ROADWORKS SUMMARY
Glen View, BINGLEY, BD16 1JE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Glen View, BD16 1JE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Glen View, BINGLEY, BD16 1JE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Glen View are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Between
1 Aug 2024 and 2 Nov 2025
Details
View Map
Share
Follow
Bath Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Bath Street, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2024 and could run through until 2 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:23.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Tanton Crescent

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Tanton Crescent, Clayton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:11.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Thorpe Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Thorpe Road, Thornton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:12.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Brooklands Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Brooklands Avenue, Thornton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 15:44.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
North Cliffe Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on North Cliffe Lane, Thornton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 15:50.

LONG TERM
Between
4 Feb and 30 Oct 2025
Details
View Map
Share
Follow
Tintern Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Tintern Avenue, Fairweather Green, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:13.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Sunningdale

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Sunningdale, Fairweather Green, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:10.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Firethorn Close

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Firethorn Close, Girlington, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 15:46.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Selborne Terrace

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Selborne Terrace, Manningham, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:08.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Walden Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Walden Drive, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:14.

LONG TERM
Between
4 Feb and 31 Oct 2025
Details
View Map
Share
Follow
Walden Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Walden Drive, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:15.

LONG TERM
Between
8 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Blenheim Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Blenheim Road, Manningham, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Apr 2025 at 14:21.

LONG TERM
Between
8 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Branksome Court

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Branksome Court, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 10 Apr 2025 at 08:24.

LONG TERM
Between
16 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Barnes Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Barnes Road, Girlington, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Apr 2025 at 13:51.

LONG TERM
Between
16 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Rayner Mount

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Rayner Mount, Allerton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Apr 2025 at 16:28.

LONG TERM
Between
16 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Duchy Crescent

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Duchy Crescent, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Apr 2025 at 15:57.

LONG TERM
Between
16 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Shay Grove

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Shay Grove, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 9 Apr 2025 at 16:24.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Allerton Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Allerton Road, Allerton, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 14:59.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Pearson Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Pearson Lane, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 14:51.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Toller Lane Roundabout

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Toller Lane Roundabout, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 14:42.

LONG TERM
Between
23 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Oak Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Oak Lane, Manningham, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 14:58.

LONG TERM
Between
25 Jun 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Toller Lane Roundabout

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Toller Lane Roundabout, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 15:41.

LONG TERM
Between
30 Jun and 30 Sep 2025
Details
View Map
Share
Follow
Otley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Otley Road, Charlestown, Baildon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 09:46.

Yorkshire Water logo
LONG TERM
Between
14 Jul and 24 Oct 2025
Details
View Map
Share
Follow
Hollingwood Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hollingwood Lane, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 8 May 2025 at 13:33.

Yorkshire Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Providence Lane

Yorkshire Water are carrying out Utility asset works on Providence Lane, Oakworth, Keighley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 July 2025 at 14:00 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 19 Aug 2025 at 14:31.

LONG TERM
Between
18 Jul and 17 Oct 2025
Details
View Map
Share
Follow
Cragg Lane

City Of Bradford Metropolitan District Council are proposing to carry out Remedial works on Cragg Lane, Denholme, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jul 2025 at 10:28.

LONG TERM
Between
18 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Altar Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Altar Drive, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 4 Apr 2025 at 13:50.

Yorkshire Water logo
LONG TERM
Between
21 Jul and 21 Sep 2025
Details
View Map
Share
Follow
Providence Crescent

Yorkshire Water are proposing to carry out Utility asset works on Providence Crescent, Oakworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 31 Jan 2025 at 12:18.

Yorkshire Water logo
LONG TERM
Between
21 Jul and 21 Sep 2025
Details
View Map
Share
Follow
Providence Crescent

Yorkshire Water are proposing to carry out Utility asset works on Providence Crescent, Oakworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 7 Feb 2025 at 14:49.

