PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Arclid Green, SANDBACH, CW11 4SY

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Arclid Green, CW11 4SY are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Arclid Green, SANDBACH, CW11 4SY
Period Covered: 2008 - 31 October 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
Arclid Greenhouse Farm, Hemmingshaw Lane
Date
26 Apr 2021
Current
Potential
40
77
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
26 Apr 2021
40
77
Total Floor Area
187 sq m
Current CO2 Emissions Level
13.0
Potential CO2 Emissions Level
4.8
CO2 per sq m per Year
68
Mains Gas Available
No
Habitable Rooms
6
Number of Extensions
1
Address
Arclid Lodge, Arclid Green
Date
29 Aug 2024
Current
Potential
70
94
Property Type
House
Built Form
Detached
Constructed
2007-2011
+
Certificate History
29 Aug 2024
70
94
Total Floor Area
157 sq m
Current CO2 Emissions Level
5.1
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
32
Mains Gas Available
No
Habitable Rooms
5
Number of Extensions
1
Address
Badgers Hollow, Arclid Green
Date
7 Dec 2023
Current
Potential
40
58
Property Type
House
Built Form
Semi-Detached
Constructed
1900-1929
+
Certificate History
7 Dec 2023
40
58
Total Floor Area
183 sq m
Current CO2 Emissions Level
12.0
Potential CO2 Emissions Level
8.7
CO2 per sq m per Year
68
Mains Gas Available
No
Habitable Rooms
8
Number of Extensions
3
Address
Foxes Den, Arclid Green
Date
7 Dec 2023
Current
Potential
52
89
Property Type
Bungalow
Built Form
Detached
Constructed
2007-2011
+
Certificate History
7 Dec 2023
52
89
Total Floor Area
43 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
64
Mains Gas Available
No
Habitable Rooms
2
Number of Extensions
0
Address
Squirrels Chase, Arclid Green
Date
1 Sep 2009
Current
Potential
46
55
Property Type
House
Built Form
Semi-Detached
Constructed
2003-2006
+
Certificate History
1 Sep 2009
46
55
Total Floor Area
187 sq m
Current CO2 Emissions Level
5.8
Potential CO2 Emissions Level
4.8
CO2 per sq m per Year
31
Mains Gas Available
No
Habitable Rooms
7
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.