ROADWORKS SUMMARY
Pot Lane, BA11 5FT

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Pot Lane, BA11 5FT and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Pot Lane, BA11 5FT

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Pot Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Wessex Water logo
LONG TERM
Until
2 Mar 2025
Details
View Map
Share
Follow
Weymouth Street

Wessex Water are carrying out Utility repair and maintenance works on Weymouth Street, Warminster.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 09:00 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 6 Aug 2024 at 13:47.

Wales And West Utilities logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Goulds Ground

Wales And West Utilities are carrying out Utility repair and maintenance works on Goulds Ground, Frome.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 09:00 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 22 Nov 2024 at 12:37.

Wales And West Utilities logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Eden Vale Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Eden Vale Road, Westbury.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 October 2024 at 09:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 22 Nov 2024 at 14:07.

Somerset County Council logo
LONG TERM
Between
4 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Locks Hill

Somerset County Council are proposing to carry out Section 50 on Locks Hill, Frome.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Somerset County Council on 18 Oct 2024 at 11:28.

Somerset County Council logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Locks Hill

Somerset County Council are carrying out Section 50 on Locks Hill, Frome.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Somerset County Council on 4 Nov 2024 at 16:07.

Wales And West Utilities logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Station Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Station Road, Westbury.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 9 November 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 22 Nov 2024 at 14:06.

Wessex Water logo
Finishing
Friday
Details
View Map
Share
Lamberts Marsh

Wessex Water were proposing to carry out Utility repair and maintenance works on Lamberts Marsh, Southwick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Wessex Water on 12 Sep 2024 at 13:37.

Wessex Water logo
Finishing
Friday
Details
View Map
Share
Follow
Lamberts Marsh

Wessex Water are carrying out Utility repair and maintenance works on Lamberts Marsh, Southwick.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 12:30 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 22 Nov 2024 at 14:21.

Wessex Water logo
Finishing
Friday
Details
View Map
Share
Follow
Lamberts Marsh

Wessex Water are proposing to carry out Utility repair and maintenance works on Lamberts Marsh, Southwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wessex Water on 18 Sep 2024 at 08:17.

Somerset County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Marsh Road

Somerset County Council are proposing to carry out Highway repair and maintenance works on Marsh Road, Standerwick, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Somerset County Council on 1 Nov 2024 at 10:10.

Bristol Waterworks Company logo
Finishing
Wednesday
Details
View Map
Share
Rudge Lane

Bristol Waterworks Company were proposing to carry out New service connection on Rudge Lane, Rudge, Frome.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Bristol Waterworks Company on 5 Sep 2024 at 09:33.

BT logo
Between
2 and 7 Dec 2024
Details
View Map
Share
A36 J A3098 Leave Including Two Way Section N

BT were proposing to carry out Utility asset works on A36 J A3098 Leave Including Two Way Section N, West Wiltshire.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 7 December 2024. The works were due to impact the verge only.

This roadwork event was last updated by BT on 11 Nov 2024 at 12:24.

Bristol Waterworks Company logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Buckland Lane

Bristol Waterworks Company were proposing to carry out Utility repair and maintenance works on Buckland Lane, Great Elm, Frome.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 5 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Bristol Waterworks Company on 24 Oct 2024 at 08:43.

Scottish Hydro Electric Power Dis logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Lower Innox

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Lower Innox, Frome.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Sep 2024 at 11:01.

BT logo
Between
2 and 7 Dec 2024
Details
View Map
Share
Chalcot Lane

BT were proposing to carry out Utility asset works on Chalcot Lane, Chapmanslade.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 7 December 2024. The works were due to impact the verge only.

This roadwork event was last updated by BT on 11 Nov 2024 at 12:09.

BT logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Chalcot Lane

BT were proposing to carry out Utility asset works on Chalcot Lane, Chapmanslade.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 4 Sep 2024 at 11:09.

BT logo
Between
2 and 6 Dec 2024
Details
View Map
Share
High Street

BT were proposing to carry out Utility asset works on High Street, Chapmanslade.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 4 Sep 2024 at 11:03.

BT logo
Between
2 and 7 Dec 2024
Details
View Map
Share
High Street

BT were proposing to carry out Utility asset works on High Street, Chapmanslade.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 7 December 2024. The works were due to impact the verge only.

This roadwork event was last updated by BT on 11 Nov 2024 at 12:09.

BT logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
A36 J A3098 Leave Including Two Way Section N

BT are proposing to carry out Utility asset works on A36 J A3098 Leave Including Two Way Section N, West Wiltshire.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 4 Sep 2024 at 09:31.

BT logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Lodge Hill

BT were proposing to carry out Utility asset works on Lodge Hill, Berkley, Frome.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 9 Sep 2024 at 13:59.

BT logo
Between
9 and 13 Dec 2024
Details
View Map
Share
High Street

BT were proposing to carry out Utility asset works on High Street, Chapmanslade.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 9 Sep 2024 at 14:09.

Wiltshire Council logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Silver Street Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Silver Street Lane, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 24 Oct 2024 at 13:24.

Wiltshire Council logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Silver Street Lane

Wiltshire Council were proposing to carry out Highway repair and maintenance works on Silver Street Lane, Trowbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 21 Oct 2024 at 13:46.

Wiltshire Council logo
Between
12 and 14 Dec 2024
Details
View Map
Share
Follow
Silver Street Lane

Wiltshire Council are proposing to carry out Highway repair and maintenance works on Silver Street Lane, Trowbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wiltshire Council on 5 Nov 2024 at 15:09.

