ROADWORKS SUMMARY
Valley Road, SUTTON COLDFIELD, B74 2JE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Valley Road, B74 2JE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Valley Road, SUTTON COLDFIELD, B74 2JE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Valley Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Birmingham City Council logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Park Circus

Birmingham City Council are carrying out Highway improvement works on Park Circus, Birmingham.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2023 at 09:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Birmingham City Council on 2 Sep 2024 at 11:36.

Walsall Metropolitan Borough Council logo
LONG TERM
Between
3 Jun and 31 Oct 2024
Details
View Map
Share
Follow
Lichfield Road

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lichfield Road, Sandhills.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 11 Mar 2024 at 10:42.

Cadent Gas logo
LONG TERM
Between
29 Jul and 21 Oct 2024
Details
View Map
Share
Follow
Walsall Road

Cadent Gas are proposing to carry out Utility asset works on Walsall Road, Perry Barr, Birmingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 21 October 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 09:30.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
1 Aug 2024 and 30 Sep 2025
Details
View Map
Share
Birchfield Road

Transport for West Midlands (TfWM) were proposing to carry out Highway improvement works on Birchfield Road, Birmingham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2024 and run through until 30 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 17 Sep 2024 at 20:21.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
1 Aug 2024 and 30 Sep 2025
Details
View Map
Share
Walsall Road

Transport for West Midlands (TfWM) were proposing to carry out Highway improvement works on Walsall Road, Perry Barr, Birmingham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2024 and run through until 30 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 18 Sep 2024 at 13:37.

Cadent Gas logo
LONG TERM
Between
7 Aug and 30 Sep 2024
Details
View Map
Share
The Grove

Cadent Gas were proposing to carry out Utility asset works on The Grove, Walsall.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 7 August 2024 and run through until 30 September 2024. The works were due to impact the verge only.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 14:39.

Cadent Gas logo
LONG TERM
Between
21 Aug and 1 Oct 2024
Details
View Map
Share
Follow
Bracebridge Road

Cadent Gas are proposing to carry out Utility asset works on Bracebridge Road, Sutton Four Oaks, Sutton Coldfield.

These works are categorised as Major.

The works will start on or after 21 August 2024 and could run through until 1 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jun 2024 at 15:30.

Cadent Gas logo
LONG TERM
Between
21 Aug and 1 Oct 2024
Details
View Map
Share
Bracebridge Road

Cadent Gas were proposing to carry out Utility asset works on Bracebridge Road, Sutton Four Oaks, Sutton Coldfield.

These works were categorised as Major.

The works were originally planned to start 21 August 2024 and run through until 1 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:52.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Wheelwright Road

Cadent Gas are carrying out Utility asset works on Wheelwright Road, Tyburn, Birmingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 August 2024 at 11:00 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 11:49.

Staffordshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Leslie Road

Staffordshire County Council are carrying out Highway repair and maintenance works on Leslie Road, Streetly.

These works are categorised as Major.

The works started on 4 September 2024 at 09:15 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 14:40.

Staffordshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Burnett Road

Staffordshire County Council are carrying out Highway repair and maintenance works on Burnett Road, Streetly, Sutton Coldfield.

These works are categorised as Major.

The works started on 5 September 2024 at 08:00 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 14:53.

Staffordshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Grasmere Avenue

Staffordshire County Council are carrying out Highway repair and maintenance works on Grasmere Avenue, Streetly.

These works are categorised as Major.

The works started on 4 September 2024 at 10:30 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 14:40.

Western Power Distribution (West Midlands) logo
LONG TERM
Until
11 Oct 2024
Details
View Map
Share
Follow
Pinfold Lane

Western Power Distribution (West Midlands) are carrying out Utility asset works on Pinfold Lane, Walsall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:00 and could run through until 11 October 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Sep 2024 at 08:40.

Cadent Gas logo
LONG TERM
Until
4 Oct 2024
Details
View Map
Share
Follow
Talbot Avenue

Cadent Gas are carrying out Utility asset works on Talbot Avenue, Streetly.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:30 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 08:59.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Walsall Road

Cadent Gas are carrying out Utility asset works on Walsall Road, Little Aston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:00 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 08:31.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
4 Sep and 26 Nov 2024
Details
View Map
Share
Walsall Road

Transport for West Midlands (TfWM) were proposing to carry out Highway improvement works on Walsall Road, Perry Barr, Birmingham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 September 2024 and run through until 26 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 21 Aug 2024 at 10:48.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Walstead Road

Cadent Gas are carrying out Utility asset works on Walstead Road, Walsall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 September 2024 at 10:20 and could run through until 23 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 14:30.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
4 Sep 2024 and 19 Dec 2025
Details
View Map
Share
Follow
Birmingham Road

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Birmingham Road, Walsall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2024 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 27 Jun 2024 at 14:53.

