PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Berryhill Park, WESTHILL, AB32 6BF

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Berryhill Park, AB32 6BF are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Berryhill Park, WESTHILL, AB32 6BF
Period Covered: 2012 - 30 September 2023

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
1 BERRYHILL PARK
Date
17 May 2021
Current
Potential
79
87
Property Type
House
Built Form
Detached
Constructed
N/A
+
Certificate History
17 May 2021
79
87
16 May 2021
79
87
15 May 2021
79
87
Total Floor Area
142 sq m
Current CO2 Emissions Level
3.8
Potential CO2 Emissions Level
1.0
CO2 per sq m per Year
27
Mains Gas Available
No
Habitable Rooms
7
Number of Extensions
0
Address
10 BERRYHILL PARK
Date
17 Oct 2023
Current
Potential
95
95
Property Type
House
Built Form
Detached
Constructed
N/A
+
Certificate History
17 Oct 2023
95
95
16 Oct 2023
95
95
Total Floor Area
161 sq m
Current CO2 Emissions Level
2.0
Potential CO2 Emissions Level
0.0
CO2 per sq m per Year
13
Mains Gas Available
No
Habitable Rooms
8
Number of Extensions
1
Address
11 BERRYHILL PARK
Date
13 Feb 2020
Current
Potential
80
90
Property Type
House
Built Form
Detached
Constructed
N/A
+
Certificate History
13 Feb 2020
80
90
Total Floor Area
140 sq m
Current CO2 Emissions Level
3.3
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
24
Mains Gas Available
No
Habitable Rooms
8
Number of Extensions
1
Address
13 BERRYHILL PARK
Date
15 Sep 2015
Current
Potential
80
90
Property Type
House
Built Form
Detached
Constructed
N/A
+
Certificate History
15 Sep 2015
80
90
16 Sep 2015
80
90
14 Sep 2015
80
90
Total Floor Area
117 sq m
Current CO2 Emissions Level
2.9
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
25
Mains Gas Available
No
Habitable Rooms
6
Number of Extensions
1
Address
15 BERRYHILL PARK
Date
16 Jan 2023
Current
Potential
97
98
Property Type
House
Built Form
Detached
Constructed
N/A
+
Certificate History
16 Jan 2023
97
98
25 Apr 2022
81
88
Total Floor Area
161 sq m
Current CO2 Emissions Level
1.7
Potential CO2 Emissions Level
0.3
CO2 per sq m per Year
10
Mains Gas Available
No
Habitable Rooms
7
Number of Extensions
1
Address
16 BERRYHILL PARK
Date
23 Mar 2023
Current
Potential
81
89
Property Type
House
Built Form
Detached
Constructed
N/A
+
Certificate History
23 Mar 2023
81
89
Total Floor Area
162 sq m
Current CO2 Emissions Level
3.7
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
23
Mains Gas Available
No
Habitable Rooms
9
Number of Extensions
1
Address
3 BERRYHILL PARK
Date
25 Aug 2020
Current
Potential
81
90
Property Type
House
Built Form
Detached
Constructed
N/A
+
Certificate History
25 Aug 2020
81
90
24 Aug 2020
81
90
23 Aug 2020
81
90
Total Floor Area
128 sq m
Current CO2 Emissions Level
3.0
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
24
Mains Gas Available
No
Habitable Rooms
7
Number of Extensions
1
Address
4 BERRYHILL PARK
Date
30 Oct 2015
Current
Potential
80
90
Property Type
House
Built Form
Detached
Constructed
N/A
+
Certificate History
30 Oct 2015
80
90
Total Floor Area
128 sq m
Current CO2 Emissions Level
3.1
Potential CO2 Emissions Level
1.2
CO2 per sq m per Year
24
Mains Gas Available
No
Habitable Rooms
7
Number of Extensions
1
Address
7 BERRYHILL PARK
Date
3 May 2021
Current
Potential
81
89
Property Type
House
Built Form
Detached
Constructed
N/A
+
Certificate History
3 May 2021
81
89
4 May 2021
81
89
2 May 2021
81
89
Total Floor Area
151 sq m
Current CO2 Emissions Level
3.4
Potential CO2 Emissions Level
1.1
CO2 per sq m per Year
23
Mains Gas Available
No
Habitable Rooms
8
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.