PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Chapel Lane, PINNER, HA5 1AB

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Chapel Lane, HA5 1AB are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Chapel Lane, PINNER, HA5 1AB
Period Covered: 2008 - 30 June 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
11 Chapel Lane
Date
15 May 2022
Current
Potential
68
86
Property Type
House
Built Form
Semi-Detached
Constructed
before 1900
+
Certificate History
15 May 2022
68
86
Total Floor Area
109 sq m
Current CO2 Emissions Level
3.3
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
30
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
12 Chapel Lane
Date
14 Apr 2011
Current
Potential
59
60
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
14 Apr 2011
59
60
Total Floor Area
103 sq m
Current CO2 Emissions Level
5.3
Potential CO2 Emissions Level
5.2
CO2 per sq m per Year
52
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
2
Address
13 Chapel Lane
Date
21 Jun 2022
Current
Potential
68
74
Property Type
Maisonette
Built Form
Detached
Constructed
1950-1966
+
Certificate History
21 Jun 2022
68
74
27 Mar 2015
67
76
8 Jun 2011
64
73
Total Floor Area
78 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
2.3
CO2 per sq m per Year
38
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
1
Address
14 Chapel Lane
Date
27 Mar 2015
Current
Potential
66
77
Property Type
Maisonette
Built Form
Detached
Constructed
1950-1966
+
Certificate History
27 Mar 2015
66
77
4 Jul 2013
65
77
Total Floor Area
59 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
45
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
Westbury Lodge Cottage, Chapel Lane
Date
16 Aug 2010
Current
Potential
40
57
Property Type
House
Built Form
Detached
Constructed
1900-1929
+
Certificate History
16 Aug 2010
40
57
Total Floor Area
91 sq m
Current CO2 Emissions Level
7.4
Potential CO2 Emissions Level
5.2
CO2 per sq m per Year
81
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.