ROADWORKS SUMMARY
South Walk, BINGLEY, BD16 1BZ
Introduction
View current and future planned roadworks and road closures for South Walk, BD16 1BZ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to South Walk, BINGLEY, BD16 1BZ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for South Walk are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
26 Jan 2025
City Of Bradford Metropolitan District Council are carrying out Highway repair and maintenance works on Thornton Road, Bradford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 22 January 2024 at 07:00 and could run through until 26 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 26 Jan 2024 at 14:48.
17 Jul 2024 and 17 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Daleside Road, Windhill, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2024 and could run through until 17 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 25 Apr 2024 at 10:27.
17 Jul 2024 and 17 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Heaton Close, Eldwick, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2024 and could run through until 17 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 25 Apr 2024 at 10:30.
17 Jul 2024 and 16 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Collier Lane, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2024 and could run through until 16 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 25 Apr 2024 at 10:16.
17 Jul 2024 and 16 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Brantcliffe Drive, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2024 and could run through until 16 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 25 Apr 2024 at 10:23.
25 Jul 2024 and 25 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Wood Street, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2024 and could run through until 25 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 26 Apr 2024 at 07:38.
25 Jul 2024 and 25 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Whitelands Road, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2024 and could run through until 25 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 26 Apr 2024 at 07:07.
29 Jul 2024 and 29 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Mary Street, Denholme, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:27.
29 Jul 2024 and 29 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Minorca Mount, Denholme, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:29.
29 Jul 2024 and 29 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Stoney Ridge Road, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:03.
29 Jul 2024 and 29 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Avondale Road, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:00.
29 Jul 2024 and 29 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Dockfield Road, Shipley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 11:47.
29 Jul 2024 and 29 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Low Close, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:54.
29 Jul 2024 and 29 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Spring Close, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:53.
29 Jul 2024 and 29 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Bromley Road, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:01.
29 Jul 2024 and 29 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Bentley Close, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:00.
29 Jul 2024 and 29 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Rocklands Place, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:53.
29 Jul 2024 and 29 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Brantcliffe Way, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:01.
29 Jul 2024 and 29 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Merville Avenue, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 29 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 30 Apr 2024 at 06:02.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Stone Lane, Oxenhope, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:54.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Tim Lane, Oakworth, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 10:10.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Denby Court, Oakworth, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 10:09.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Southlea Avenue, Oakworth, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:54.
1 Aug 2024 and 2 Nov 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Bath Street, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 2 November 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:23.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Well Street, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:26.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on West Bank Close, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:30.
1 Aug 2024 and 1 Aug 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Parson Street, Lawkholme, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 August 2024 and could run through until 1 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 May 2024 at 09:28.
3 Sep and 3 Dec 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Bradford Road, Riddlesden, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2024 and could run through until 3 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 4 Jun 2024 at 07:58.
16 Sep 2024 and 28 Mar 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Keighley Road, Oxenhope, Keighley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 28 March 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Sep 2024 at 12:23.
30 Sep and 31 Dec 2024
City Of Bradford Metropolitan District Council were proposing to carry out Highway repair and maintenance works on Otley Road, Shipley.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 31 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Oct 2024 at 10:17.
30 Sep and 31 Dec 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Kirkgate, Shipley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 5 Aug 2024 at 13:57.
1 Oct and 31 Dec 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Thwaites Brow Road, Thwaites Brow, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 31 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Aug 2024 at 14:56.
29 Nov 2024
City Of Bradford Metropolitan District Council are carrying out Highway repair and maintenance works on Emm Lane, Heaton, Bradford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 10:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 8 Oct 2024 at 12:12.
18 Oct and 29 Nov 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Emm Lane, Heaton, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 October 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 18 Jul 2024 at 13:27.
21 Oct and 31 Dec 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Kirkgate, Shipley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 4 Oct 2024 at 14:01.
29 Nov 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Bingley Road, Cullingworth, Bingley.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 October 2024 at 11:05 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 07:56.
29 Nov 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Hill End Lane, Harden, Bingley.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 October 2024 at 11:05 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 07:59.
28 Oct 2024 and 9 May 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Keighley Road, Oxenhope, Keighley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 9 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 5 Aug 2024 at 15:31.
29 Nov 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Hill End Lane, Harden, Bingley.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 October 2024 at 10:25 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 15:07.
