PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Sandhills, LEEDS, LS14 3DN

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Sandhills, LS14 3DN are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Sandhills, LEEDS, LS14 3DN
Period Covered: 2008 - 31 January 2025

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
Field Head, Sandhills
Date
19 Nov 2013
Current
Potential
58
75
Property Type
House
Built Form
Detached
Constructed
before 1900
+
Certificate History
19 Nov 2013
58
75
Total Floor Area
771 sq m
Current CO2 Emissions Level
2.5
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
3
Mains Gas Available
Yes
Habitable Rooms
11
Number of Extensions
1
Address
Field Head Lodge, Sandhills
Date
22 Aug 2010
Current
Potential
66
73
Property Type
House
Built Form
Detached
Constructed
1900-1929
+
Certificate History
22 Aug 2010
66
73
25 May 2009
63
68
Total Floor Area
86 sq m
Current CO2 Emissions Level
3.8
Potential CO2 Emissions Level
3.1
CO2 per sq m per Year
44
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
Hollycroft, Sandhills
Date
12 Oct 2022
Current
Potential
67
82
Property Type
House
Built Form
Detached
Constructed
1930-1949
+
Certificate History
12 Oct 2022
67
82
31 Mar 2014
68
82
Total Floor Area
266 sq m
Current CO2 Emissions Level
10.0
Potential CO2 Emissions Level
6.0
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
7
Number of Extensions
1
Address
Hollycroft Annex, Sandhills
Date
31 Mar 2014
Current
Potential
47
67
Property Type
Flat
Built Form
Detached
Constructed
2003-2006
+
Certificate History
31 Mar 2014
47
67
Total Floor Area
46 sq m
Current CO2 Emissions Level
2.3
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
50
Mains Gas Available
No
Habitable Rooms
2
Number of Extensions
0
Address
The Grove, Sandhills
Date
7 Aug 2024
Current
Potential
21
80
Property Type
House
Built Form
Detached
Constructed
before 1900
+
Certificate History
7 Aug 2024
21
80
Total Floor Area
313 sq m
Current CO2 Emissions Level
33.0
Potential CO2 Emissions Level
9.1
CO2 per sq m per Year
107
Mains Gas Available
Yes
Habitable Rooms
11
Number of Extensions
1
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.