PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Green Lane, BICESTER, OX26 1UR

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Green Lane, OX26 1UR are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Green Lane, BICESTER, OX26 1UR
Period Covered: 2008 - 30 September 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
22 Green Lane, Chesterton
Date
24 Apr 2009
Current
Potential
35
59
Property Type
House
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
24 Apr 2009
35
59
Total Floor Area
122 sq m
Current CO2 Emissions Level
10.0
Potential CO2 Emissions Level
6.1
CO2 per sq m per Year
92
Mains Gas Available
No
Habitable Rooms
7
Number of Extensions
1
Address
3 Green Lane, Chesterton
Date
26 Jul 2010
Current
Potential
47
57
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
26 Jul 2010
47
57
Total Floor Area
99 sq m
Current CO2 Emissions Level
7.3
Potential CO2 Emissions Level
5.7
CO2 per sq m per Year
61
Mains Gas Available
No
Habitable Rooms
6
Number of Extensions
1
Address
4 Green Lane, Chesterton
Date
31 May 2020
Current
Potential
61
79
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
31 May 2020
61
79
Total Floor Area
105 sq m
Current CO2 Emissions Level
5.1
Potential CO2 Emissions Level
2.7
CO2 per sq m per Year
48
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
5 Green Lane, Chesterton
Date
7 Jan 2015
Current
Potential
53
69
Property Type
House
Built Form
Detached
Constructed
1996-2002
+
Certificate History
7 Jan 2015
53
69
7 Jan 2015
41
54
Total Floor Area
101 sq m
Current CO2 Emissions Level
5.3
Potential CO2 Emissions Level
3.5
CO2 per sq m per Year
52
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
1
Address
6 Green Lane, Chesterton
Date
2 Jun 2016
Current
Potential
76
86
Property Type
House
Built Form
Detached
Constructed
N/A
+
Certificate History
2 Jun 2016
76
86
Total Floor Area
128 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
21
Mains Gas Available
No
Habitable Rooms
0
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.