ROADWORKS SUMMARY
Walnut Close, FROME, BA11 6QA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Walnut Close, BA11 6QA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Walnut Close, FROME, BA11 6QA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Walnut Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wales And West Utilities logo
LONG TERM
Until
17 Jun 2025
Details
View Map
Share
Follow
Oakfield Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Oakfield Road, Frome.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 April 2025 at 08:35 and could run through until 17 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 28 May 2025 at 13:28.

Wales And West Utilities logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Wine Street

Wales And West Utilities are carrying out Utility repair and maintenance works on Wine Street, Frome.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 11:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 30 May 2025 at 08:24.

Wiltshire Council logo
LONG TERM
Between
29 Apr and 9 Jul 2025
Details
View Map
Share
Polebarn Road

Wiltshire Council were proposing to carry out Section 58 on Polebarn Road, Trowbridge.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 April 2025 and run through until 9 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 17:02.

Wiltshire Council logo
LONG TERM
Between
29 Apr and 9 Jul 2025
Details
View Map
Share
Roundstone Street

Wiltshire Council were proposing to carry out Section 58 on Roundstone Street, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 April 2025 and run through until 9 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 16:58.

Wiltshire Council logo
LONG TERM
Between
6 May and 16 Jul 2025
Details
View Map
Share
Polebarn Road

Wiltshire Council were proposing to carry out Section 58 on Polebarn Road, Trowbridge.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 16 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 9 Dec 2024 at 15:40.

Wiltshire Council logo
LONG TERM
Between
6 May and 16 Jul 2025
Details
View Map
Share
Follow
Roundstone Street

Wiltshire Council are proposing to carry out Section 58 on Roundstone Street, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 17:09.

Wales And West Utilities logo
Finishing
Friday
Details
View Map
Share
Follow
South Parade

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on South Parade, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 23 Dec 2024 at 15:26.

Wiltshire Council logo
LONG TERM
Between
12 May and 23 Jul 2025
Details
View Map
Share
Follow
Quartermaster Road

Wiltshire Council are proposing to carry out Section 50 on Quartermaster Road, West Wilts Trading Estate, Westbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 8 May 2025 at 08:48.

Wiltshire Council logo
LONG TERM
Until
23 Jul 2025
Details
View Map
Share
Follow
Quartermaster Road

Wiltshire Council are carrying out Section 50 on Quartermaster Road, West Wilts Trading Estate, Westbury.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 09:30 and could run through until 23 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 20 May 2025 at 10:55.

Wiltshire Council logo
LONG TERM
Until
24 Jul 2025
Details
View Map
Share
Follow
Roundstone Street

Wiltshire Council are carrying out Section 58 on Roundstone Street, Trowbridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 09:00 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 20 May 2025 at 15:56.

Somerset County Council logo
Between
26 May and 13 Jun 2025
Details
View Map
Share
Follow
St Johns Road

Somerset County Council are proposing to carry out Highway repair and maintenance works on St Johns Road, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 3 Apr 2025 at 16:46.

Somerset County Council logo
Between
26 May and 13 Jun 2025
Details
View Map
Share
Follow
St Johns Road

Somerset County Council are proposing to carry out Highway repair and maintenance works on St Johns Road, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 1 May 2025 at 14:39.

Wiltshire Council logo
Between
27 May and 19 Jun 2025
Details
View Map
Share
Follow
Link Road

Wiltshire Council are proposing to carry out Section 50 on Link Road, West Wilts Trading Estate, Westbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 19 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 8 May 2025 at 08:51.

Wiltshire Council logo
Until
19 Jun 2025
Details
View Map
Share
Follow
Link Road

Wiltshire Council are carrying out Section 50 on Link Road, West Wilts Trading Estate, Westbury.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 13:00 and could run through until 19 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 30 May 2025 at 15:31.

Wiltshire Council logo
Between
27 May and 13 Jun 2025
Details
View Map
Share
Follow
St Margarets Street

Wiltshire Council are proposing to carry out Highway improvement works on St Margarets Street, Bradford On Avon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 31 Jan 2025 at 18:00.

Wiltshire Council logo
Between
27 May and 13 Jun 2025
Details
View Map
Share
St Margarets Street

Wiltshire Council were proposing to carry out Highway improvement works on St Margarets Street, Bradford On Avon.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 15 May 2025 at 16:17.

Wales And West Utilities logo
Finishing
Today
Details
View Map
Share
Follow
Jones Hill

Wales And West Utilities are carrying out Utility repair and maintenance works on Jones Hill, Bradford On Avon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 12:36 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 28 May 2025 at 14:46.