LONG TERM
Between
29 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Toller Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Toller Lane, Heaton, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 31 Jul 2025 at 09:20.

LONG TERM
Between
29 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Leylands Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Leylands Lane, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Jul 2025 at 08:56.

LONG TERM
Between
31 Jul 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Toller Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Toller Lane, Heaton, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 31 Jul 2025 at 10:44.

Northern Gas Networks logo
LONG TERM
Between
4 Aug and 26 Sep 2025
Details
View Map
Share
Hunters Park Avenue

Northern Gas Networks carried out Utility repair and maintenance works on Hunters Park Avenue, Clayton, Bradford.

These works were categorised as Major.

Multi-way signals were in place for some or all of the period.

The works were originally planned between 4 Aug 2025 and 26 Sep 2025 and were actually completed between 4 Aug 2025 (07:55) and 3 Sep 2025 (12:49). The works impacted the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Sep 2025 at 12:49.

LONG TERM
Between
4 Aug 2025 and 30 Apr 2026
Details
View Map
Share
Follow
Oak Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Oak Lane, Manningham, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 30 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Apr 2025 at 15:44.

Northern Gas Networks logo
Tomorrow
Details
View Map
Share
Brighouse And Denholme Road

Northern Gas Networks carried out Utility repair and maintenance works on Brighouse And Denholme Road, Denholme, Bradford.

These works were categorised as Major.

Two-way signals were in place for some or all of the period.

The works were originally planned between 8 Aug 2025 and 4 Sep 2025 and were actually completed between 8 Aug 2025 (07:00) and 3 Sep 2025 (12:48). The works impacted the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 3 Sep 2025 at 12:48.

Yorkshire Water logo
LONG TERM
Between
11 Aug and 23 Nov 2025
Details
View Map
Share
Follow
Hollingwood Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hollingwood Lane, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Jun 2025 at 08:56.

Northern Powergrid (Yorkshire) logo
Until
12 Sep 2025
Details
View Map
Share
Follow
Bradford Road

Northern Powergrid (Yorkshire) are carrying out Utility asset works on Bradford Road, Bingley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2025 at 11:00 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 Aug 2025 at 09:28.

Northern Gas Networks logo
Until
12 Sep 2025
Details
View Map
Share
Follow
Pasture Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Pasture Lane, Clayton, Bradford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 09:00 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Aug 2025 at 09:19.

LONG TERM
Between
18 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
North Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on North Street, Haworth, Keighley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 May 2025 at 09:16.

Northern Gas Networks logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Sunhurst Drive

Northern Gas Networks are carrying out Utility repair and maintenance works on Sunhurst Drive, Oakworth, Keighley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:00 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Sep 2025 at 09:32.

LONG TERM
Between
21 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Main Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Main Street, Wilsden, Bingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 21 May 2025 at 15:36.

LONG TERM
Between
21 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Cold Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Cold Street, Haworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 08:58.

LONG TERM
Between
21 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Sun Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Sun Lane, Stanbury, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 21 May 2025 at 15:45.

LONG TERM
Between
21 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
West Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on West Lane, Haworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 09:13.

LONG TERM
Between
21 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Wilsden Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Wilsden Road, Harden, Bingley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 21 May 2025 at 15:41.

LONG TERM
Between
21 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Stanley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Stanley Road, Ingrow, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 21 May 2025 at 16:20.

LONG TERM
Between
21 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Keighley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Keighley Road, Bingley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 21 May 2025 at 15:43.

LONG TERM
Between
21 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Bankfield Walk

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Bankfield Walk, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 08:51.

