ROADWORKS SUMMARY
West Royd Grove, SHIPLEY, BD18 2PF
Introduction

View current and future planned roadworks and road closures for West Royd Grove, BD18 2PF and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to West Royd Grove, SHIPLEY, BD18 2PF
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for West Royd Grove are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
6 Jan and 20 Dec 2025
Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 December 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 9 Oct 2024 at 12:19.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Ripley Street, West Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Nov 2024 at 11:56.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Tanton Crescent, Clayton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:11.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Bolling Road, West Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 15:43.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Thorpe Road, Thornton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:12.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Brooklands Avenue, Thornton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 15:44.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on North Cliffe Lane, Thornton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 15:50.
4 Feb and 30 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Tintern Avenue, Fairweather Green, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 30 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:13.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Sunningdale, Fairweather Green, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:10.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Killinghall Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:23.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Firethorn Close, Girlington, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 15:46.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Selborne Terrace, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:08.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Walden Drive, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:14.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Walden Drive, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:15.
10 Sep 2025
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Little Horton Lane, Little Horton, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 April 2025 at 08:00 and could run through until 10 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 1 Apr 2025 at 09:36.
7 Dec 2026
Leeds City Council are carrying out Highway improvement works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 08:00 and could run through until 7 December 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Leeds City Council on 20 May 2025 at 08:12.
5 Oct 2025
Yorkshire Water are carrying out Utility asset works on Leeds Old Road, Thornbury, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 May 2025 at 08:00 and could run through until 5 October 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Yorkshire Water on 19 Aug 2025 at 15:00.
19 May and 21 Sep 2025
Yorkshire Water are proposing to carry out Utility asset works on Leeds Old Road, Thornbury, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 21 September 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 3 Feb 2025 at 14:24.
28 Sep 2025
Yorkshire Water are carrying out Utility asset works on Intake Road, Fagley, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:00 and could run through until 28 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 3 Sep 2025 at 13:03.
8 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Blenheim Road, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 14:21.
8 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Branksome Court, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Apr 2025 at 08:24.
13 Jun 2025 and 1 Jul 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Calverley Lane, Horsforth, Leeds.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 1 July 2026. The works will impact the carriageway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 17 Feb 2025 at 16:07.
16 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Rooley Lane, Bradford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 16:19.
16 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Barnes Road, Girlington, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Apr 2025 at 13:51.
16 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Rayner Mount, Allerton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Apr 2025 at 16:28.
16 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Duchy Crescent, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 15:57.
16 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Shay Grove, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Apr 2025 at 16:24.
23 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Bierley Lane, Bierley, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 14:49.
23 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Manchester Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 11:24.
23 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Smiddles Lane, Little Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 11:15.
23 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Great Horton Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 15:42.
23 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Quebec Street, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 1 May 2025 at 16:01.
23 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Westgate, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 11:17.
23 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Wigan Street, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 1 May 2025 at 15:55.
23 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Allerton Road, Allerton, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 14:59.
23 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Pearson Lane, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 14:51.
23 Jun 2025 and 1 May 2026
Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 1 May 2026. The works will impact the verge and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 11 Jun 2025 at 09:06.
23 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Toller Lane Roundabout, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 14:42.
23 Jun 2025 and 1 May 2026
Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 1 May 2026. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Leeds City Council on 11 Jun 2025 at 09:03.
1 May 2026
Leeds City Council are carrying out Highway improvement works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 23 June 2025 at 08:00 and could run through until 1 May 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Leeds City Council on 4 Jul 2025 at 14:35.
1 May 2026
Leeds City Council are carrying out Highway improvement works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 23 June 2025 at 08:00 and could run through until 1 May 2026. The works will impact the verge and footpath.
This roadwork event was last updated by Leeds City Council on 4 Jul 2025 at 14:36.
23 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Oak Lane, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 14:58.
28 Oct 2025
Yorkshire Water are carrying out Utility repair and maintenance works on Ward Street, Great Horton, Bradford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 June 2025 at 15:53 and could run through until 28 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 29 Jul 2025 at 13:46.
25 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Toller Lane Roundabout, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 15:41.
26 Jun 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Westbury Road, Horton Bank Top, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Apr 2025 at 15:27.
30 Jun and 30 Sep 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Otley Road, Charlestown, Baildon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 09:46.