Somerset County Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Coal Lane

Somerset County Council are proposing to carry out Highway repair and maintenance works on Coal Lane, Great Elm, Frome.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Somerset County Council on 22 Nov 2024 at 11:09.

BT logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Laurel Close

BT are proposing to carry out Utility asset works on Laurel Close, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Oct 2024 at 11:43.

Somerset County Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hapsford Hill

Somerset County Council are proposing to carry out Highway repair and maintenance works on Hapsford Hill, Great Elm, Frome.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Somerset County Council on 22 Nov 2024 at 11:18.

BT logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Stonebridge Drive

BT are proposing to carry out Utility asset works on Stonebridge Drive, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Oct 2024 at 11:43.

BT logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Lodge Hill

BT were proposing to carry out Utility asset works on Lodge Hill, Berkley, Frome.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 21 Oct 2024 at 14:14.

BT logo
Between
6 and 10 Jan 2025
Details
View Map
Share
High Street

BT were proposing to carry out Utility asset works on High Street, Chapmanslade.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 21 Oct 2024 at 14:14.

Wessex Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Coach Road

Wessex Water are proposing to carry out New service connection on Coach Road, Westbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 30 Oct 2024 at 17:33.

Wessex Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Coach Road

Wessex Water are proposing to carry out New service connection on Coach Road, Westbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wessex Water on 24 Oct 2024 at 11:43.

Scottish Hydro Electric Power Dis logo
Between
11 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Grove Lane

Scottish Hydro Electric Power Dis are proposing to carry out Remedial works on Grove Lane, Frome.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 26 Sep 2024 at 15:02.

Wales And West Utilities logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Frome Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Frome Road, Southwick.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 2 Oct 2024 at 09:04.

Scottish Hydro Electric Power Dis logo
Between
15 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Manor Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Manor Road, Frome.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Oct 2024 at 10:30.

Scottish Hydro Electric Power Dis logo
Between
15 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Manor Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Manor Road, Frome.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Oct 2024 at 11:44.

Wessex Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Weymouth Street

Wessex Water are proposing to carry out Utility repair and maintenance works on Weymouth Street, Warminster.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wessex Water on 8 Nov 2024 at 08:45.

Wiltshire Council logo
LONG TERM
Between
3 Feb and 25 Apr 2025
Details
View Map
Share
Follow
Frogmore Road

Wiltshire Council are proposing to carry out Highway improvement works on Frogmore Road, Westbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 22 Nov 2024 at 16:50.

Wiltshire Council logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Frogmore Road

Wiltshire Council were proposing to carry out Highway improvement works on Frogmore Road, Westbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 22 Nov 2024 at 09:31.

Wiltshire Council logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Frogmore Road

Wiltshire Council are proposing to carry out Highway improvement works on Frogmore Road, Westbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wiltshire Council on 25 Oct 2024 at 08:40.

Wiltshire Council logo
LONG TERM
Between
3 Feb and 25 Apr 2025
Details
View Map
Share
Follow
Frogmore Road

Wiltshire Council are proposing to carry out Highway improvement works on Frogmore Road, Westbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the footway and cycleway.

This roadwork event was last updated by Wiltshire Council on 22 Nov 2024 at 16:53.

Wiltshire Council logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Frogmore Road

Wiltshire Council were proposing to carry out Highway improvement works on Frogmore Road, Westbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the footway and cycleway.

This roadwork event was last updated by Wiltshire Council on 22 Nov 2024 at 09:30.

Wiltshire Council logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Frogmore Road

Wiltshire Council are proposing to carry out Highway improvement works on Frogmore Road, Westbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 March 2025. The works will impact the footway and cycleway.

This roadwork event was last updated by Wiltshire Council on 25 Oct 2024 at 08:44.

BT logo
Between
10 and 17 Feb 2025
Details
View Map
Share
High Street

BT were proposing to carry out Utility asset works on High Street, Chapmanslade.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 17 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 6 Nov 2024 at 11:24.

BT logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Follow
A36 J A3098 Leave Including Two Way Section N

BT are proposing to carry out Utility asset works on A36 J A3098 Leave Including Two Way Section N, West Wiltshire.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 5 Nov 2024 at 15:58.

BT logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Chalcot Lane

BT were proposing to carry out Utility asset works on Chalcot Lane, Chapmanslade.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 17 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 6 Nov 2024 at 11:23.

Wales And West Utilities logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Little Keyford Lane

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Little Keyford Lane, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 8 Nov 2024 at 12:12.

Somerset County Council logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Coal Lane

Somerset County Council are proposing to carry out Highway repair and maintenance works on Coal Lane, Great Elm, Frome.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Somerset County Council on 15 Nov 2024 at 09:28.


Roadworks Map near to Pot Lane, BA11 5FT

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Nov 2024 05:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Pot Lane, BA11 5FT (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Somerset County Council logo
MAJOR
  
MARSH ROAD, STANDERWICK 
(0.9 miles)
Somerset County Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 24 Nov 2024 - 27 Nov 2024
0.9
Details
Share
Follow
2
National Highways logo
MAJOR
  
A36 FROM J B3099 TO J A361 EAST OF BECKINGTON 
(0.9 miles)
National Highways
Works for Rail Purposes - Verge - No carriageway incursion
Planned
Scheduled: 20 Oct 2022 - 20 Oct 2027
0.9
Details
Share
Follow
3
BT logo
STEPHENSON DRIVE 
(1.0 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Cancelled
(Scheduled: 21 Nov 2024 - 25 Nov 2024)
1.0
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.