LONG TERM
Between
21 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Coronation Way

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Coronation Way, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 08:57.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Halifax Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Halifax Road, Denholme, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 11:40.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Denby Mount

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Denby Mount, Oxenhope, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 09:25.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Ashfield Terrace

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Ashfield Terrace, Haworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 09:31.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Prospect Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Prospect Street, Haworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 09:30.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Belle Isle Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Belle Isle Road, Haworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 09:23.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Market Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Market Street, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 11:37.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Market Square

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Market Square, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 15:47.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Victoria Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Victoria Street, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 09:47.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Salts Mill Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Salts Mill Road, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 11:39.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Myrtle Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Myrtle Drive, Cross Roads, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 09:49.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Victoria Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Victoria Road, Oakworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 13:45.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Hainworth Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Hainworth Lane, Hainworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 09:51.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Victoria Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Victoria Road, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 08:53.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Westburn Grove

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Westburn Grove, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 09:17.

Northern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Kings Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kings Road, Crossflatts, Bingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 18 Jun 2025 at 09:52.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Holmewood Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Holmewood Road, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 08:47.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Lustre Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Lustre Street, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 13:45.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
North Dean Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on North Dean Road, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 09:52.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Belgrave Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Belgrave Road, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 08:55.

LONG TERM
Between
22 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Linnet Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Linnet Street, Lawkholme, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 May 2025 at 08:50.

Northern Gas Networks logo
Between
26 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Brighouse And Denholme Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brighouse And Denholme Road, Denholme, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 2 Jul 2025 at 16:49.

LONG TERM
Between
27 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Central Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Central Drive, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 15:57.

LONG TERM
Between
27 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Bracken Bank Avenue

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Bracken Bank Avenue, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 15:59.

LONG TERM
Between
27 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Back Caister Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Back Caister Street, Ingrow, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 15:55.

LONG TERM
Between
27 Aug 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Heber Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Heber Street, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 27 May 2025 at 15:52.

Northern Powergrid (Yorkshire) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Chapel Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Chapel Lane, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 24 Jun 2025 at 14:41.

Northern Powergrid (Yorkshire) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Chapel Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Chapel Lane, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 26 Jun 2025 at 13:35.

Today
Details
View Map
Share
Allerton Road

City Of Bradford Metropolitan District Council carried out Highway improvement works on Allerton Road, Allerton, Bradford.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 29 Aug 2025 and 3 Sep 2025 and were actually completed between 29 Aug 2025 (19:00) and 3 Sep 2025 (02:30). The works impacted the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Sep 2025 at 08:55.

LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Myrtle Drive

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Myrtle Drive, Cross Roads, Keighley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 August 2025 at 08:00 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Sep 2025 at 11:11.

Northern Powergrid (Yorkshire) logo
Finishing
Friday
Details
View Map
Share
Follow
Denholme Road

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Denholme Road, Oxenhope, Keighley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 August 2025 at 01:30 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Sep 2025 at 13:40.

LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Market Street

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Market Street, Shipley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 August 2025 at 08:30 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Sep 2025 at 11:12.

LONG TERM
Between
1 Sep and 24 Nov 2025
Details
View Map
Share
Follow
Cragg Lane

City Of Bradford Metropolitan District Council are proposing to carry out Remedial works on Cragg Lane, Denholme, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Aug 2025 at 11:27.

Northern Gas Networks logo
LONG TERM
Between
1 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Halifax Road

Northern Gas Networks are proposing to carry out Utility asset works on Halifax Road, Denholme, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2025 at 15:53.

Quickline Commucations logo
Finishing
Sunday
Details
View Map
Share
Allerton Lane

Quickline Commucations were proposing to carry out Utility asset works on Allerton Lane, Allerton, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 7 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 17 Jul 2025 at 13:22.

Finishing
Tomorrow
Details
View Map
Share
Follow
Barnes Road

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Barnes Road, Girlington, Bradford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 19:00 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 Sep 2025 at 07:51.

LONG TERM
Until
1 Oct 2025
Details
View Map
Share
Follow
Denby Mount

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Denby Mount, Oxenhope, Keighley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Sep 2025 at 11:15.