7 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Landscove Avenue, Holme Wood, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Apr 2025 at 15:10.
7 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Heysham Drive, Holme Wood, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Apr 2025 at 14:25.
7 Jul and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Leeds Road, Thornbury, Bradford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Oct 2024 at 14:30.
9 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Little Horton Lane, Little Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Apr 2025 at 16:13.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Birch Close, West Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Apr 2025 at 16:00.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Fenby Avenue, Dudley Hill, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Apr 2025 at 15:50.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Prospect Street, East Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 10:22.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Wakefield Road, Bradford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:27.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on New Otley Road, Barkerend, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Apr 2025 at 15:59.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Otley Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:30.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Killinghall Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:28.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Dudley Hill Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:29.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Harrogate Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 14 Apr 2025 at 14:44.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Undercliffe Road, Eccleshill, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 10:22.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Leeds Road, Eccleshill, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 10:22.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Bradford Road, Idle, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 09:55.
10 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Albion Road, Idle, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 08:25.
11 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Killinghall Road, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 14:19.
11 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Fagley Road, Fagley, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 15:25.
14 Jul and 24 Oct 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hollingwood Lane, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 8 May 2025 at 13:33.
14 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on North Brook Street, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Apr 2025 at 16:29.
14 Jul 2025 and 1 Mar 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Quakers Lane, Rawdon, Leeds.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 1 March 2026. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 12 May 2025 at 11:20.
14 Jul 2025 and 23 Jan 2026
Yorkshire Water are proposing to carry out Utility asset works on Harrogate Road, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 23 January 2026. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 1 Jul 2025 at 10:11.
23 Jan 2026
Yorkshire Water are carrying out Utility asset works on Harrogate Road, Rawdon, Leeds.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 July 2025 at 08:00 and could run through until 23 January 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 5 Aug 2025 at 08:44.
14 Jul and 5 Oct 2025
Yorkshire Water are proposing to carry out Utility asset works on Windmill Lane, Yeadon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 5 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 24 Apr 2025 at 13:52.
14 Jul and 5 Oct 2025
Yorkshire Water are proposing to carry out Utility asset works on Windmill Lane, Yeadon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 5 October 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 29 Apr 2025 at 08:20.
15 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Royds Hall Avenue, Odsal, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:23.
15 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Reevy Road, Wibsey, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:33.
15 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on St Helena Road, Wibsey, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Apr 2025 at 14:16.
15 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Speeton Avenue, Horton Bank Top, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:12.
15 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Ned Lane, Holme Wood, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:23.
15 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Tyersal Lane, Tyersal, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 09:33.
18 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Altar Drive, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 4 Apr 2025 at 13:50.
19 Sep 2025
Yorkshire Water are carrying out Utility repair and maintenance works on Greenacre Park, Rawdon, Leeds.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 July 2025 at 08:00 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 28 Aug 2025 at 17:03.
Today
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Leeds Road, Thornbury, Bradford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2025 at 07:30 and could run through until 3 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 28 Jul 2025 at 08:41.
17 Oct 2025
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Leeds Road, Thornbury, Bradford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 July 2025 at 07:30 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 28 Jul 2025 at 08:45.
29 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Toller Lane, Heaton, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 31 Jul 2025 at 09:20.
29 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Leylands Lane, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Jul 2025 at 08:56.
21 Sep 2025
Yorkshire Water are carrying out Utility asset works on Thornbury Road, Thornbury, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 August 2025 at 12:30 and could run through until 21 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 19 Aug 2025 at 15:52.
31 Jul 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Toller Lane, Heaton, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 31 Jul 2025 at 10:44.
Friday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ripley Street, West Bowling, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 22 Jul 2025 at 14:43.
4 Aug and 26 Sep 2025
Northern Gas Networks carried out Utility repair and maintenance works on Hunters Park Avenue, Clayton, Bradford.
These works were categorised as Major.
Multi-way signals were in place for some or all of the period.
The works were originally planned between 4 Aug 2025 and 26 Sep 2025 and were actually completed between 4 Aug 2025 (07:55) and 3 Sep 2025 (12:49). The works impacted the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Sep 2025 at 12:49.
Monday
Grain Communications (formerly Solway Communications) are carrying out Utility asset works on Fagley Road, Fagley, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 August 2025 at 08:00 and could run through until 8 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 2 Sep 2025 at 14:49.
