PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Morland Road, COVENTRY, CV6 4FX

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Morland Road, CV6 4FX are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Morland Road, COVENTRY, CV6 4FX
Period Covered: 2008 - 31 October 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
1 Morland Road
Date
23 Sep 2012
Current
Potential
64
80
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
23 Sep 2012
64
80
Total Floor Area
80 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
43
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
10 Morland Road
Date
21 Jun 2024
Current
Potential
66
84
Property Type
House
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
21 Jun 2024
66
84
6 Jul 2012
65
83
Total Floor Area
80 sq m
Current CO2 Emissions Level
3.5
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
43
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
11 Morland Road
Date
5 Apr 2023
Current
Potential
68
83
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
5 Apr 2023
68
83
29 Jul 2010
64
73
Total Floor Area
89 sq m
Current CO2 Emissions Level
3.5
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
13 Morland Road
Date
3 Apr 2017
Current
Potential
69
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
3 Apr 2017
69
86
Total Floor Area
81 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
38
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
14 Morland Road
Date
13 Oct 2013
Current
Potential
66
82
Property Type
House
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
13 Oct 2013
66
82
17 Aug 2013
68
89
Total Floor Area
86 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
1.8
CO2 per sq m per Year
39
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
16 Morland Road
Date
22 Feb 2015
Current
Potential
54
82
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
22 Feb 2015
54
82
Total Floor Area
87 sq m
Current CO2 Emissions Level
5.3
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
61
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
17 Morland Road
Date
27 Nov 2015
Current
Potential
46
78
Property Type
House
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
27 Nov 2015
46
78
Total Floor Area
80 sq m
Current CO2 Emissions Level
5.9
Potential CO2 Emissions Level
2.4
CO2 per sq m per Year
74
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
18 Morland Road
Date
9 Sep 2019
Current
Potential
67
81
Property Type
House
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
9 Sep 2019
67
81
Total Floor Area
88 sq m
Current CO2 Emissions Level
3.6
Potential CO2 Emissions Level
2.1
CO2 per sq m per Year
40
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
19 Morland Road
Date
28 Aug 2018
Current
Potential
52
77
Property Type
House
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
28 Aug 2018
52
77
8 May 2018
58
78
Total Floor Area
73 sq m
Current CO2 Emissions Level
4.8
Potential CO2 Emissions Level
2.3
CO2 per sq m per Year
66
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
2 Morland Road
Date
7 Oct 2022
Current
Potential
71
85
Property Type
House
Built Form
Semi-Detached
Constructed
1950-1966
+
Certificate History
7 Oct 2022
71
85
23 Jul 2009
60
69
Total Floor Area
82 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
35
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
20 Morland Road
Date
11 Jan 2017
Current
Potential
70
89
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
11 Jan 2017
70
89
29 Jan 2016
58
79
Total Floor Area
70 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
0.9
CO2 per sq m per Year
38
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
21 Morland Road
Date
30 Jul 2024
Current
Potential
71
85
Property Type
House
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
30 Jul 2024
71
85
Total Floor Area
82 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
35
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
23 Morland Road
Date
25 Sep 2015
Current
Potential
67
82
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
25 Sep 2015
67
82
Total Floor Area
86 sq m
Current CO2 Emissions Level
3.5
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
41
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
24 Morland Road
Date
10 Apr 2019
Current
Potential
50
75
Property Type
House
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
10 Apr 2019
50
75
Total Floor Area
77 sq m
Current CO2 Emissions Level
6.1
Potential CO2 Emissions Level
3.1
CO2 per sq m per Year
79
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
25 Morland Road
Date
18 Oct 2016
Current
Potential
55
77
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
18 Oct 2016
55
77
Total Floor Area
104 sq m
Current CO2 Emissions Level
6.1
Potential CO2 Emissions Level
3.1
CO2 per sq m per Year
59
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
2
Address
26 Morland Road
Date
13 Feb 2013
Current
Potential
61
84
Property Type
House
Built Form
End-Terrace
Constructed
1950-1966
+
Certificate History
13 Feb 2013
61
84
Total Floor Area
77 sq m
Current CO2 Emissions Level
3.7
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
48
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
28 Morland Road
Date
18 Dec 2014
Current
Potential
65
83
Property Type
House
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
18 Dec 2014
65
83
18 Dec 2013
54
80
Total Floor Area
95 sq m
Current CO2 Emissions Level
4.1
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
43
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
30 Morland Road
Date
20 Jan 2016
Current
Potential
65
81
Property Type
House
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
20 Jan 2016
65
81
Total Floor Area
107 sq m
Current CO2 Emissions Level
4.5
Potential CO2 Emissions Level
2.6
CO2 per sq m per Year
42
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
32 Morland Road
Date
12 Feb 2018
Current
Potential
66
81
Property Type
House
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
12 Feb 2018
66
81
Total Floor Area
84 sq m
Current CO2 Emissions Level
3.5
Potential CO2 Emissions Level
2.1
CO2 per sq m per Year
42
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
34 MORLAND ROAD
Date
19 May 2021
Current
Potential
71
83
Property Type
House
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
19 May 2021
71
83
Total Floor Area
82 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
1.7
CO2 per sq m per Year
35
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
36 Morland Road
Date
16 Aug 2015
Current
Potential
41
80
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
16 Aug 2015
41
80
Total Floor Area
83 sq m
Current CO2 Emissions Level
6.9
Potential CO2 Emissions Level
2.2
CO2 per sq m per Year
83
Mains Gas Available
Yes
Habitable Rooms
6
Number of Extensions
1
Address
38 Morland Road
Date
5 Jun 2014
Current
Potential
55
77
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
5 Jun 2014
55
77
Total Floor Area
78 sq m
Current CO2 Emissions Level
4.4
Potential CO2 Emissions Level
2.2
CO2 per sq m per Year
57
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
40 Morland Road
Date
14 Jul 2016
Current
Potential
58
81
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
14 Jul 2016
58
81
6 Jul 2016
59
79
Total Floor Area
84 sq m
Current CO2 Emissions Level
4.6
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
55
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
44 Morland Road
Date
20 Jun 2017
Current
Potential
66
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
20 Jun 2017
66
86
Total Floor Area
71 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
44
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
5 Morland Road
Date
23 Oct 2022
Current
Potential
67
81
Property Type
House
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
23 Oct 2022
67
81
Total Floor Area
86 sq m
Current CO2 Emissions Level
3.5
Potential CO2 Emissions Level
2.0
CO2 per sq m per Year
41
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
7 Morland Road
Date
21 Nov 2016
Current
Potential
63
79
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
21 Nov 2016
63
79
18 Dec 2014
59
73
Total Floor Area
90 sq m
Current CO2 Emissions Level
4.0
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
45
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Address
8 Morland Road
Date
19 Feb 2015
Current
Potential
53
81
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
19 Feb 2015
53
81
23 Apr 2013
57
82
Total Floor Area
71 sq m
Current CO2 Emissions Level
3.6
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
51
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
1
Address
9 Morland Road
Date
16 Jul 2010
Current
Potential
72
77
Property Type
House
Built Form
Mid-Terrace
Constructed
1930-1949
+
Certificate History
16 Jul 2010
72
77
Total Floor Area
83 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
2.5
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
1
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.