ROADWORKS SUMMARY
St. Michaels Avenue, YEOVIL, BA21 4NB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for St. Michaels Avenue, BA21 4NB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to St. Michaels Avenue, YEOVIL, BA21 4NB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for St. Michaels Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Somerset County Council logo
LONG TERM
Between
22 Apr 2022 and 22 Apr 2027
Details
View Map
Share
Follow
Howell Hill

Somerset County Council are proposing to carry out Highway improvement works on Howell Hill, West Camel, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2022 and could run through until 22 April 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Somerset County Council on 19 Feb 2024 at 11:31.

Somerset County Council logo
LONG TERM
Between
14 Oct and 31 Dec 2024
Details
View Map
Share
Follow
Sandringham Road

Somerset County Council are proposing to carry out Works for road purposes on Sandringham Road, Yeovil.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Somerset County Council on 5 Sep 2024 at 15:07.

Somerset County Council logo
LONG TERM
Between
14 Oct and 31 Dec 2024
Details
View Map
Share
Follow
Vale Road

Somerset County Council are proposing to carry out Works for road purposes on Vale Road, Yeovil.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Somerset County Council on 5 Sep 2024 at 15:07.

Somerset County Council logo
LONG TERM
Between
14 Oct and 31 Dec 2024
Details
View Map
Share
Follow
Howard Road

Somerset County Council are proposing to carry out Works for road purposes on Howard Road, Yeovil.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Somerset County Council on 5 Sep 2024 at 15:07.

Somerset County Council logo
LONG TERM
Between
14 Oct and 31 Dec 2024
Details
View Map
Share
Follow
Lyde Road

Somerset County Council are proposing to carry out Works for road purposes on Lyde Road, Yeovil.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Somerset County Council on 5 Sep 2024 at 15:08.

Somerset County Council logo
LONG TERM
Between
14 Oct and 31 Dec 2024
Details
View Map
Share
Follow
Belvedere Road

Somerset County Council are proposing to carry out Works for road purposes on Belvedere Road, Yeovil.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Somerset County Council on 5 Sep 2024 at 15:07.

Somerset County Council logo
LONG TERM
Between
14 Oct and 31 Dec 2024
Details
View Map
Share
Pembroke Close

Somerset County Council were proposing to carry out Works for road purposes on Pembroke Close, Yeovil.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 31 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 14 Oct 2024 at 09:34.

Somerset County Council logo
LONG TERM
Between
14 Oct and 31 Dec 2024
Details
View Map
Share
Follow
Meadow Road

Somerset County Council are proposing to carry out Works for road purposes on Meadow Road, Yeovil.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Somerset County Council on 5 Sep 2024 at 15:06.

Somerset County Council logo
LONG TERM
Between
14 Oct and 31 Dec 2024
Details
View Map
Share
Follow
St Johns Road

Somerset County Council are proposing to carry out Works for road purposes on St Johns Road, Yeovil.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Somerset County Council on 5 Sep 2024 at 15:05.

Somerset County Council logo
LONG TERM
Between
24 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Glovers Walk

Somerset County Council are proposing to carry out Highway improvement works on Glovers Walk, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Somerset County Council on 3 Oct 2024 at 15:44.

Somerset County Council logo
LONG TERM
Between
28 Oct and 31 Dec 2024
Details
View Map
Share
Belvedere Road

Somerset County Council were proposing to carry out Works for road purposes on Belvedere Road, Yeovil.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 31 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 14 Oct 2024 at 09:33.

Somerset County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Rnas Yeovilton Road

Somerset County Council are carrying out Highway improvement works on Rnas Yeovilton Road, Yeovilton, Yeovil.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 09:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 22 Nov 2024 at 08:18.

Somerset County Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Glovers Walk

Somerset County Council are carrying out Highway improvement works on Glovers Walk, Yeovil.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 08:00 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Somerset County Council on 20 Nov 2024 at 13:53.

Somerset County Council logo
Finishing
Friday
Details
View Map
Share
Rnas Yeovilton Road

Somerset County Council were proposing to carry out Highway improvement works on Rnas Yeovilton Road, Yeovilton, Yeovil.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 19 Nov 2024 at 08:22.

