ROADWORKS SUMMARY
Richmond Road, BATH, BA1 5TU
Introduction
View current and future planned roadworks and road closures for Richmond Road, BA1 5TU and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Richmond Road, BATH, BA1 5TU
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Richmond Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
30 Sep 2024 and 31 Mar 2025
Wiltshire Council are proposing to carry out Highway repair and maintenance works on Lower Stoke, Limpley Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wiltshire Council on 3 Oct 2024 at 12:54.
30 Sep 2024 and 31 Mar 2025
Wiltshire Council are proposing to carry out Highway repair and maintenance works on Lower Stoke, Limpley Stoke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Wiltshire Council on 4 Oct 2024 at 12:32.
10 Jan 2025
Wiltshire Council are carrying out Highway repair and maintenance works on Henley Lane, Box.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 December 2024 at 15:56 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wiltshire Council on 9 Dec 2024 at 12:12.
Tomorrow
Wessex Water are proposing to carry out Utility repair and maintenance works on Rosemount Lane, Lyncombe, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wessex Water on 5 Dec 2024 at 09:38.
13 and 23 Dec 2024
Wessex Water are proposing to carry out Utility repair and maintenance works on Church Lane, Monkton Combe, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wessex Water on 16 Sep 2024 at 07:49.
13 and 23 Dec 2024
Wessex Water are proposing to carry out Utility repair and maintenance works on Church Lane, Monkton Combe, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wessex Water on 9 Dec 2024 at 08:47.
Wednesday
Wiltshire Council are proposing to carry out Highway repair and maintenance works on Rode Hill, Colerne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wiltshire Council on 24 Oct 2024 at 12:50.
Wednesday
Wiltshire Council are proposing to carry out Highway repair and maintenance works on Rode Hill South East C4 Past Ditteridge To Mill Lane Box, Ditteridge, Box.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wiltshire Council on 24 Oct 2024 at 12:50.
Wednesday
Wessex Water are proposing to carry out Utility repair and maintenance works on Tyning Lane, Fairfield Park, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wessex Water on 12 Sep 2024 at 12:37.
Wednesday
Wessex Water are proposing to carry out Utility repair and maintenance works on Tyning Lane, Fairfield Park, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wessex Water on 26 Sep 2024 at 11:21.
17 and 21 Dec 2024
Wiltshire Council are proposing to carry out Highway repair and maintenance works on Rode Hill South East C4 Past Ditteridge To Mill Lane Box, Ditteridge, Box.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wiltshire Council on 5 Nov 2024 at 15:14.
17 and 19 Dec 2024
Wessex Water were proposing to carry out New service connection on Cheltenham Street, Westmoreland, Bath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Wessex Water on 25 Sep 2024 at 13:39.
17 and 21 Dec 2024
Wiltshire Council are proposing to carry out Highway repair and maintenance works on Rode Hill, Colerne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wiltshire Council on 5 Nov 2024 at 15:14.
2 and 6 Jan 2025
Wessex Water are proposing to carry out Utility repair and maintenance works on Church Lane, Monkton Combe, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wessex Water on 9 Dec 2024 at 08:47.
2 and 6 Jan 2025
Wessex Water are proposing to carry out Utility repair and maintenance works on Church Lane, Monkton Combe, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wessex Water on 16 Sep 2024 at 07:49.
5 and 26 Jan 2025
Western Power Distribution (South West) were proposing to carry out Utility asset works on Chapel Row, City Centre, Bath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 January 2025 and run through until 26 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 28 Nov 2024 at 09:12.
5 and 26 Jan 2025
Western Power Distribution (South West) were proposing to carry out Utility asset works on St Paul's Place, Kingsmead, Bath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 January 2025 and run through until 26 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 28 Nov 2024 at 09:14.
5 and 26 Jan 2025
Western Power Distribution (South West) are proposing to carry out Utility asset works on Chapel Row, City Centre, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 2 Dec 2024 at 16:06.
5 and 26 Jan 2025
Western Power Distribution (South West) were proposing to carry out Utility asset works on Queen Square, City Centre, Bath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 January 2025 and run through until 26 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 28 Nov 2024 at 09:14.
