2026 and could run through until 17 January 2027. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 19 Aug 2026 at 10:38.
9 and 13 Nov 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Beverley Drive, Wyke, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 9 Sep 2026 at 10:45.
9 and 17 Nov 2026
Leeds City Council are proposing to carry out Highway repair and maintenance works on Valley Road, Pudsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 17 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 13 Aug 2026 at 14:40.
9 and 13 Nov 2026
Yorkshire Water are proposing to carry out Utility asset works on Broadlea Hill, Bramley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 21 Aug 2026 at 09:33.
9 and 19 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Nunroyd Avenue, Guiseley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 November 2026 and could run through until 19 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 May 2026 at 15:48.
10 Nov and 7 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lawns Lane, Farnley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2026 and could run through until 7 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 14:44.
10 and 17 Nov 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on St James Terrace, Horsforth, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2026 and could run through until 17 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Aug 2026 at 11:16.
11 and 26 Nov 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lawns Lane, Farnley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2026 and could run through until 26 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 14:44.
11 Nov and 15 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Whitehall Road, Lower Wortley, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2026 and could run through until 15 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 14:45.
11 and 17 Nov 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Kent Crescent, Pudsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2026 and could run through until 17 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Jul 2026 at 11:13.
12 and 18 Nov 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on The Grove, Horsforth, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2026 and could run through until 18 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Aug 2026 at 14:09.
16 and 20 Nov 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Back Horton Grange Road Se, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 18 Aug 2026 at 11:53.
16 and 19 Nov 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bagley Lane, Farsley, Pudsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 19 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 9 Jul 2026 at 11:24.
16 and 20 Nov 2026
Yorkshire Water are proposing to carry out New service connection on Rhodes Place, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 16 Sep 2026 at 10:40.
16 Nov and 4 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Saltaire, Shipley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Aug 2026 at 16:44.
17 and 24 Nov 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Armley Grange View, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2026 and could run through until 24 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Aug 2026 at 14:10.
20 Nov and 8 Dec 2026
Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Heaton Road, Heaton, Bradford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 November 2026 and run through until 8 December 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 27 Aug 2026 at 16:19.
20 Nov and 8 Dec 2026
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Heaton Road, Heaton, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 27 Aug 2026 at 16:20.
20 Nov and 8 Dec 2026
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Heaton Road, Heaton, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2026 and could run through until 8 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 4 Sep 2026 at 09:05.
23 and 27 Nov 2026
Northern Powergrid (Yorkshire) are proposing to carry out Disconnection or alteration of supply on Caldene Avenue, Low Moor, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Jul 2026 at 16:06.
23 and 27 Nov 2026
Yorkshire Water are proposing to carry out New service connection on Greenhill Lane, Bradford Moor, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 15:36.
23 and 27 Nov 2026
Yorkshire Water are proposing to carry out New service connection on Greenhill Lane, Bradford Moor, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 16 Sep 2026 at 07:46.
23 and 27 Nov 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Cunliffe Terrace, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 3 Sep 2026 at 15:39.
23 and 27 Nov 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Cunliffe Terrace, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 7 Sep 2026 at 21:17.
23 Nov and 11 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on De Lacy Mount, Kirkstall, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 11 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Sep 2026 at 12:17.
23 and 27 Nov 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Wells Road, Guiseley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 28 Aug 2026 at 16:44.
25 Nov and 9 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Morris Lane, Kirkstall, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2026 and could run through until 9 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Aug 2026 at 15:58.
26 Nov and 10 Dec 2026
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Whetley Lane, Manningham, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2026 and could run through until 10 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 25 Aug 2026 at 14:50.
26 Nov and 10 Dec 2026
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Whetley Lane, Manningham, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2026 and could run through until 10 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 25 Aug 2026 at 15:15.
30 Nov and 14 Dec 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Morris Lane, Kirkstall, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2026 and could run through until 14 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Sep 2026 at 16:03.
2 and 4 Dec 2026
City Of Bradford Metropolitan District Council are proposing to carry out roadworks on Nelson Street, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2026 and could run through until 4 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Sep 2026 at 14:03.
2 and 10 Dec 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Newlaithes Road, Horsforth, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2026 and could run through until 10 December 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Aug 2026 at 15:52.
7 Dec 2026 and 15 Jan 2027
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cooper Lane, Shelf, Halifax.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 15 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Aug 2026 at 14:57.
7 and 11 Dec 2026
Leeds City Council are proposing to carry out Highway repair and maintenance works on Claremont Place, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 11 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 17 Aug 2026 at 15:47.
7 and 11 Dec 2026
Leeds City Council are proposing to carry out Highway repair and maintenance works on Pudsey Road, Bramley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2026 and could run through until 11 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 11 Sep 2026 at 12:39.
14 and 18 Dec 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Back Waverley Terrace Ne, Lidget Green, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 15:29.
14 and 18 Dec 2026
Leeds City Council are proposing to carry out Highway repair and maintenance works on Claremont Street, Armley, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 17 Aug 2026 at 15:51.
Roadworks Map near to Rushton Avenue, BRADFORD, BD3 7HZ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Rushton Avenue, BRADFORD, BD3 7HZ (18 Events)
(Scheduled Dates)
(miles)
(Scheduled: 14 Sep 2026 - 27 Sep 2026)
(Scheduled: 14 Sep 2026 - 25 Oct 2026)
(Scheduled: 10 Sep 2026 - 16 Sep 2026)
(Scheduled: 16 Sep 2026 - 22 Sep 2026)
Contains public sector information licensed under the Open Government Licence v3.0.