Wales And West Utilities logo
Finishing
Today
Details
View Map
Share
Follow
Winsley Hill

Wales And West Utilities are carrying out Utility repair and maintenance works on Winsley Hill, Limpley Stoke.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 10:35 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 2 Jun 2025 at 14:39.

Network Rail logo
Between
31 May and 22 Jun 2025
Details
View Map
Share
Lower Stoke

Network Rail were proposing to carry out Works for Rail Purposes on Lower Stoke, Limpley Stoke.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 May 2025 and run through until 22 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 10 Apr 2025 at 12:27.

Wales And West Utilities logo
Until
24 Jun 2025
Details
View Map
Share
Follow
South Parade

Wales And West Utilities are carrying out Utility repair and maintenance works on South Parade, Frome.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 09:30 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 3 Jun 2025 at 11:06.

Wiltshire Council logo
Until
13 Jun 2025
Details
View Map
Share
Follow
Bratton Road

Wiltshire Council are carrying out Highway repair and maintenance works on Bratton Road, West Ashton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:00 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 2 Jun 2025 at 10:09.

Wales And West Utilities logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Frome Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Frome Road, Southwick.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 24 Dec 2024 at 15:37.

Wales And West Utilities logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Frome Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Frome Road, Southwick.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 30 Dec 2024 at 14:15.

Wessex Water logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Bull's Hill

Wessex Water are proposing to carry out Utility repair and maintenance works on Bull's Hill, Wellow, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 27 Feb 2025 at 16:21.

Wiltshire Council logo
Finishing
Monday
Details
View Map
Share
Follow
Kennet Way

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Kennet Way, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 18 Mar 2025 at 11:26.

Wiltshire Council logo
Finishing
Monday
Details
View Map
Share
Follow
Kennet Way

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Kennet Way, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 27 May 2025 at 15:17.

Wiltshire Council logo
Finishing
Monday
Details
View Map
Share
Follow
Canal Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Canal Road, Trowbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 21 May 2025 at 11:13.

Wiltshire Council logo
Finishing
Monday
Details
View Map
Share
Canal Road

Wiltshire Council were proposing to carry out Highway repair and maintenance works on Canal Road, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 30 May 2025 at 12:17.

Wiltshire Council logo
Finishing
Monday
Details
View Map
Share
Follow
Canal Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Canal Road, Trowbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 2 Jun 2025 at 10:08.

Wiltshire Council logo
Finishing
Monday
Details
View Map
Share
Follow
Canal Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Canal Road, Trowbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 30 May 2025 at 14:18.

Wiltshire Council logo
Finishing
Monday
Details
View Map
Share
Hammond Way

Wiltshire Council were proposing to carry out Highway repair and maintenance works on Hammond Way, Trowbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 30 May 2025 at 12:25.

Wiltshire Council logo
Finishing
Monday
Details
View Map
Share
Follow
Hammond Way

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Hammond Way, Trowbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 30 May 2025 at 14:19.

Wiltshire Council logo
Finishing
Monday
Details
View Map
Share
Follow
Hammond Way

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Hammond Way, Trowbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 2 Jun 2025 at 10:02.

Somerset County Council logo
Between
12 and 19 Jun 2025
Details
View Map
Share
Follow
Frome Bypass

Somerset County Council are proposing to carry out Highway repair and maintenance works on Frome Bypass, Berkley, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 4 Apr 2025 at 09:51.

Somerset County Council logo
Between
13 and 19 Jun 2025
Details
View Map
Share
Follow
Frome Bypass

Somerset County Council are proposing to carry out Highway repair and maintenance works on Frome Bypass, Berkley, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 10 Mar 2025 at 13:35.

Wiltshire Council logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
County Way

Wiltshire Council are proposing to carry out Highway repair and maintenance works on County Way, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 30 May 2025 at 16:20.

Wiltshire Council logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Hilperton Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Hilperton Road, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 30 May 2025 at 16:35.

Wiltshire Council logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Roundstone Street

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Roundstone Street, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 30 May 2025 at 16:24.

Wiltshire Council logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Hilperton Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Hilperton Road, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 30 May 2025 at 16:39.

Wiltshire Council logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
The Halve

Wiltshire Council are proposing to carry out Highway repair and maintenance works on The Halve, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 23 May 2025 at 15:37.

Wiltshire Council logo
LONG TERM
Between
16 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Middle Lane

Wiltshire Council are proposing to carry out Section 50 on Middle Lane, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 30 May 2025 at 15:46.