4 Aug and 19 Sep 2025
Leeds City Council are proposing to carry out Highway improvement works on Ring Road Farsley, Farsley, Pudsey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 30 Jul 2025 at 13:20.
19 Sep 2025
Leeds City Council are carrying out Highway improvement works on Ring Road Farsley, Farsley, Pudsey.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 August 2025 at 09:30 and could run through until 19 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 18 Aug 2025 at 08:50.
4 Aug 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Oak Lane, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 15:44.
11 Aug and 23 Nov 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hollingwood Lane, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 20 Jun 2025 at 08:56.
11 Aug and 21 Sep 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Avenue, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 21 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 9 May 2025 at 10:32.
13 Aug and 17 Sep 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Parkside Road, West Bowling, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 August 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 15 May 2025 at 12:02.
12 Sep 2025
Northern Powergrid (Yorkshire) are carrying out Utility asset works on Bradford Road, Bingley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 August 2025 at 11:00 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 Aug 2025 at 09:28.
18 Aug and 3 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Castle Street, West Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 1 Apr 2025 at 10:26.
18 Aug and 3 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Castle Street, West Bowling, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 7 Apr 2025 at 10:36.
18 Aug and 3 Oct 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Upper Castle Street, West Bowling, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 August 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 19 Aug 2025 at 07:56.
6 Oct 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Upper Castle Street, West Bowling, Bradford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 August 2025 at 14:00 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 19 Aug 2025 at 14:42.
12 Sep 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Pasture Lane, Clayton, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 August 2025 at 09:00 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 22 Aug 2025 at 09:19.
Friday
Northern Gas Networks were proposing to carry out Utility asset works on Bowling Old Lane, West Bowling, Bradford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Aug 2025 at 12:47.
18 Aug and 24 Oct 2025
Energy Assets Pipelines are proposing to carry out Utility asset works on Listerhills Road, Listerhills, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Energy Assets Pipelines on 20 Jun 2025 at 14:23.
18 Aug and 24 Oct 2025
Energy Assets Pipelines are proposing to carry out Utility asset works on Listerhills Road, Listerhills, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Energy Assets Pipelines on 9 Jul 2025 at 16:14.
18 Aug and 24 Oct 2025
Energy Assets Pipelines were proposing to carry out Utility asset works on Listerhills Road, Listerhills, Bradford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 August 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Energy Assets Pipelines on 25 Jul 2025 at 09:46.
24 Oct 2025
Energy Assets Pipelines are carrying out Utility asset works on Listerhills Road, Listerhills, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 August 2025 at 13:15 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Energy Assets Pipelines on 22 Aug 2025 at 13:21.
18 Aug and 24 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Canada Crescent, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 6 Jun 2025 at 17:57.
18 Aug and 24 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Canada Crescent, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 25 Jun 2025 at 13:12.
18 Aug and 24 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 6 Jun 2025 at 18:02.
18 Aug and 24 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 25 Jun 2025 at 13:46.
18 Aug and 24 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 25 Jun 2025 at 13:02.
18 Aug and 24 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 6 Jun 2025 at 18:00.
Tuesday
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Harrogate Road, Rawdon, Leeds.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 August 2025 and run through until 9 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 24 Jun 2025 at 12:38.
25 Sep 2025
Yorkshire Water are carrying out Utility repair and maintenance works on Greenacre Park Avenue, Rawdon, Leeds.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 August 2025 at 16:45 and could run through until 25 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 26 Aug 2025 at 08:38.
21 Aug 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Main Street, Wilsden, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 21 May 2025 at 15:36.
21 Aug 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Wilsden Road, Harden, Bingley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 21 May 2025 at 15:41.
21 Aug 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Keighley Road, Bingley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 21 May 2025 at 15:43.
22 Aug 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Market Street, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 11:37.
22 Aug 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Market Square, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 15:47.
22 Aug 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Victoria Street, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 09:47.
22 Aug 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Salts Mill Road, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 11:39.
Friday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kings Road, Crossflatts, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 18 Jun 2025 at 09:52.
25 Aug and 24 Oct 2025
Energy Assets Pipelines were proposing to carry out Utility asset works on Listerhills Road, Listerhills, Bradford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 August 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Energy Assets Pipelines on 19 Jun 2025 at 11:39.