Cadent Gas logo
LONG TERM
Between
6 Sep and 10 Oct 2024
Details
View Map
Share
Follow
Talbot Avenue

Cadent Gas are proposing to carry out Utility asset works on Talbot Avenue, Streetly.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2024 and could run through until 10 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jun 2024 at 09:45.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Oval Road

Cadent Gas are carrying out Utility asset works on Oval Road, Birmingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 08:00 and could run through until 26 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 08:28.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Crossway Lane

Severn Trent Water are carrying out Utility repair and maintenance works on Crossway Lane, Birmingham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 14:17 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Sep 2024 at 10:33.

Western Power Distribution (West Midlands) logo
Finishing
Friday
Details
View Map
Share
Follow
Bishops Way

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Bishops Way, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 22 May 2024 at 06:00.

Western Power Distribution (West Midlands) logo
Until
30 Sep 2024
Details
View Map
Share
Follow
Bishops Way

Western Power Distribution (West Midlands) are carrying out Utility asset works on Bishops Way, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2024 at 09:20 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 10 Sep 2024 at 09:24.

Transport for West Midlands (TfWM) logo
LONG TERM
Until
11 Oct 2024
Details
View Map
Share
Follow
Walsall Road

Transport for West Midlands (TfWM) are carrying out Highway improvement works on Walsall Road, Perry Barr, Birmingham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 07:00 and could run through until 11 October 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 18 Sep 2024 at 08:29.

Cadent Gas logo
LONG TERM
Until
15 Oct 2024
Details
View Map
Share
Follow
Blackroot Road

Cadent Gas are carrying out Utility asset works on Blackroot Road, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2024 at 14:00 and could run through until 15 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 14:03.

Sandwell Metropolitan Borough Council logo
Until
2 Oct 2024
Details
View Map
Share
Follow
Coniston Crescent

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on Coniston Crescent, Great Barr, Birmingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2024 at 09:00 and could run through until 2 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Sep 2024 at 13:54.

Sandwell Metropolitan Borough Council logo
Until
4 Oct 2024
Details
View Map
Share
Follow
James Road

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on James Road, Great Barr, Birmingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 09:00 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Sep 2024 at 15:12.

Sandwell Metropolitan Borough Council logo
Until
2 Oct 2024
Details
View Map
Share
Follow
South View

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on South View, Great Barr, Birmingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2024 at 10:00 and could run through until 2 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Sep 2024 at 13:54.

Sandwell Metropolitan Borough Council logo
Until
2 Oct 2024
Details
View Map
Share
Follow
West Road

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on West Road, Great Barr, Birmingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2024 at 09:00 and could run through until 2 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Sep 2024 at 13:55.

Sandwell Metropolitan Borough Council logo
Until
4 Oct 2024
Details
View Map
Share
Follow
Broome Avenue

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on Broome Avenue, Great Barr, Birmingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 09:00 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Sep 2024 at 15:13.

Sandwell Metropolitan Borough Council logo
Until
4 Oct 2024
Details
View Map
Share
Follow
Chudleigh Grove

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on Chudleigh Grove, Great Barr, Birmingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 09:00 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Sep 2024 at 15:12.

Cadent Gas logo
LONG TERM
Between
12 Sep and 25 Oct 2024
Details
View Map
Share
Follow
Vesey Road

Cadent Gas are proposing to carry out Utility asset works on Vesey Road, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jun 2024 at 13:34.

Cadent Gas logo
LONG TERM
Until
25 Oct 2024
Details
View Map
Share
Follow
Vesey Road

Cadent Gas are carrying out Utility asset works on Vesey Road, Sutton Coldfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2024 at 09:30 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 09:59.

Sandwell Metropolitan Borough Council logo
Until
4 Oct 2024
Details
View Map
Share
Follow
Stanhurst Way

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on Stanhurst Way, West Bromwich.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2024 at 09:00 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Sep 2024 at 15:11.

Sandwell Metropolitan Borough Council logo
Until
4 Oct 2024
Details
View Map
Share
Follow
Rokeby Road

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on Rokeby Road, Great Barr, Birmingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 09:00 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Sep 2024 at 15:12.

Sandwell Metropolitan Borough Council logo
Until
4 Oct 2024
Details
View Map
Share
Follow
Columbine Close

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on Columbine Close, Walsall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 08:30 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Sep 2024 at 14:31.

Sandwell Metropolitan Borough Council logo
Until
4 Oct 2024
Details
View Map
Share
Follow
Mallow Close

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on Mallow Close, Walsall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 08:30 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Sep 2024 at 14:30.