Wiltshire Council logo
LONG TERM
Between
16 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Middle Lane

Wiltshire Council are proposing to carry out Section 50 on Middle Lane, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 30 May 2025 at 16:02.

Wiltshire Council logo
Between
20 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Hawkeridge Road

Wiltshire Council are proposing to carry out Section 50 on Hawkeridge Road, Heywood.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 8 May 2025 at 08:59.

Wiltshire Council logo
Between
20 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Hawkeridge Road

Wiltshire Council are proposing to carry out Section 50 on Hawkeridge Road, Heywood.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 8 May 2025 at 16:31.

Somerset County Council logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Frome Bypass

Somerset County Council are proposing to carry out Highway repair and maintenance works on Frome Bypass, Berkley, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 30 May 2025 at 12:57.

Wales And West Utilities logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Follow
Catherine Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Catherine Street, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 11 Apr 2025 at 16:57.

Wales And West Utilities logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Follow
Catherine Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Catherine Street, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 2 Jun 2025 at 14:49.

BT logo
Between
25 and 28 Jun 2025
Details
View Map
Share
The Mount

BT were proposing to carry out Utility asset works on The Mount, Frome.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 June 2025 and run through until 28 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 2 Apr 2025 at 08:30.

BT logo
Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
Silver Street Lane

BT are proposing to carry out Utility asset works on Silver Street Lane, Brokerswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 11 Apr 2025 at 11:59.

Wiltshire Council logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Stormore

Wiltshire Council were proposing to carry out Section 50 on Stormore, Dilton Marsh.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 4 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 29 Apr 2025 at 11:36.

Wiltshire Council logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Stormore

Wiltshire Council are proposing to carry out Section 50 on Stormore, Dilton Marsh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 8 May 2025 at 15:39.

Wiltshire Council logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Stormore

Wiltshire Council are proposing to carry out Section 50 on Stormore, Dilton Marsh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 13 May 2025 at 11:11.

Wales And West Utilities logo
LONG TERM
Between
30 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Westbury Leigh

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Westbury Leigh, Westbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 30 May 2025 at 16:17.

Gigaclear logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Mill Lane

Gigaclear are proposing to carry out Remedial works on Mill Lane, Beckington, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 10 Apr 2025 at 15:43.

Gigaclear logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Horse Close

Gigaclear are proposing to carry out Remedial works on Horse Close, Beckington, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 10 Apr 2025 at 15:32.

Wales And West Utilities logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Harford Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Harford Street, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 24 Dec 2024 at 14:46.

Wales And West Utilities logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Harford Street

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Harford Street, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 18 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 17 Mar 2025 at 12:24.

Wales And West Utilities logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Eastbourne Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Eastbourne Road, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 24 Dec 2024 at 14:39.

Wales And West Utilities logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Eastbourne Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Eastbourne Road, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 18 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 17 Mar 2025 at 12:25.

Gigaclear logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Belcombe Place

Gigaclear were proposing to carry out Remedial works on Belcombe Place, Bradford On Avon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 2 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 16 May 2025 at 08:35.

Gigaclear logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Belcombe Place

Gigaclear were proposing to carry out Remedial works on Belcombe Place, Bradford On Avon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 2 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 23 May 2025 at 08:54.

Wiltshire Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Cottles Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Cottles Lane, Turleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 1 May 2025 at 16:47.

Wiltshire Council logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Cottles Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Cottles Lane, Turleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 9 May 2025 at 08:40.

Wales And West Utilities logo
Between
1 and 4 Jul 2025
Details
View Map
Share
Follow
Church Acre

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Church Acre, Bradford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 14 Apr 2025 at 09:40.

Wiltshire Council logo
Between
2 and 16 Jul 2025
Details
View Map
Share
Follow
Hawkeridge Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Hawkeridge Road, Heywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 7 Apr 2025 at 12:04.

Wiltshire Council logo
Between
2 and 16 Jul 2025
Details
View Map
Share
Follow
Hawkeridge Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Hawkeridge Road, Heywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 11 Apr 2025 at 12:47.

Wiltshire Council logo
Between
2 and 16 Jul 2025
Details
View Map
Share
Follow
Hawkeridge Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Hawkeridge Road, North Bradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 7 Apr 2025 at 12:05.

Wiltshire Council logo
Between
2 and 16 Jul 2025
Details
View Map
Share
Follow
Hawkeridge Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Hawkeridge Road, North Bradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 11 Apr 2025 at 12:45.

Scottish Hydro Electric Power Dis logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Stormore

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Stormore, Dilton Marsh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Apr 2025 at 11:11.