Somerset County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Rnas Yeovilton Road

Somerset County Council are proposing to carry out Highway improvement works on Rnas Yeovilton Road, Yeovilton, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 19 Nov 2024 at 11:54.

Wessex Water logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Font Villas

Wessex Water are carrying out Utility repair and maintenance works on Font Villas, West Coker, Yeovil.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:30 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 2 Dec 2024 at 09:33.

Wessex Water logo
Finishing
Friday
Details
View Map
Share
Follow
Font Lane

Wessex Water are carrying out Utility repair and maintenance works on Font Lane, West Coker, Yeovil.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:30 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 2 Dec 2024 at 09:33.

Somerset County Council logo
Between
2 and 30 Dec 2024
Details
View Map
Share
South Western Terrace

Somerset County Council were proposing to carry out Highway improvement works on South Western Terrace, Yeovil.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 30 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Somerset County Council on 29 Nov 2024 at 11:56.

Somerset County Council logo
Finishing
Friday
Details
View Map
Share
Follow
South Western Terrace

Somerset County Council are proposing to carry out Highway improvement works on South Western Terrace, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Somerset County Council on 27 Nov 2024 at 08:36.

Somerset County Council logo
Finishing
Today
Details
View Map
Share
Follow
Yeovil Marsh Road

Somerset County Council are proposing to carry out Highway repair and maintenance works on Yeovil Marsh Road, Yeovil Marsh, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 6 Nov 2024 at 14:47.

Somerset County Council logo
Finishing
Today
Details
View Map
Share
Follow
Yeovil Marsh Road

Somerset County Council are carrying out Highway repair and maintenance works on Yeovil Marsh Road, Yeovil Marsh, Yeovil.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 11:17 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 16 Dec 2024 at 11:17.

BT logo
Between
2 and 4 Jan 2025
Details
View Map
Share
Follow
Castle Town Way

BT are proposing to carry out Utility asset works on Castle Town Way, Sherborne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 4 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 17 Sep 2024 at 10:20.

BT logo
Between
2 and 4 Jan 2025
Details
View Map
Share
Follow
Castle Town Way

BT are proposing to carry out Utility asset works on Castle Town Way, Sherborne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 4 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 21 Nov 2024 at 12:10.

Wessex Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Hummer Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Hummer Road, Hummer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 10 Oct 2024 at 15:20.

Somerset County Council logo
Between
6 and 29 Jan 2025
Details
View Map
Share
Meadow Road

Somerset County Council were proposing to carry out Works for road purposes on Meadow Road, Yeovil.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 29 Nov 2024 at 14:30.

Wessex Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Hummer Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Hummer Road, Hummer.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 4 Oct 2024 at 10:35.

Scottish Hydro Electric Power Dis logo
Between
6 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Highfield Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Highfield Road, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Oct 2024 at 08:30.

Scottish Hydro Electric Power Dis logo
Between
6 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Highfield Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Highfield Road, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Oct 2024 at 16:19.

Somerset County Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Lyde Road

Somerset County Council are proposing to carry out Works for road purposes on Lyde Road, Yeovil.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 2 Dec 2024 at 15:57.

Somerset County Council logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Lyde Road

Somerset County Council are proposing to carry out Works for road purposes on Lyde Road, Yeovil.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 3 Dec 2024 at 08:17.

Somerset County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Hendford Hill

Somerset County Council are proposing to carry out Highway repair and maintenance works on Hendford Hill, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Somerset County Council on 17 Jul 2024 at 11:07.

Somerset County Council logo
Between
6 and 29 Jan 2025
Details
View Map
Share
Follow
Hendford Hill

Somerset County Council are proposing to carry out Highway repair and maintenance works on Hendford Hill, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Somerset County Council on 11 Sep 2024 at 08:53.

Somerset County Council logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Larkhill Road

Somerset County Council are proposing to carry out Highway repair and maintenance works on Larkhill Road, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 3 Dec 2024 at 11:57.

Wessex Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Combe Street Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Combe Street Lane, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 26 Nov 2024 at 16:07.

Wessex Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Combe Street Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Combe Street Lane, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 31 Oct 2024 at 12:56.

Somerset County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Orchard Street

Somerset County Council are proposing to carry out Highway repair and maintenance works on Orchard Street, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 3 Dec 2024 at 11:57.