LONG TERM
Until
1 Oct 2025
Details
View Map
Share
Follow
Cold Street

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Cold Street, Haworth, Keighley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Sep 2025 at 11:16.

BT logo
Finishing
Friday
Details
View Map
Share
Station Road

BT were proposing to carry out Utility asset works on Station Road, Haworth, Keighley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 5 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 22 May 2025 at 11:00.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Station Road

BT are proposing to carry out Utility asset works on Station Road, Haworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 20 May 2025 at 15:10.

LONG TERM
Between
1 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Ebor Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Ebor Lane, Haworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 1 Jul 2025 at 11:23.

LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Ebor Lane

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Ebor Lane, Haworth, Keighley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 07:45 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 1 Sep 2025 at 16:14.

Northern Gas Networks logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Colne Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Colne Road, Oakworth, Keighley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 15:55.

LONG TERM
Between
1 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Prospect Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Prospect Street, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 May 2025 at 13:46.

LONG TERM
Between
1 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Nile Crescent

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Nile Crescent, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 May 2025 at 13:46.

LONG TERM
Between
1 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Nile Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Nile Street, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 May 2025 at 13:46.

LONG TERM
Between
1 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Bronte Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Bronte Street, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 May 2025 at 14:34.

LONG TERM
Between
1 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Grange Crescent

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Grange Crescent, Riddlesden, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 May 2025 at 13:42.

LONG TERM
Between
1 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Scott Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Scott Lane, Riddlesden, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 May 2025 at 13:50.

Northern Powergrid (Yorkshire) logo
Between
1 and 12 Sep 2025
Details
View Map
Share
Parkers Lane

Northern Powergrid (Yorkshire) were proposing to carry out New service connection on Parkers Lane, Utley, Keighley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 12 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Jun 2025 at 10:03.

Yorkshire Water logo
Finishing
Monday
Details
View Map
Share
Follow
Back Kensington Street

Yorkshire Water are carrying out Utility repair and maintenance works on Back Kensington Street, Girlington, Bradford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 12:30 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2025 at 13:52.

Finishing
Friday
Details
View Map
Share
Follow
Prospect Street

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Prospect Street, Haworth, Keighley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 08:00 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Sep 2025 at 11:17.

LONG TERM
Until
2 Oct 2025
Details
View Map
Share
Follow
Belle Isle Road

City Of Bradford Metropolitan District Council are carrying out Highway improvement works on Belle Isle Road, Haworth, Keighley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 08:00 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 3 Sep 2025 at 11:18.

Northern Gas Networks logo
Between
2 and 22 Sep 2025
Details
View Map
Share
Colne Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Colne Road, Oakworth, Keighley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Jun 2025 at 10:26.

Between
6 and 15 Sep 2025
Details
View Map
Share
Follow
Toller Lane Roundabout

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Toller Lane Roundabout, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 22 Aug 2025 at 11:28.

LONG TERM
Between
8 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Sun Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Sun Lane, Stanbury, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 23 Jul 2025 at 15:55.

LONG TERM
Between
8 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Hainworth Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Hainworth Lane, Hainworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 Aug 2025 at 14:21.

Northern Powergrid (Yorkshire) logo
Between
8 and 19 Sep 2025
Details
View Map
Share
Follow
Chapel Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Chapel Lane, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Jul 2025 at 14:10.

Northern Powergrid (Yorkshire) logo
Between
8 and 19 Sep 2025
Details
View Map
Share
Follow
Chapel Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Chapel Lane, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Jul 2025 at 08:49.

LONG TERM
Between
9 Sep and 9 Oct 2025
Details
View Map
Share
Follow
Stanley Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Stanley Road, Ingrow, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 Aug 2025 at 14:23.

LONG TERM
Between
9 Sep and 9 Oct 2025
Details
View Map
Share
Follow
Victoria Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Victoria Road, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 Aug 2025 at 14:23.

