ROADWORKS SUMMARY
Crooked Lane, FROME, BA11 6PQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Crooked Lane, BA11 6PQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Crooked Lane, FROME, BA11 6PQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Crooked Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wiltshire Council logo
LONG TERM
Between
30 Sep 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Lower Stoke

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Lower Stoke, Limpley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wiltshire Council on 3 Oct 2024 at 12:54.

Wiltshire Council logo
LONG TERM
Between
30 Sep 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Lower Stoke

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Lower Stoke, Limpley Stoke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wiltshire Council on 4 Oct 2024 at 12:32.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
3 Jan and 7 Feb 2025
Details
View Map
Share
St Johns Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on St Johns Road, Frome.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Dec 2024 at 16:37.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Rodden Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Rodden Road, Frome.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Dec 2024 at 16:36.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Coronation Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Coronation Road, Frome.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Dec 2024 at 16:35.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Whitestone Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Whitestone Road, Frome.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Dec 2024 at 16:38.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Berkley Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Berkley Road, Frome.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Dec 2024 at 16:34.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Wiltshire Drive

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wiltshire Drive, Trowbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 28 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Nov 2024 at 14:27.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Ramsbury Walk

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Ramsbury Walk, Trowbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Nov 2024 at 14:24.

Scottish Hydro Electric Power Dis logo
Until
7 Feb 2025
Details
View Map
Share
Follow
Grove Lane

Scottish Hydro Electric Power Dis are carrying out Remedial works on Grove Lane, Frome.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 January 2025 at 09:30 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Jan 2025 at 12:10.

Wales And West Utilities logo
Finishing
Tomorrow
Details
View Map
Share
Frome Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Frome Road, Southwick.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 3 Dec 2024 at 08:52.

Scottish Hydro Electric Power Dis logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Wiltshire Drive

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wiltshire Drive, Trowbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Dec 2024 at 09:42.

Scottish Hydro Electric Power Dis logo
Between
15 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Manor Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Manor Road, Frome.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Oct 2024 at 10:30.

Scottish Hydro Electric Power Dis logo
Until
11 Feb 2025
Details
View Map
Share
Follow
Manor Road

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Manor Road, Frome.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 January 2025 at 11:45 and could run through until 11 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Jan 2025 at 11:59.

Somerset County Council logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Coal Lane

Somerset County Council are proposing to carry out Highway repair and maintenance works on Coal Lane, Great Elm, Frome.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Somerset County Council on 23 Dec 2024 at 12:48.

Somerset County Council logo
Until
12 Feb 2025
Details
View Map
Share
Follow
Coal Lane

Somerset County Council are carrying out Highway repair and maintenance works on Coal Lane, Great Elm, Frome.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 January 2025 at 09:00 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Somerset County Council on 23 Jan 2025 at 09:06.

Somerset County Council logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hapsford Hill

Somerset County Council are proposing to carry out Highway repair and maintenance works on Hapsford Hill, Great Elm, Frome.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Somerset County Council on 20 Dec 2024 at 16:04.

Somerset County Council logo
Until
12 Feb 2025
Details
View Map
Share
Follow
Hapsford Hill

Somerset County Council are carrying out Highway repair and maintenance works on Hapsford Hill, Great Elm, Frome.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 January 2025 at 09:00 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Somerset County Council on 23 Jan 2025 at 09:05.

Wiltshire Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Frogmore Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Frogmore Road, Westbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 20 Dec 2024 at 11:57.

Wiltshire Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Frogmore Road

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Frogmore Road, Westbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wiltshire Council on 2 Jan 2025 at 14:31.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Wiltshire Drive

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wiltshire Drive, Trowbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Jan 2025 at 13:58.

Wiltshire Council logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Belcombe Road

Wiltshire Council are proposing to carry out roadworks on Belcombe Road, Bradford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 7 Nov 2024 at 16:38.

Scottish Hydro Electric Power Dis logo
Between
29 Jan and 18 Feb 2025
Details
View Map
Share
Follow
Westfield Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Westfield Road, Trowbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 18 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Jan 2025 at 10:42.

Wiltshire Council logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Frogmore Road

Wiltshire Council are proposing to carry out Highway improvement works on Frogmore Road, Westbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the footway and cycleway.