1 Nov 2024 and 31 Jan 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Otley Road, Shipley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Oct 2024 at 07:55.
Tomorrow
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Denholme Road, Oxenhope, Keighley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 6 Nov 2024 at 15:20.
11 Nov and 6 Dec 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Hirst Lane, Saltaire, Shipley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 4 Nov 2024 at 14:19.
29 Nov 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Carr Lane, East Morton, Keighley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 09:39.
11 and 29 Nov 2024
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Elm Grove, East Morton, Keighley.
These works were categorised as Major.
The works were originally planned to start 11 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 08:37.
12 and 29 Nov 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Morton Lane, East Morton, Keighley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 09:47.
29 Nov 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Morton Lane, East Morton, Keighley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 09:30 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 11:21.
12 and 29 Nov 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Street Lane, East Morton, Keighley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 12 Nov 2024 at 09:39.
3 Dec 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Street Lane, East Morton, Keighley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 08:30 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 10:05.
15 and 29 Nov 2024
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Street Lane, East Morton, Keighley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Oct 2024 at 14:07.
18 Nov 2024 and 31 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bertram Drive, Baildon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 22 Aug 2024 at 14:20.
18 Nov and 13 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Baildon Road, Baildon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 18 Oct 2024 at 08:39.
18 Nov and 2 Dec 2024
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Baildon Road, Baildon.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 14:10.
18 Nov 2024 and 31 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Enfield Road, Baildon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 22 Aug 2024 at 14:22.
18 Nov 2024 and 31 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Cliffe Lane West, Baildon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 22 Aug 2024 at 14:22.
18 Nov 2024 and 31 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Glenholm Road, Baildon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 22 Aug 2024 at 14:23.
18 Nov and 6 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Micklethwaite Lane, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Sep 2024 at 15:49.
18 Nov and 4 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Micklethwaite Lane, Bingley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 12:35.
4 Dec 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Micklethwaite Lane, Bingley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 12:00 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 13:36.
6 Dec 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Sty Lane, Micklethwaite, Bingley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 12:56.
17 Jan 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Wimborne Drive, Keighley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:30 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 09:41.
18 Nov 2024 and 17 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Raynham Crescent, Keighley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 11:49.
Tuesday
Yorkshire Water are carrying out Utility repair and maintenance works on Back Kirkgate North, Shipley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 14:00 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 20 Nov 2024 at 13:39.
Monday
Northern Gas Networks are carrying out Utility repair and maintenance works on Keighley Road, Bingley.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 14:53 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 15:13.
Yorkshire Water carried out roadworks on Lane Side, Wilsden, Bingley.
Multi-way signals were in place for some or all of the period.
The works were originally planned between 21 Nov 2024 and 27 Nov 2024 and were actually completed on 21 Nov 2024 between 09:43 and 14:57. The works impacted the carriageway only.
This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 15:21.
Yorkshire Water carried out roadworks on Haworth Road, Wilsden, Bingley.
Multi-way signals were in place for some or all of the period.
The works were originally planned between 21 Nov 2024 and 27 Nov 2024 and were actually completed on 21 Nov 2024 between 09:43 and 14:57. The works impacted the carriageway only.
This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 15:23.
Yorkshire Water carried out roadworks on Low Wood, Wilsden, Bingley.
Multi-way signals were in place for some or all of the period.
The works were originally planned between 21 Nov 2024 and 27 Nov 2024 and were actually completed on 21 Nov 2024 between 09:43 and 14:57. The works impacted the carriageway only.
This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 15:24.
21 Nov and 12 Dec 2024
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Hoyle Court Road, Baildon.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 November 2024 and run through until 12 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 08:30.
21 and 29 Nov 2024
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Heaton Close, Eldwick, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 25 Oct 2024 at 13:46.
21 Nov and 4 Dec 2024
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Micklethwaite Lane, Bingley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 November 2024 and run through until 4 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 12:31.
25 Nov and 13 Dec 2024
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Enfield Road, Baildon.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 25 Sep 2024 at 13:43.
25 Nov and 13 Dec 2024
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Cliffe Lane West, Baildon.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 25 Sep 2024 at 13:42.
25 Nov and 9 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Greenhill Drive, Micklethwaite, Bingley.
These works are categorised as Major.