Sandwell Metropolitan Borough Council logo
Until
4 Oct 2024
Details
View Map
Share
Follow
Willowherb Close

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on Willowherb Close, Walsall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 09:00 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Sep 2024 at 13:56.

Sandwell Metropolitan Borough Council logo
Until
4 Oct 2024
Details
View Map
Share
Follow
Snapdragon Drive

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on Snapdragon Drive, Walsall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 08:30 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Sep 2024 at 14:32.

Sandwell Metropolitan Borough Council logo
Until
4 Oct 2024
Details
View Map
Share
Follow
Radford Close

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on Radford Close, Walsall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 10:00 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Sep 2024 at 14:32.

Sandwell Metropolitan Borough Council logo
Until
4 Oct 2024
Details
View Map
Share
Follow
Barrington Close

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on Barrington Close, Walsall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 10:00 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Sep 2024 at 14:33.

Sandwell Metropolitan Borough Council logo
Finishing
Today
Details
View Map
Share
Follow
Columbine Close

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Columbine Close, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2024 and could run through until 21 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 20 Aug 2024 at 13:06.

Sandwell Metropolitan Borough Council logo
Finishing
Today
Details
View Map
Share
Follow
Mallow Close

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Mallow Close, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2024 and could run through until 21 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 19 Aug 2024 at 16:01.

Sandwell Metropolitan Borough Council logo
Finishing
Today
Details
View Map
Share
Follow
Willowherb Close

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Willowherb Close, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2024 and could run through until 21 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 19 Aug 2024 at 13:23.

Sandwell Metropolitan Borough Council logo
Finishing
Today
Details
View Map
Share
Follow
Snapdragon Drive

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Snapdragon Drive, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2024 and could run through until 21 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 21 Aug 2024 at 09:35.

Sandwell Metropolitan Borough Council logo
Finishing
Today
Details
View Map
Share
Follow
Radford Close

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Radford Close, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2024 and could run through until 21 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 20 Aug 2024 at 13:02.

Sandwell Metropolitan Borough Council logo
Finishing
Today
Details
View Map
Share
Follow
Barrington Close

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Barrington Close, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2024 and could run through until 21 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 20 Aug 2024 at 13:01.

Sandwell Metropolitan Borough Council logo
Finishing
Today
Details
View Map
Share
Follow
Avon Grove

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Avon Grove, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2024 and could run through until 21 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 20 Aug 2024 at 13:13.

Sandwell Metropolitan Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Avon Grove

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on Avon Grove, Walsall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 10:00 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Sep 2024 at 14:33.

Sandwell Metropolitan Borough Council logo
Finishing
Today
Details
View Map
Share
Follow
Fir Tree Drive

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Fir Tree Drive, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2024 and could run through until 21 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 20 Aug 2024 at 13:07.

Sandwell Metropolitan Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Fir Tree Drive

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on Fir Tree Drive, Walsall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 10:30 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Sep 2024 at 14:34.

Sandwell Metropolitan Borough Council logo
Finishing
Today
Details
View Map
Share
Follow
Larchwood Road

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Larchwood Road, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2024 and could run through until 21 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 20 Aug 2024 at 09:54.

Sandwell Metropolitan Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Larchwood Road

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on Larchwood Road, Walsall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 10:30 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Sep 2024 at 14:34.

Sandwell Metropolitan Borough Council logo
Finishing
Today
Details
View Map
Share
Follow
Heather Avenue

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Heather Avenue, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2024 and could run through until 21 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 20 Aug 2024 at 13:04.

Sandwell Metropolitan Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Heather Avenue

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on Heather Avenue, Walsall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 10:00 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Sep 2024 at 14:35.

Sandwell Metropolitan Borough Council logo
Until
3 Oct 2024
Details
View Map
Share
Follow
Almond Avenue

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on Almond Avenue, Walsall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 10:00 and could run through until 3 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Sep 2024 at 14:35.

Sandwell Metropolitan Borough Council logo
Until
3 Oct 2024
Details
View Map
Share
Follow
Lilac Avenue

Sandwell Metropolitan Borough Council are carrying out Highway repair and maintenance works on Lilac Avenue, Walsall.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 10:30 and could run through until 3 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 17 Sep 2024 at 14:36.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Birmingham Road

Cadent Gas are carrying out Utility repair and maintenance works on Birmingham Road, Sutton Trinity, Sutton Coldfield.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2024 at 10:28 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 09:48.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Maney Corner

Cadent Gas are carrying out roadworks on Maney Corner, Sutton Coldfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2024 at 10:28 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 09:54.

Sandwell Metropolitan Borough Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Almond Avenue

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Almond Avenue, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2024 and could run through until 22 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 19 Aug 2024 at 15:32.

