ROADWORKS SUMMARY
Mallard Close, WESTBURY, BA13 3XR
Introduction
View current and future planned roadworks and road closures for Mallard Close, BA13 3XR and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Mallard Close, WESTBURY, BA13 3XR
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Mallard Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
2 Mar 2025
Wessex Water are carrying out Utility repair and maintenance works on Weymouth Street, Warminster.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 August 2024 at 09:00 and could run through until 2 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wessex Water on 6 Aug 2024 at 13:47.
6 Jan and 28 Mar 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Ramsbury Walk, Trowbridge.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Nov 2024 at 14:24.
6 Jan and 28 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wiltshire Drive, Trowbridge.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Nov 2024 at 14:27.
13 Jan and 7 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wiltshire Drive, Trowbridge.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Dec 2024 at 09:42.
Tomorrow
Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Frome Road, Southwick.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 3 Dec 2024 at 08:52.
20 Jan and 7 Feb 2025
Wiltshire Council are proposing to carry out Highway improvement works on Elizabeth Way, Hilperton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Wiltshire Council on 30 Jan 2025 at 16:07.
Wednesday
Wiltshire Council are proposing to carry out Highway improvement works on Elizabeth Way, Hilperton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Wiltshire Council on 10 Dec 2024 at 10:23.
27 Jan and 24 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wiltshire Drive, Trowbridge.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Jan 2025 at 13:58.
Tomorrow
Wiltshire Council are proposing to carry out Highway repair and maintenance works on Frogmore Road, Westbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wiltshire Council on 20 Dec 2024 at 11:57.
Tomorrow
Wiltshire Council are proposing to carry out Highway repair and maintenance works on Frogmore Road, Westbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wiltshire Council on 2 Jan 2025 at 14:31.
29 Jan and 18 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Westfield Road, Trowbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 18 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Jan 2025 at 10:42.
Tomorrow
BT are proposing to carry out Utility asset works on Greater Lane, Edington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 20 Nov 2024 at 15:46.
3 Feb and 21 Mar 2025
Wiltshire Council were proposing to carry out Highway improvement works on Frogmore Road, Westbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 22 Nov 2024 at 09:31.
3 Feb and 18 Mar 2025
Wiltshire Council were proposing to carry out Section 58 on Hilperton Road, Trowbridge.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 18 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 16:36.
3 Feb and 18 Mar 2025
Wiltshire Council were proposing to carry out Section 58 on The Halve, Trowbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 18 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 16:28.
3 Feb and 25 Apr 2025
Wiltshire Council are proposing to carry out Highway improvement works on Frogmore Road, Westbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 29 Nov 2024 at 17:02.
3 Feb and 25 Apr 2025
Wiltshire Council are proposing to carry out Highway improvement works on Frogmore Road, Westbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 22 Nov 2024 at 16:50.
3 Feb and 21 Mar 2025
Wiltshire Council are proposing to carry out Highway improvement works on Frogmore Road, Westbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 25 Oct 2024 at 08:40.
3 Feb and 25 Apr 2025
Wiltshire Council are proposing to carry out Highway improvement works on Frogmore Road, Westbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the footway and cycleway.
This roadwork event was last updated by Wiltshire Council on 29 Nov 2024 at 17:03.
3 Feb and 25 Apr 2025
Wiltshire Council are proposing to carry out Highway improvement works on Frogmore Road, Westbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the footway and cycleway.
This roadwork event was last updated by Wiltshire Council on 22 Nov 2024 at 16:53.
3 Feb and 21 Mar 2025
Wiltshire Council were proposing to carry out Highway improvement works on Frogmore Road, Westbury.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the footway and cycleway.
This roadwork event was last updated by Wiltshire Council on 22 Nov 2024 at 09:30.
3 Feb and 21 Mar 2025
Wiltshire Council are proposing to carry out Highway improvement works on Frogmore Road, Westbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the footway and cycleway.
This roadwork event was last updated by Wiltshire Council on 25 Oct 2024 at 08:44.
3 and 21 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Wiltshire Drive, Trowbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Jan 2025 at 17:46.
3 Feb and 21 Mar 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Ramsbury Walk, Trowbridge.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Dec 2024 at 09:40.
4 and 7 Feb 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Roundstone Street, Trowbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 6 Dec 2024 at 06:39.
4 and 7 Feb 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Roundstone Street, Trowbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 22 Nov 2024 at 17:22.
10 and 17 Feb 2025
BT were proposing to carry out Utility asset works on Chalcot Lane, Chapmanslade.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 17 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 6 Nov 2024 at 11:23.
10 and 28 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Wiltshire Drive, Trowbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jan 2025 at 16:14.
10 and 17 Feb 2025
BT were proposing to carry out Utility asset works on High Street, Chapmanslade.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 17 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 6 Nov 2024 at 11:24.
10 and 28 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lockeridge Close, Trowbridge.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Jan 2025 at 11:30.
10 and 17 Feb 2025
BT are proposing to carry out Utility asset works on A36 J A3098 Leave Including Two Way Section N, West Wiltshire.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 5 Nov 2024 at 15:58.
10 Feb and 25 Mar 2025
Wiltshire Council were proposing to carry out Section 58 on Hilperton Road, Trowbridge.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 25 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 9 Dec 2024 at 16:28.
10 Feb and 25 Mar 2025
Wiltshire Council are proposing to carry out Section 58 on The Halve, Trowbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 16:58.
10 Feb and 25 Mar 2025
Wiltshire Council are proposing to carry out Section 58 on The Halve, Trowbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 10 Dec 2024 at 12:16.