25 Aug 2025 and 2 May 2026
Leeds City Council are proposing to carry out Highway improvement works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 2 May 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 11 Jun 2025 at 09:01.
2 May 2026
Leeds City Council are carrying out Highway improvement works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 26 August 2025 at 05:00 and could run through until 2 May 2026. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Leeds City Council on 26 Aug 2025 at 10:49.
26 Aug 2025 and 14 Jan 2026
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Planetrees Road, Laisterdyke, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 14 January 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Aug 2025 at 10:57.
Tuesday
Northern Gas Networks are carrying out New service connection on Back Wellands Terrace North, Bradford Moor, Bradford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 August 2025 at 09:48 and could run through until 9 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Sep 2025 at 08:33.
Friday
Northern Gas Networks are carrying out Utility repair and maintenance works on Layton Park Avenue, Rawdon, Leeds.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 August 2025 at 10:45 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Sep 2025 at 08:00.
26 Aug and 1 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Drive, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 08:12.
26 Aug and 1 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Crescent, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Apr 2025 at 08:28.
26 Aug and 1 Oct 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 1 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 11:30.
27 Aug 2025 and 2 May 2026
Leeds City Council are proposing to carry out Highway improvement works on Stanningley Bypass, Stanningley, Pudsey.
These works are categorised as Major.
The works will start on or after 27 August 2025 and could run through until 2 May 2026. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 25 Jul 2025 at 12:54.
City Of Bradford Metropolitan District Council carried out Highway improvement works on Allerton Road, Allerton, Bradford.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 29 Aug 2025 and 3 Sep 2025 and were actually completed between 29 Aug 2025 (19:00) and 3 Sep 2025 (02:30). The works impacted the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Sep 2025 at 08:55.
2 Oct 2025
Northern Powergrid (Yorkshire) are carrying out Utility asset works on Woodhall Road, Calverley, Pudsey.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 August 2025 at 13:00 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 1 Sep 2025 at 13:29.
30 Sep 2025
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Market Street, Shipley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 August 2025 at 08:30 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Sep 2025 at 11:12.
Friday
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Back Dirkhill Road, Great Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Jun 2025 at 10:17.
Friday
Northern Powergrid (Yorkshire) were proposing to carry out New service connection on Back Dirkhill Road, Great Horton, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Sep 2025 at 08:52.
Sunday
Quickline Commucations were proposing to carry out Utility asset works on Allerton Lane, Allerton, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 7 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Quickline Commucations on 17 Jul 2025 at 13:22.
1 and 10 Sep 2025
Northern Gas Networks are proposing to carry out New service connection on Back Wellands Terrace North, Bradford Moor, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 Jun 2025 at 13:41.
Tomorrow
City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Barnes Road, Girlington, Bradford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 19:00 and could run through until 4 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 Sep 2025 at 07:51.
1 and 26 Sep 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Gain Lane, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Aug 2025 at 13:50.
1 and 26 Sep 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Gain Lane, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 13 Aug 2025 at 09:03.
30 Sep 2025
Northern Powergrid (Yorkshire) are carrying out Utility asset works on Gain Lane, Bradford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 September 2025 at 10:30 and could run through until 30 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Sep 2025 at 12:19.
1 Sep 2025 and 30 Jan 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Bolton Road, Bradford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 30 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Oct 2024 at 14:15.
7 Oct 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Canada Crescent, Rawdon, Leeds.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 08:30 and could run through until 7 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 1 Sep 2025 at 09:15.
7 Oct 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Park Avenue, Rawdon, Leeds.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 08:30 and could run through until 7 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 1 Sep 2025 at 09:14.
6 Nov 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Batter Lane, Rawdon, Leeds.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 08:30 and could run through until 6 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 1 Sep 2025 at 09:11.
1 Sep 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Derry Hill, Menston, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 May 2025 at 14:35.
1 Sep 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on St Peters Way, Menston, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 May 2025 at 14:34.
1 Sep 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Moorfield Avenue, Menston, Ilkley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 May 2025 at 14:38.
Monday
Yorkshire Water are carrying out Utility repair and maintenance works on Back Kensington Street, Girlington, Bradford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2025 at 12:30 and could run through until 8 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 2 Sep 2025 at 13:52.