5 and 26 Jan 2025
Western Power Distribution (South West) are proposing to carry out Utility asset works on Queen Square, City Centre, Bath.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 2 Dec 2024 at 16:05.
6 and 9 Jan 2025
Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Snow Hill, Walcot, Bath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 6 Dec 2024 at 12:14.
6 and 9 Jan 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Snow Hill, Walcot, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 6 Dec 2024 at 12:54.
6 and 9 Jan 2025
Wiltshire Council are proposing to carry out Highway repair and maintenance works on Road From 216 Blackberry Lane South To Junction At Winsley Hill, Conkwell, Limpley Stoke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wiltshire Council on 1 Nov 2024 at 16:22.
6 and 9 Jan 2025
Wiltshire Council are proposing to carry out Highway repair and maintenance works on Road From 216 Blackberry Lane South To Junction At Winsley Hill, Conkwell, Limpley Stoke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wiltshire Council on 5 Nov 2024 at 13:31.
7 and 9 Jan 2025
Wessex Water are proposing to carry out New service connection on Princes Street, City Centre, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wessex Water on 7 Oct 2024 at 12:15.
7 and 9 Jan 2025
Wessex Water are proposing to carry out New service connection on Princes Street, City Centre, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wessex Water on 21 Oct 2024 at 12:22.
8 and 10 Jan 2025
Gigaclear were proposing to carry out Utility asset works on Winsley, Winsley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Gigaclear on 9 Dec 2024 at 13:15.
13 and 17 Jan 2025
Wessex Water were proposing to carry out New service connection on Westmoreland Street, Westmoreland, Bath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wessex Water on 15 Oct 2024 at 10:02.
25 Jan and 9 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on A4 From J A363 Roundabout To J A46 W, Bath And North East Somerset.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 5 Dec 2024 at 13:33.
25 Jan and 9 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on A4 From J A363 Roundabout To J A46 W, Bath And North East Somerset.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 2 Dec 2024 at 16:30.
25 Jan and 9 Feb 2025
Network Rail were proposing to carry out Works for Rail Purposes on A4 From J A363 Roundabout To J A46 W, Bath And North East Somerset.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 January 2025 and run through until 9 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 4 Nov 2024 at 13:45.
27 Jan and 21 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on New King Street, Kingsmead, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 21 Nov 2024 at 10:25.
27 Jan and 21 Feb 2025
Western Power Distribution (South West) are proposing to carry out Disconnection or alteration of supply on Rossiter Road, Widcombe, Bath.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 25 Nov 2024 at 11:21.
27 Jan and 21 Feb 2025
Western Power Distribution (South West) are proposing to carry out Disconnection or alteration of supply on Rossiter Road, Widcombe, Bath.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 12 Nov 2024 at 14:53.
27 Jan and 21 Feb 2025
Bath And North East Somerset Council are proposing to carry out Highway improvement works on Widcombe Hill, Widcombe, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bath And North East Somerset Council on 11 Dec 2024 at 07:36.
27 Jan and 10 Feb 2025
Western Power Distribution (South West) are proposing to carry out Utility asset works on Queen Square, City Centre, Bath.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 11 Dec 2024 at 18:42.
28 Jan and 4 Feb 2025
Western Power Distribution (South West) are proposing to carry out New service connection on Cul-de-sac At Rear Of 90 To 108 Frome Road, Odd Down, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 1 Nov 2024 at 14:59.
28 Jan and 4 Feb 2025
Western Power Distribution (South West) are proposing to carry out New service connection on Cul-de-sac At Rear Of 90 To 108 Frome Road, Odd Down, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 29 Oct 2024 at 08:25.
3 and 14 Feb 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Oldbury Lane, Upton Cheyney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 5 Dec 2024 at 09:41.
4 and 10 Feb 2025
Western Power Distribution (South West) are proposing to carry out New service connection on Cedric Road, Lower Weston, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 29 Oct 2024 at 12:47.
4 and 10 Feb 2025
Western Power Distribution (South West) are proposing to carry out New service connection on Cedric Road, Lower Weston, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 8 Nov 2024 at 17:18.
