PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Lavender Gardens, WARRINGTON, WA5 1GW

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Lavender Gardens, WA5 1GW are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Lavender Gardens, WARRINGTON, WA5 1GW
Period Covered: 2008 - 31 October 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
116 Lavender Gardens
Date
12 Jul 2011
Current
Potential
84
84
Property Type
House
Built Form
Semi-Detached
Constructed
N/A
+
Certificate History
12 Jul 2011
84
84
Total Floor Area
86 sq m
Current CO2 Emissions Level
1.3
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
15
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
118 Lavender Gardens, Bewsey & Whitecross
Date
10 Feb 2021
Current
Potential
78
89
Property Type
House
Built Form
Semi-Detached
Constructed
2007-2011
+
Certificate History
10 Feb 2021
78
89
Total Floor Area
86 sq m
Current CO2 Emissions Level
2.1
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
24
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
118 Lavender Gardens
Date
12 Jul 2011
Current
Potential
84
84
Property Type
House
Built Form
Semi-Detached
Constructed
N/A
+
Certificate History
12 Jul 2011
84
84
Total Floor Area
86 sq m
Current CO2 Emissions Level
1.3
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
15
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
120 Lavender Gardens
Date
12 Jul 2011
Current
Potential
84
84
Property Type
House
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
12 Jul 2011
84
84
Total Floor Area
76 sq m
Current CO2 Emissions Level
1.2
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
15
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
122 Lavender Gardens
Date
12 Jul 2011
Current
Potential
86
86
Property Type
House
Built Form
Mid-Terrace
Constructed
N/A
+
Certificate History
12 Jul 2011
86
86
Total Floor Area
76 sq m
Current CO2 Emissions Level
1.0
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
13
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
124 Lavender Gardens
Date
12 Jul 2011
Current
Potential
86
86
Property Type
House
Built Form
Mid-Terrace
Constructed
N/A
+
Certificate History
12 Jul 2011
86
86
25 Jul 2022
79
79
Total Floor Area
76 sq m
Current CO2 Emissions Level
1.0
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
13
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
126 Lavender Gardens
Date
12 Jul 2011
Current
Potential
84
84
Property Type
House
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
12 Jul 2011
84
84
25 Jul 2022
78
78
Total Floor Area
76 sq m
Current CO2 Emissions Level
1.2
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
16
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
128 Lavender Gardens, Bewsey & Whitecross
Date
10 Feb 2021
Current
Potential
77
89
Property Type
House
Built Form
End-Terrace
Constructed
2007-2011
+
Certificate History
10 Feb 2021
77
89
Total Floor Area
86 sq m
Current CO2 Emissions Level
2.1
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
24
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
128 Lavender Gardens
Date
20 Jun 2011
Current
Potential
84
84
Property Type
House
Built Form
Semi-Detached
Constructed
N/A
+
Certificate History
20 Jun 2011
84
84
Total Floor Area
86 sq m
Current CO2 Emissions Level
1.3
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
15
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
130 Lavender Gardens
Date
20 Jun 2011
Current
Potential
84
84
Property Type
House
Built Form
Semi-Detached
Constructed
N/A
+
Certificate History
20 Jun 2011
84
84
25 Jul 2022
78
78
Total Floor Area
86 sq m
Current CO2 Emissions Level
1.3
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
15
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
132 Lavender Gardens
Date
27 Mar 2024
Current
Potential
78
80
Property Type
House
Built Form
End-Terrace
Constructed
2012 onwards
+
Certificate History
27 Mar 2024
78
80
20 Jun 2011
84
84
Total Floor Area
75 sq m
Current CO2 Emissions Level
1.6
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
21
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
134 Lavender Gardens
Date
20 Jun 2011
Current
Potential
86
86
Property Type
House
Built Form
Mid-Terrace
Constructed
N/A
+
Certificate History
20 Jun 2011
86
86
Total Floor Area
76 sq m
Current CO2 Emissions Level
1.0
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
13
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
136 Lavender Gardens, Bewsey & Whitecross
Date
25 Apr 2021
Current
Potential
78
89
Property Type
House
Built Form
End-Terrace
Constructed
2007-2011
+
Certificate History
25 Apr 2021
78
89
Total Floor Area
86 sq m
Current CO2 Emissions Level
2.1
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
24
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
136 Lavender Gardens
Date
20 Jun 2011
Current
Potential
84
84
Property Type
House
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
20 Jun 2011
84
84
18 Sep 2022
78
78
Total Floor Area
76 sq m
Current CO2 Emissions Level
1.2
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
16
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
138 Lavender Gardens
Date
12 Mar 2022
Current
Potential
78
91
Property Type
House
Built Form
Semi-Detached
Constructed
2007-2011
+
Certificate History
12 Mar 2022
78
91
20 Jun 2011
84
84
Total Floor Area
74 sq m
Current CO2 Emissions Level
1.7
Potential CO2 Emissions Level
0.6
CO2 per sq m per Year
23
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
140 Lavender Gardens
Date
20 Jun 2011
Current
Potential
84
84
Property Type
House
Built Form
Semi-Detached
Constructed
N/A
+
Certificate History
20 Jun 2011
84
84
Total Floor Area
76 sq m
Current CO2 Emissions Level
1.2
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
16
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
49 Lavender Gardens
Date
9 Mar 2011
Current
Potential
88
88
Property Type
House
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
9 Mar 2011
88
88
Total Floor Area
86 sq m
Current CO2 Emissions Level
1.3
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
15
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
51 Lavender Gardens
Date
9 Mar 2011
Current
Potential
90
90
Property Type
House
Built Form
Mid-Terrace
Constructed
N/A
+
Certificate History
9 Mar 2011
90
90
Total Floor Area
86 sq m
Current CO2 Emissions Level
1.1
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
13
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
53 Lavender Gardens
Date
9 Mar 2011
Current
Potential
88
88
Property Type
House
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
9 Mar 2011
88
88
Total Floor Area
88 sq m
Current CO2 Emissions Level
1.3
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
15
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
55 Lavender Gardens
Date
25 Apr 2011
Current
Potential
84
84
Property Type
House
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
25 Apr 2011
84
84
Total Floor Area
86 sq m
Current CO2 Emissions Level
1.3
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
16
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
57 Lavender Gardens
Date
10 May 2011
Current
Potential
86
86
Property Type
House
Built Form
Mid-Terrace
Constructed
N/A
+
Certificate History
10 May 2011
86
86
1 Aug 2022
79
79
Total Floor Area
86 sq m
Current CO2 Emissions Level
1.1
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
13
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Address
59 Lavender Gardens, Bewsey & Whitecross
Date
10 Feb 2021
Current
Potential
77
89
Property Type
House
Built Form
End-Terrace
Constructed
2007-2011
+
Certificate History
10 Feb 2021
77
89
Total Floor Area
86 sq m
Current CO2 Emissions Level
2.1
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
25
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
59 Lavender Gardens
Date
10 May 2011
Current
Potential
84
84
Property Type
House
Built Form
End-Terrace
Constructed
N/A
+
Certificate History
10 May 2011
84
84
Total Floor Area
86 sq m
Current CO2 Emissions Level
1.3
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
16
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.