This roadwork event was last updated by Wiltshire Council on 25 Oct 2024 at 08:44.

Wiltshire Council logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Frogmore Road

Wiltshire Council were proposing to carry out Highway improvement works on Frogmore Road, Westbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the footway and cycleway.

This roadwork event was last updated by Wiltshire Council on 22 Nov 2024 at 09:30.

Wiltshire Council logo
LONG TERM
Between
3 Feb and 25 Apr 2025
Details
View Map
Share
Follow
Frogmore Road

Wiltshire Council are proposing to carry out Highway improvement works on Frogmore Road, Westbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the footway and cycleway.

This roadwork event was last updated by Wiltshire Council on 22 Nov 2024 at 16:53.

Wiltshire Council logo
LONG TERM
Between
3 Feb and 25 Apr 2025
Details
View Map
Share
Follow
Frogmore Road

Wiltshire Council are proposing to carry out Highway improvement works on Frogmore Road, Westbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the footway and cycleway.

This roadwork event was last updated by Wiltshire Council on 29 Nov 2024 at 17:03.

Wiltshire Council logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Frogmore Road

Wiltshire Council are proposing to carry out Highway improvement works on Frogmore Road, Westbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 25 Oct 2024 at 08:40.

Wiltshire Council logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Frogmore Road

Wiltshire Council were proposing to carry out Highway improvement works on Frogmore Road, Westbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 22 Nov 2024 at 09:31.

Wiltshire Council logo
LONG TERM
Between
3 Feb and 25 Apr 2025
Details
View Map
Share
Follow
Frogmore Road

Wiltshire Council are proposing to carry out Highway improvement works on Frogmore Road, Westbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 22 Nov 2024 at 16:50.

Wiltshire Council logo
LONG TERM
Between
3 Feb and 25 Apr 2025
Details
View Map
Share
Follow
Frogmore Road

Wiltshire Council are proposing to carry out Highway improvement works on Frogmore Road, Westbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 29 Nov 2024 at 17:02.

Scottish Hydro Electric Power Dis logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Wiltshire Drive

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Wiltshire Drive, Trowbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Jan 2025 at 17:46.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Ramsbury Walk

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Ramsbury Walk, Trowbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Dec 2024 at 09:40.

Wiltshire Council logo
LONG TERM
Between
3 Feb and 18 Mar 2025
Details
View Map
Share
Hilperton Road

Wiltshire Council were proposing to carry out Section 58 on Hilperton Road, Trowbridge.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 18 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 16:36.

Wiltshire Council logo
LONG TERM
Between
3 Feb and 18 Mar 2025
Details
View Map
Share
The Halve

Wiltshire Council were proposing to carry out Section 58 on The Halve, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 18 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 16:28.

Wales And West Utilities logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Roundstone Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Roundstone Street, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 22 Nov 2024 at 17:22.

Wales And West Utilities logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Roundstone Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Roundstone Street, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 6 Dec 2024 at 06:39.

Wales And West Utilities logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Little Keyford Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Little Keyford Lane, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 4 Dec 2024 at 13:52.

Wales And West Utilities logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Little Keyford Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Little Keyford Lane, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 17 Dec 2024 at 12:33.

BT logo
Between
10 and 17 Feb 2025
Details
View Map
Share
High Street

BT were proposing to carry out Utility asset works on High Street, Chapmanslade.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 17 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 6 Nov 2024 at 11:24.

BT logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Follow
A36 J A3098 Leave Including Two Way Section N

BT are proposing to carry out Utility asset works on A36 J A3098 Leave Including Two Way Section N, West Wiltshire.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 5 Nov 2024 at 15:58.

BT logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Chalcot Lane

BT were proposing to carry out Utility asset works on Chalcot Lane, Chapmanslade.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 17 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 6 Nov 2024 at 11:23.

Somerset County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Fulwell Lane

Somerset County Council are proposing to carry out Section 50 on Fulwell Lane, Faulkland, Radstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 20 Dec 2024 at 12:20.

Somerset County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Fulwell Lane

Somerset County Council are proposing to carry out Section 50 on Fulwell Lane, Faulkland, Radstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 24 Dec 2024 at 11:57.