Monday
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Kerry Street, Horsforth, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2025 and run through until 8 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 10 Jun 2025 at 14:32.
Tomorrow
Quickline Commucations were proposing to carry out Utility repair and maintenance works on Greenlea Road, Apperley Bridge, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2025 and run through until 4 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Quickline Commucations on 1 Sep 2025 at 14:50.
Tuesday
Yorkshire Water are carrying out Utility repair and maintenance works on Victoria Gardens, Horsforth, Leeds.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 September 2025 at 08:15 and could run through until 9 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 3 Sep 2025 at 11:37.
4 and 21 Sep 2025
Yorkshire Water are proposing to carry out Utility asset works on Killinghall Road, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 7 Feb 2025 at 15:20.
4 and 21 Sep 2025
Yorkshire Water are proposing to carry out Utility asset works on Killinghall Road, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 25 Mar 2025 at 13:47.
4 and 21 Sep 2025
Yorkshire Water are proposing to carry out roadworks on Barkerend Road, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2025 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 09:12.
4 Sep and 8 Oct 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Woodhall Road, Calverley, Pudsey.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 Aug 2025 at 08:34.
6 and 15 Sep 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Toller Lane Roundabout, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Aug 2025 at 11:28.
8 and 12 Sep 2025
Energy Assets Pipelines were proposing to carry out roadworks on Preston Street, Listerhills, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 September 2025 and run through until 12 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Energy Assets Pipelines on 24 Jun 2025 at 13:27.
8 and 12 Sep 2025
Energy Assets Pipelines are proposing to carry out roadworks on Preston Street, Listerhills, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Energy Assets Pipelines on 24 Jun 2025 at 14:32.
8 and 21 Sep 2025
Yorkshire Water are proposing to carry out Utility asset works on Charles Avenue, Thornbury, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 18 Feb 2025 at 11:09.
8 and 21 Sep 2025
Yorkshire Water are proposing to carry out Utility asset works on Charles Avenue, Thornbury, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 19 Feb 2025 at 16:15.
8 Sep and 17 Oct 2025
BT are proposing to carry out Utility repair and maintenance works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 23 Jun 2025 at 15:38.
8 Sep and 17 Oct 2025
BT are proposing to carry out Utility repair and maintenance works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 25 Jun 2025 at 14:55.
8 Sep and 19 Oct 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Rise, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 19 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 9 May 2025 at 10:44.
10 and 16 Sep 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Duchy Avenue, Heaton, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 September 2025 and run through until 16 September 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 30 Jun 2025 at 11:31.
14 Sep and 14 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Victoria Street, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Aug 2025 at 16:03.
14 Sep and 14 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Salts Mill Road, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Aug 2025 at 16:02.
15 Sep and 10 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Blenheim Road, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Aug 2025 at 16:26.
15 Sep and 5 Dec 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Bolton Road, Bradford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 5 Mar 2025 at 11:04.
15 and 23 Sep 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Oastler Road, Saltaire, Shipley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 23 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 14 Aug 2025 at 07:45.
15 and 19 Sep 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Kerry Street, Horsforth, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 30 Jul 2025 at 12:33.
15 and 17 Sep 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Sheriff Lane, Eldwick, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 15 Jul 2025 at 13:58.
15 Sep and 17 Oct 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Rise, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 22 May 2025 at 15:14.
18 Sep 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Chapel Row, Wilsden, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 13:46.
18 Sep 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Wilsden Hill Road, Wilsden, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 14:37.
18 Sep 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Thorn Close, Wrose, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 13:46.
18 Sep 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Grosvenor Road, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 14:36.
18 Sep 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Back Bradford Road Nw, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 14:35.
18 Sep 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Sandals Road, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 14:36.
18 Sep 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Kirklands Lane, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 14:42.
19 Sep and 17 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Blenheim Road, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 11:59.
19 Sep 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Poplar Crescent, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:02.
19 Sep 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Back Birklands Road South, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:07.
19 Sep 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Woodway, Cottingley, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:04.
19 Sep 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Thornacre Crescent, Wrose, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 13:59.
19 Sep 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Westfield Lane, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 13:33.
19 Sep 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Spring Hill, Wrose, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:16.
19 Sep 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Manor Court, Cottingley, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:08.
19 Sep 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Glenaire, Windhill, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:05.
