ROADWORKS SUMMARY
Holme Lea, YORK, YO32 5XG
Introduction
View current and future planned roadworks and road closures for Holme Lea, YO32 5XG and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Holme Lea, YORK, YO32 5XG
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Holme Lea are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Sunday
Yorkshire Water are carrying out Utility asset works on Goose Track Lane, West Lilling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 August 2024 at 08:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 27 Aug 2024 at 08:11.
2 and 22 Dec 2024
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Woodlands Grove, Monk, York.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 22 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 12 Nov 2024 at 10:11.
Monday
Yorkshire Water are carrying out Utility repair and maintenance works on Haxby Road, New Earswick, York.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 08:00 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 10 Dec 2024 at 14:50.
1 and 7 Jan 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Moor Lane, Strensall, York.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 7 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 10 Oct 2024 at 11:51.
6 and 10 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Stripe Lane, Skelton, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Northeast) on 7 Oct 2024 at 07:57.
6 Jan and 14 Feb 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shipton Road, Skelton, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 23 Sep 2024 at 09:39.
6 and 10 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Stripe Lane, Skelton, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Northeast) on 16 Oct 2024 at 11:54.
6 Jan and 14 Feb 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shipton Road, Skelton, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 30 Sep 2024 at 12:10.
6 Jan and 28 Mar 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shipton Road, Skelton, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 4 Oct 2024 at 10:23.
6 Jan and 14 Feb 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shipton Road, Skelton, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 16 Oct 2024 at 11:57.
6 Jan and 14 Feb 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shipton Road, Skelton, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 23 Oct 2024 at 08:16.
6 Jan and 28 Mar 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shipton Road, Skelton, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 27 Aug 2024 at 10:19.
6 Jan and 14 Feb 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shipton Road, Skelton, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Sep 2024 at 15:30.
6 Jan and 14 Feb 2025
Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Shipton Road, Skelton, York.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 30 Sep 2024 at 10:05.
6 and 26 Jan 2025
National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Overton Road, Overton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by National Grid Electricity Transmission on 5 Dec 2024 at 17:05.
6 and 27 Jan 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Moor Lane, Strensall, York.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 27 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 8 Aug 2024 at 10:01.
6 Jan and 3 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Moor Lane, Strensall, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Aug 2024 at 10:02.
6 Jan and 3 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Moor Lane, Strensall, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Sep 2024 at 11:32.
6 Jan and 3 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Moor Lane, Strensall, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Sep 2024 at 10:56.
6 Jan and 3 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Moor Lane, Strensall, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Sep 2024 at 10:06.
6 and 31 Jan 2025
City Of York Council are proposing to carry out Highway repair and maintenance works on Low Petergate, Guildhall, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of York Council on 29 Oct 2024 at 13:38.
6 and 31 Jan 2025
City Of York Council are proposing to carry out Highway repair and maintenance works on Low Petergate, Guildhall, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of York Council on 10 Dec 2024 at 15:08.
13 and 17 Jan 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Moor Lane, Strensall, York.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 4 Oct 2024 at 12:29.
13 and 19 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Mill Lane, Heworth, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Nov 2024 at 09:57.
13 and 19 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Mill Lane, Heworth, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Nov 2024 at 08:58.
13 and 19 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Mill Lane, Heworth, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 3 Oct 2024 at 10:18.
13 Jan and 2 Feb 2025
National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Overton Road, Overton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by National Grid Electricity Transmission on 5 Dec 2024 at 17:14.
13 and 19 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Mill Lane, Heworth, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 20 Nov 2024 at 10:47.
13 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Haxby Road, New Earswick, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 13 Sep 2024 at 11:58.
20 Jan and 17 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ox Carr Lane, Strensall, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 11 Sep 2024 at 11:34.
20 and 24 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Rice Lane, Flaxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 4 Nov 2024 at 15:53.
20 and 24 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Rice Lane, Flaxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 12 Dec 2024 at 13:01.
20 and 24 Jan 2025
Network Rail were proposing to carry out Works for Rail Purposes on Flaxton Station To Lilling Lane, Flaxton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 14 Oct 2024 at 15:18.
20 and 24 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Flaxton Station To Lilling Lane, Flaxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 4 Nov 2024 at 15:54.
20 and 24 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Flaxton Station To Lilling Lane, Flaxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 12 Dec 2024 at 13:03.
20 Jan and 14 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ox Carr Lane, Strensall, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 17 Sep 2024 at 11:18.
20 Jan and 14 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ox Carr Lane, Strensall, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 16 Sep 2024 at 11:00.
20 and 28 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Northgate Lane, Upper Helmsley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 28 Nov 2024 at 13:23.
20 Jan and 10 Mar 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Ox Carr Lane, Strensall, York.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 10 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 8 Aug 2024 at 13:39.
20 Jan and 17 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ox Carr Lane, Strensall, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 8 Aug 2024 at 13:45.
27 Jan and 3 Feb 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Moor Lane, Strensall, York.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 3 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 22 Nov 2024 at 11:54.
2 and 4 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Wigginton Road, Bootham, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 17 Sep 2024 at 11:41.
11 and 13 Feb 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bedern, Guildhall, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 14 Nov 2024 at 08:42.
11 and 13 Feb 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bedern, Guildhall, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 13 Nov 2024 at 08:07.
17 and 24 Feb 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Moor Lane, Strensall, York.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 24 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 26 Nov 2024 at 12:55.
17 and 24 Feb 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Moor Lane, Strensall, York.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 24 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 28 Nov 2024 at 12:59.
17 Feb and 24 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Clifton Place, Clifton, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 09:06.
17 Feb and 9 Mar 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Woodlands Grove, Monk, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 11 Nov 2024 at 11:14.
17 Feb and 24 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Clifton, Clifton, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 Sep 2024 at 14:24.
24 Feb and 17 Mar 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Malton Road, Heworth, York.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the footway and cycleway.
This roadwork event was last updated by Yorkshire Water on 10 Dec 2024 at 10:37.
24 Feb and 21 Mar 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Fifth Avenue, Heworth, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 2 Dec 2024 at 11:48.
3 Mar and 14 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Strensall Road, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 11 Sep 2024 at 11:52.
3 Mar and 14 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Strensall Road, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 29 Aug 2024 at 12:07.
10 Mar and 4 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Strensall Road, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 16 Sep 2024 at 11:05.
10 and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Clifton Place, Clifton, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 24 Oct 2024 at 09:08.
10 and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Clifton Place, Clifton, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 29 Oct 2024 at 10:25.
10 Mar and 4 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Strensall Road, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 17 Sep 2024 at 11:16.
Roadworks Map near to Holme Lea, YORK, YO32 5XG
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Holme Lea, YORK, YO32 5XG (1 Events)
(Scheduled Dates)
(miles)
(Scheduled: 9 Dec 2024 - 18 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.