ROADWORKS SUMMARY
Preston Yard, Micklegate, SELBY, YO8 4EF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Preston Yard, Micklegate, YO8 4EF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Preston Yard, Micklegate, SELBY, YO8 4EF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Preston Yard, Micklegate are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Northern Powergrid (Northeast) logo
Until
15 Apr 2025
Details
View Map
Share
Follow
Camblesforth To Drax Power Station

Northern Powergrid (Northeast) are carrying out Utility repair and maintenance works on Camblesforth To Drax Power Station, Camblesforth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 March 2025 at 07:45 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 21 Mar 2025 at 07:53.

Northern Powergrid (Northeast) logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Camblesforth To Drax Power Station

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Camblesforth To Drax Power Station, Camblesforth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 7 Jan 2025 at 14:56.

Northern Powergrid (Yorkshire) logo
Between
24 Mar and 22 Apr 2025
Details
View Map
Share
Follow
Pear Tree Avenue

Northern Powergrid (Yorkshire) are proposing to carry out Diversionary works on Pear Tree Avenue, Long Drax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Jan 2025 at 15:14.

Northern Powergrid (Yorkshire) logo
Until
22 Apr 2025
Details
View Map
Share
Follow
Pear Tree Avenue

Northern Powergrid (Yorkshire) are carrying out Diversionary works on Pear Tree Avenue, Long Drax.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 11:30 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 24 Mar 2025 at 13:09.

Northern Powergrid (Yorkshire) logo
Between
31 Mar and 29 Apr 2025
Details
View Map
Share
Follow
New Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on New Road, Drax.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 29 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 4 Feb 2025 at 17:16.

Northern Powergrid (Yorkshire) logo
Between
31 Mar and 20 Apr 2025
Details
View Map
Share
Follow
New Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on New Road, Drax.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 20 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 17 Feb 2025 at 15:17.

Northern Powergrid (Yorkshire) logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Fir Tree Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Fir Tree Lane, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 4 Mar 2025 at 14:04.

Northern Powergrid (Yorkshire) logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Fir Tree Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Fir Tree Lane, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 14 Mar 2025 at 14:04.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Mill Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:10.

North Yorkshire County Council logo
Between
1 Apr and 1 May 2025
Details
View Map
Share
Follow
Mill Lane

North Yorkshire County Council are proposing to carry out Highway improvement works on Mill Lane, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 17 Mar 2025 at 13:01.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Lingcroft Close

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Lingcroft Close, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:09.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 2 May 2025
Details
View Map
Share
Follow
Lingcroft Close

North Yorkshire County Council are proposing to carry out Highway improvement works on Lingcroft Close, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 08:39.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Pinewood Drive

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Pinewood Drive, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:12.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 2 May 2025
Details
View Map
Share
Follow
Pinewood Drive

North Yorkshire County Council are proposing to carry out Highway improvement works on Pinewood Drive, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 08:42.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Brigg Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Brigg Lane, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:13.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Manor Drive

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Manor Drive, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:14.

North Yorkshire County Council logo
Between
1 Apr and 1 May 2025
Details
View Map
Share
Follow
Manor Drive

North Yorkshire County Council are proposing to carry out Highway improvement works on Manor Drive, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 14 Mar 2025 at 08:59.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Millfield Drive

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Millfield Drive, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:16.

North Yorkshire County Council logo
Between
1 Apr and 1 May 2025
Details
View Map
Share
Follow
Millfield Drive

North Yorkshire County Council are proposing to carry out Highway improvement works on Millfield Drive, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 08:43.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Underwit Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Underwit Road, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:15.

North Yorkshire County Council logo
Between
1 Apr and 1 May 2025
Details
View Map
Share
Follow
Underwit Road

North Yorkshire County Council are proposing to carry out Highway improvement works on Underwit Road, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 08:38.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Beech Tree Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Beech Tree Lane, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:14.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 1 May 2025
Details
View Map
Share
Follow
Beech Tree Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Beech Tree Lane, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 14 Mar 2025 at 14:56.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Prospect Close

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Prospect Close, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:11.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 2 May 2025
Details
View Map
Share
Follow
Prospect Close

North Yorkshire County Council are proposing to carry out Highway improvement works on Prospect Close, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 08:44.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Oaklands Crescent

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Oaklands Crescent, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:13.

North Yorkshire County Council logo
Between
1 Apr and 1 May 2025
Details
View Map
Share
Follow
Oaklands Crescent

North Yorkshire County Council are proposing to carry out Highway improvement works on Oaklands Crescent, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 14 Mar 2025 at 09:10.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
From Brigg Lane To End Of Cul De Sac

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on From Brigg Lane To End Of Cul De Sac, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:12.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Croftway

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Croftway, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:11.

