1
Riverbank Way, Lowfields Industrial Park, Elland
Image: © David Lally
Taken: 25 Mar 2009
0.07 miles
2
Path between canal towpath and river, Elland
This is an unofficial alternative to the towpath.
Image: © Humphrey Bolton
Taken: 5 Apr 2023
0.10 miles
3
The Calder and Hebble Navigation west of Crowther Bridge
Image: © habiloid
Taken: 15 Apr 2022
0.10 miles
4
Clay pipe works from the canal towpath, Southowram
This view of the pipe works (see also other photo) shows how rural its location is. There are many (presumably) scrap pipes in the surrounding woodland, an eyesore to us but perhaps useful shelter for animals!
Image: © Humphrey Bolton
Taken: 18 Nov 2005
0.11 miles
5
Lock View, Lowfields Industrial Park
To the north west of Elland. An estate of medium-large units.
Image: © David Lally
Taken: 25 Mar 2009
0.12 miles
6
Goods Yard Full of Ceramic Drainage Pipes
Image: © Anthony Parkes
Taken: 9 Mar 2015
0.14 miles
7
Calder and Hebble Navigation heading East towards Cromwell Bottom
Pleasant stretch of the canal between Elland and Brighouse, as it passes through autumnal woodland
Image: © Chris Heaton
Taken: 7 Nov 2023
0.15 miles
8
Road closure on the A6025, Southowram
The road is closed from Ash Grove Fireclay Works to a point to the east of the first houses in Elland. There has been subsidence, and cracks have appeared in the road surface. A narrow way has been left for pedestrians. This has required a long length of fencing, so we should be grateful. However the way through is not wide enough for cycling.
Image: © Humphrey Bolton
Taken: 1 Jun 2020
0.16 miles
9
Crack in the surface of the A6025, Elland
This is one of the cracks that have caused the long term road closure, It has been sealed, but I suspect that this is only a temporary measure and that more extensive works will be necessary.
Image: © Humphrey Bolton
Taken: 1 Jun 2020
0.16 miles
10
Park Road, Elland, after repairs
This road started to subside in February 2020 after heavy rain, and was closed. Two years later the repairs, which included many piles connected by a concrete beam, have been finished and the road re-opened.
Image: © Humphrey Bolton
Taken: 10 Feb 2022
0.16 miles