PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Morland Close, MITCHAM, CR4 3JT

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Morland Close, CR4 3JT are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Morland Close, MITCHAM, CR4 3JT
Period Covered: 2008 - 31 January 2025

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
1 Morland Close
Date
28 Jun 2017
Current
Potential
70
86
Property Type
House
Built Form
End-Terrace
Constructed
1983-1990
+
Certificate History
28 Jun 2017
70
86
Total Floor Area
57 sq m
Current CO2 Emissions Level
2.1
Potential CO2 Emissions Level
0.8
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
11 Morland Close
Date
20 Jun 2017
Current
Potential
64
91
Property Type
House
Built Form
Mid-Terrace
Constructed
1983-1990
+
Certificate History
20 Jun 2017
64
91
Total Floor Area
58 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
0.3
CO2 per sq m per Year
44
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
12 Morland Close
Date
10 Nov 2014
Current
Potential
72
89
Property Type
House
Built Form
Mid-Terrace
Constructed
1967-1975
+
Certificate History
10 Nov 2014
72
89
Total Floor Area
60 sq m
Current CO2 Emissions Level
1.9
Potential CO2 Emissions Level
0.6
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
14 Morland Close
Date
8 Jul 2018
Current
Potential
68
87
Property Type
House
Built Form
End-Terrace
Constructed
1983-1990
+
Certificate History
8 Jul 2018
68
87
Total Floor Area
57 sq m
Current CO2 Emissions Level
2.3
Potential CO2 Emissions Level
0.7
CO2 per sq m per Year
40
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
15 Morland Close
Date
16 May 2018
Current
Potential
73
88
Property Type
House
Built Form
Mid-Terrace
Constructed
1976-1982
+
Certificate History
16 May 2018
73
88
Total Floor Area
58 sq m
Current CO2 Emissions Level
1.8
Potential CO2 Emissions Level
0.6
CO2 per sq m per Year
31
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
17 Morland Close
Date
5 Dec 2018
Current
Potential
64
86
Property Type
House
Built Form
End-Terrace
Constructed
1991-1995
+
Certificate History
5 Dec 2018
64
86
Total Floor Area
56 sq m
Current CO2 Emissions Level
2.6
Potential CO2 Emissions Level
0.7
CO2 per sq m per Year
46
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
18 Morland Close
Date
19 Aug 2020
Current
Potential
72
86
Property Type
House
Built Form
End-Terrace
Constructed
1983-1990
+
Certificate History
19 Aug 2020
72
86
6 Jul 2010
74
75
Total Floor Area
73 sq m
Current CO2 Emissions Level
2.2
Potential CO2 Emissions Level
0.9
CO2 per sq m per Year
30
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
1
Address
19 Morland Close
Date
23 Oct 2014
Current
Potential
68
92
Property Type
House
Built Form
Enclosed End-Terrace
Constructed
1983-1990
+
Certificate History
23 Oct 2014
68
92
23 Oct 2014
69
93
Total Floor Area
44 sq m
Current CO2 Emissions Level
1.8
Potential CO2 Emissions Level
0.2
CO2 per sq m per Year
42
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
2 Morland Close
Date
11 Jun 2009
Current
Potential
68
78
Property Type
House
Built Form
Mid-Terrace
Constructed
1991-1995
+
Certificate History
11 Jun 2009
68
78
Total Floor Area
57 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
50
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
22 Morland Close
Date
9 Feb 2013
Current
Potential
74
88
Property Type
House
Built Form
Mid-Terrace
Constructed
1983-1990
+
Certificate History
9 Feb 2013
74
88
7 Jun 2010
80
80
Total Floor Area
76 sq m
Current CO2 Emissions Level
2.1
Potential CO2 Emissions Level
0.9
CO2 per sq m per Year
28
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
23 Morland Close
Date
14 May 2013
Current
Potential
70
90
Property Type
House
Built Form
Mid-Terrace
Constructed
1991-1995
+
Certificate History
14 May 2013
70
90
Total Floor Area
64 sq m
Current CO2 Emissions Level
2.3
Potential CO2 Emissions Level
0.5
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
24 Morland Close
Date
5 Dec 2013
Current
Potential
71
92
Property Type
House
Built Form
Mid-Terrace
Constructed