10 and 24 Feb 2025
Western Power Distribution (South West) are proposing to carry out Utility asset works on Barton Street, City Centre, Bath.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 11 Dec 2024 at 18:47.
11 and 14 Feb 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Morford Street, Lansdown, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 25 Oct 2024 at 14:37.
11 and 14 Feb 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Morford Street, Lansdown, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 19 Nov 2024 at 07:42.
19 and 21 Feb 2025
BT are proposing to carry out Utility asset works on Salisbury Road, Larkhall, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 27 Nov 2024 at 15:11.
21 Feb and 6 Mar 2025
South Gloucestershire Council are proposing to carry out Highway improvement works on Oldbury Lane, Upton Cheyney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 6 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South Gloucestershire Council on 29 Nov 2024 at 07:47.
24 Feb and 21 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Edward Street, Bathwick, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 23 Sep 2024 at 07:47.
24 Feb and 10 Mar 2025
Western Power Distribution (South West) are proposing to carry out Utility asset works on Upper Borough Walls, City Centre, Bath.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 11 Dec 2024 at 15:06.
24 Feb and 10 Mar 2025
Western Power Distribution (South West) are proposing to carry out Utility asset works on Sawclose, City Centre, Bath.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 11 Dec 2024 at 15:06.
24 Feb and 14 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Lyncombe Vale Road, Lyncombe, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 9 Dec 2024 at 11:18.
26 Feb and 18 Mar 2025
Western Power Distribution (South West) are proposing to carry out Utility asset works on Russell Street, City Centre, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 18 Oct 2024 at 09:29.
26 Feb and 18 Mar 2025
Western Power Distribution (South West) are proposing to carry out Utility asset works on Russell Street, City Centre, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 25 Sep 2024 at 11:20.
3 and 5 Mar 2025
Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Ashwicke Road, Marshfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Bristol Waterworks Company on 29 Nov 2024 at 10:48.
3 and 5 Mar 2025
Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Ashwicke Road, Marshfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Bristol Waterworks Company on 10 Dec 2024 at 09:49.
3 and 28 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Pulteney Mews, Bathwick, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 1 Oct 2024 at 14:46.
3 and 28 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Pulteney Mews, Bathwick, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 23 Sep 2024 at 07:49.
3 and 28 Mar 2025
Bath And North East Somerset Council are proposing to carry out Highway improvement works on Mill Lane, Bathampton, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bath And North East Somerset Council on 10 Dec 2024 at 07:44.
3 and 28 Mar 2025
Bath And North East Somerset Council are proposing to carry out Highway improvement works on Mill Lane, Bathampton, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bath And North East Somerset Council on 6 Dec 2024 at 10:13.
3 and 28 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Edward Street, Bathwick, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 2 Oct 2024 at 12:09.
3 and 28 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Pulteney Mews, Bathwick, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 2 Oct 2024 at 12:09.
3 Mar and 4 Apr 2025
Bath And North East Somerset Council are proposing to carry out Highway improvement works on Milsom Street, City Centre, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bath And North East Somerset Council on 11 Dec 2024 at 07:38.
3 Mar and 4 Apr 2025
Bath And North East Somerset Council are proposing to carry out Highway improvement works on Milsom Street, City Centre, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bath And North East Somerset Council on 11 Dec 2024 at 13:55.
3 and 28 Mar 2025
Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Edward Street, Bathwick, Bath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 5 Sep 2024 at 19:03.
3 and 28 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Edward Street, Bathwick, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 1 Oct 2024 at 14:45.
10 Mar and 25 Apr 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Lyncombe Vale, Lyncombe, Bath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 9 Dec 2024 at 11:19.
Roadworks Map near to Richmond Road, BATH, BA1 5TU
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Richmond Road, BATH, BA1 5TU (21 Events)
(Scheduled Dates)
(miles)
(Scheduled: 9 Dec 2024 - 16 Dec 2024)
(Scheduled: 11 Nov 2024 - 20 Dec 2024)
(Scheduled: 3 Dec 2024 - 20 Dec 2024)
(Scheduled: 6 Dec 2024 - 13 Dec 2024)