PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
The Hydneye, EASTBOURNE, BN22 9BU

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for The Hydneye, BN22 9BU are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for The Hydneye, EASTBOURNE, BN22 9BU
Period Covered: 2008 - 31 October 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
11a The Hydneye
Date
10 May 2023
Current
Potential
69
74
Property Type
Flat
Built Form
Mid-Terrace
Constructed
1976-1982
+
Certificate History
10 May 2023
69
74
4 Apr 2013
73
79
Total Floor Area
64 sq m
Current CO2 Emissions Level
2.4
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
37
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
13a The Hydneye
Date
8 Sep 2022
Current
Potential
70
70
Property Type
Flat
Built Form
Mid-Terrace
Constructed
1983-1990
+
Certificate History
8 Sep 2022
70
70
30 Jun 2009
72
76
Total Floor Area
64 sq m
Current CO2 Emissions Level
2.3
Potential CO2 Emissions Level
2.3
CO2 per sq m per Year
36
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
15a The Hydneye
Date
8 Sep 2022
Current
Potential
72
72
Property Type
Flat
Built Form
Mid-Terrace
Constructed
1983-1990
+
Certificate History
8 Sep 2022
72
72
7 Oct 2008
64
68
Total Floor Area
64 sq m
Current CO2 Emissions Level
2.2
Potential CO2 Emissions Level
2.2
CO2 per sq m per Year
34
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
1a The Hydneye
Date
28 Feb 2014
Current
Potential
56
69
Property Type
Flat
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
28 Feb 2014
56
69
Total Floor Area
50 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
1.9
CO2 per sq m per Year
62
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
3a The Hydneye
Date
15 Aug 2024
Current
Potential
59
72
Property Type
Flat
Built Form
Mid-Terrace
Constructed
1950-1966
+
Certificate History
15 Aug 2024
59
72
10 Sep 2020
67
72
12 Nov 2019
35
74
19 Jun 2014
35
62
Total Floor Area
44 sq m
Current CO2 Emissions Level
2.7
Potential CO2 Emissions Level
1.6
CO2 per sq m per Year
63
Mains Gas Available
Yes
Habitable Rooms
2
Number of Extensions
0
Address
5a The Hydneye
Date
4 Mar 2020
Current
Potential
49
68
Property Type
Flat
Built Form
End-Terrace
Constructed
1967-1975
+
Certificate History
4 Mar 2020
49
68
28 Jan 2011
25
45
Total Floor Area
59 sq m
Current CO2 Emissions Level
5.2
Potential CO2 Emissions Level
3.9
CO2 per sq m per Year
87
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
7a The Hydneye
Date
23 Jan 2023
Current
Potential
73
79
Property Type
Flat
Built Form
Mid-Terrace
Constructed
1976-1982
+
Certificate History
23 Jan 2023
73
79
Total Floor Area
60 sq m
Current CO2 Emissions Level
1.9
Potential CO2 Emissions Level
1.3
CO2 per sq m per Year
32
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.