BT logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Broadstone Lane

BT are proposing to carry out Utility asset works on Broadstone Lane, Hardington Mandeville, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Nov 2024 at 16:05.

Wessex Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
George Street

Wessex Water are proposing to carry out Utility repair and maintenance works on George Street, Sherborne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 10 Oct 2024 at 15:20.

Wessex Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
George Street

Wessex Water are proposing to carry out Utility repair and maintenance works on George Street, Sherborne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 8 Oct 2024 at 10:55.

BT logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Broadstone Lane

BT are proposing to carry out Utility asset works on Broadstone Lane, Hardington Mandeville, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 17 Oct 2024 at 14:54.

Somerset County Council logo
Between
16 and 20 Jan 2025
Details
View Map
Share
Follow
Orchard Street

Somerset County Council are proposing to carry out Highway repair and maintenance works on Orchard Street, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 5 Sep 2024 at 15:18.

Somerset County Council logo
Between
16 and 20 Jan 2025
Details
View Map
Share
West Street

Somerset County Council were proposing to carry out Highway repair and maintenance works on West Street, Yeovil.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 January 2025 and run through until 20 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 4 Sep 2024 at 13:10.

Somerset County Council logo
Between
17 and 21 Jan 2025
Details
View Map
Share
Follow
Larkhill Road

Somerset County Council are proposing to carry out Highway repair and maintenance works on Larkhill Road, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 5 Sep 2024 at 16:17.

Wessex Water logo
Between
19 and 21 Jan 2025
Details
View Map
Share
Follow
Wyndham Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Wyndham Street, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 18 Nov 2024 at 08:39.

Wessex Water logo
Between
19 and 21 Jan 2025
Details
View Map
Share
Follow
Wyndham Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Wyndham Street, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 12 Nov 2024 at 16:02.

Wessex Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
North Street

Wessex Water are proposing to carry out Utility repair and maintenance works on North Street, Bradford Abbas.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 22 Oct 2024 at 10:20.

Wessex Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
North Street

Wessex Water are proposing to carry out Utility repair and maintenance works on North Street, Bradford Abbas.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 24 Oct 2024 at 15:15.

Wessex Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Ham Hill Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Ham Hill Road, Higher Odcombe, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 21 Oct 2024 at 14:44.

Wessex Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Ham Hill Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Ham Hill Road, Higher Odcombe, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 21 Oct 2024 at 08:37.

Wessex Water logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Alvington Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Alvington Lane, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 15 Nov 2024 at 08:22.

Wessex Water logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Alvington Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Alvington Lane, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 8 Nov 2024 at 08:36.

Somerset County Council logo
LONG TERM
Between
29 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Highfield Road

Somerset County Council are proposing to carry out Highway improvement works on Highfield Road, Yeovil.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Somerset County Council on 12 Dec 2024 at 08:51.

BT logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Great Pit Lane

BT were proposing to carry out Utility asset works on Great Pit Lane, Rimpton, Yeovil.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 14 Nov 2024 at 15:05.

BT logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Dark Lane

BT were proposing to carry out Utility asset works on Dark Lane, Sandford Orcas.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 14 Nov 2024 at 15:07.

Somerset County Council logo
LONG TERM
Between
3 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Highfield Road

Somerset County Council are proposing to carry out Highway improvement works on Highfield Road, Yeovil.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Somerset County Council on 3 Dec 2024 at 16:16.

BT logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Penmore Road

BT were proposing to carry out Utility asset works on Penmore Road, Sandford Orcas.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 14 Nov 2024 at 15:09.

Wessex Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Chapel Hill

Wessex Water are proposing to carry out Utility repair and maintenance works on Chapel Hill, Higher Odcombe, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 22 Nov 2024 at 09:30.

Wessex Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Chapel Hill

Wessex Water are proposing to carry out Utility repair and maintenance works on Chapel Hill, Higher Odcombe, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 28 Nov 2024 at 08:06.

Scottish Hydro Electric Power Dis logo
Between
4 and 26 Feb 2025
Details
View Map
Share
Follow
Marsh Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Marsh Lane, Yeovil.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 26 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 5 Dec 2024 at 12:54.

BT logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Penmore Road

BT are proposing to carry out Utility asset works on Penmore Road, Sandford Orcas.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 3 Dec 2024 at 12:05.