19 Sep 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Glenfield, Windhill, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 13:58.
19 Sep 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Temple Rhydding Drive, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:15.
19 Sep 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Highfield Crescent, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:15.
19 Sep 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Lens Drive, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:20.
20 and 28 Sep 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Great Horton Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Aug 2025 at 10:43.
22 Sep and 7 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ripley Street, West Bowling, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Sep 2025 at 12:58.
22 Sep and 7 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Spring Mill Street, West Bowling, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Sep 2025 at 12:56.
22 Sep and 26 Oct 2025
Yorkshire Water are proposing to carry out Utility asset works on Warley Drive, Bradford Moor, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 18 Feb 2025 at 08:28.
22 Sep and 26 Oct 2025
Yorkshire Water are proposing to carry out Utility asset works on Warley Drive, Bradford Moor, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 26 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 19 Feb 2025 at 15:21.
22 Sep 2025 and 25 Jan 2026
Yorkshire Water are proposing to carry out Utility asset works on Harrogate Road, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 25 January 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 25 Apr 2025 at 06:47.
22 Sep and 31 Oct 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Victoria Avenue, Yeadon, Leeds.
These works are categorised as Major.
The works will start on or after 22 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 18 Jun 2025 at 09:57.
22 Sep and 31 Oct 2025
Leeds City Council are proposing to carry out Highway repair and maintenance works on Victoria Avenue, Yeadon, Leeds.
These works are categorised as Major.
The works will start on or after 22 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Leeds City Council on 19 Jun 2025 at 11:17.
25 Sep 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Bolton Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 25 Jun 2025 at 16:10.
25 Sep 2025 and 30 Apr 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Holdsworth Street, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 25 Jun 2025 at 17:13.
29 Sep and 17 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakleigh Terrace, Clayton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 15 May 2025 at 13:49.
29 Sep and 17 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakleigh Terrace, Clayton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 10:49.
29 Sep and 17 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakleigh Terrace, Clayton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 12:58.
29 Sep and 3 Oct 2025
Energy Assets Pipelines were proposing to carry out roadworks on Norcroft Street, Listerhills, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Energy Assets Pipelines on 24 Jun 2025 at 13:30.
29 Sep and 3 Oct 2025
Energy Assets Pipelines are proposing to carry out roadworks on Norcroft Street, Listerhills, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Energy Assets Pipelines on 24 Jun 2025 at 14:36.
29 Sep and 3 Oct 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bonn Road, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 25 Jul 2025 at 11:15.
29 Sep and 3 Oct 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bonn Road, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 25 Jul 2025 at 13:11.
29 Sep and 8 Oct 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Prune Park Lane, Bradford.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 24 Jul 2025 at 10:10.
29 Sep and 29 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Wood Street, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 26 Aug 2025 at 11:25.
29 Sep and 3 Oct 2025
BT are proposing to carry out Utility asset works on Glovershaw Lane, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 1 Jul 2025 at 08:18.
29 Sep and 3 Oct 2025
BT are proposing to carry out Utility asset works on Glovershaw Lane, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 3 Jul 2025 at 10:25.
29 Sep and 3 Oct 2025
BT are proposing to carry out Utility asset works on Glovershaw Lane, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 4 Jul 2025 at 14:47.
29 Sep and 3 Oct 2025
BT are proposing to carry out Utility asset works on Glovershaw Lane, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 18 Aug 2025 at 11:09.
29 Sep and 3 Oct 2025
BT are proposing to carry out Utility asset works on Spring Lane, Eldwick, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 2 Jul 2025 at 08:06.
29 Sep and 3 Oct 2025
BT are proposing to carry out Utility asset works on Spring Lane, Eldwick, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 4 Jul 2025 at 14:30.
29 Sep and 3 Oct 2025
BT are proposing to carry out Utility asset works on Spring Lane, Eldwick, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 18 Aug 2025 at 11:08.
29 Sep and 3 Oct 2025
BT are proposing to carry out Utility asset works on Spring Lane, Eldwick, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 1 Jul 2025 at 08:19.
30 Sep and 24 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Drive, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 6 Jun 2025 at 18:03.
30 Sep and 24 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Drive, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 25 Jun 2025 at 13:41.
30 Sep and 24 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Crescent, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 6 Jun 2025 at 17:56.
