ROADWORKS SUMMARY
Cumbrian Avenue, YORK, YO32 5UU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Cumbrian Avenue, YO32 5UU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Cumbrian Avenue, YORK, YO32 5UU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Cumbrian Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Yorkshire Water logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Goose Track Lane

Yorkshire Water are carrying out Utility asset works on Goose Track Lane, West Lilling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 08:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 27 Aug 2024 at 08:11.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Murton Way

Northern Gas Networks are carrying out Utility repair and maintenance works on Murton Way, Murton, York.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 11:16 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 3 Dec 2024 at 13:54.

Yorkshire Water logo
Between
2 and 22 Dec 2024
Details
View Map
Share
Woodlands Grove

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Woodlands Grove, Monk, York.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 22 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 12 Nov 2024 at 10:11.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Murton Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Murton Lane, Murton, York.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 December 2024 at 14:30 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Dec 2024 at 09:12.

Northern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Murton Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Murton Lane, Murton, York.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 December 2024 at 14:30 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Dec 2024 at 08:26.

Yorkshire Water logo
Between
4 and 11 Dec 2024
Details
View Map
Share
Moor Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Moor Lane, Strensall, York.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 12:08.

Network Rail logo
Finishing
Tuesday
Details
View Map
Share
Wigginton Road

Network Rail were proposing to carry out Works for Rail Purposes on Wigginton Road, Bootham, York.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 December 2024 and run through until 10 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Sep 2024 at 15:28.

Network Rail logo
Finishing
Tuesday
Details
View Map
Share
Follow
Wigginton Road

Network Rail are proposing to carry out Works for Rail Purposes on Wigginton Road, Bootham, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 7 Aug 2024 at 16:30.

Yorkshire Water logo
Between
1 and 7 Jan 2025
Details
View Map
Share
Moor Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Moor Lane, Strensall, York.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 7 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Oct 2024 at 11:51.

Northern Powergrid (Northeast) logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Shipton Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shipton Road, Skelton, York.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 4 Oct 2024 at 10:23.

Northern Powergrid (Northeast) logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Shipton Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shipton Road, Skelton, York.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 23 Sep 2024 at 09:39.

Northern Powergrid (Northeast) logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Shipton Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shipton Road, Skelton, York.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 16 Oct 2024 at 11:57.

Northern Powergrid (Northeast) logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Shipton Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shipton Road, Skelton, York.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 23 Oct 2024 at 08:16.

Northern Powergrid (Northeast) logo
LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Shipton Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shipton Road, Skelton, York.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 27 Aug 2024 at 10:19.

Northern Powergrid (Northeast) logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Shipton Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shipton Road, Skelton, York.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Sep 2024 at 15:30.

Northern Powergrid (Northeast) logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Shipton Road

Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Shipton Road, Skelton, York.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 30 Sep 2024 at 10:05.

Northern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Moor Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Moor Lane, Strensall, York.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 27 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 8 Aug 2024 at 10:01.

Northern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Moor Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Moor Lane, Strensall, York.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Aug 2024 at 10:02.

Northern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Moor Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Moor Lane, Strensall, York.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Sep 2024 at 11:32.

Northern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Moor Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Moor Lane, Strensall, York.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Sep 2024 at 10:56.

Northern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Moor Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Moor Lane, Strensall, York.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 17 Sep 2024 at 10:06.

Northern Powergrid (Northeast) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Stripe Lane

Northern Powergrid (Northeast) are proposing to carry out New service connection on Stripe Lane, Skelton, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 16 Oct 2024 at 11:54.

Northern Powergrid (Northeast) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Stripe Lane

Northern Powergrid (Northeast) are proposing to carry out New service connection on Stripe Lane, Skelton, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 7 Oct 2024 at 07:57.

Northern Powergrid (Northeast) logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Shipton Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shipton Road, Skelton, York.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 30 Sep 2024 at 12:10.

Northern Powergrid (Northeast) logo
Between
13 and 19 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Northern Powergrid (Northeast) are proposing to carry out New service connection on Mill Lane, Heworth, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Nov 2024 at 08:58.

Northern Powergrid (Northeast) logo
Between
13 and 19 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Northern Powergrid (Northeast) are proposing to carry out New service connection on Mill Lane, Heworth, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Nov 2024 at 09:57.

