1
City Gateway halls of residence, five years on
University of Southampton halls of residence, just over five years after
Image
Image: © David Martin
Taken: 8 Aug 2019
0.01 miles
2
City Gateway development, under construction at Swaythling (5)
The wrapping is now all removed and the fit-out of the ground floor retail units is well advanced. New paving and planting on the photographer's side of the road make it difficult to locate exactly the same viewpoint as for
Image
Image: © David Martin
Taken: 6 May 2014
0.01 miles
3
City Gateway development, under construction at Swaythling
This new 15-storey tower will provide student residences, with businesses at ground level.
Image: © David Martin
Taken: 8 Jun 2013
0.02 miles
4
City Gateway development, under construction at Swaythling (3)
Compare progress with
Image taken three and a half months earlier. The tower crane has very recently been taken down. It was not possible to stand on exactly the same spot as the earlier images due to the works taking place in the foreground.
Image: © David Martin
Taken: 26 Nov 2013
0.02 miles
5
Co-operative food store on Stoneham Way
Image: © JThomas
Taken: 25 Apr 2022
0.02 miles
6
Southampton City Gateway under construction
Looking along Stoneham Way at this construction site, with Thomas Lewis Way on the left. The agents for the development are Hughes Ellard http://www.hughesellard.com whose particulars state "a major mixed use development which will provide 364 student accommodation units, let to the University of Southampton, a 6 GP medical centre, a Lloyds Pharmacy and a number of commercial/retail units. At the centre of the scheme will be an open landscaped area with managed car parking. Handover of the commercial units is proposed for summer 2014. Units of between 105 to 470 sq m (1,129 to 5,057 sq ft)". From the aerial view it would appear that the site was formerly commercial with car parking.
The developers are Bouyges Development http://bouygues-development.com whose web site gives the project start date as 1st October 2012, completion 31st July 2014, approximate value £24 million. The architect is Stride Treglown.
Image: © Peter Facey
Taken: 14 Mar 2013
0.02 miles
7
City Gateway development, under construction at Swaythling (2)
Compare progress with
Image, taken two months earlier.
Image: © David Martin
Taken: 9 Aug 2013
0.02 miles
8
City Gateway development, under construction at Swaythling (4)
At last the building is being unwrapped. Compare
Image taken three months earlier. Builders' fences continue to obscure the view on the photographer's side of the road.
Image: © David Martin
Taken: 15 Feb 2014
0.02 miles
9
Fallen tree outside the shops at Swaythling
Just when you've nearly finished the new block paving...
Image: © David Martin
Taken: 15 Feb 2014
0.04 miles
10
Swaythling: A335 Stoneham Way and A35 Burgess Road junction
The dual carriageway in the foreground is the A335 Stoneham Way. At the junction the A335 peels off to the left into Thomas Lewis Way, while the A35 Burgess Road is straight ahead at the lights. The two marks across the road are trench scars of some underground utility installation, not violent skid marks resulting from someone's late decision that the A335 was preferable to the A35.
Image: © Nigel Cox
Taken: 24 Jan 2010
0.05 miles