30 Sep and 24 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Crescent, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 25 Jun 2025 at 13:43.
1 Oct and 11 Nov 2025
Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on New Cross Street, West Bowling, Bradford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 October 2025 and run through until 11 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 30 May 2025 at 14:37.
1 Oct and 11 Nov 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on New Cross Street, West Bowling, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 30 May 2025 at 15:21.
1 Oct and 11 Nov 2025
Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on New Cross Street, West Bowling, Bradford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 October 2025 and run through until 11 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 30 May 2025 at 11:38.
1 and 9 Oct 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Swinnow Lane, Swinnow, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 21 Jul 2025 at 14:39.
6 Oct and 14 Nov 2025
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Bradford Road, Stanningley, Pudsey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Jun 2025 at 09:44.
6 Oct and 14 Nov 2025
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Ring Road Farsley, Farsley, Pudsey.
These works are categorised as Major.
The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Jun 2025 at 09:45.
6 and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Baildon Road, Baildon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 5 Aug 2025 at 11:19.
6 Oct and 2 Nov 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Mews, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 9 May 2025 at 10:30.
13 and 31 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakleigh Terrace, Clayton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Aug 2025 at 15:40.
13 and 17 Oct 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Prospect Street, Farsley, Pudsey.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 22 Jul 2025 at 12:37.
13 and 17 Oct 2025
Yorkshire Water were proposing to carry out New service connection on Prospect Street, Farsley, Pudsey.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 18 Jul 2025 at 11:05.
13 Oct and 6 Nov 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Drive, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Aug 2025 at 11:18.
13 Oct and 6 Nov 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Larkfield Crescent, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Aug 2025 at 11:17.
13 and 31 Oct 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Greenacre Park Mews, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 22 May 2025 at 15:23.
16 Oct and 5 Nov 2025
Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on The Greenway, Barkerend, Bradford.
These works are categorised as Major.
There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.
The works will start on or after 16 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 17 Jul 2025 at 13:23.
20 and 24 Oct 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hudson Crescent, Great Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 25 Jul 2025 at 12:28.
20 Oct and 5 Nov 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Church Lane, Pudsey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 27 Aug 2025 at 20:12.
20 Oct and 5 Nov 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Church Lane, Pudsey.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Sep 2025 at 12:18.
20 Oct and 5 Nov 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Church Lane, Pudsey.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Sep 2025 at 13:07.
20 Oct and 9 Nov 2025
Yorkshire Water are proposing to carry out Utility asset works on Thornbury Grove, Thornbury, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 18 Feb 2025 at 11:14.
20 Oct and 9 Nov 2025
Yorkshire Water are proposing to carry out Utility asset works on Thornbury Grove, Thornbury, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 3 Mar 2025 at 16:51.
20 and 24 Oct 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Valley Road, Shipley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 25 Jul 2025 at 13:43.
20 and 25 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Section 50 on Kingsway, Wrose, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 Aug 2025 at 12:13.
20 and 25 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Section 50 on Kingsway, Wrose, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 25 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 28 Aug 2025 at 10:11.
20 and 29 Oct 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Oastler Road, Saltaire, Shipley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 27 Aug 2025 at 10:01.
20 Oct and 3 Nov 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Otley Road, Charlestown, Baildon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Apr 2025 at 16:30.
20 Oct and 3 Nov 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kirklands Lane, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Apr 2025 at 16:01.
20 Oct and 3 Nov 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kirklands Lane, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 26 Aug 2025 at 15:04.
21 and 23 Oct 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Allerton Lane, Allerton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 Jul 2025 at 15:58.
21 and 23 Oct 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Allerton Lane, Allerton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Jul 2025 at 09:00.
22 Oct and 11 Nov 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kirklands Lane, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Apr 2025 at 11:43.
25 Oct and 2 Nov 2025
Northern Gas Networks are proposing to carry out New service connection on City Road, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 1 Sep 2025 at 09:03.
27 Oct and 2 Nov 2025
Quickline Commucations are proposing to carry out Utility asset works on Allerton Lane, Allerton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Quickline Commucations on 17 Jul 2025 at 16:08.
27 Oct and 2 Nov 2025
Quickline Commucations are proposing to carry out Utility asset works on Allerton Lane, Allerton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Quickline Commucations on 18 Jul 2025 at 09:16.