North Yorkshire County Council logo
Between
1 Apr and 1 May 2025
Details
View Map
Share
Follow
Croftway

North Yorkshire County Council are proposing to carry out Highway improvement works on Croftway, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 08:44.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Oaklands

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Oaklands, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:12.

North Yorkshire County Council logo
Between
1 Apr and 1 May 2025
Details
View Map
Share
Follow
Oaklands

North Yorkshire County Council are proposing to carry out Highway improvement works on Oaklands, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 08:50.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Croft Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Croft Road, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:16.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 2 May 2025
Details
View Map
Share
Follow
Croft Road

North Yorkshire County Council are proposing to carry out Highway improvement works on Croft Road, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 08:37.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Camela Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Camela Lane, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 12:57.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Camela Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Camela Lane, Barlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:15.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Hillam Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Hillam Road, Gateforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 14:44.

North Yorkshire County Council logo
Between
1 and 30 Apr 2025
Details
View Map
Share
Follow
Hillam Road

North Yorkshire County Council are proposing to carry out Highway improvement works on Hillam Road, Gateforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 14 Mar 2025 at 08:50.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Turnham Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Turnham Lane, Cliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 13:10.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 2 May 2025
Details
View Map
Share
Follow
Turnham Lane

North Yorkshire County Council are proposing to carry out Highway improvement works on Turnham Lane, Cliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 13:53.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Scalm Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Scalm Lane, Cawood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 18 Dec 2024 at 15:58.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Cliffe Cottage To Lara Bridge

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Cliffe Cottage To Lara Bridge, Cliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 14:45.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Barlby New By-pass

North Yorkshire County Council were proposing to carry out Highway repair and maintenance works on Barlby New By-pass, Barlby.

These works were categorised as Major.

The works were originally planned to start 1 April 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 28 Jan 2025 at 11:28.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Biggin Bridge To Scalm Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Biggin Bridge To Scalm Lane, Cawood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 18 Dec 2024 at 16:01.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
Hagg Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Hagg Lane, Cawood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 18 Dec 2024 at 16:01.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 2 May 2025
Details
View Map
Share
Follow
Hagg Lane

North Yorkshire County Council are proposing to carry out Highway improvement works on Hagg Lane, Cawood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 24 Mar 2025 at 14:02.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 15 May 2025
Details
View Map
Share
Follow
Great Close

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Great Close, Cawood.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 15 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 15:08.

North Yorkshire County Council logo
LONG TERM
Between
1 Apr and 30 Sep 2025
Details
View Map
Share
Follow
King Rudding Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on King Rudding Lane, Riccall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 8 Jan 2025 at 16:20.

North Yorkshire County Council logo
Between
3 Apr and 1 May 2025
Details
View Map
Share
Follow
Camela Lane

North Yorkshire County Council are proposing to carry out Highway improvement works on Camela Lane, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 14 Mar 2025 at 08:47.

North Yorkshire County Council logo
Between
3 Apr and 1 May 2025
Details
View Map
Share
Follow
Cliffe Cottage To Lara Bridge

North Yorkshire County Council are proposing to carry out Highway improvement works on Cliffe Cottage To Lara Bridge, Cliffe.

These works are categorised as Major.

The works will start on or after 3 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 11 Mar 2025 at 15:56.

North Yorkshire County Council logo
Between
3 Apr and 1 May 2025
Details
View Map
Share
Follow
King Rudding Lane

North Yorkshire County Council are proposing to carry out Highway improvement works on King Rudding Lane, Riccall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 14 Mar 2025 at 09:02.

Northern Powergrid (Northeast) logo
Between
4 Apr and 2 May 2025
Details
View Map
Share
Follow
Brigg Lane

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Brigg Lane, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Jan 2025 at 16:16.

North Yorkshire County Council logo
Between
4 Apr and 2 May 2025
Details
View Map
Share
Follow
Scalm Lane

North Yorkshire County Council are proposing to carry out Highway improvement works on Scalm Lane, Cawood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 14 Mar 2025 at 09:12.

North Yorkshire County Council logo
Between
4 Apr and 2 May 2025
Details
View Map
Share
Follow
Biggin Bridge To Scalm Lane

North Yorkshire County Council are proposing to carry out Highway improvement works on Biggin Bridge To Scalm Lane, Cawood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 14 Mar 2025 at 09:20.

Northern Powergrid (Northeast) logo
Between
7 Apr and 2 May 2025
Details
View Map
Share
Follow
Brigg Lane

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Brigg Lane, Camblesforth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 21 Feb 2025 at 15:52.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
7 Apr and 16 Jun 2025
Details
View Map
Share
Follow
Wren Hall Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Wren Hall Lane, Drax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 16 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 4 Feb 2025 at 16:51.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
7 Apr and 16 Jun 2025
Details
View Map
Share
Follow
Wren Hall Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Wren Hall Lane, Drax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 16 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Feb 2025 at 09:41.