Scottish Hydro Electric Power Dis logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Wiltshire Drive

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Wiltshire Drive, Trowbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jan 2025 at 16:14.

Scottish Hydro Electric Power Dis logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Lockeridge Close

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lockeridge Close, Trowbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Jan 2025 at 11:30.

Wiltshire Council logo
LONG TERM
Between
10 Feb and 25 Mar 2025
Details
View Map
Share
Hilperton Road

Wiltshire Council were proposing to carry out Section 58 on Hilperton Road, Trowbridge.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 25 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 9 Dec 2024 at 16:28.

Wiltshire Council logo
LONG TERM
Between
10 Feb and 25 Mar 2025
Details
View Map
Share
Follow
The Halve

Wiltshire Council are proposing to carry out Section 58 on The Halve, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 16:58.

Wiltshire Council logo
LONG TERM
Between
10 Feb and 25 Mar 2025
Details
View Map
Share
Follow
The Halve

Wiltshire Council are proposing to carry out Section 58 on The Halve, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 10 Dec 2024 at 12:16.

Wessex Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Rosemary Lane

Wessex Water are proposing to carry out Utility repair and maintenance works on Rosemary Lane, Freshford, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 7 Jan 2025 at 15:21.

Wessex Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Rosemary Lane

Wessex Water were proposing to carry out Utility repair and maintenance works on Rosemary Lane, Freshford, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 20 Jan 2025 at 11:03.

Somerset County Council logo
LONG TERM
Between
17 Feb and 5 Apr 2025
Details
View Map
Share
Follow
The Butts

Somerset County Council are proposing to carry out Works for road purposes on The Butts, Frome.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 6 Jan 2025 at 14:32.

Somerset County Council logo
LONG TERM
Between
17 Feb and 5 Apr 2025
Details
View Map
Share
Follow
Somerset Road

Somerset County Council are proposing to carry out Works for road purposes on Somerset Road, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 2 Jan 2025 at 12:34.

Somerset County Council logo
LONG TERM
Between
17 Feb and 5 Apr 2025
Details
View Map
Share
Follow
Somerset Road

Somerset County Council are proposing to carry out Works for road purposes on Somerset Road, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 13 Jan 2025 at 12:35.

Somerset County Council logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Coal Lane

Somerset County Council are proposing to carry out Highway repair and maintenance works on Coal Lane, Great Elm, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Somerset County Council on 15 Nov 2024 at 09:28.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Ramsbury Walk

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Ramsbury Walk, Trowbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Jan 2025 at 13:56.

Bath And North East Somerset Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Bath Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Bath Hill, Wellow, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 17 Jan 2025 at 15:47.

Bath And North East Somerset Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Bath Hill

Bath And North East Somerset Council are proposing to carry out Highway improvement works on Bath Hill, Wellow, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bath And North East Somerset Council on 20 Jan 2025 at 10:31.

Gigaclear logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Newtown

Gigaclear are proposing to carry out Utility asset works on Newtown, Bradford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 13 Dec 2024 at 15:16.

Gigaclear logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Newtown

Gigaclear are proposing to carry out Utility asset works on Newtown, Bradford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 20 Jan 2025 at 08:34.

Scottish Hydro Electric Power Dis logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Keyford

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Keyford, Frome.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Dec 2024 at 08:58.

Scottish Hydro Electric Power Dis logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Keyford

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Keyford, Frome.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Dec 2024 at 10:56.

Gigaclear logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Tellisford Lane

Gigaclear are proposing to carry out Remedial works on Tellisford Lane, Norton St Philip, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 28 Jan 2025 at 11:26.

Wales And West Utilities logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
Sharpstone Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Sharpstone Lane, Freshford, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 7 Jan 2025 at 12:28.

Wales And West Utilities logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Follow
Sharpstone Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Sharpstone Lane, Freshford, Bath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 15 Jan 2025 at 15:34.

BT logo
Between
4 and 7 Mar 2025
Details
View Map
Share
Follow
Gypsy Lane

BT are proposing to carry out Utility asset works on Gypsy Lane, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 23 Dec 2024 at 11:58.

