ROADWORKS SUMMARY
Kingfisher Drive, WESTBURY, BA13 3XW
Introduction
View current and future planned roadworks and road closures for Kingfisher Drive, BA13 3XW and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Kingfisher Drive, WESTBURY, BA13 3XW
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Kingfisher Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
2 Mar 2025
Wessex Water are carrying out Utility repair and maintenance works on Weymouth Street, Warminster.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 August 2024 at 09:00 and could run through until 2 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wessex Water on 6 Aug 2024 at 13:47.
Friday
Wales And West Utilities are carrying out Utility repair and maintenance works on Station Road, Westbury.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 9 November 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 26 Nov 2024 at 12:09.
Sunday
Wiltshire Council were proposing to carry out Highway improvement works on Hill Street, Trowbridge.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 8 Aug 2024 at 15:18.
Sunday
Wiltshire Council are carrying out Highway improvement works on Hill Street, Trowbridge.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 22 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 18 Nov 2024 at 08:22.
Sunday
Wiltshire Council are proposing to carry out Highway improvement works on Hill Street, Trowbridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 4 Sep 2024 at 09:52.
27 Dec 2024
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Glebe Road, Trowbridge.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 13:30 and could run through until 27 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Nov 2024 at 14:27.
Friday
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Glebe Road, Trowbridge.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Nov 2024 at 12:09.
Friday
Wiltshire Council are carrying out Highway improvement works on Wicker Hill, Trowbridge.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 2 Dec 2024 at 09:43.
Friday
Wiltshire Council are proposing to carry out Highway improvement works on Wicker Hill, Trowbridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 27 Nov 2024 at 07:38.
Friday
Wiltshire Council are carrying out Highway improvement works on Town Bridge, Trowbridge.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 2 Dec 2024 at 09:43.
Friday
Wiltshire Council are proposing to carry out Highway improvement works on Town Bridge, Trowbridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 27 Nov 2024 at 07:41.
Friday
BT were proposing to carry out Utility asset works on West Ashton Road, West Ashton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 13 Sep 2024 at 11:56.
1 and 3 Jan 2025
Wessex Water are proposing to carry out New service connection on Greater Lane, Edington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 January 2025 and could run through until 3 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wessex Water on 24 Oct 2024 at 11:24.
6 and 24 Jan 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Westfield Road, Trowbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Dec 2024 at 16:06.
6 and 24 Jan 2025
Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Eastbourne Road, Trowbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 29 Nov 2024 at 20:31.
6 Jan and 28 Mar 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Ramsbury Walk, Trowbridge.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Nov 2024 at 14:24.
6 and 8 Jan 2025
Wessex Water are proposing to carry out New service connection on Greater Lane, Edington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wessex Water on 24 Oct 2024 at 13:18.
6 and 8 Jan 2025
Wessex Water are proposing to carry out New service connection on Greater Lane, Edington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wessex Water on 30 Oct 2024 at 17:31.
6 Jan and 28 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wiltshire Drive, Trowbridge.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Nov 2024 at 14:27.
6 and 10 Jan 2025
BT were proposing to carry out Utility asset works on Lodge Hill, Berkley, Frome.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 21 Oct 2024 at 14:14.
6 and 10 Jan 2025
BT were proposing to carry out Utility asset works on High Street, Chapmanslade.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 21 Oct 2024 at 14:14.
7 and 10 Jan 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Dursley Road, Trowbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 30 Oct 2024 at 07:15.
7 and 10 Jan 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Dursley Road, Trowbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 16 Dec 2024 at 14:12.
7 and 9 Jan 2025
Wessex Water are proposing to carry out New service connection on Coach Road, Westbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wessex Water on 24 Oct 2024 at 11:43.
7 and 9 Jan 2025
Wessex Water are proposing to carry out New service connection on Coach Road, Westbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wessex Water on 30 Oct 2024 at 17:33.
13 Jan and 7 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Wiltshire Drive, Trowbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Dec 2024 at 13:18.
13 and 31 Jan 2025
Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Frome Road, Southwick.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 3 Dec 2024 at 08:52.
15 and 21 Jan 2025
Wiltshire Council are proposing to carry out Highway repair and maintenance works on Old Dilton Road, Dilton Marsh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 21 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wiltshire Council on 16 Dec 2024 at 16:51.
15 and 21 Jan 2025
Wiltshire Council are proposing to carry out Highway repair and maintenance works on Old Dilton Road, Old Dilton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 21 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wiltshire Council on 16 Dec 2024 at 17:01.
20 Jan and 5 Feb 2025
Wiltshire Council are proposing to carry out Highway improvement works on Elizabeth Way, Hilperton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Wiltshire Council on 10 Dec 2024 at 12:46.
20 Jan and 5 Feb 2025
Wiltshire Council are proposing to carry out Highway improvement works on Elizabeth Way, Hilperton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Wiltshire Council on 10 Dec 2024 at 10:23.