Northern Gas Networks logo
Between
7 and 17 Apr 2025
Details
View Map
Share
Follow
Ebor Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ebor Street, Selby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 11:43.

Northern Gas Networks logo
Between
7 and 17 Apr 2025
Details
View Map
Share
Follow
Ebor Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ebor Street, Selby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Mar 2025 at 12:07.

Northern Gas Networks logo
Between
7 and 17 Apr 2025
Details
View Map
Share
Follow
York Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Street, Selby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 11:44.

Northern Gas Networks logo
Between
7 and 17 Apr 2025
Details
View Map
Share
Follow
York Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Street, Selby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Feb 2025 at 16:08.

Northern Gas Networks logo
Between
7 and 17 Apr 2025
Details
View Map
Share
Follow
Brook Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brook Street, Selby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 09:58.

Northern Gas Networks logo
Between
7 and 17 Apr 2025
Details
View Map
Share
Follow
Brook Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brook Street, Selby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Dec 2024 at 15:27.

Northern Gas Networks logo
Between
7 and 17 Apr 2025
Details
View Map
Share
Follow
Gowthorpe

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gowthorpe, Selby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 10:08.

Northern Gas Networks logo
Between
7 and 17 Apr 2025
Details
View Map
Share
Follow
Gowthorpe

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gowthorpe, Selby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Mar 2025 at 12:02.

Network Rail logo
Between
21 and 23 Apr 2025
Details
View Map
Share
Follow
Leeds Road

Network Rail are proposing to carry out Works for Rail Purposes on Leeds Road, Selby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Dec 2024 at 16:04.

National Grid Electricity Transmission logo
Between
30 Apr and 2 May 2025
Details
View Map
Share
Follow
Wren Hall Lane

National Grid Electricity Transmission are proposing to carry out Utility asset works on Wren Hall Lane, Drax.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Grid Electricity Transmission on 26 Feb 2025 at 15:49.

North Yorkshire County Council logo
LONG TERM
Between
1 May and 1 Jul 2025
Details
View Map
Share
Follow
The Mount

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on The Mount, Selby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 18 Mar 2025 at 13:10.

North Yorkshire County Council logo
LONG TERM
Between
1 May and 1 Jul 2025
Details
View Map
Share
Follow
Portholme Crescent

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Portholme Crescent, Selby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 18 Mar 2025 at 13:08.

Northern Gas Networks logo
Between
15 and 29 May 2025
Details
View Map
Share
Follow
Newport Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Newport Avenue, Selby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 29 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Mar 2025 at 10:03.

Northern Gas Networks logo
LONG TERM
Between
15 May and 25 Jun 2025
Details
View Map
Share
Follow
Doncaster Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Doncaster Road, Selby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 24 Mar 2025 at 16:14.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Laurel Close

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Laurel Close, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:22.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Acorn Way

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Acorn Way, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:26.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Wood Close

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Wood Close, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:26.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Field Avenue

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Field Avenue, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:23.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Wood Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Wood Lane, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:24.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
The Coppice

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on The Coppice, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:23.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Tudor Close

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Tudor Close, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:25.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Stuart Grove

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Stuart Grove, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:26.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Sandway Avenue

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Sandway Avenue, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:23.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Norman Close

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Norman Close, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:26.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Sandway Close

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Sandway Close, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:25.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Sandway Drive

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Sandway Drive, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:22.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Saxon Close

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Saxon Close, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:25.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Orchard Way

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Orchard Way, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:25.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Foxdale Avenue

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Foxdale Avenue, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:21.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Meadow Garth

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Meadow Garth, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:23.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Meadow Close

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Meadow Close, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:27.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Meadow Drive

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Meadow Drive, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:24.

North Yorkshire County Council logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Follow
Linden Way

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Linden Way, Thorpe Willoughby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:22.