The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Jul 2024 at 07:08.
26 Nov and 10 Dec 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Enfield Road, Baildon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 09:14.
26 Nov and 10 Dec 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Enfield Road, Baildon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 10:07.
26 Nov and 10 Dec 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Enfield Road, Baildon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 15 Nov 2024 at 09:26.
26 Nov and 10 Dec 2024
Yorkshire Water are proposing to carry out roadworks on Temple Rhydding Drive, Baildon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 18 Nov 2024 at 09:43.
26 Nov and 10 Dec 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Enfield Road, Baildon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 18 Nov 2024 at 14:30.
26 Nov and 10 Dec 2024
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Enfield Road, Baildon.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 November 2024 and run through until 10 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 18 Nov 2024 at 08:55.
26 and 28 Nov 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Back Marion Street, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 2 Sep 2024 at 10:15.
26 and 28 Nov 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Back Marion Street, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 3 Sep 2024 at 08:43.
9 Dec 2024 and 10 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hirst Mill Crescent, Saltaire, Shipley.
These works are categorised as Major.
The works will start on or after 9 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 May 2024 at 13:40.
10 and 12 Dec 2024
BT were proposing to carry out Utility repair and maintenance works on Back Heidelberg Road, Manningham, Bradford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 18 Sep 2024 at 08:06.
10 and 12 Dec 2024
BT are proposing to carry out Utility repair and maintenance works on Back Heidelberg Road, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 20 Sep 2024 at 11:13.
10 and 12 Dec 2024
BT are proposing to carry out Utility repair and maintenance works on Back Heidelberg Road, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 21 Nov 2024 at 09:16.
11 Dec 2024 and 11 Mar 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on North Park Road, Heaton, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 11 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Sep 2024 at 08:34.
11 Dec 2024 and 11 Mar 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Park View Road, Manningham, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 11 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 11 Sep 2024 at 08:35.
11 and 13 Dec 2024
BT were proposing to carry out Utility asset works on Bents Lane, Wilsden, Bingley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 19 Sep 2024 at 12:58.
11 and 13 Dec 2024
BT are proposing to carry out Utility asset works on Bents Lane, Wilsden, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 18 Sep 2024 at 11:13.
11 and 13 Dec 2024
BT are proposing to carry out Utility asset works on Bents Lane, Wilsden, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 17 Sep 2024 at 16:35.
11 and 13 Dec 2024
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Micklethwaite Lane, Bingley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 16 Oct 2024 at 08:34.
16 and 18 Dec 2024
Network Rail were proposing to carry out Works for Rail Purposes on Low Mill Lane, Keighley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 21 Oct 2024 at 15:53.
16 Dec 2024 and 10 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Green, Micklethwaite, Bingley.
These works are categorised as Major.
The works will start on or after 16 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Jul 2024 at 07:08.
2 Jan and 2 Feb 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Victor Road, Manningham, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 2 Oct 2024 at 15:40.
3 and 17 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Street, Micklethwaite, Bingley.
These works are categorised as Major.
The works will start on or after 3 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Jul 2024 at 07:08.
6 and 17 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Oxenhope, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 13:31.
6 and 17 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Oxenhope, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 15:31.
6 and 17 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Oxenhope, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 4 Nov 2024 at 14:50.
6 and 20 Jan 2025
Yorkshire Water are proposing to carry out roadworks on Keighley Road, Cullingworth, Bingley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 22 Oct 2024 at 13:24.
6 and 20 Jan 2025
Yorkshire Water were proposing to carry out Utility asset works on Ryecroft Road, Harden, Bingley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 20 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 21 Oct 2024 at 15:03.
6 and 20 Jan 2025
Yorkshire Water are proposing to carry out Utility asset works on Ryecroft Road, Harden, Bingley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 22 Oct 2024 at 14:43.
6 and 20 Jan 2025
Yorkshire Water are proposing to carry out roadworks on Goff Well Lane, Keighley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 22 Oct 2024 at 14:43.
6 and 20 Jan 2025
Yorkshire Water are proposing to carry out roadworks on Hainworth Shaw Lane, Keighley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 22 Oct 2024 at 13:23.
6 Jan and 7 Apr 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Thwaites Brow Road, Thwaites Brow, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 7 Nov 2024 at 13:29.