1983-1990
+
Certificate History
5 Dec 2013
71
92
Total Floor Area
60 sq m
Current CO2 Emissions Level
2.0
Potential CO2 Emissions Level
0.3
CO2 per sq m per Year
34
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
28 Morland Close
Date
8 Oct 2019
Current
Potential
69
72
Property Type
Flat
Built Form
End-Terrace
Constructed
1983-1990
+
Certificate History
8 Oct 2019
69
72
3 Dec 2008
77
80
Total Floor Area
37 sq m
Current CO2 Emissions Level
1.7
Potential CO2 Emissions Level
1.4
CO2 per sq m per Year
46
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
30 Morland Close
Date
30 Apr 2013
Current
Potential
77
93
Property Type
House
Built Form
Mid-Terrace
Constructed
1976-1982
+
Certificate History
30 Apr 2013
77
93
Total Floor Area
56 sq m
Current CO2 Emissions Level
1.4
Potential CO2 Emissions Level
0.2
CO2 per sq m per Year
25
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
31 Morland Close
Date
13 Jul 2014
Current
Potential
66
88
Property Type
House
Built Form
End-Terrace
Constructed
1983-1990
+
Certificate History
13 Jul 2014
66
88
Total Floor Area
57 sq m
Current CO2 Emissions Level
2.5
Potential CO2 Emissions Level
0.7
CO2 per sq m per Year
43
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
32 Morland Close
Date
27 Aug 2012
Current
Potential
72
92
Property Type
House
Built Form
Enclosed End-Terrace
Constructed
1983-1990
+
Certificate History
27 Aug 2012
72
92
Total Floor Area
45 sq m
Current CO2 Emissions Level
1.6
Potential CO2 Emissions Level
0.2
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
2
Number of Extensions
0
Address
33 Morland Close
Date
6 Feb 2019
Current
Potential
74
87
Property Type
House
Built Form
Enclosed End-Terrace
Constructed
1983-1990
+
Certificate History
6 Feb 2019
74
87
20 Oct 2010
67
78
Total Floor Area
63 sq m
Current CO2 Emissions Level
1.8
Potential CO2 Emissions Level
0.7
CO2 per sq m per Year
29
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
35 Morland Close
Date
8 Jul 2018
Current
Potential
57
92
Property Type
House
Built Form
Enclosed End-Terrace
Constructed
1976-1982
+
Certificate History
8 Jul 2018
57
92
Total Floor Area
45 sq m
Current CO2 Emissions Level
2.4
Potential CO2 Emissions Level
0.2
CO2 per sq m per Year
54
Mains Gas Available
Yes
Habitable Rooms
2
Number of Extensions
0
Address
5 Morland Close
Date
20 Apr 2017
Current
Potential
71
89
Property Type
House
Built Form
Mid-Terrace
Constructed
1991-1995
+
Certificate History
20 Apr 2017
71
89
Total Floor Area
60 sq m
Current CO2 Emissions Level
2.0
Potential CO2 Emissions Level
0.6
CO2 per sq m per Year
34
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
6 Morland Close
Date
28 Sep 2018
Current
Potential
74
86
Property Type
House
Built Form
Mid-Terrace
Constructed
1976-1982
+
Certificate History
28 Sep 2018
74
86
Total Floor Area
81 sq m
Current CO2 Emissions Level
2.1
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
26
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
7 MORLAND CLOSE, MITCHAM
Date
21 Dec 2020
Current
Potential
72
88
Property Type
House
Built Form
End-Terrace
Constructed
1991-1995
+
Certificate History
21 Dec 2020
72
88
Total Floor Area
60 sq m
Current CO2 Emissions Level
1.9
Potential CO2 Emissions Level
0.6
CO2 per sq m per Year
31
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
9 Morland Close
Date
26 Jul 2018
Current
Potential
72
89
Property Type
House
Built Form
Enclosed End-Terrace
Constructed
1983-1990
+
Certificate History
26 Jul 2018
72
89
Total Floor Area
46 sq m
Current CO2 Emissions Level
1.6
Potential CO2 Emissions Level
0.4
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
2
Number of Extensions
0
Address
Studio Flat, 28 Morland Close
Date
13 Oct 2019
Current
Potential
65
75
Property Type
Flat
Built Form
End-Terrace
Constructed
1976-1982
+
Certificate History
13 Oct 2019
65
75
3 Dec 2008
66
76
Total Floor Area
30 sq m
Current CO2 Emissions Level
1.8
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
59
Mains Gas Available
Yes
Habitable Rooms
1
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2025.