Scottish Hydro Electric Power Dis logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Stormore

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Stormore, Dilton Marsh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Apr 2025 at 16:35.

Wiltshire Council logo
Between
7 and 18 Jul 2025
Details
View Map
Share
County Way

Wiltshire Council were proposing to carry out Highway improvement works on County Way, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 7 Mar 2025 at 14:52.

BT logo
Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
The Mount

BT are proposing to carry out Utility asset works on The Mount, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 30 Apr 2025 at 15:55.

Wessex Water logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Gibbs Close

Wessex Water are proposing to carry out Utility repair and maintenance works on Gibbs Close, Westbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 1 May 2025 at 15:48.

Wessex Water logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Gibbs Close

Wessex Water are proposing to carry out Utility repair and maintenance works on Gibbs Close, Westbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 12 May 2025 at 09:25.

Scottish Hydro Electric Power Dis logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Rodden Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Rodden Road, Frome.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 8 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Feb 2025 at 16:00.

Wales And West Utilities logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
West End

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on West End, Westbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Wales And West Utilities on 13 Feb 2025 at 17:18.

Wales And West Utilities logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
West End

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on West End, Westbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Wales And West Utilities on 24 Feb 2025 at 14:00.

Wales And West Utilities logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
West End

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on West End, Westbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 29 August 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Wales And West Utilities on 8 May 2025 at 13:06.

Wales And West Utilities logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
West End

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on West End, Westbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 12 May 2025 at 12:03.

Wales And West Utilities logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Goose Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Goose Street, Beckington, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 2 May 2025 at 14:43.

Wiltshire Council logo
LONG TERM
Between
21 Jul and 17 Oct 2025
Details
View Map
Share
County Way

Wiltshire Council were proposing to carry out Highway improvement works on County Way, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 17 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 7 Mar 2025 at 14:51.

Wiltshire Council logo
LONG TERM
Between
21 Jul and 17 Oct 2025
Details
View Map
Share
Mortimer Street

Wiltshire Council were proposing to carry out Highway improvement works on Mortimer Street, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 17 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 7 Mar 2025 at 14:50.

Wiltshire Council logo
LONG TERM
Between
21 Jul and 17 Oct 2025
Details
View Map
Share
Longfield Road West

Wiltshire Council were proposing to carry out Highway improvement works on Longfield Road West, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 17 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 7 Mar 2025 at 14:51.

Wiltshire Council logo
LONG TERM
Between
21 Jul and 17 Oct 2025
Details
View Map
Share
County Way

Wiltshire Council were proposing to carry out Highway improvement works on County Way, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 17 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 7 Mar 2025 at 14:50.

Wiltshire Council logo
LONG TERM
Between
21 Jul and 17 Oct 2025
Details
View Map
Share
Mortimer Street

Wiltshire Council were proposing to carry out Highway improvement works on Mortimer Street, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 7 Mar 2025 at 14:49.

Wiltshire Council logo
LONG TERM
Between
21 Jul and 17 Oct 2025
Details
View Map
Share
Bythesea Road

Wiltshire Council were proposing to carry out Highway improvement works on Bythesea Road, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 17 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 7 Mar 2025 at 14:52.

Network Rail logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Lower Stoke

Network Rail are proposing to carry out Works for Rail Purposes on Lower Stoke, Limpley Stoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 8 May 2025 at 12:01.

Network Rail logo
LONG TERM
Between
21 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Lower Stoke

Network Rail are proposing to carry out Works for Rail Purposes on Lower Stoke, Limpley Stoke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 19 May 2025 at 13:07.

Wiltshire Council logo
Between
22 and 25 Jul 2025
Details
View Map
Share
Roundstone Street

Wiltshire Council were proposing to carry out Highway repair and maintenance works on Roundstone Street, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 23 May 2025 at 15:25.

Wiltshire Council logo
Between
22 and 25 Jul 2025
Details
View Map
Share
Hilperton Road

Wiltshire Council were proposing to carry out Highway repair and maintenance works on Hilperton Road, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 23 May 2025 at 15:25.

Wiltshire Council logo
Between
22 and 25 Jul 2025
Details
View Map
Share
The Halve

Wiltshire Council were proposing to carry out Highway repair and maintenance works on The Halve, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 23 May 2025 at 15:24.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
24 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Berkley Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Berkley Road, Frome.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 May 2025 at 10:25.

Wiltshire Council logo
LONG TERM
Between
25 Jul and 25 Nov 2025
Details
View Map
Share
Follow
Roundstone Street

Wiltshire Council are proposing to carry out Highway improvement works on Roundstone Street, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 25 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 23 May 2025 at 11:32.