Northern Powergrid (Northeast) logo
Between
13 and 19 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Northern Powergrid (Northeast) are proposing to carry out New service connection on Mill Lane, Heworth, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 20 Nov 2024 at 10:47.

Yorkshire Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Moor Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Moor Lane, Strensall, York.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 4 Oct 2024 at 12:29.

Northern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Haxby Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Haxby Road, New Earswick, York.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Sep 2024 at 11:58.

Northern Powergrid (Northeast) logo
Between
13 and 19 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Northern Powergrid (Northeast) are proposing to carry out New service connection on Mill Lane, Heworth, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 3 Oct 2024 at 10:18.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Ox Carr Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ox Carr Lane, Strensall, York.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Sep 2024 at 11:34.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Ox Carr Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ox Carr Lane, Strensall, York.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 17 Sep 2024 at 11:18.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Ox Carr Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ox Carr Lane, Strensall, York.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 16 Sep 2024 at 11:00.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Ox Carr Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ox Carr Lane, Strensall, York.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 8 Aug 2024 at 13:45.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 10 Mar 2025
Details
View Map
Share
Ox Carr Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Ox Carr Lane, Strensall, York.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 10 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 8 Aug 2024 at 13:39.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Rice Lane

Network Rail are proposing to carry out Works for Rail Purposes on Rice Lane, Flaxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 4 Nov 2024 at 15:53.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Flaxton Station To Lilling Lane

Network Rail were proposing to carry out Works for Rail Purposes on Flaxton Station To Lilling Lane, Flaxton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 14 Oct 2024 at 15:18.

Network Rail logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Flaxton Station To Lilling Lane

Network Rail are proposing to carry out Works for Rail Purposes on Flaxton Station To Lilling Lane, Flaxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 4 Nov 2024 at 15:54.

Northern Powergrid (Northeast) logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Northgate Lane

Northern Powergrid (Northeast) are proposing to carry out New service connection on Northgate Lane, Upper Helmsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 28 Nov 2024 at 13:23.

Yorkshire Water logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Moor Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Moor Lane, Strensall, York.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 3 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 22 Nov 2024 at 11:54.

Network Rail logo
Between
2 and 4 Feb 2025
Details
View Map
Share
Follow
Wigginton Road

Network Rail are proposing to carry out Works for Rail Purposes on Wigginton Road, Bootham, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 17 Sep 2024 at 11:41.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Clifton Place

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Clifton Place, Clifton, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 09:06.

Yorkshire Water logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Moor Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Moor Lane, Strensall, York.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 24 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 28 Nov 2024 at 12:59.

Yorkshire Water logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Moor Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Moor Lane, Strensall, York.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 24 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 26 Nov 2024 at 12:55.

Yorkshire Water logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Woodlands Grove

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Woodlands Grove, Monk, York.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Nov 2024 at 11:14.

Northern Gas Networks logo
LONG TERM
Between
17 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Clifton

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Clifton, Clifton, York.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Sep 2024 at 14:24.

Yorkshire Water logo
Between
24 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Malton Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Malton Road, Heworth, York.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the footway and cycleway.

This roadwork event was last updated by Yorkshire Water on 2 Dec 2024 at 14:46.

Northern Powergrid (Northeast) logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Fifth Avenue

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Fifth Avenue, Heworth, York.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 2 Dec 2024 at 11:48.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 14 Apr 2025
Details
View Map
Share
Follow
Strensall Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Strensall Road, York.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Sep 2024 at 11:52.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 14 Apr 2025
Details
View Map
Share
Follow
Strensall Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Strensall Road, York.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 29 Aug 2024 at 12:07.


Roadworks Map near to Cumbrian Avenue, YORK, YO32 5UU

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 4 Dec 2024 19:22
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Cumbrian Avenue, YORK, YO32 5UU (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Yorkshire Water logo
MAJOR
  
MOOR LANE, STRENSALL 
(0.4 miles)
Yorkshire Water
Utility repair and maintenance works - Carriageway - Road closure
Cancelled
(Scheduled: 4 Dec 2024 - 11 Dec 2024)
0.4
Details
Share
2
Yorkshire Water logo
URGENT
  
THE VILLAGE, STRENSALL 
(0.7 miles)
Yorkshire Water
Utility repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 3 Dec 2024 11:20
(Scheduled: 3 Dec 2024 - 7 Dec 2024)
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.