20 and 24 Jan 2025
Wessex Water are proposing to carry out Utility repair and maintenance works on Weymouth Street, Warminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wessex Water on 8 Nov 2024 at 08:45.
29 and 31 Jan 2025
BT are proposing to carry out Utility asset works on Greater Lane, Edington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 20 Nov 2024 at 15:46.
3 Feb and 25 Apr 2025
Wiltshire Council are proposing to carry out Highway improvement works on Frogmore Road, Westbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the footway and cycleway.
This roadwork event was last updated by Wiltshire Council on 22 Nov 2024 at 16:53.
3 Feb and 18 Mar 2025
Wiltshire Council were proposing to carry out Section 58 on Hilperton Road, Trowbridge.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 18 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 16:36.
3 Feb and 18 Mar 2025
Wiltshire Council were proposing to carry out Section 58 on The Halve, Trowbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 18 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 16:28.
3 Feb and 21 Mar 2025
Wiltshire Council are proposing to carry out Highway improvement works on Frogmore Road, Westbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the footway and cycleway.
This roadwork event was last updated by Wiltshire Council on 25 Oct 2024 at 08:44.
3 Feb and 21 Mar 2025
Wiltshire Council were proposing to carry out Highway improvement works on Frogmore Road, Westbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the footway and cycleway.
This roadwork event was last updated by Wiltshire Council on 22 Nov 2024 at 09:30.
3 Feb and 25 Apr 2025
Wiltshire Council are proposing to carry out Highway improvement works on Frogmore Road, Westbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the footway and cycleway.
This roadwork event was last updated by Wiltshire Council on 29 Nov 2024 at 17:03.
3 Feb and 21 Mar 2025
Wiltshire Council are proposing to carry out Highway improvement works on Frogmore Road, Westbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 25 Oct 2024 at 08:40.
3 Feb and 21 Mar 2025
Wiltshire Council were proposing to carry out Highway improvement works on Frogmore Road, Westbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 22 Nov 2024 at 09:31.
3 Feb and 21 Mar 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Ramsbury Walk, Trowbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Dec 2024 at 13:27.
3 Feb and 25 Apr 2025
Wiltshire Council are proposing to carry out Highway improvement works on Frogmore Road, Westbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 22 Nov 2024 at 16:50.
3 Feb and 25 Apr 2025
Wiltshire Council are proposing to carry out Highway improvement works on Frogmore Road, Westbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 29 Nov 2024 at 17:02.
4 and 7 Feb 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Roundstone Street, Trowbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 22 Nov 2024 at 17:22.
4 and 7 Feb 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Roundstone Street, Trowbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 6 Dec 2024 at 06:39.
10 Feb and 25 Mar 2025
Wiltshire Council were proposing to carry out Section 58 on Hilperton Road, Trowbridge.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 25 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 9 Dec 2024 at 16:28.
10 and 17 Feb 2025
BT were proposing to carry out Utility asset works on High Street, Chapmanslade.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 17 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 6 Nov 2024 at 11:24.
10 and 17 Feb 2025
BT are proposing to carry out Utility asset works on A36 J A3098 Leave Including Two Way Section N, West Wiltshire.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 5 Nov 2024 at 15:58.
10 Feb and 25 Mar 2025
Wiltshire Council are proposing to carry out Section 58 on The Halve, Trowbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 10 Dec 2024 at 12:16.
10 and 17 Feb 2025
BT were proposing to carry out Utility asset works on Chalcot Lane, Chapmanslade.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 17 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 6 Nov 2024 at 11:23.
10 Feb and 25 Mar 2025
Wiltshire Council are proposing to carry out Section 58 on The Halve, Trowbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 16:58.
17 and 28 Feb 2025
Wiltshire Council are proposing to carry out Highway repair and maintenance works on Bratton Road, West Ashton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wiltshire Council on 1 Nov 2024 at 14:57.
18 and 20 Feb 2025
BT are proposing to carry out Utility asset works on Plants Green, Warminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 9 Dec 2024 at 11:51.
18 and 20 Feb 2025
BT are proposing to carry out Utility asset works on Plants Green, Warminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 10 Dec 2024 at 12:23.
10 and 15 Mar 2025
BT were proposing to carry out Utility asset works on Chalcot Lane, Chapmanslade.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 15 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 11 Nov 2024 at 13:56.
10 and 15 Mar 2025
BT were proposing to carry out Utility asset works on A36 J A3098 Leave Including Two Way Section N, West Wiltshire.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 15 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 11 Nov 2024 at 13:57.
10 and 15 Mar 2025
BT were proposing to carry out Utility asset works on High Street, Chapmanslade.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 15 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 11 Nov 2024 at 13:49.
Roadworks Map near to Kingfisher Drive, WESTBURY, BA13 3XW
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Kingfisher Drive, WESTBURY, BA13 3XW (4 Events)
(Scheduled Dates)
(miles)
(Scheduled: 4 Nov 2024 - 20 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.