Yorkshire Water logo
Between
10 and 16 Sep 2025
Details
View Map
Share
Duchy Avenue

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Duchy Avenue, Heaton, Bradford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 September 2025 and run through until 16 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 30 Jun 2025 at 11:31.

LONG TERM
Between
11 Sep and 11 Oct 2025
Details
View Map
Share
Follow
Westburn Grove

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Westburn Grove, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 Aug 2025 at 14:21.

LONG TERM
Between
11 Sep and 11 Oct 2025
Details
View Map
Share
Follow
Holmewood Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Holmewood Road, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 13 Aug 2025 at 14:23.

LONG TERM
Between
12 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Coronation Way

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Coronation Way, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Aug 2025 at 10:06.

LONG TERM
Between
14 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Victoria Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Victoria Street, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Aug 2025 at 16:03.

LONG TERM
Between
14 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Salts Mill Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Salts Mill Road, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Aug 2025 at 16:02.

Northern Gas Networks logo
Between
15 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Blenheim Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Blenheim Road, Manningham, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Aug 2025 at 16:26.

Yorkshire Water logo
Between
15 and 23 Sep 2025
Details
View Map
Share
Oastler Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Oastler Road, Saltaire, Shipley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 23 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 14 Aug 2025 at 07:45.

Quickline Commucations logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Sheriff Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Sheriff Lane, Eldwick, Bingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 15 Jul 2025 at 13:58.

LONG TERM
Between
15 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Belgrave Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Belgrave Road, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Aug 2025 at 16:00.

LONG TERM
Between
17 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Linnet Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Linnet Street, Lawkholme, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 20 Aug 2025 at 15:59.

LONG TERM
Between
18 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Chapel Row

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Chapel Row, Wilsden, Bingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 13:46.

LONG TERM
Between
18 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Wilsden Hill Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Wilsden Hill Road, Wilsden, Bingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 14:37.

LONG TERM
Between
18 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Thorn Close

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Thorn Close, Wrose, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 13:46.

LONG TERM
Between
18 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Grosvenor Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Grosvenor Road, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 14:36.

LONG TERM
Between
18 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Back Bradford Road Nw

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Back Bradford Road Nw, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 14:35.

LONG TERM
Between
18 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Sandals Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Sandals Road, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 14:36.

LONG TERM
Between
18 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Kirklands Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Kirklands Lane, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 14:42.

LONG TERM
Between
18 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Heber Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Heber Street, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jun 2025 at 14:43.

Northern Gas Networks logo
Between
19 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Blenheim Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Blenheim Road, Manningham, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 11:59.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Poplar Crescent

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Poplar Crescent, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:02.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Greenfield Crescent

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Greenfield Crescent, Cullingworth, Bingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:05.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Highfield Terrace

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Highfield Terrace, Cullingworth, Bingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 13:57.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Back Birklands Road South

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Back Birklands Road South, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:07.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Woodway

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Woodway, Cottingley, Bingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:04.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Thornacre Crescent

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Thornacre Crescent, Wrose, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 13:59.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Westfield Lane

City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Westfield Lane, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 13:33.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Spring Hill

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Spring Hill, Wrose, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:16.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Manor Court

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Manor Court, Cottingley, Bingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:08.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Glenaire

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Glenaire, Windhill, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:05.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Glenfield

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Glenfield, Windhill, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 13:58.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Temple Rhydding Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Temple Rhydding Drive, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:15.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Highfield Crescent

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Highfield Crescent, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:15.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Lens Drive

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Lens Drive, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 14:20.

LONG TERM
Between
19 Sep 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Redwood Close

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Redwood Close, Long Lee, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 Jun 2025 at 13:56.

Yorkshire Water logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Calton Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Calton Road, Thwaites Brow, Keighley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 3 Jul 2025 at 12:26.

LONG TERM
Between
26 Sep and 26 Oct 2025
Details
View Map
Share
Follow
Halifax Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Halifax Road, Denholme, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 26 Aug 2025 at 13:30.