Sandwell Metropolitan Borough Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lilac Avenue

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lilac Avenue, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2024 and could run through until 22 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 20 Aug 2024 at 09:50.

Cadent Gas logo
Between
15 Sep and 3 Oct 2024
Details
View Map
Share
Follow
Kenilworth Close

Cadent Gas are proposing to carry out Utility asset works on Kenilworth Close, Sutton Coldfield.

These works are categorised as Major.

The works will start on or after 15 September 2024 and could run through until 3 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 May 2024 at 12:30.

Birmingham City Council logo
Between
16 Sep and 6 Oct 2024
Details
View Map
Share
Follow
Aston Hall Road

Birmingham City Council are proposing to carry out Highway improvement works on Aston Hall Road, Perry Barr, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 6 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Birmingham City Council on 25 Jun 2024 at 10:04.

Cadent Gas logo
Between
16 Sep and 7 Oct 2024
Details
View Map
Share
Follow
Wheelwright Road

Cadent Gas are proposing to carry out Utility asset works on Wheelwright Road, Stockland Green, Birmingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 7 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Mar 2024 at 10:29.

Cadent Gas logo
Between
16 Sep and 7 Oct 2024
Details
View Map
Share
Wheelwright Road

Cadent Gas were proposing to carry out Utility asset works on Wheelwright Road, Stockland Green, Birmingham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2024 and run through until 7 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 11:04.

Cadent Gas logo
Between
16 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Maple Drive

Cadent Gas are proposing to carry out Utility asset works on Maple Drive, Walsall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Aug 2024 at 09:02.

Cadent Gas logo
Until
4 Oct 2024
Details
View Map
Share
Follow
Maple Drive

Cadent Gas are carrying out Utility asset works on Maple Drive, Walsall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 10:00 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 10:35.

Cadent Gas logo
LONG TERM
Until
23 Oct 2024
Details
View Map
Share
Follow
Barker Road

Cadent Gas are carrying out Utility asset works on Barker Road, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 12:00 and could run through until 23 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 12:36.

Cadent Gas logo
LONG TERM
Between
22 Sep and 24 Oct 2024
Details
View Map
Share
Follow
Barker Road

Cadent Gas are proposing to carry out Utility asset works on Barker Road, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2024 and could run through until 24 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 May 2024 at 06:38.

Walsall Metropolitan Borough Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Aldridge Road

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Aldridge Road, Streetly.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 26 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 16 Sep 2024 at 12:03.

Cadent Gas logo
Between
23 Sep and 6 Oct 2024
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Shelfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 6 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 16:12.

Cadent Gas logo
Between
23 Sep and 6 Oct 2024
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Shelfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 6 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 14:14.

Cadent Gas logo
Between
23 Sep and 6 Oct 2024
Details
View Map
Share
Follow
Greenfields Road

Cadent Gas are proposing to carry out Utility asset works on Greenfields Road, Shelfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 6 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 16:22.

Cadent Gas logo
Between
23 Sep and 6 Oct 2024
Details
View Map
Share
Follow
Greenfields Road

Cadent Gas are proposing to carry out Utility asset works on Greenfields Road, Shelfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 6 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 14:14.

Walsall Metropolitan Borough Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Bescot Crescent

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bescot Crescent, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 26 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 13 Sep 2024 at 17:35.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
26 Sep and 15 Nov 2024
Details
View Map
Share
Follow
Birchfield Road

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Birchfield Road, Birmingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 4 Jul 2024 at 09:49.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
26 Sep and 15 Nov 2024
Details
View Map
Share
Birchfield Road

Transport for West Midlands (TfWM) were proposing to carry out Highway improvement works on Birchfield Road, Birmingham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 September 2024 and run through until 15 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 17 Sep 2024 at 20:23.

Cadent Gas logo
Between
30 Sep and 25 Oct 2024
Details
View Map
Share
Follow
The Hurstway

Cadent Gas are proposing to carry out Utility asset works on The Hurstway, Birmingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 15:19.

Cadent Gas logo
Between
30 Sep and 21 Oct 2024
Details
View Map
Share
Follow
Silver Birch Road

Cadent Gas are proposing to carry out Utility asset works on Silver Birch Road, Streetly.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 21 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 10:13.

Walsall Metropolitan Borough Council logo
Between
1 and 4 Oct 2024
Details
View Map
Share
Follow
Bescot Road

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bescot Road, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 15 Jul 2024 at 14:22.

Western Power Distribution (West Midlands) logo
Between
2 and 21 Oct 2024
Details
View Map
Share
Follow
Winleigh Road

Western Power Distribution (West Midlands) are proposing to carry out Diversionary works on Winleigh Road, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 21 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Jul 2024 at 08:29.