27 Oct and 7 Nov 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rosebery Road, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 6 Aug 2025 at 16:02.
27 and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Section 50 on Kingsway, Wrose, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 Aug 2025 at 10:29.
27 and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Section 50 on Kingsway, Wrose, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 Aug 2025 at 14:17.
27 and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Kingsway, Wrose, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 Aug 2025 at 15:16.
27 and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Kingsway, Wrose, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 1 Sep 2025 at 08:04.
27 Oct 2025 and 1 Feb 2026
Yorkshire Water are proposing to carry out Utility asset works on Windmill Lane, Yeadon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 1 February 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 22 May 2025 at 07:20.
29 Oct and 4 Nov 2025
Yorkshire Water are proposing to carry out New service connection on Back Clarence Road, Horsforth, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 7 Aug 2025 at 13:53.
3 and 5 Nov 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Nelson Street, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 13 Aug 2025 at 11:59.
3 and 28 Nov 2025
Yorkshire Water are proposing to carry out Utility asset works on Broadway, Horsforth, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 9 Jul 2025 at 13:45.
3 and 28 Nov 2025
Yorkshire Water are proposing to carry out Utility asset works on Rawdon Road, Horsforth, Leeds.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 9 Jul 2025 at 13:41.
8 and 10 Nov 2025
Network Rail are proposing to carry out Works for Rail Purposes on Sir Fred Hoyle Way, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2025 and could run through until 10 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 18 Aug 2025 at 11:18.
8 and 10 Nov 2025
Network Rail were proposing to carry out Works for Rail Purposes on Sir Fred Hoyle Way, Bingley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 November 2025 and run through until 10 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 1 Sep 2025 at 14:32.
10 and 12 Nov 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Miles Hill Crescent, Bierley, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 19 Aug 2025 at 09:00.
10 and 12 Nov 2025
Cityfibre Metro Networks are proposing to carry out Utility repair and maintenance works on Miles Hill Crescent, Bierley, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 29 Aug 2025 at 14:41.
10 and 14 Nov 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Back Dirkhill Road, Great Horton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Sep 2025 at 11:50.
10 and 12 Nov 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Nelson Street, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 21 Aug 2025 at 12:04.
10 and 23 Nov 2025
Yorkshire Water are proposing to carry out Utility asset works on Thornbury Crescent, Thornbury, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 18 Feb 2025 at 11:13.
10 and 23 Nov 2025
Yorkshire Water are proposing to carry out Utility asset works on Thornbury Crescent, Thornbury, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 25 Feb 2025 at 11:39.
17 Nov and 12 Dec 2025
Northern Gas Networks are proposing to carry out Utility asset works on Wapping Road, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Aug 2025 at 13:39.
17 Nov and 12 Dec 2025
Northern Gas Networks are proposing to carry out Utility asset works on Wapping Road, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 20 Aug 2025 at 14:51.
24 Nov and 3 Dec 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Oastler Road, Saltaire, Shipley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 November 2025 and run through until 3 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 27 Aug 2025 at 11:02.
24 and 28 Nov 2025
BT are proposing to carry out Utility asset works on Aire Valley Road, Keighley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 21 Aug 2025 at 16:32.
24 and 28 Nov 2025
BT are proposing to carry out Utility asset works on Keighley Road, Bingley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 21 Aug 2025 at 16:37.
25 Nov and 15 Dec 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lane Side, Wilsden, Bingley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2025 and could run through until 15 December 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Northern Gas Networks on 18 Aug 2025 at 11:38.
1 and 10 Dec 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Oastler Road, Saltaire, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 27 Aug 2025 at 15:20.
1 and 10 Dec 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Oastler Road, Saltaire, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 28 Aug 2025 at 16:11.
1 and 5 Dec 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Knott Lane, Rawdon, Leeds.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 December 2025 and run through until 5 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 2 Sep 2025 at 11:41.
1 and 5 Dec 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Knott Lane, Rawdon, Leeds.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 2 Sep 2025 at 11:43.
1 Dec 2025 and 31 Mar 2026
City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Wood Street, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 May 2025 at 11:34.
Roadworks Map near to West Royd Grove, SHIPLEY, BD18 2PF (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to West Royd Grove, SHIPLEY, BD18 2PF (34 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.