Between
26 Sep and 26 Oct 2025
Details
View Map
Share
Follow
Halifax Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Halifax Road, Denholme, Bradford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 29 Aug 2025 at 08:02.

Northern Gas Networks logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Oakleigh Terrace

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakleigh Terrace, Clayton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 May 2025 at 13:49.

Northern Gas Networks logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Oakleigh Terrace

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakleigh Terrace, Clayton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 10:49.

Northern Gas Networks logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Oakleigh Terrace

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakleigh Terrace, Clayton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 May 2025 at 12:58.

Yorkshire Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Bonn Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bonn Road, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 25 Jul 2025 at 11:15.

Yorkshire Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Bonn Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bonn Road, Heaton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 25 Jul 2025 at 13:11.

Northern Gas Networks logo
Between
29 Sep and 8 Oct 2025
Details
View Map
Share
Prune Park Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Prune Park Lane, Bradford.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 24 Jul 2025 at 10:10.

Yorkshire Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Norbreck Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Norbreck Drive, Cross Roads, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 2 Jul 2025 at 16:02.

Yorkshire Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Norbreck Drive

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Norbreck Drive, Cross Roads, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Jul 2025 at 14:38.

LONG TERM
Between
29 Sep and 29 Oct 2025
Details
View Map
Share
Follow
Wood Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Wood Street, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 26 Aug 2025 at 11:25.

Northern Gas Networks logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Colne Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Colne Road, Oakworth, Keighley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Jun 2025 at 11:15.

Northern Gas Networks logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Colne Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Colne Road, Oakworth, Keighley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Jun 2025 at 14:49.

Northern Powergrid (Yorkshire) logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Back Shaw Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Back Shaw Lane, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 Jul 2025 at 14:10.

Northern Powergrid (Yorkshire) logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Back Shaw Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Back Shaw Lane, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 31 Jul 2025 at 11:05.

BT logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Glovershaw Lane

BT are proposing to carry out Utility asset works on Glovershaw Lane, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 1 Jul 2025 at 08:18.

BT logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Glovershaw Lane

BT are proposing to carry out Utility asset works on Glovershaw Lane, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 3 Jul 2025 at 10:25.

BT logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Glovershaw Lane

BT are proposing to carry out Utility asset works on Glovershaw Lane, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 4 Jul 2025 at 14:47.

BT logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Glovershaw Lane

BT are proposing to carry out Utility asset works on Glovershaw Lane, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 18 Aug 2025 at 11:09.

BT logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Spring Lane

BT are proposing to carry out Utility asset works on Spring Lane, Eldwick, Bingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 2 Jul 2025 at 08:06.

BT logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Spring Lane

BT are proposing to carry out Utility asset works on Spring Lane, Eldwick, Bingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 4 Jul 2025 at 14:30.

BT logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Spring Lane

BT are proposing to carry out Utility asset works on Spring Lane, Eldwick, Bingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 18 Aug 2025 at 11:08.

BT logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Spring Lane

BT are proposing to carry out Utility asset works on Spring Lane, Eldwick, Bingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 1 Jul 2025 at 08:19.

BRSK logo
Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Vale Mill Lane

BRSK are proposing to carry out Utility repair and maintenance works on Vale Mill Lane, Haworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BRSK on 3 Jun 2025 at 09:48.

BRSK logo
Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Vale Mill Lane

BRSK are proposing to carry out Utility repair and maintenance works on Vale Mill Lane, Haworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BRSK on 3 Jun 2025 at 10:02.

Quickline Commucations logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Yate Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Yate Lane, Oxenhope, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 5 Aug 2025 at 11:12.

Quickline Commucations logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Yate Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Yate Lane, Oxenhope, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 6 Aug 2025 at 09:31.