6 and 31 Jan 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Raynham Crescent, Keighley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 1 Aug 2024 at 15:19.
9 and 24 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hoyle Court Road, Baildon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Oct 2024 at 14:26.
10 and 15 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Spring Gardens Lane, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 7 Oct 2024 at 10:54.
10 and 14 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hospital Road, Riddlesden, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 16:02.
13 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Denholme Road, Oxenhope, Keighley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 7 Nov 2024 at 08:39.
13 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Denholme Road, Oxenhope, Keighley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 08:45.
20 Jan and 7 Feb 2025
Yorkshire Water are proposing to carry out Utility asset works on Hainworth Shaw Lane, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 25 Oct 2024 at 09:54.
20 and 22 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Glen Lee Lane, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 29 Oct 2024 at 08:14.
20 and 22 Jan 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Glen Lee Lane, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 1 Nov 2024 at 09:35.
29 and 31 Jan 2025
BT are proposing to carry out Utility asset works on Spring Lane, Eldwick, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 5 Nov 2024 at 15:00.
29 and 31 Jan 2025
BT are proposing to carry out Utility asset works on Spring Lane, Eldwick, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 11 Nov 2024 at 08:56.
1 Feb and 1 Mar 2025
City Of Bradford Metropolitan District Council were proposing to carry out Highway repair and maintenance works on Hirst Lane, Saltaire, Shipley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 February 2025 and run through until 1 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 4 Nov 2024 at 13:59.
3 Feb and 31 May 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Terrington Crest, Clayton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Oct 2024 at 12:26.
3 Feb and 31 May 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Fountain Street, Thornton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Oct 2024 at 07:59.
3 Feb and 31 May 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Upper Grange Avenue, Allerton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Oct 2024 at 12:27.
3 Feb and 31 May 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Duckworth Lane, Heaton, Bradford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 16 Oct 2024 at 16:01.
3 Feb and 31 May 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Chellow Lane, Daisy Hill, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Oct 2024 at 07:57.
3 Feb and 31 May 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Daisy Hill Lane, Daisy Hill, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Oct 2024 at 07:58.
3 Feb and 31 May 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Hazelwood Road, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Oct 2024 at 08:00.
3 Feb and 31 May 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Woodale Avenue, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Oct 2024 at 16:01.
3 Feb and 31 May 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Brantwood Road, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 17 Oct 2024 at 07:56.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Tanton Crescent, Clayton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:11.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Thorpe Road, Thornton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:12.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Brooklands Avenue, Thornton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 15:44.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on North Cliffe Lane, Thornton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 15:50.
4 Feb and 30 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Tintern Avenue, Fairweather Green, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 30 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:13.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Sunningdale, Fairweather Green, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:10.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Firethorn Close, Girlington, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 15:46.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Selborne Terrace, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:08.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Walden Drive, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:14.
4 Feb and 31 Oct 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Walden Drive, Heaton, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 16:15.
4 Feb and 30 May 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Haworth Road, Bradford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 12 Nov 2024 at 12:34.
6 Feb and 11 Jul 2025
City Of Bradford Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Hebden Bridge Road, Oxenhope, Keighley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 11 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by City Of Bradford Metropolitan District Council on 15 Nov 2024 at 09:47.
10 and 12 Feb 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Glen Road, Eldwick, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 19 Nov 2024 at 14:47.
10 and 24 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Head Lane, Utley, Keighley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 16:14.
11 and 13 Feb 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Westfield Road, Manningham, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 19 Nov 2024 at 12:16.
11 and 13 Feb 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Providence Row, Baildon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 19 Nov 2024 at 08:59.
12 and 14 Feb 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Spring Lane, Eldwick, Bingley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 18 Nov 2024 at 09:17.
17 and 19 Feb 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Main Road, Denholme, Bradford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 13 Nov 2024 at 09:18.
17 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on School Street, Steeton, Steeton With Eastburn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 11 Oct 2024 at 12:51.
Roadworks Map near to South Walk, BINGLEY, BD16 1BZ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to South Walk, BINGLEY, BD16 1BZ (6 Events)
(Scheduled Dates)
(miles)
(Scheduled: 30 Oct 2024 - 29 Nov 2024)
(Scheduled: 23 Oct 2024 - 29 Nov 2024)
(Scheduled: 23 Oct 2024 - 29 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.