Cadent Gas logo
LONG TERM
Between
6 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Blackroot Road

Cadent Gas are proposing to carry out Utility asset works on Blackroot Road, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 May 2024 at 06:38.

BT logo
Between
7 and 11 Oct 2024
Details
View Map
Share
Jerrys Lane

BT were proposing to carry out Utility repair and maintenance works on Jerrys Lane, Birmingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 11 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 9 Sep 2024 at 15:54.

Birmingham City Council logo
LONG TERM
Between
7 Oct and 16 Dec 2024
Details
View Map
Share
Follow
Lindridge Road

Birmingham City Council are proposing to carry out Highway improvement works on Lindridge Road, Sutton New Hall, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Birmingham City Council on 4 Sep 2024 at 10:52.

Birmingham City Council logo
LONG TERM
Between
7 Oct and 16 Dec 2024
Details
View Map
Share
Follow
Lindridge Road

Birmingham City Council are proposing to carry out Highway improvement works on Lindridge Road, Sutton New Hall, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Birmingham City Council on 11 Sep 2024 at 11:36.

Cadent Gas logo
Between
7 and 18 Oct 2024
Details
View Map
Share
Greenfields Road

Cadent Gas were proposing to carry out Utility asset works on Greenfields Road, Shelfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 18 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 09:53.

Cadent Gas logo
Between
7 and 18 Oct 2024
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Shelfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 16:24.

Cadent Gas logo
Between
7 and 18 Oct 2024
Details
View Map
Share
Follow
Green Lane

Cadent Gas are proposing to carry out Utility asset works on Green Lane, Shelfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 09:55.

Staffordshire County Council logo
Between
7 and 11 Oct 2024
Details
View Map
Share
Follow
Holly Hill Road

Staffordshire County Council are proposing to carry out Highway improvement works on Holly Hill Road, Shenstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 11 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Sep 2024 at 15:04.

Staffordshire County Council logo
Between
7 and 11 Oct 2024
Details
View Map
Share
Follow
Church Road

Staffordshire County Council are proposing to carry out Highway improvement works on Church Road, Shenstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 11 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Sep 2024 at 15:17.

Cadent Gas logo
Between
14 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Landswood Close

Cadent Gas are proposing to carry out Utility asset works on Landswood Close, Birmingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 09:25.

Western Power Distribution (West Midlands) logo
Between
14 Oct and 8 Nov 2024
Details
View Map
Share
Kings Road

Western Power Distribution (West Midlands) were proposing to carry out Utility asset works on Kings Road, Oscott, Birmingham.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 8 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 19 Sep 2024 at 13:34.

Virgin Media logo
Between
14 and 17 Oct 2024
Details
View Map
Share
Follow
Lichfield Road

Virgin Media are proposing to carry out New service connection on Lichfield Road, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 17 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 15 Aug 2024 at 16:05.

Staffordshire County Council logo
Between
14 and 16 Oct 2024
Details
View Map
Share
Follow
Mill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Mill Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 16 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 30 Aug 2024 at 15:00.

Staffordshire County Council logo
Between
15 and 28 Oct 2024
Details
View Map
Share
Follow
Sutton Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Sutton Road, Carroway Head.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 28 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Aug 2024 at 13:48.

South Staffordshire Water logo
Between
16 and 18 Oct 2024
Details
View Map
Share
Follow
Coleshill Street

South Staffordshire Water are proposing to carry out Remedial works on Coleshill Street, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 19 Aug 2024 at 12:00.

Cadent Gas logo
Between
21 and 24 Oct 2024
Details
View Map
Share
Follow
Spring Hill

Cadent Gas are proposing to carry out New service connection on Spring Hill, Erdington, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 24 Jul 2024 at 09:11.

BT logo
Between
21 and 23 Oct 2024
Details
View Map
Share
Follow
Witton Lodge Road

BT are proposing to carry out Utility repair and maintenance works on Witton Lodge Road, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 10 Sep 2024 at 11:36.

South Staffordshire Water logo
Between
21 and 23 Oct 2024
Details
View Map
Share
Follow
Ravensdale Gardens

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Ravensdale Gardens, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 7 Aug 2024 at 10:55.

South Staffordshire Water logo
Between
21 and 23 Oct 2024
Details
View Map
Share
Follow
Ravensdale Gardens

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Ravensdale Gardens, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 16 Sep 2024 at 15:41.

Staffordshire County Council logo
Between
21 and 25 Oct 2024
Details
View Map
Share
Follow
Thornhill Road

Staffordshire County Council are proposing to carry out Highway improvement works on Thornhill Road, Streetly.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Sep 2024 at 11:23.