Quickline Commucations logo
Between
6 and 10 Oct 2025
Details
View Map
Share
White Lane

Quickline Commucations were proposing to carry out Utility asset works on White Lane, Oakworth, Keighley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 10 October 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 5 Aug 2025 at 14:30.

Quickline Commucations logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
White Lane

Quickline Commucations are proposing to carry out Utility asset works on White Lane, Oakworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 5 Aug 2025 at 14:42.

Quickline Commucations logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
White Lane

Quickline Commucations are proposing to carry out Utility asset works on White Lane, Oakworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 6 Aug 2025 at 09:33.

Between
6 and 31 Oct 2025
Details
View Map
Share
Follow
Baildon Road

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Baildon Road, Baildon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 5 Aug 2025 at 11:19.

Yorkshire Water logo
Between
8 and 14 Oct 2025
Details
View Map
Share
Follow
Green Head Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Green Head Lane, Utley, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Jul 2025 at 09:49.

Northern Gas Networks logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Oakleigh Terrace

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakleigh Terrace, Clayton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Aug 2025 at 15:40.

Quickline Commucations logo
Between
13 and 19 Oct 2025
Details
View Map
Share
Follow
Denholme Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Denholme Road, Oxenhope, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 7 Aug 2025 at 11:02.

Quickline Commucations logo
Between
13 and 19 Oct 2025
Details
View Map
Share
Follow
Denholme Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Denholme Road, Oxenhope, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Quickline Commucations on 12 Aug 2025 at 12:54.

Quickline Commucations logo
Between
13 and 19 Oct 2025
Details
View Map
Share
Follow
Station Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Station Road, Oxenhope, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 8 Aug 2025 at 15:56.

Quickline Commucations logo
Between
13 and 19 Oct 2025
Details
View Map
Share
Follow
Station Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Station Road, Oxenhope, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 12 Aug 2025 at 13:01.

Northern Gas Networks logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Providence Court

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Providence Court, Oakworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 15:53.

Yorkshire Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Valley Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Valley Road, Shipley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 25 Jul 2025 at 13:43.

Yorkshire Water logo
Between
20 and 29 Oct 2025
Details
View Map
Share
Oastler Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Oastler Road, Saltaire, Shipley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 27 Aug 2025 at 10:01.

Northern Gas Networks logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Otley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Otley Road, Charlestown, Baildon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Apr 2025 at 16:30.

Northern Gas Networks logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Kirklands Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kirklands Lane, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Apr 2025 at 16:01.

Northern Gas Networks logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Kirklands Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kirklands Lane, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Aug 2025 at 15:04.

Yorkshire Water logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Bradford Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bradford Road, Riddlesden, Keighley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 24 Jul 2025 at 15:48.

Yorkshire Water logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Bradford Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bradford Road, Riddlesden, Keighley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 28 Jul 2025 at 14:23.

Northern Powergrid (Yorkshire) logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Follow
Allerton Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Allerton Lane, Allerton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 Jul 2025 at 15:58.

Northern Powergrid (Yorkshire) logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Follow
Allerton Lane

Northern Powergrid (Yorkshire) are proposing to carry out Utility repair and maintenance works on Allerton Lane, Allerton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Jul 2025 at 09:00.

Northern Gas Networks logo
Between
22 Oct and 11 Nov 2025
Details
View Map
Share
Follow
Kirklands Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kirklands Lane, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Apr 2025 at 11:43.

Quickline Commucations logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Allerton Lane

Quickline Commucations are proposing to carry out Utility asset works on Allerton Lane, Allerton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 17 Jul 2025 at 16:08.

Quickline Commucations logo
Between
27 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Allerton Lane

Quickline Commucations are proposing to carry out Utility asset works on Allerton Lane, Allerton, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Quickline Commucations on 18 Jul 2025 at 09:16.

Northern Gas Networks logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Rosebery Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rosebery Road, Manningham, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 6 Aug 2025 at 16:02.