Wiltshire Council logo
LONG TERM
Between
25 Jul and 25 Nov 2025
Details
View Map
Share
Follow
Roundstone Street

Wiltshire Council are proposing to carry out Highway improvement works on Roundstone Street, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 25 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 2 Jun 2025 at 14:14.

Wessex Water logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Bull's Hill

Wessex Water are proposing to carry out Utility repair and maintenance works on Bull's Hill, Wellow, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 28 Feb 2025 at 08:12.

Wessex Water logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Bull's Hill

Wessex Water are proposing to carry out Utility repair and maintenance works on Bull's Hill, Wellow, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 13 Mar 2025 at 13:46.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
1 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Long Ground

Scottish Hydro Electric Power Dis are proposing to carry out roadworks on Long Ground, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Apr 2025 at 16:30.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
1 Aug and 12 Sep 2025
Details
View Map
Share
Long Ground

Scottish Hydro Electric Power Dis were proposing to carry out roadworks on Long Ground, Frome.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 12 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Apr 2025 at 11:40.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
1 Aug and 12 Sep 2025
Details
View Map
Share
Long Ground

Scottish Hydro Electric Power Dis were proposing to carry out roadworks on Long Ground, Frome.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 12 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Apr 2025 at 15:45.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
1 Aug and 12 Sep 2025
Details
View Map
Share
Keyford

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Keyford, Frome.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 12 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Apr 2025 at 09:59.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
1 Aug and 12 Sep 2025
Details
View Map
Share
Keyford

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Keyford, Frome.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 May 2025 at 14:39.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
1 Aug and 12 Sep 2025
Details
View Map
Share
Keyford

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Keyford, Frome.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Apr 2025 at 10:59.

Scottish Hydro Electric Power Dis logo
Between
1 and 12 Aug 2025
Details
View Map
Share
Keyford

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Keyford, Frome.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 12 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Apr 2025 at 10:59.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
1 Aug and 12 Sep 2025
Details
View Map
Share
Keyford

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Keyford, Frome.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 May 2025 at 09:48.

BT logo
Between
1 and 5 Aug 2025
Details
View Map
Share
Follow
Lodge Hill

BT are proposing to carry out Utility asset works on Lodge Hill, Berkley, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 28 May 2025 at 09:49.

BT logo
Between
1 and 5 Aug 2025
Details
View Map
Share
Follow
Lodge Hill

BT are proposing to carry out Utility asset works on Lodge Hill, Berkley, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 3 Jun 2025 at 15:29.

BT logo
Between
1 and 5 Aug 2025
Details
View Map
Share
Follow
High Street

BT are proposing to carry out Utility asset works on High Street, Westbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 27 May 2025 at 15:56.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
4 Aug and 12 Sep 2025
Details
View Map
Share
Crown Gardens

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Crown Gardens, Frome.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 12 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 May 2025 at 15:37.

BT logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
The Mount

BT are proposing to carry out Utility asset works on The Mount, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 May 2025 at 08:25.

Scottish Hydro Electric Power Dis logo
Between
18 Aug and 5 Sep 2025
Details
View Map
Share
Berkley Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Berkley Road, Frome.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 5 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Feb 2025 at 15:57.

BT logo
Between
19 and 21 Aug 2025
Details
View Map
Share
Follow
High Street

BT are proposing to carry out Utility asset works on High Street, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 27 May 2025 at 16:56.

BT logo
Between
19 and 21 Aug 2025
Details
View Map
Share
Follow
High Street

BT are proposing to carry out Utility asset works on High Street, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 30 May 2025 at 07:48.

Wiltshire Council logo
Between
19 and 21 Aug 2025
Details
View Map
Share
Follow
Cottles Lane

Wiltshire Council are proposing to carry out Core Sampling on Cottles Lane, Turleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 27 May 2025 at 10:08.

Wales And West Utilities logo
Between
26 and 29 Aug 2025
Details
View Map
Share
Follow
Little Keyford Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Little Keyford Lane, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 19 May 2025 at 11:28.

Murphy Power Distribution logo
Between
26 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Seymour Road

Murphy Power Distribution are proposing to carry out Utility asset works on Seymour Road, Trowbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 22 May 2025 at 08:50.

Murphy Power Distribution logo
Between
26 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Seymour Road

Murphy Power Distribution are proposing to carry out Utility asset works on Seymour Road, Trowbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 23 May 2025 at 11:56.


Roadworks Map near to Walnut Close, FROME, BA11 6QA (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 17:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Walnut Close, FROME, BA11 6QA (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.