Cadent Gas logo
Between
21 and 23 Oct 2024
Details
View Map
Share
Follow
Borneo Street

Cadent Gas are proposing to carry out Remedial works on Borneo Street, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Jul 2024 at 13:15.

Staffordshire County Council logo
Between
21 and 25 Oct 2024
Details
View Map
Share
Follow
Forge Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Forge Lane, Mill Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 12:13.

Staffordshire County Council logo
Between
21 and 25 Oct 2024
Details
View Map
Share
Follow
Little Hay Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Little Hay Lane, Little Hay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 14:14.

Staffordshire County Council logo
Between
21 and 25 Oct 2024
Details
View Map
Share
Follow
Fighting Cock Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Fighting Cock Lane, Stonnall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 12:00.

Western Power Distribution (West Midlands) logo
Between
26 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Collingwood Drive

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Collingwood Drive, Great Barr.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 12 Sep 2024 at 14:20.

Western Power Distribution (West Midlands) logo
Between
26 Oct and 3 Nov 2024
Details
View Map
Share
Follow
Wilderness Lane

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Wilderness Lane, Great Barr, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 5 Sep 2024 at 10:32.

T-Mobile (UK) logo
On
27 Oct 2024
Details
View Map
Share
Follow
Park Street

T-Mobile (UK) are proposing to carry out Utility asset works on Park Street, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 27 October 2024 and are due to last for only one day. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 18 Sep 2024 at 15:43.

Birmingham City Council logo
Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Chain Walk

Birmingham City Council are proposing to carry out Highway improvement works on Chain Walk, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Birmingham City Council on 17 Sep 2024 at 12:22.

Cadent Gas logo
Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Braemar Road

Cadent Gas are proposing to carry out Utility asset works on Braemar Road, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jul 2024 at 10:40.

Cadent Gas logo
Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Braemar Road

Cadent Gas are proposing to carry out Utility asset works on Braemar Road, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Aug 2024 at 12:37.

Cadent Gas logo
Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Somerville Road

Cadent Gas are proposing to carry out Utility asset works on Somerville Road, Sutton Vesey, Sutton Coldfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2024 at 13:34.

Severn Trent Water logo
Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Stephens Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Stephens Road, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Jul 2024 at 09:47.

Severn Trent Water logo
Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Stephens Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Stephens Road, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 6 Aug 2024 at 12:24.

Birmingham City Council logo
Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Rectory Road

Birmingham City Council are proposing to carry out Highway improvement works on Rectory Road, Sutton Trinity, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Birmingham City Council on 19 Sep 2024 at 13:57.

Western Power Distribution (West Midlands) logo
Between
28 Oct and 3 Nov 2024
Details
View Map
Share
Old Hall Lane

Western Power Distribution (West Midlands) were proposing to carry out Utility asset works on Old Hall Lane, Aldridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 3 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 23 Aug 2024 at 13:50.

South Staffordshire Water logo
Between
28 Oct and 1 Nov 2024
Details
View Map
Share
Follow
Westhaven Road

South Staffordshire Water are proposing to carry out New service connection on Westhaven Road, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 27 Aug 2024 at 13:25.

Western Power Distribution (West Midlands) logo
Between
28 Oct and 3 Nov 2024
Details
View Map
Share
Pinfold Lane

Western Power Distribution (West Midlands) were proposing to carry out Utility asset works on Pinfold Lane, Walsall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 3 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 23 Aug 2024 at 13:54.

Severn Trent Water logo
Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Whitmore Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Whitmore Street, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Aug 2024 at 14:25.

Severn Trent Water logo
Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Whitmore Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Whitmore Street, Walsall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 8 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2024 at 09:56.

Cadent Gas logo
Between
28 and 30 Oct 2024
Details
View Map
Share
Follow
Service Road From 49 To 99 Birmingham Road

Cadent Gas are proposing to carry out Remedial works on Service Road From 49 To 99 Birmingham Road, Aldridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Jul 2024 at 12:25.

Walsall Metropolitan Borough Council logo
Between
30 Oct and 5 Nov 2024
Details
View Map
Share
Follow
Holden Crescent

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Holden Crescent, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 5 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 7 Aug 2024 at 12:47.

Transport for West Midlands (TfWM) logo
Between
1 and 6 Nov 2024
Details
View Map
Share
Follow
Walsall Road

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Walsall Road, Perry Barr, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 11 Aug 2024 at 10:33.

Transport for West Midlands (TfWM) logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Walsall Road

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Walsall Road, Perry Barr, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 11 Aug 2024 at 14:16.

Cadent Gas logo
LONG TERM
Between
4 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Mayfield Road

Cadent Gas are proposing to carry out Utility asset works on Mayfield Road, Streetly.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 10:18.