Network Rail logo
Between
8 and 10 Nov 2025
Details
View Map
Share
Follow
Sir Fred Hoyle Way

Network Rail are proposing to carry out Works for Rail Purposes on Sir Fred Hoyle Way, Bingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Aug 2025 at 11:18.

Network Rail logo
Between
8 and 10 Nov 2025
Details
View Map
Share
Sir Fred Hoyle Way

Network Rail were proposing to carry out Works for Rail Purposes on Sir Fred Hoyle Way, Bingley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 November 2025 and run through until 10 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 1 Sep 2025 at 14:32.

Northern Gas Networks logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
Providence Court

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Providence Court, Oakworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 5 Jun 2025 at 10:48.

Northern Gas Networks logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
Providence Court

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Providence Court, Oakworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 5 Jun 2025 at 10:59.

Yorkshire Water logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Hainworth Shaw Lane

Yorkshire Water are proposing to carry out New service connection on Hainworth Shaw Lane, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 18 Aug 2025 at 11:14.

Yorkshire Water logo
LONG TERM
Between
17 Nov 2025 and 1 Feb 2026
Details
View Map
Share
Follow
Providence Crescent

Yorkshire Water are proposing to carry out Utility asset works on Providence Crescent, Oakworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 1 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Aug 2025 at 08:54.

Yorkshire Water logo
LONG TERM
Between
17 Nov 2025 and 1 Feb 2026
Details
View Map
Share
Follow
Providence Crescent

Yorkshire Water are proposing to carry out Utility asset works on Providence Crescent, Oakworth, Keighley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 1 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 21 Aug 2025 at 08:40.

Yorkshire Water logo
Between
24 Nov and 3 Dec 2025
Details
View Map
Share
Oastler Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Oastler Road, Saltaire, Shipley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 November 2025 and run through until 3 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 27 Aug 2025 at 11:02.

BT logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Aire Valley Road

BT are proposing to carry out Utility asset works on Aire Valley Road, Keighley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Aug 2025 at 16:32.

BT logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Keighley Road

BT are proposing to carry out Utility asset works on Keighley Road, Bingley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Aug 2025 at 16:37.

Northern Gas Networks logo
Between
25 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Lane Side

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lane Side, Wilsden, Bingley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 15 December 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 18 Aug 2025 at 11:38.

Yorkshire Water logo
Between
1 and 10 Dec 2025
Details
View Map
Share
Follow
Oastler Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Oastler Road, Saltaire, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 27 Aug 2025 at 15:20.

Yorkshire Water logo
Between
1 and 10 Dec 2025
Details
View Map
Share
Follow
Oastler Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Oastler Road, Saltaire, Shipley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 28 Aug 2025 at 16:11.

LONG TERM
Between
1 Dec 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Wood Street

City Of Bradford Metropolitan District Council are proposing to carry out Highway improvement works on Wood Street, Baildon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Bradford Metropolitan District Council on 19 May 2025 at 11:34.


Roadworks Map near to Glen View, BINGLEY, BD16 1JE (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Sep 2025 13:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Glen View, BINGLEY, BD16 1JE (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
MAJOR
  
WILSDEN ROAD, HARDEN 
(0.2 miles)
City Of Bradford Metropolitan District Council
Highway improvement works - Carriageway - Multi-way signals
Planned
Scheduled: 21 Aug 2025 - 31 Mar 2026
0.2
Details
Share
Follow
2
MAJOR
  
WILSDEN ROAD, HARDEN 
(0.2 miles)
City Of Bradford Metropolitan District Council
Highway improvement works - Carriageway - Multi-way signals
Complete
26 Aug 2025 09:30 - 1 Sep 2025 15:00
0.2
Details
Share
3
Yorkshire Water logo
URGENT
  
LEE CLOSE, WILSDEN 
(0.8 miles)
Yorkshire Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
1 Sep 2025 09:29 - 3 Sep 2025 10:00
0.8
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.