PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Melbourne Avenue, DRONFIELD, S18 8YW

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Melbourne Avenue, S18 8YW are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Melbourne Avenue, DRONFIELD, S18 8YW
Period Covered: 2008 - 31 January 2025

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
10 Melbourne Avenue, Dronfield Woodhouse
Date
27 Jan 2017
Current
Potential
65
83
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
27 Jan 2017
65
83
Total Floor Area
118 sq m
Current CO2 Emissions Level
5.2
Potential CO2 Emissions Level
2.6
CO2 per sq m per Year
44
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
0
Address
13 Melbourne Avenue, Dronfield Woodhouse
Date
6 Mar 2020
Current
Potential
66
84
Property Type
House
Built Form
Detached
Constructed
1976-1982
+
Certificate History
6 Mar 2020
66
84
Total Floor Area
113 sq m
Current CO2 Emissions Level
4.7
Potential CO2 Emissions Level
2.4
CO2 per sq m per Year
42
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
14 Melbourne Avenue, Dronfield Woodhouse
Date
17 Feb 2011
Current
Potential
67
70
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
17 Feb 2011
67
70
Total Floor Area
129 sq m
Current CO2 Emissions Level
4.9
Potential CO2 Emissions Level
4.5
CO2 per sq m per Year
38
Mains Gas Available
Yes
Habitable Rooms
8
Number of Extensions
1
Address
19 Melbourne Avenue, Dronfield Woodhouse
Date
3 Dec 2013
Current
Potential
72
82
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
3 Dec 2013
72
82
9 Sep 2013
69
78
Total Floor Area
237 sq m
Current CO2 Emissions Level
6.8
Potential CO2 Emissions Level
4.3
CO2 per sq m per Year
29
Mains Gas Available
Yes
Habitable Rooms
10
Number of Extensions
2
Address
21 Melbourne Avenue, Dronfield Woodhouse
Date
23 Jan 2024
Current
Potential
66
78
Property Type
House
Built Form
Detached
Constructed
1950-1966
+
Certificate History
23 Jan 2024
66
78
31 May 2010
55
70
Total Floor Area
123 sq m
Current CO2 Emissions Level
4.8
Potential CO2 Emissions Level
3.2
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
22 Melbourne Avenue, Dronfield Woodhouse
Date
25 Oct 2011
Current
Potential
60
70
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
25 Oct 2011
60
70
Total Floor Area
123 sq m
Current CO2 Emissions Level
5.6
Potential CO2 Emissions Level
4.0
CO2 per sq m per Year
45
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
2
Address
23 Melbourne Avenue, Dronfield Woodhouse
Date
8 Jun 2020
Current
Potential
55
79
Property Type
House
Built Form
Detached
Constructed
1976-1982
+
Certificate History
8 Jun 2020
55
79
Total Floor Area
120 sq m
Current CO2 Emissions Level
6.9
Potential CO2 Emissions Level
3.3
CO2 per sq m per Year
58
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
24 Melbourne Avenue, Dronfield Woodhouse
Date
26 Jan 2018
Current
Potential
71
85
Property Type
House
Built Form
Detached
Constructed
1976-1982
+
Certificate History
26 Jan 2018
71
85
Total Floor Area
107 sq m
Current CO2 Emissions Level
3.7
Potential CO2 Emissions Level
2.1
CO2 per sq m per Year
35
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
2
Address
3 Melbourne Avenue, Dronfield Woodhouse
Date
11 May 2012
Current
Potential
53
81
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
11 May 2012
53
81
Total Floor Area
114 sq m
Current CO2 Emissions Level
6.0
Potential CO2 Emissions Level
2.2
CO2 per sq m per Year
53
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
30 Melbourne Avenue, Dronfield Woodhouse
Date
5 May 2011
Current
Potential
45
61
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
5 May 2011
45
61
Total Floor Area
117 sq m
Current CO2 Emissions Level
6.6
Potential CO2 Emissions Level
4.5
CO2 per sq m per Year
65
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
32 Melbourne Avenue, Dronfield Woodhouse
Date
9 Jun 2018
Current
Potential
67
80
Property Type
Bungalow
Built Form
Detached
Constructed
1950-1966
+
Certificate History
9 Jun 2018
67
80
Total Floor Area
126 sq m
Current CO2 Emissions Level
5.0
Potential CO2 Emissions Level
3.4
CO2 per sq m per Year
40
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
36 Melbourne Avenue, Dronfield Woodhouse
Date
12 Nov 2013
Current
Potential
67
80
Property Type
Bungalow
Built Form
Detached
Constructed
1950-1966
+
Certificate History
12 Nov 2013
67
80
Total Floor Area
116 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
2.6
CO2 per sq m per Year
35
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
38 Melbourne Avenue, Dronfield Woodhouse
Date
4 Apr 2024
Current
Potential
73
84
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
4 Apr 2024
73
84
7 May 2010
62
69
Total Floor Area
112 sq m
Current CO2 Emissions Level
3.7
Potential CO2 Emissions Level
2.3
CO2 per sq m per Year
33
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
2
Address
4 Melbourne Avenue, Dronfield Woodhouse
Date
18 Feb 2020
Current
Potential
60
78
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
18 Feb 2020
60
78
Total Floor Area
103 sq m
Current CO2 Emissions Level
