PARLIAMENTARY WRITTEN QUESTION
Railways: Repairs and Maintenance (30 July 2024)
Question Asked
Asked by:
Helen Whately (Conservative)
Answer
Rail infrastructure is managed by Network Rail (NR). The Department for Transport (DfT) provides grant funding to NR for operations, maintenance, and renewals via five-year regulated ‘Control Periods’. Funding for each Control Period is established through a statutory process of Periodic Reviews, the timelines for which have not aligned with Spending Review periods.
At Spending Review 2021, DfT’s budgets were set for a period (2021/22-2024/25) which extended beyond the end of the previous Control Period (Control Period 6, 2019/20-2023/24). The periodic review to determine Control Period 7 (2024/25-2028/29) concluded in October 2023, confirming the funding requirements for 2024/25. Therefore, the assumption for maintenance costs in 2024/25 had to be revised following the periodic review in 2023 as these costs were higher than budgeted at SR21.
Answered by:
Darren Jones (Labour)
6 September 2024
Contains Parliamentary information licensed under the Open Parliament Licence v3.0.