Northern Gas Networks logo
Between
19 May and 2 Jun 2025
Details
View Map
Share
Follow
Westfield Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Westfield Road, Selby.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 25 Mar 2025 at 15:56.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 1 Nov 2025
Details
View Map
Share
Follow
Camblesforth Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Camblesforth Road, Barlow.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 12:21.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 1 Oct 2025
Details
View Map
Share
Follow
Mayfield Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Mayfield Road, Brayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 10 Mar 2025 at 12:01.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 1 Oct 2025
Details
View Map
Share
Follow
Beaumont Place

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Beaumont Place, Brayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 3 Mar 2025 at 15:03.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 20 Oct 2025
Details
View Map
Share
Follow
Selby Bypass

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Selby Bypass, Selby.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:35.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 20 Oct 2025
Details
View Map
Share
Follow
East Common Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on East Common Lane, Selby.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:36.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 1 Nov 2025
Details
View Map
Share
Follow
Ings Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Ings Road, Cliffe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 14:19.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 20 Oct 2025
Details
View Map
Share
Follow
Selby Bypass

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Selby Bypass, Selby.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:31.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 1 Oct 2025
Details
View Map
Share
Follow
Olympia Crescent

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Olympia Crescent, Selby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 3 Mar 2025 at 15:14.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 1 Oct 2025
Details
View Map
Share
Follow
Carentan Close

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Carentan Close, Selby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 3 Mar 2025 at 15:05.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 1 Oct 2025
Details
View Map
Share
Follow
Normandy Close

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Normandy Close, Selby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 3 Mar 2025 at 15:12.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 1 Nov 2025
Details
View Map
Share
Follow
Biggin Lane To Biggin Bridge

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Biggin Lane To Biggin Bridge, Biggin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 10:26.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 1 Nov 2025
Details
View Map
Share
Follow
Black Fen Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Black Fen Lane, Selby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 13:19.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 1 Nov 2025
Details
View Map
Share
Follow
Oxmoor Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Oxmoor Lane, Biggin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 10:41.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 1 Nov 2025
Details
View Map
Share
Follow
Dickey Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Dickey Lane, Wistow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 13:15.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 1 Nov 2025
Details
View Map
Share
Follow
Sand Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Sand Lane, Selby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 13:25.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 1 Nov 2025
Details
View Map
Share
Follow
Long Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Long Lane, Cawood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 13:13.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 1 Nov 2025
Details
View Map
Share
Follow
Long Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Long Lane, Wistow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 13:09.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 1 Nov 2025
Details
View Map
Share
Follow
Oxmoor Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Oxmoor Lane, Church Fenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 10:44.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 1 Nov 2025
Details
View Map
Share
Follow
Cornelius Causeway

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Cornelius Causeway, North Duffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 25 Mar 2025 at 09:28.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 1 Oct 2025
Details
View Map
Share
Follow
Green Lane

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Green Lane, North Duffield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 3 Mar 2025 at 15:07.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 1 Nov 2025
Details
View Map
Share
Follow
Blackwood Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Blackwood Road, Skipwith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 13:51.

North Yorkshire County Council logo
LONG TERM
Between
2 Jun and 1 Nov 2025
Details
View Map
Share
Follow
Common Road

North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Common Road, Skipwith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Yorkshire County Council on 4 Mar 2025 at 13:55.


Roadworks Map near to Preston Yard, Micklegate, SELBY, YO8 4EF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 25 Mar 2025 20:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Preston Yard, Micklegate, SELBY, YO8 4EF (7 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Powergrid (Yorkshire) logo
URGENT
  
NEW MILLGATE 
(0.1 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Complete
20 Mar 2025 17:30 - 25 Mar 2025 15:40
0.1
Details
Share
2
Northern Gas Networks logo
NEW STREET 
(0.1 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Priority working
In Progress
Since: 25 Mar 2025 20:15
(Scheduled: 25 Mar 2025)
0.1
Details
Share
Follow
3
North Yorkshire County Council logo
BROOK STREET 
(0.5 miles)
North Yorkshire County Council
Highway improvement works - Footway, Carriageway - Two-way signals
Cancelled
(Scheduled: 24 Mar 2025 - 28 Mar 2025)
0.5
Details
Share
4
Yorkshire Water logo
URGENT
  
WESTBOURNE GROVE 
(0.6 miles)
Yorkshire Water
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 15 Mar 2025 12:00
(Scheduled: 15 Mar 2025 - 28 Mar 2025)
0.6
Details
Share
Follow
5
Northern Powergrid (Yorkshire) logo
URGENT
  
HOLLYWOOD 
(0.6 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 20 Mar 2025 09:50
(Scheduled: 20 Mar 2025 - 26 Mar 2025)
0.6
Details
Share
Follow
6
North Yorkshire County Council logo
BAWTRY ROAD 
(0.6 miles)
North Yorkshire County Council
Highway repair and maintenance works - Footway, Carriageway - Two-way signals
Complete
24 Mar 2025 09:31 - 15:36
0.6
Details
Share
7
Kingston Comms (Hull) logo
COCKRET ROAD 
(0.6 miles)
Kingston Comms (Hull)
New service connection - Footway, Verge - No carriageway incursion
Cancelled
(Scheduled: 24 Mar 2025 - 26 Mar 2025)
0.6
Details
Share