PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Bridgnorth Row, WORCESTER, WR4 0QF

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Bridgnorth Row, WR4 0QF are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Bridgnorth Row, WORCESTER, WR4 0QF
Period Covered: 2008 - 31 January 2025

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
1 Bridgnorth Row, Berkeley Beverborne
Date
13 Oct 2015
Current
Potential
65
87
Property Type
House
Built Form
End-Terrace
Constructed
1983-1990
+
Certificate History
13 Oct 2015
65
87
Total Floor Area
55 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
0.9
CO2 per sq m per Year
48
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
10 Bridgnorth Row, Berkeley Beverborne
Date
17 Jul 2018
Current
Potential
60
83
Property Type
House
Built Form
Mid-Terrace
Constructed
1996-2002
+
Certificate History
17 Jul 2018
60
83
Total Floor Area
71 sq m
Current CO2 Emissions Level
3.5
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
49
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
2
Address
11 Bridgnorth Row, Berkeley Beverborne
Date
9 Apr 2010
Current
Potential
62
72
Property Type
House
Built Form
Detached
Constructed
1996-2002
+
Certificate History
9 Apr 2010
62
72
Total Floor Area
96 sq m
Current CO2 Emissions Level
4.0
Potential CO2 Emissions Level
3.0
CO2 per sq m per Year
51
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
11 BRIDGNORTH ROW, WORCESTER
Date
24 Sep 2020
Current
Potential
70
82
Property Type
House
Built Form
Detached
Constructed
1991-1995
+
Certificate History
24 Sep 2020
70
82
Total Floor Area
93 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
14 Bridgnorth Row, Berkeley Beverborne
Date
29 Mar 2011
Current
Potential
61
70
Property Type
House
Built Form
Detached
Constructed
1991-1995
+
Certificate History
29 Mar 2011
61
70
Total Floor Area
77 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
3.2
CO2 per sq m per Year
53
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
15 BRIDGNORTH ROW, WORCESTER
Date
19 Feb 2021
Current
Potential
70
85
Property Type
House
Built Form
End-Terrace
Constructed
1991-1995
+
Certificate History
19 Feb 2021
70
85
Total Floor Area
77 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
2
Address
16 Bridgnorth Row, Berkeley Beverborne
Date
31 Mar 2020
Current
Potential
89
91
Property Type
House
Built Form
End-Terrace
Constructed
1996-2002
+
Certificate History
31 Mar 2020
89
91
9 Jan 2009
69
74
Total Floor Area
87 sq m
Current CO2 Emissions Level
1.2
Potential CO2 Emissions Level
0.9
CO2 per sq m per Year
14
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
17 Bridgnorth Row, Berkeley Beverborne
Date
14 Aug 2022
Current
Potential
65
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1991-1995
+
Certificate History
14 Aug 2022
65
86
8 May 2011
60
69
Total Floor Area
73 sq m
Current CO2 Emissions Level
3.3
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
45
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
18 Bridgnorth Row, Berkeley Beverborne
Date
13 Nov 2024
Current
Potential
69
83
Property Type
House
Built Form
Mid-Terrace
Constructed
1996-2002
+
Certificate History
13 Nov 2024
69
83
26 Jun 2013
65
85
18 Apr 2012
62
86
Total Floor Area
72 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
2
Address
19 Bridgnorth Row, Berkeley Beverborne
Date
2 Dec 2008
Current
Potential
66
75
Property Type
House
Built Form
End-Terrace
Constructed
1996-2002
+
Certificate History
2 Dec 2008
66
75
Total Floor Area
87 sq m
Current CO2 Emissions Level
3.3
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
47
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
19 BRIDGNORTH ROW, WORCESTER
Date
10 Oct 2020
Current
Potential
59
85
Property Type
House
Built Form
End-Terrace
Constructed
1983-1990
+
Certificate History
10 Oct 2020
59
85
Total Floor Area
68 sq m
Current CO2 Emissions Level