5.4
Potential CO2 Emissions Level
3.2
CO2 per sq m per Year
52
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
40 Melbourne Avenue, Dronfield Woodhouse
Date
27 Mar 2023
Current
Potential
66
79
Property Type
Bungalow
Built Form
Detached
Constructed
1967-1975
+
Certificate History
27 Mar 2023
66
79
Total Floor Area
119 sq m
Current CO2 Emissions Level
5.0
Potential CO2 Emissions Level
3.3
CO2 per sq m per Year
42
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
2
Address
44 Melbourne Avenue, Dronfield Woodhouse
Date
17 Jun 2015
Current
Potential
47
79
Property Type
Bungalow
Built Form
Detached
Constructed
1967-1975
+
Certificate History
17 Jun 2015
47
79
29 Jun 2014
51
80
Total Floor Area
184 sq m
Current CO2 Emissions Level
11.0
Potential CO2 Emissions Level
4.4
CO2 per sq m per Year
60
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
46 Melbourne Avenue, Dronfield Woodhouse
Date
14 Mar 2013
Current
Potential
62
78
Property Type
Bungalow
Built Form
Detached
Constructed
1967-1975
+
Certificate History
14 Mar 2013
62
78
Total Floor Area
187 sq m
Current CO2 Emissions Level
7.4
Potential CO2 Emissions Level
4.4
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
2
Address
5 Melbourne Avenue, Dronfield Woodhouse
Date
28 Feb 2013
Current
Potential
43
78
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
28 Feb 2013
43
78
Total Floor Area
120 sq m
Current CO2 Emissions Level
8.2
Potential CO2 Emissions Level
2.9
CO2 per sq m per Year
68
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
1
Address
50 Melbourne Avenue, Dronfield Woodhouse
Date
17 May 2015
Current
Potential
46
77
Property Type
Bungalow
Built Form
Detached
Constructed
1967-1975
+
Certificate History
17 May 2015
46
77
Total Floor Area
136 sq m
Current CO2 Emissions Level
9.6
Potential CO2 Emissions Level
4.1
CO2 per sq m per Year
70
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
3
Address
54 Melbourne Avenue, Dronfield Woodhouse
Date
31 Jul 2017
Current
Potential
62
78
Property Type
Bungalow
Built Form
Detached
Constructed
1950-1966
+
Certificate History
31 Jul 2017
62
78
Total Floor Area
129 sq m
Current CO2 Emissions Level
6.1
Potential CO2 Emissions Level
3.8
CO2 per sq m per Year
47
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
58 Melbourne Avenue, Dronfield Woodhouse
Date
20 Mar 2019
Current
Potential
65
77
Property Type
Bungalow
Built Form
Detached
Constructed
1967-1975
+
Certificate History
20 Mar 2019
65
77
Total Floor Area
147 sq m
Current CO2 Emissions Level
5.8
Potential CO2 Emissions Level
4.0
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
2
Address
6 Melbourne Avenue, Dronfield Woodhouse
Date
23 May 2023
Current
Potential
67
81
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
23 May 2023
67
81
Total Floor Area
126 sq m
Current CO2 Emissions Level
5.2
Potential CO2 Emissions Level
3.2
CO2 per sq m per Year
41
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
2
Address
62 Melbourne Avenue, Dronfield Woodhouse
Date
25 Aug 2014
Current
Potential
61
82
Property Type
Bungalow
Built Form
Detached
Constructed
1950-1966
+
Certificate History
25 Aug 2014
61
82
3 Apr 2013
61
79
Total Floor Area
135 sq m
Current CO2 Emissions Level
5.9
Potential CO2 Emissions Level
2.6
CO2 per sq m per Year
44
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
64 Melbourne Avenue, Dronfield Woodhouse
Date
2 Jul 2014
Current
Potential
69
82
Property Type
Bungalow
Built Form
Detached
Constructed
1967-1975
+
Certificate History
2 Jul 2014
69
82
Total Floor Area
125 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
33
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
74 Melbourne Avenue, Dronfield Woodhouse
Date
12 Jul 2023
Current
Potential
72
80
Property Type
Bungalow
Built Form
Detached
Constructed
1950-1966
+
Certificate History
12 Jul 2023
72
80
Total Floor Area
219 sq m
Current CO2 Emissions Level
7.0
Potential CO2 Emissions Level
5.2
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
3
Address
80 Melbourne Avenue, Dronfield Woodhouse
Date
24 Jul 2014
Current
Potential
60
81
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
24 Jul 2014
60
81
Total Floor Area
153 sq m
Current CO2 Emissions Level
6.7
Potential CO2 Emissions Level
3.0
CO2 per sq m per Year
43
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
0
Address
84 Melbourne Avenue, Dronfield Woodhouse
Date
6 Jul 2022
Current
Potential
66
79
Property Type
House
Built Form
Detached
Constructed
1967-1975
+
Certificate History
6 Jul 2022
66
79
Total Floor Area
179 sq m
Current CO2 Emissions Level
7.1
Potential CO2 Emissions Level
4.6
CO2 per sq m per Year
40
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
1
Address
86 Melbourne Avenue, Dronfield Woodhouse
Date
16 Apr 2024
Current
Potential
61
80
Property Type
House
Built Form
Detached
Constructed
1950-1966
+
Certificate History
16 Apr 2024
61
80
Total Floor Area
108 sq m
Current CO2 Emissions Level
5.5
Potential CO2 Emissions Level
2.9
CO2 per sq m per Year
51
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.