BT logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Dark Lane

BT are proposing to carry out Utility asset works on Dark Lane, Sandford Orcas.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 3 Dec 2024 at 12:05.

BT logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Great Pit Lane

BT are proposing to carry out Utility asset works on Great Pit Lane, Rimpton, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 3 Dec 2024 at 15:14.

Fulcrum Electrical Assets logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Sutton Montis Road

Fulcrum Electrical Assets are proposing to carry out Utility asset works on Sutton Montis Road, Queen Camel, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Fulcrum Electrical Assets on 17 Dec 2024 at 10:42.

Wessex Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Longford Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Longford Road, Thornford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 15 Nov 2024 at 15:00.

Wessex Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Longford Road

Wessex Water are proposing to carry out Utility repair and maintenance works on Longford Road, Thornford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 11 Nov 2024 at 14:55.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
27 Feb and 1 May 2025
Details
View Map
Share
Follow
Combe Street Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Combe Street Lane, Yeovil.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 1 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 5 Dec 2024 at 12:54.

Somerset County Council logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Lyde Road

Somerset County Council were proposing to carry out Highway improvement works on Lyde Road, Yeovil.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Somerset County Council on 2 Dec 2024 at 12:17.

Somerset County Council logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Lyde Road

Somerset County Council are proposing to carry out Highway improvement works on Lyde Road, Yeovil.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Somerset County Council on 2 Dec 2024 at 12:32.

Gigaclear logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Almshouse Lane

Gigaclear are proposing to carry out Utility asset works on Almshouse Lane, Ilchester, Yeovil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gigaclear on 17 Dec 2024 at 11:59.


Roadworks Map near to St. Michaels Avenue, YEOVIL, BA21 4NB

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 03:21
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to St. Michaels Avenue, YEOVIL, BA21 4NB (23 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Wessex Water logo
MUDFORD ROAD 
(0.3 miles)
Wessex Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
17 Dec 2024 08:20 - 11:05
0.3
Details
Share
2
Wessex Water logo
BUCKLERS MEAD ROAD 
(0.3 miles)
Wessex Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 18 Dec 2024 - 20 Dec 2024
0.3
Details
Share
Follow
3
Wessex Water logo
MILFORD ROAD 
(0.3 miles)
Wessex Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
16 Dec 2024 09:05 - 16:45
0.3
Details
Share
4
Wessex Water logo
MUDFORD ROAD 
(0.5 miles)
Wessex Water
Utility repair and maintenance works - Footway - Multi-way signals
Planned
Scheduled: 18 Dec 2024 - 19 Dec 2024
0.5
Details
Share
Follow
5
Wessex Water logo
COLLEGE GREEN 
(0.5 miles)
Wessex Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 18 Dec 2024 - 20 Dec 2024
0.5
Details
Share
Follow
6
Somerset County Council logo
MAJOR
  
MUDFORD ROAD 
(0.6 miles)
Somerset County Council
Optional permit (no fee) e.g. for traffic management etc - Footway - Some carriageway incursion
In Progress
Since: 29 Jul 2024 08:00
(Scheduled: 29 Jul 2024 - 31 Jan 2025)
0.6
Details
Share
Follow
7
Somerset County Council logo
MAJOR
  
ST JOHNS ROAD 
(0.8 miles)
Somerset County Council
Works for road purposes - Carriageway - Multi-way signals
Planned
Scheduled: 14 Oct 2024 - 31 Dec 2024
0.8
Details
Share
Follow
8
Wessex Water logo
ROMSEY ROAD 
(0.8 miles)
Wessex Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 18 Dec 2024 - 20 Dec 2024
0.8
Details
Share
Follow
9
Somerset County Council logo
MAJOR
  
LYDE ROAD 
(0.8 miles)
Somerset County Council
Works for road purposes - Footpath - No carriageway incursion
In Progress
Since: 28 Oct 2024 07:00
(Scheduled: 28 Oct 2024 - 7 Feb 2025)
0.8
Details
Share
Follow
10
BT logo
CECIL STREET 
(0.8 miles)
BT
Utility asset works - Carriageway - Some carriageway incursion
Planned
Scheduled: 16 Dec 2024 - 18 Dec 2024
0.8
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.