South Staffordshire Water logo
Between
4 and 7 Nov 2024
Details
View Map
Share
Follow
Lichfield Road

South Staffordshire Water are proposing to carry out New service connection on Lichfield Road, Sutton Four Oaks, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 7 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 18 Sep 2024 at 15:17.

Severn Trent Water logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Follow
Slade Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Slade Road, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Aug 2024 at 16:30.

Severn Trent Water logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Slade Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Slade Road, Sutton Coldfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 15 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Sep 2024 at 11:19.

Staffordshire County Council logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Rosemary Hill Road

Staffordshire County Council are proposing to carry out Highway improvement works on Rosemary Hill Road, Little Aston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Sep 2024 at 15:49.

Transport for West Midlands (TfWM) logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Walsall Road

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Walsall Road, Perry Barr, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 9 Sep 2024 at 14:43.

Cadent Gas logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Jockey Road

Cadent Gas are proposing to carry out Remedial works on Jockey Road, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2024 at 13:34.

Cadent Gas logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Somerville Road

Cadent Gas are proposing to carry out Remedial works on Somerville Road, Sutton Vesey, Sutton Coldfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2024 at 13:34.

Staffordshire County Council logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Thornhill Road

Staffordshire County Council are proposing to carry out Highway improvement works on Thornhill Road, Streetly.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Aug 2024 at 10:21.

Staffordshire County Council logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Rosemary Hill Road

Staffordshire County Council are proposing to carry out Highway improvement works on Rosemary Hill Road, Little Aston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Sep 2024 at 11:39.

Staffordshire County Council logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Walsall Road

Staffordshire County Council are proposing to carry out Highway improvement works on Walsall Road, Little Aston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Sep 2024 at 12:17.

Staffordshire County Council logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Walsall Road

Staffordshire County Council are proposing to carry out Highway improvement works on Walsall Road, Little Aston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Sep 2024 at 15:49.

Cadent Gas logo
Between
12 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Cedarwood Croft

Cadent Gas are proposing to carry out Utility asset works on Cedarwood Croft, Birmingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 14:55.

Cadent Gas logo
Between
12 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Spouthouse Lane

Cadent Gas are proposing to carry out Utility asset works on Spouthouse Lane, Great Barr, Birmingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 08:49.

Cadent Gas logo
LONG TERM
Between
12 Nov 2024 and 30 Jan 2025
Details
View Map
Share
Old Walsall Road

Cadent Gas were proposing to carry out Utility asset works on Old Walsall Road, Perry Barr, Birmingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2024 and run through until 30 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 10:22.

Birmingham City Council logo
Between
13 and 27 Nov 2024
Details
View Map
Share
Follow
Rectory Road

Birmingham City Council are proposing to carry out Highway improvement works on Rectory Road, Sutton Trinity, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Birmingham City Council on 16 Aug 2024 at 15:19.

South Staffordshire Water logo
Between
13 and 15 Nov 2024
Details
View Map
Share
Follow
Lynn Lane

South Staffordshire Water are proposing to carry out Remedial works on Lynn Lane, Shenstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 10 Sep 2024 at 08:18.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
18 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Birchfield Road

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Birchfield Road, Birmingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 4 Jul 2024 at 09:49.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
18 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Birchfield Road

Transport for West Midlands (TfWM) are proposing to carry out Highway improvement works on Birchfield Road, Birmingham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 7 Aug 2024 at 14:27.

Staffordshire County Council logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Mill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Mill Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 29 Aug 2024 at 10:07.

Cadent Gas logo
Between
20 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Brookland Road

Cadent Gas are proposing to carry out Utility asset works on Brookland Road, Walsall Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 16:25.

Cadent Gas logo
LONG TERM
Between
25 Nov 2024 and 28 Mar 2025
Details
View Map
Share
Follow
The Hurstway

Cadent Gas are proposing to carry out Utility asset works on The Hurstway, Birmingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 14:31.

Cadent Gas logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Landswood Close

Cadent Gas are proposing to carry out Utility asset works on Landswood Close, Birmingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 14:26.

Cadent Gas logo
LONG TERM
Between
25 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Mayfield Road

Cadent Gas are proposing to carry out Utility asset works on Mayfield Road, Streetly.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 16:43.

Cadent Gas logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Silver Birch Road

Cadent Gas are proposing to carry out Utility asset works on Silver Birch Road, Streetly.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 16:39.

Walsall Metropolitan Borough Council logo
Between
25 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Aldridge Road

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Aldridge Road, Streetly.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 5 Sep 2024 at 17:10.

Cadent Gas logo
LONG TERM
Between
25 Nov 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Grosvenor Avenue

Cadent Gas are proposing to carry out Utility asset works on Grosvenor Avenue, Streetly.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 16:41.

