PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Sunnyside Court, ABERDEEN, AB12 4LY

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Sunnyside Court, AB12 4LY are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Sunnyside Court, ABERDEEN, AB12 4LY
Period Covered: 2012 - 30 September 2023

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
10 SUNNYSIDE COURT , PORTLETHEN
Date
2 Feb 2018
Current
Potential
79
81
Property Type
Flat
Built Form
Enclosed End-Terrace
Constructed
2008 onwards
+
Certificate History
2 Feb 2018
79
81
Total Floor Area
67 sq m
Current CO2 Emissions Level
1.6
Potential CO2 Emissions Level
0.1
CO2 per sq m per Year
24
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
11 SUNNYSIDE COURT , PORTLETHEN
Date
20 Aug 2018
Current
Potential
81
81
Property Type
Flat
Built Form
Mid-Terrace
Constructed
2008 onwards
+
Certificate History
20 Aug 2018
81
81
21 Aug 2018
81
81
19 Aug 2018
81
81
Total Floor Area
67 sq m
Current CO2 Emissions Level
1.5
Potential CO2 Emissions Level
0.0
CO2 per sq m per Year
23
Mains Gas Available
No
Habitable Rooms
4
Number of Extensions
0
Address
14 SUNNYSIDE COURT , PORTLETHEN
Date
1 Mar 2024
Current
Potential
80
80
Property Type
Flat
Built Form
End-Terrace
Constructed
2008 onwards
+
Certificate History
1 Mar 2024
80
80
8 Sep 2020
80
80
9 Sep 2020
80
80
Total Floor Area
56 sq m
Current CO2 Emissions Level
1.3
Potential CO2 Emissions Level
0.0
CO2 per sq m per Year
24
Mains Gas Available
No
Habitable Rooms
2
Number of Extensions
0
Address
16 SUNNYSIDE COURT , PORTLETHEN
Date
10 Oct 2022
Current
Potential
81
81
Property Type
Flat
Built Form
Mid-Terrace
Constructed
2008 onwards
+
Certificate History
10 Oct 2022
81
81
9 Oct 2022
81
81
30 Jan 2014
81
81
8 Oct 2022
81
81
Total Floor Area
66 sq m
Current CO2 Emissions Level
1.5
Potential CO2 Emissions Level
0.0
CO2 per sq m per Year
23
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
17 SUNNYSIDE COURT , PORTLETHEN
Date
2 Apr 2019
Current
Potential
80
80
Property Type
Flat
Built Form
Semi-Detached
Constructed
2008 onwards
+
Certificate History
2 Apr 2019
80
80
3 Apr 2019
80
80
1 Apr 2019
80
80
Total Floor Area
67 sq m
Current CO2 Emissions Level
1.6
Potential CO2 Emissions Level
0.0
CO2 per sq m per Year
25
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
18 SUNNYSIDE COURT , PORTLETHEN
Date
3 Oct 2022
Current
Potential
81
82
Property Type
Flat
Built Form
End-Terrace
Constructed
2008 onwards
+
Certificate History
3 Oct 2022
81
82
2 Oct 2022
81
82
1 Oct 2022
81
82
15 Sep 2020
82
83
Total Floor Area
55 sq m
Current CO2 Emissions Level
1.1
Potential CO2 Emissions Level
0.0
CO2 per sq m per Year
21
Mains Gas Available
No
Habitable Rooms
2
Number of Extensions
0
Address
19 SUNNYSIDE COURT , PORTLETHEN
Date
11 Jul 2022
Current
Potential
83
83
Property Type
Flat
Built Form
Semi-Detached
Constructed
2008 onwards
+
Certificate History
11 Jul 2022
83
83
12 Jul 2022
83
83
10 Jul 2022
83
83
Total Floor Area
66 sq m
Current CO2 Emissions Level
1.2
Potential CO2 Emissions Level
0.0
CO2 per sq m per Year
19
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
2 SUNNYSIDE COURT , PORTLETHEN
Date
7 Feb 2020
Current
Potential
79
79
Property Type
Flat
Built Form
Mid-Terrace
Constructed
2003-2007
+
Certificate History
7 Feb 2020
79
79
Total Floor Area
63 sq m
Current CO2 Emissions Level
1.7
Potential CO2 Emissions Level
0.0
CO2 per sq m per Year
26
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
21 SUNNYSIDE COURT , PORTLETHEN
Date
9 Jun 2022
Current
Potential
82
82
Property Type
Flat
Built Form
Semi-Detached
Constructed
2008 onwards
+
Certificate History
9 Jun 2022
82
82
8 Jun 2022
82
82
7 Jun 2022
82
82
Total Floor Area
67 sq m
Current CO2 Emissions Level
1.3
Potential CO2 Emissions Level
0.0
CO2 per sq m per Year
20
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
25 SUNNYSIDE COURT , PORTLETHEN
Date
7 May 2021
Current
Potential
80
81
Property Type
Flat
Built Form
Mid-Terrace
Constructed
2008 onwards
+
Certificate History
7 May 2021
80
81
6 May 2021
80
81
5 May 2021
80
81
Total Floor Area
67 sq m
Current CO2 Emissions Level
1.6
Potential CO2 Emissions Level
0.1
CO2 per sq m per Year
24
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
4 SUNNYSIDE COURT , PORTLETHEN
Date
4 Nov 2021
Current
Potential
77
78
Property Type
Flat
Built Form
Semi-Detached
Constructed
2003-2007
+
Certificate History
4 Nov 2021
77
78
Total Floor Area
65 sq m
Current CO2 Emissions Level
1.9
Potential CO2 Emissions Level
0.1
CO2 per sq m per Year
29
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Address
6 SUNNYSIDE COURT , PORTLETHEN
Date
8 Jan 2020
Current
Potential
81
81
Property Type
Flat
Built Form
Mid-Terrace
Constructed
2003-2007
+
Certificate History
8 Jan 2020
81
81
Total Floor Area
63 sq m
Current CO2 Emissions Level
1.3
Potential CO2 Emissions Level
0.0
CO2 per sq m per Year
21
Mains Gas Available
No
Habitable Rooms
3
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.