ROADWORKS SUMMARY
Bank Road, SELBY, YO8 5AN
Introduction

View current and future planned roadworks and road closures for Bank Road, YO8 5AN and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Bank Road, SELBY, YO8 5AN
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Bank Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
15 Apr 2025
Northern Powergrid (Northeast) are carrying out Utility repair and maintenance works on Camblesforth To Drax Power Station, Camblesforth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 March 2025 at 07:45 and could run through until 15 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Northeast) on 21 Mar 2025 at 07:53.
24 Mar and 11 Apr 2025
Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Camblesforth To Drax Power Station, Camblesforth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Northeast) on 7 Jan 2025 at 14:56.
24 Mar and 22 Apr 2025
Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Pear Tree Avenue, Long Drax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 22 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Jan 2025 at 15:14.
22 Apr 2025
Northern Powergrid (Yorkshire) are carrying out Diversionary works on Pear Tree Avenue, Long Drax.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 March 2025 at 11:30 and could run through until 22 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 24 Mar 2025 at 13:09.
31 Mar and 29 Apr 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on New Road, Drax.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 29 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 4 Feb 2025 at 17:16.
31 Mar and 20 Apr 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on New Road, Drax.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 20 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 17 Feb 2025 at 15:17.
31 Mar and 4 Apr 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Fir Tree Lane, Thorpe Willoughby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 4 Mar 2025 at 14:04.
31 Mar and 4 Apr 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Fir Tree Lane, Thorpe Willoughby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Mar 2025 at 14:04.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:10.
1 Apr and 1 May 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Mill Lane, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 17 Mar 2025 at 13:01.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Lingcroft Close, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:09.
1 Apr and 2 May 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Lingcroft Close, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 08:39.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Pinewood Drive, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:12.
1 Apr and 2 May 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Pinewood Drive, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 08:42.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Brigg Lane, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:13.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Manor Drive, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:14.
1 Apr and 1 May 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Manor Drive, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 14 Mar 2025 at 08:59.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Millfield Drive, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:16.
1 Apr and 1 May 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Millfield Drive, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 08:43.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Underwit Road, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:15.
1 Apr and 1 May 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Underwit Road, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 08:38.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Beech Tree Lane, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:14.
1 Apr and 1 May 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Beech Tree Lane, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 14 Mar 2025 at 14:56.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Prospect Close, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:11.
1 Apr and 2 May 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Prospect Close, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 08:44.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Oaklands Crescent, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:13.
1 Apr and 1 May 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Oaklands Crescent, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 14 Mar 2025 at 09:10.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on From Brigg Lane To End Of Cul De Sac, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:12.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Croftway, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:11.
1 Apr and 1 May 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Croftway, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 08:44.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Oaklands, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:12.
1 Apr and 1 May 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Oaklands, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 08:50.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Croft Road, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:16.
1 Apr and 2 May 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Croft Road, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 08:37.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Camela Lane, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 12:57.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Camela Lane, Barlow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:15.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Hillam Road, Gateforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 14:44.
1 and 30 Apr 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Hillam Road, Gateforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 14 Mar 2025 at 08:50.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Turnham Lane, Cliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 13:10.
1 Apr and 2 May 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Turnham Lane, Cliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 13:53.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Scalm Lane, Cawood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 18 Dec 2024 at 15:58.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Cliffe Cottage To Lara Bridge, Cliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 14:45.
1 Apr and 30 Sep 2025
North Yorkshire County Council were proposing to carry out Highway repair and maintenance works on Barlby New By-pass, Barlby.
These works were categorised as Major.
The works were originally planned to start 1 April 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 28 Jan 2025 at 11:28.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Biggin Bridge To Scalm Lane, Cawood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 18 Dec 2024 at 16:01.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Hagg Lane, Cawood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 18 Dec 2024 at 16:01.
1 Apr and 2 May 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Hagg Lane, Cawood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 14:02.
1 Apr and 15 May 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Great Close, Cawood.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 15:08.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on King Rudding Lane, Riccall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:20.
3 Apr and 1 May 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Camela Lane, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 14 Mar 2025 at 08:47.
3 Apr and 1 May 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Cliffe Cottage To Lara Bridge, Cliffe.
These works are categorised as Major.
The works will start on or after 3 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 11 Mar 2025 at 15:56.
3 Apr and 1 May 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on King Rudding Lane, Riccall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 14 Mar 2025 at 09:02.
4 Apr and 2 May 2025
Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Brigg Lane, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Jan 2025 at 16:16.
4 Apr and 2 May 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Scalm Lane, Cawood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 14 Mar 2025 at 09:12.
4 Apr and 2 May 2025
North Yorkshire County Council are proposing to carry out Highway improvement works on Biggin Bridge To Scalm Lane, Cawood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 14 Mar 2025 at 09:20.
7 Apr and 2 May 2025
Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Brigg Lane, Camblesforth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 21 Feb 2025 at 15:52.
7 Apr and 16 Jun 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Wren Hall Lane, Drax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 16 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 4 Feb 2025 at 16:51.
7 Apr and 16 Jun 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Wren Hall Lane, Drax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 16 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Feb 2025 at 09:41.
7 and 17 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ebor Street, Selby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 11:43.
7 and 17 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ebor Street, Selby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 7 Mar 2025 at 12:07.
7 and 17 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Street, Selby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 11:44.