Wales And West Utilities logo
Between
4 and 7 Mar 2025
Details
View Map
Share
Follow
Cottles Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Cottles Lane, Turleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 17 Dec 2024 at 16:40.

Wales And West Utilities logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Cottles Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Cottles Lane, Turleigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wales And West Utilities on 2 Jan 2025 at 17:03.

BT logo
Between
10 and 15 Mar 2025
Details
View Map
Share
High Street

BT were proposing to carry out Utility asset works on High Street, Chapmanslade.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 15 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Nov 2024 at 13:49.

BT logo
Between
10 and 15 Mar 2025
Details
View Map
Share
A36 J A3098 Leave Including Two Way Section N

BT were proposing to carry out Utility asset works on A36 J A3098 Leave Including Two Way Section N, West Wiltshire.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 15 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Nov 2024 at 13:57.

BT logo
Between
10 and 15 Mar 2025
Details
View Map
Share
Chalcot Lane

BT were proposing to carry out Utility asset works on Chalcot Lane, Chapmanslade.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 15 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Nov 2024 at 13:56.

Wiltshire Council logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Dursley Road

Wiltshire Council are proposing to carry out Highway improvement works on Dursley Road, Heywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 24 Dec 2024 at 11:33.

Wiltshire Council logo
Between
17 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Dursley Road

Wiltshire Council are proposing to carry out Highway improvement works on Dursley Road, Heywood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 7 Jan 2025 at 12:10.

Wiltshire Council logo
LONG TERM
Between
19 Mar and 28 Apr 2025
Details
View Map
Share
Roundstone Street

Wiltshire Council were proposing to carry out Section 58 on Roundstone Street, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 March 2025 and run through until 28 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 16:49.

Wiltshire Council logo
LONG TERM
Between
19 Mar and 28 Apr 2025
Details
View Map
Share
Yerbury Street

Wiltshire Council were proposing to carry out Section 58 on Yerbury Street, Trowbridge.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 March 2025 and run through until 28 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 16:53.

Wiltshire Council logo
LONG TERM
Between
19 Mar and 28 Apr 2025
Details
View Map
Share
Hilperton Road

Wiltshire Council were proposing to carry out Section 58 on Hilperton Road, Trowbridge.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 March 2025 and run through until 28 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 16:44.

Gigaclear logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Belcombe Place

Gigaclear were proposing to carry out Utility asset works on Belcombe Place, Bradford On Avon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 26 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 31 Dec 2024 at 12:12.

BT logo
Between
25 and 28 Mar 2025
Details
View Map
Share
Follow
Gypsy Lane

BT are proposing to carry out Utility asset works on Gypsy Lane, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 27 Jan 2025 at 08:20.

Wiltshire Council logo
LONG TERM
Between
26 Mar and 5 May 2025
Details
View Map
Share
Follow
Roundstone Street

Wiltshire Council are proposing to carry out Section 58 on Roundstone Street, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 17:04.

Wiltshire Council logo
LONG TERM
Between
26 Mar and 5 May 2025
Details
View Map
Share
Follow
Roundstone Street

Wiltshire Council are proposing to carry out Section 58 on Roundstone Street, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 10 Dec 2024 at 12:20.

Wiltshire Council logo
LONG TERM
Between
26 Mar and 5 May 2025
Details
View Map
Share
Yerbury Street

Wiltshire Council were proposing to carry out Section 58 on Yerbury Street, Trowbridge.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 March 2025 and run through until 5 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 9 Dec 2024 at 15:41.

Wiltshire Council logo
LONG TERM
Between
26 Mar and 5 May 2025
Details
View Map
Share
Hilperton Road

Wiltshire Council were proposing to carry out Section 58 on Hilperton Road, Trowbridge.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 March 2025 and run through until 5 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 9 Dec 2024 at 15:41.

BT logo
Between
31 Mar and 3 Apr 2025
Details
View Map
Share
Follow
The Mount

BT are proposing to carry out Utility asset works on The Mount, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 16 Jan 2025 at 12:56.

Somerset County Council logo
Between
31 Mar and 5 Apr 2025
Details
View Map
Share
Follow
Butts Hill

Somerset County Council are proposing to carry out Works for road purposes on Butts Hill, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 5 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 6 Jan 2025 at 14:14.