National Highways logo
Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
A38 Weeford To Bassetts Pole

National Highways are proposing to carry out Highway repair and maintenance works on A38 Weeford To Bassetts Pole, Weeford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 27 Aug 2024 at 10:52.

BT logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Burcote Road

BT were proposing to carry out Utility repair and maintenance works on Burcote Road, Birmingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 10 Sep 2024 at 09:33.

South Staffordshire Water logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Ashcroft Lane

South Staffordshire Water are proposing to carry out Remedial works on Ashcroft Lane, Shenstone, Lichfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 9 Sep 2024 at 10:14.

Sandwell Metropolitan Borough Council logo
Between
28 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Charlemont Road

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Charlemont Road, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 19 Sep 2024 at 14:09.

Sandwell Metropolitan Borough Council logo
Between
28 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Wigmore Lane

Sandwell Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Wigmore Lane, West Bromwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sandwell Metropolitan Borough Council on 19 Sep 2024 at 14:09.

Severn Trent Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Finch Road

Severn Trent Water are proposing to carry out Utility asset works on Finch Road, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Sep 2024 at 10:57.

Severn Trent Water logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Kingsbury Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Kingsbury Road, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2024 at 09:48.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 19 Feb 2025
Details
View Map
Share
Follow
Old Walsall Road

Cadent Gas are proposing to carry out Utility asset works on Old Walsall Road, Perry Barr, Birmingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 10:30.

Walsall Metropolitan Borough Council logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Queslett Road

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Queslett Road, Great Barr.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 10 Sep 2024 at 11:58.

South Staffordshire Water logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Follow
Railway Road

South Staffordshire Water are proposing to carry out Remedial works on Railway Road, Sutton Trinity, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 6 Sep 2024 at 08:55.

Walsall Metropolitan Borough Council logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Bescot Crescent

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bescot Crescent, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 11 Sep 2024 at 18:01.

Cadent Gas logo
Between
4 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Brackendale Drive

Cadent Gas are proposing to carry out Utility asset works on Brackendale Drive, Walsall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 10:30.

Staffordshire County Council logo
Between
8 and 20 Dec 2024
Details
View Map
Share
Follow
Sutton Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Sutton Road, Carroway Head.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 11:36.

Severn Trent Water logo
Between
9 and 17 Dec 2024
Details
View Map
Share
Follow
Whitmore Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Whitmore Street, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Sep 2024 at 13:29.

Cadent Gas logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Middleton Road

Cadent Gas are proposing to carry out Remedial works on Middleton Road, Streetly.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 16:09.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Forge Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Forge Lane, Mill Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 11:58.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Fighting Cock Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Fighting Cock Lane, Stonnall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 11:03.

South Staffordshire Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Four Oaks Road

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Four Oaks Road, Sutton Coldfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South Staffordshire Water on 18 Sep 2024 at 11:06.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Little Hay Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Little Hay Lane, Little Hay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 12:15.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Holly Hill Road

Staffordshire County Council are proposing to carry out Highway improvement works on Holly Hill Road, Shenstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Sep 2024 at 10:28.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Church Road

Staffordshire County Council are proposing to carry out Highway improvement works on Church Road, Shenstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Sep 2024 at 10:28.


Roadworks Map near to Valley Road, SUTTON COLDFIELD, B74 2JE

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Sep 2024 01:26
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Valley Road, SUTTON COLDFIELD, B74 2JE (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
South Staffordshire Water logo
GROVE WAY 
(0.1 miles)
South Staffordshire Water
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 20 Sep 2024 13:04
(Scheduled: 20 Sep 2024 - 24 Sep 2024)
0.1
Details
Share
Follow
2
Cadent Gas logo
MAJOR
  
GROSVENOR AVENUE 
(0.6 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 16 Sep 2024 08:30
(Scheduled: 16 Sep 2024 - 15 Nov 2024)
0.6
Details
Share
Follow
3
Severn Trent Water logo
BAKERS LANE 
(0.9 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
20 Sep 2024 11:28 - 12:24
0.9
Details
Share
4
Staffordshire County Council logo
MAJOR
  
LESLIE ROAD 
(1.0 miles)
Staffordshire County Council
Highway repair and maintenance works - Carriageway - Stop/go boards
In Progress
Since: 4 Sep 2024 09:15
(Scheduled: 31 Aug 2024 - 23 Sep 2024)
1.0
Details
Share
Follow
5
Staffordshire County Council logo
MAJOR
  
GRASMERE AVENUE 
(1.0 miles)
Staffordshire County Council
Highway repair and maintenance works - Carriageway - Stop/go boards
In Progress
Since: 4 Sep 2024 10:30
(Scheduled: 1 Sep 2024 - 23 Sep 2024)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.