10 Feb and 15 Mar 2025
Wiltshire Council are proposing to carry out Highway improvement works on Elizabeth Way, Hilperton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 15 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wiltshire Council on 20 Jan 2025 at 07:58.
17 and 28 Feb 2025
Wiltshire Council are proposing to carry out Highway repair and maintenance works on Bratton Road, West Ashton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wiltshire Council on 1 Nov 2024 at 14:57.
17 Feb and 28 Mar 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Ramsbury Walk, Trowbridge.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Jan 2025 at 13:56.
18 and 20 Feb 2025
BT are proposing to carry out Utility asset works on Plants Green, Warminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 10 Dec 2024 at 12:23.
18 and 20 Feb 2025
BT are proposing to carry out Utility asset works on Plants Green, Warminster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 9 Dec 2024 at 11:51.
10 and 15 Mar 2025
BT were proposing to carry out Utility asset works on Chalcot Lane, Chapmanslade.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 15 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 11 Nov 2024 at 13:56.
10 and 15 Mar 2025
BT were proposing to carry out Utility asset works on A36 J A3098 Leave Including Two Way Section N, West Wiltshire.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 15 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 11 Nov 2024 at 13:57.
10 and 15 Mar 2025
BT were proposing to carry out Utility asset works on High Street, Chapmanslade.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 15 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 11 Nov 2024 at 13:49.
17 Mar and 4 Apr 2025
Wiltshire Council are proposing to carry out Highway improvement works on Dursley Road, Heywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wiltshire Council on 7 Jan 2025 at 12:10.
17 Mar and 4 Apr 2025
Wiltshire Council are proposing to carry out Highway improvement works on Dursley Road, Heywood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wiltshire Council on 24 Dec 2024 at 11:33.
19 Mar and 28 Apr 2025
Wiltshire Council were proposing to carry out Section 58 on Roundstone Street, Trowbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 March 2025 and run through until 28 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 16:49.
19 Mar and 28 Apr 2025
Wiltshire Council were proposing to carry out Section 58 on Yerbury Street, Trowbridge.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 March 2025 and run through until 28 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 16:53.
19 Mar and 28 Apr 2025
Wiltshire Council were proposing to carry out Section 58 on Hilperton Road, Trowbridge.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 March 2025 and run through until 28 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 16:44.
26 Mar and 5 May 2025
Wiltshire Council are proposing to carry out Section 58 on Roundstone Street, Trowbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 March 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 17:04.
26 Mar and 5 May 2025
Wiltshire Council are proposing to carry out Section 58 on Roundstone Street, Trowbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 March 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 10 Dec 2024 at 12:20.
26 Mar and 5 May 2025
Wiltshire Council were proposing to carry out Section 58 on Yerbury Street, Trowbridge.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 March 2025 and run through until 5 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 9 Dec 2024 at 15:41.
26 Mar and 5 May 2025
Wiltshire Council were proposing to carry out Section 58 on Hilperton Road, Trowbridge.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 March 2025 and run through until 5 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 9 Dec 2024 at 15:41.
7 and 17 Apr 2025
Wiltshire Council are proposing to carry out Highway repair and maintenance works on Westbury Road, Coulston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wiltshire Council on 24 Jan 2025 at 10:39.
7 and 17 Apr 2025
Wiltshire Council are proposing to carry out Highway repair and maintenance works on Westbury Road, Coulston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wiltshire Council on 23 Jan 2025 at 15:53.
8 and 10 Apr 2025
Wiltshire Council are proposing to carry out Highway repair and maintenance works on Hoopers Pool, Southwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wiltshire Council on 10 Jan 2025 at 16:45.
14 and 16 Apr 2025
BT are proposing to carry out Utility asset works on Stormore, Dilton Marsh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 22 Jan 2025 at 17:05.
14 and 16 Apr 2025
BT are proposing to carry out Utility asset works on Wyke Road, Trowbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 22 Jan 2025 at 16:58.
14 and 18 Apr 2025
Wiltshire Council are proposing to carry out Highway repair and maintenance works on Main Street, Keevil.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wiltshire Council on 24 Jan 2025 at 17:02.
14 and 18 Apr 2025
Wiltshire Council are proposing to carry out Highway repair and maintenance works on Main Street, Keevil.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wiltshire Council on 20 Jan 2025 at 15:46.
14 and 16 Apr 2025
BT are proposing to carry out Utility asset works on Southwick Road, North Bradley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 22 Jan 2025 at 16:54.
24 and 26 Apr 2025
Wiltshire Council are proposing to carry out Highway repair and maintenance works on Clearwood, Dilton Marsh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wiltshire Council on 23 Jan 2025 at 09:41.
24 and 26 Apr 2025
Wiltshire Council are proposing to carry out Highway repair and maintenance works on Stormore, Dilton Marsh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wiltshire Council on 23 Jan 2025 at 09:37.
26 and 28 Apr 2025
Wiltshire Council are proposing to carry out Highway repair and maintenance works on Silver Street Lane, Trowbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wiltshire Council on 23 Jan 2025 at 11:33.
29 Apr and 9 Jul 2025
Wiltshire Council were proposing to carry out Section 58 on Roundstone Street, Trowbridge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 April 2025 and run through until 9 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 16:58.
29 Apr and 9 Jul 2025
Wiltshire Council were proposing to carry out Section 58 on Polebarn Road, Trowbridge.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 April 2025 and run through until 9 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 17:02.
Roadworks Map near to Mallard Close, WESTBURY, BA13 3XR (5 Events)
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Mallard Close, WESTBURY, BA13 3XR (5 Events)
(Scheduled Dates)
(miles)
(Scheduled: 30 Jan 2025 - 31 Jan 2025)
Contains public sector information licensed under the Open Government Licence v3.0.