Somerset County Council logo
Between
31 Mar and 5 Apr 2025
Details
View Map
Share
Follow
Butts Hill

Somerset County Council are proposing to carry out Works for road purposes on Butts Hill, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 5 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 8 Jan 2025 at 11:38.

BT logo
Between
7 and 14 Apr 2025
Details
View Map
Share
Follow
The Mount

BT are proposing to carry out Utility asset works on The Mount, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Jan 2025 at 14:52.

Netomnia logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Whitewell Road

Netomnia were proposing to carry out Remedial works on Whitewell Road, Frome.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 9 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Netomnia on 7 Jan 2025 at 13:06.

Wessex Water logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Rosemary Lane

Wessex Water were proposing to carry out Utility repair and maintenance works on Rosemary Lane, Freshford, Bath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 9 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 7 Jan 2025 at 13:55.

BT logo
Between
8 and 11 Apr 2025
Details
View Map
Share
Gypsy Lane

BT were proposing to carry out Utility asset works on Gypsy Lane, Frome.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 April 2025 and run through until 11 April 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 27 Jan 2025 at 08:17.

Wiltshire Council logo
Between
8 and 10 Apr 2025
Details
View Map
Share
Follow
Hoopers Pool

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Hoopers Pool, Southwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 10 Jan 2025 at 16:45.

Gigaclear logo
Between
8 and 10 Apr 2025
Details
View Map
Share
Follow
Belcombe Place

Gigaclear are proposing to carry out Utility asset works on Belcombe Place, Bradford On Avon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 10 Jan 2025 at 17:06.

BT logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Stormore

BT are proposing to carry out Utility asset works on Stormore, Dilton Marsh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Jan 2025 at 17:05.

BT logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Southwick Road

BT are proposing to carry out Utility asset works on Southwick Road, North Bradley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Jan 2025 at 16:54.

BT logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Follow
Stonebridge Drive

BT are proposing to carry out Utility asset works on Stonebridge Drive, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Jan 2025 at 13:55.

BT logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Follow
Laurel Close

BT are proposing to carry out Utility asset works on Laurel Close, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Jan 2025 at 13:55.

Wiltshire Council logo
Between
24 and 26 Apr 2025
Details
View Map
Share
Follow
Stormore

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Stormore, Dilton Marsh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 23 Jan 2025 at 09:37.

Wiltshire Council logo
Between
24 and 26 Apr 2025
Details
View Map
Share
Follow
Clearwood

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Clearwood, Dilton Marsh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 23 Jan 2025 at 09:41.

Wiltshire Council logo
Between
26 and 28 Apr 2025
Details
View Map
Share
Follow
Silver Street Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Silver Street Lane, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 23 Jan 2025 at 11:33.

Wales And West Utilities logo
LONG TERM
Between
28 Apr and 30 May 2025
Details
View Map
Share
Follow
Wine Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Wine Street, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 23 Dec 2024 at 15:27.

Wales And West Utilities logo
LONG TERM
Between
28 Apr and 30 May 2025
Details
View Map
Share
Follow
Wine Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Wine Street, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 30 Dec 2024 at 13:34.

Wiltshire Council logo
LONG TERM
Between
29 Apr and 9 Jul 2025
Details
View Map
Share
Polebarn Road

Wiltshire Council were proposing to carry out Section 58 on Polebarn Road, Trowbridge.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 April 2025 and run through until 9 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 17:02.

Wiltshire Council logo
LONG TERM
Between
29 Apr and 9 Jul 2025
Details
View Map
Share
Roundstone Street

Wiltshire Council were proposing to carry out Section 58 on Roundstone Street, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 April 2025 and run through until 9 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 26 Nov 2024 at 16:58.


Roadworks Map near to Crooked Lane, FROME, BA11 6PQ (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 30 Jan 2025 23:22
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Crooked Lane, FROME, BA11 6PQ (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Gigaclear logo
HIGH STREET, RODE 
(0.3 miles)
Gigaclear
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 27 Jan 2025 - 4 Feb 2025
0.3
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.