3.7
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
55
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
2
Address
21 Bridgnorth Row, Berkeley Beverborne
Date
5 Dec 2024
Current
Potential
69
83
Property Type
House
Built Form
Detached
Constructed
1996-2002
+
Certificate History
5 Dec 2024
69
83
1 Jul 2014
61
80
Total Floor Area
94 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
23 Bridgnorth Row, Berkeley Beverborne
Date
30 Jul 2024
Current
Potential
64
85
Property Type
House
Built Form
Detached
Constructed
1996-2002
+
Certificate History
30 Jul 2024
64
85
Total Floor Area
80 sq m
Current CO2 Emissions Level
3.6
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
46
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
25 Bridgnorth Row, Berkeley Beverborne
Date
28 Jul 2010
Current
Potential
60
70
Property Type
House
Built Form
Detached
Constructed
1991-1995
+
Certificate History
28 Jul 2010
60
70
Total Floor Area
83 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
3.0
CO2 per sq m per Year
50
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
27 Bridgnorth Row, Berkeley Beverborne
Date
4 Feb 2016
Current
Potential
69
72
Property Type
House
Built Form
Mid-Terrace
Constructed
1996-2002
+
Certificate History
4 Feb 2016
69
72
Total Floor Area
84 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
2.8
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
4
Address
29 Bridgnorth Row, Berkeley Beverborne
Date
19 May 2010
Current
Potential
75
77
Property Type
House
Built Form
End-Terrace
Constructed
1996-2002
+
Certificate History
19 May 2010
75
77
Total Floor Area
92 sq m
Current CO2 Emissions Level
2.5
Potential CO2 Emissions Level
2.4
CO2 per sq m per Year
33
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
29 BRIDGNORTH ROW, WORCESTER
Date
3 Dec 2020
Current
Potential
75
87
Property Type
House
Built Form
End-Terrace
Constructed
1996-2002
+
Certificate History
3 Dec 2020
75
87
Total Floor Area
78 sq m
Current CO2 Emissions Level
2.2
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
28
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
3 Bridgnorth Row, Berkeley Beverborne
Date
23 May 2022
Current
Potential
71
88
Property Type
House
Built Form
Mid-Terrace
Constructed
1991-1995
+
Certificate History
23 May 2022
71
88
4 Oct 2010
72
78
Total Floor Area
54 sq m
Current CO2 Emissions Level
2.1
Potential CO2 Emissions Level
0.8
CO2 per sq m per Year
38
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
33 Bridgnorth Row, Berkeley Beverborne
Date
13 Sep 2020
Current
Potential
68
88
Property Type
House
Built Form
Detached
Constructed
1991-1995
+
Certificate History
13 Sep 2020
68
88
Total Floor Area
77 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
38
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
4 Bridgnorth Row, Berkeley Beverborne
Date
24 Feb 2023
Current
Potential
65
89
Property Type
House
Built Form
Mid-Terrace
Constructed
1976-1982
+
Certificate History
24 Feb 2023
65
89
5 Sep 2012
65
85
Total Floor Area
75 sq m
Current CO2 Emissions Level
3.3
Potential CO2 Emissions Level
0.8
CO2 per sq m per Year
43
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
7 Bridgnorth Row, Berkeley Beverborne
Date
23 May 2022
Current
Potential
69
83
Property Type
House
Built Form
End-Terrace
Constructed
1996-2002
+
Certificate History
23 May 2022
69
83
7 Jan 2012
56
65
Total Floor Area
71 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
2
Address
8 Bridgnorth Row, Berkeley Beverborne
Date
20 Oct 2019
Current
Potential
61
83
Property Type
House
Built Form
End-Terrace
Constructed
1991-1995
+
Certificate History
20 Oct 2019
61
83
7 Oct 2009
61
71
Total Floor Area
71 sq m
Current CO2 Emissions Level
3.6
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
51
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
2
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.