7 and 17 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Street, Selby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Feb 2025 at 16:08.
7 and 17 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brook Street, Selby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 09:58.
7 and 17 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brook Street, Selby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 Dec 2024 at 15:27.
7 and 17 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gowthorpe, Selby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 10:08.
7 and 17 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gowthorpe, Selby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 7 Mar 2025 at 12:02.
21 and 23 Apr 2025
Network Rail are proposing to carry out Works for Rail Purposes on Leeds Road, Selby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 18 Dec 2024 at 16:04.
30 Apr and 2 May 2025
National Grid Electricity Transmission are proposing to carry out Utility asset works on Wren Hall Lane, Drax.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Grid Electricity Transmission on 26 Feb 2025 at 15:49.
1 May and 1 Jul 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on The Mount, Selby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 18 Mar 2025 at 13:10.
1 May and 1 Jul 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Portholme Crescent, Selby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 18 Mar 2025 at 13:08.
15 and 29 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Newport Avenue, Selby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 May 2025 and could run through until 29 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 25 Mar 2025 at 10:03.
15 May and 25 Jun 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Doncaster Road, Selby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 May 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Mar 2025 at 16:14.
19 May and 13 Jun 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Laurel Close, Thorpe Willoughby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:22.
19 May and 13 Jun 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Acorn Way, Thorpe Willoughby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:26.
19 May and 13 Jun 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Wood Close, Thorpe Willoughby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:26.
19 May and 13 Jun 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Field Avenue, Thorpe Willoughby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:23.
19 May and 13 Jun 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Wood Lane, Thorpe Willoughby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:24.
19 May and 13 Jun 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on The Coppice, Thorpe Willoughby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:23.
19 May and 13 Jun 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Tudor Close, Thorpe Willoughby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:25.
19 May and 13 Jun 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Stuart Grove, Thorpe Willoughby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:26.
19 May and 13 Jun 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Sandway Avenue, Thorpe Willoughby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:23.
19 May and 13 Jun 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Norman Close, Thorpe Willoughby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:26.
19 May and 13 Jun 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Sandway Close, Thorpe Willoughby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:25.
19 May and 13 Jun 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Sandway Drive, Thorpe Willoughby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:22.
19 May and 13 Jun 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Saxon Close, Thorpe Willoughby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:25.
19 May and 13 Jun 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Orchard Way, Thorpe Willoughby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:25.
19 May and 13 Jun 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Foxdale Avenue, Thorpe Willoughby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:21.
19 May and 13 Jun 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Meadow Garth, Thorpe Willoughby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:23.
19 May and 13 Jun 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Meadow Close, Thorpe Willoughby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:27.
19 May and 13 Jun 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Meadow Drive, Thorpe Willoughby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:24.
19 May and 13 Jun 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Linden Way, Thorpe Willoughby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:22.
19 May and 2 Jun 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westfield Road, Selby.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 25 Mar 2025 at 15:56.
2 Jun and 1 Nov 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Camblesforth Road, Barlow.
These works are categorised as Major.
The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 12:21.
2 Jun and 1 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Mayfield Road, Brayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 10 Mar 2025 at 12:01.
2 Jun and 1 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Beaumont Place, Brayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 3 Mar 2025 at 15:03.
2 Jun and 20 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Selby Bypass, Selby.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:35.
2 Jun and 20 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on East Common Lane, Selby.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:36.
2 Jun and 1 Nov 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Ings Road, Cliffe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 14:19.
2 Jun and 20 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Selby Bypass, Selby.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 20 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:31.
2 Jun and 1 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Olympia Crescent, Selby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 3 Mar 2025 at 15:14.
2 Jun and 1 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Carentan Close, Selby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 3 Mar 2025 at 15:05.
2 Jun and 1 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Normandy Close, Selby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 3 Mar 2025 at 15:12.
2 Jun and 1 Nov 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Biggin Lane To Biggin Bridge, Biggin.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 10:26.
2 Jun and 1 Nov 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Black Fen Lane, Selby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 13:19.
2 Jun and 1 Nov 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Oxmoor Lane, Biggin.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 10:41.
2 Jun and 1 Nov 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Dickey Lane, Wistow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 13:15.
2 Jun and 1 Nov 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Sand Lane, Selby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 13:25.
2 Jun and 1 Nov 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Long Lane, Cawood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 13:13.
2 Jun and 1 Nov 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Long Lane, Wistow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 13:09.
2 Jun and 1 Nov 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Cornelius Causeway, North Duffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:28.
2 Jun and 1 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Green Lane, North Duffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 3 Mar 2025 at 15:07.
2 Jun and 1 Nov 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Green Lane, North Duffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:29.
2 Jun and 1 Nov 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on The Green, North Duffield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:29.
2 Jun and 1 Nov 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Blackwood Road, Skipwith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 13:51.
2 Jun and 1 Nov 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Common Road, Skipwith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 13:55.
Roadworks Map near to Bank Road, SELBY, YO8 5AN
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Bank Road, SELBY, YO8 5AN (7 Events)
(Scheduled Dates)
(miles)
(Scheduled: 25 Mar 2025)
(Scheduled: 20 Mar 2025 - 26 Mar 2025)
(Scheduled: 15 Mar 2025 - 28 Mar 2025)
Contains public sector information licensed under the Open Government Licence v3.0.