ROADWORKS SUMMARY
Station Lane, YORK, YO30 1BT
Introduction

View current and future planned roadworks and road closures for Station Lane, YO30 1BT and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Station Lane, YORK, YO30 1BT
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Station Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
13 Apr 2022 and 13 Jun 2025
City Of York Council are proposing to carry out roadworks on Water End, Clifton, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 April 2022 and could run through until 13 June 2025. The works will impact the footway, carriageway, verge and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of York Council on 2 Feb 2023 at 08:43.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on York Bridge Road, Tollerton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Yorkshire County Council on 31 Jan 2025 at 09:29.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Brownmoor Lane, Huby.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Yorkshire County Council on 31 Jan 2025 at 14:04.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Linton On Ouse To Aldwark Bridge, Linton On Ouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Yorkshire County Council on 20 Jan 2025 at 09:03.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Grange Garth, Linton-on-ouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Yorkshire County Council on 20 Jan 2025 at 09:04.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Beech Tree Court, Linton-on-ouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Yorkshire County Council on 20 Jan 2025 at 09:09.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Newton On Ouse Church To Linton Woods Lane, Newton On Ouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Yorkshire County Council on 20 Jan 2025 at 09:15.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Moor Lane, Newton On Ouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Yorkshire County Council on 20 Jan 2025 at 09:14.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Main Street, Linton-on-ouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Yorkshire County Council on 20 Jan 2025 at 09:02.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Main Street, Linton-on-ouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Yorkshire County Council on 20 Jan 2025 at 09:01.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Linton Meadow, Linton-on-ouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Yorkshire County Council on 20 Jan 2025 at 09:10.
1 Apr and 31 Oct 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Newton On Ouse Church To Linton Woods Lane, Newton On Ouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by North Yorkshire County Council on 20 Jan 2025 at 09:16.
7 Apr and 23 Jun 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ridgeway, Acomb, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Gas Networks on 14 Oct 2024 at 12:15.
20 Jun 2025
Harlaxton Energy Networks are carrying out Utility asset works on Boroughbridge Road, Beckfield, York.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 08:10 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Harlaxton Energy Networks on 3 Jun 2025 at 11:39.
7 Apr and 27 Jun 2025
Harlaxton Energy Networks are proposing to carry out Utility asset works on Boroughbridge Road, Beckfield, York.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Harlaxton Energy Networks on 21 Mar 2025 at 12:50.
7 Apr and 20 Jun 2025
Harlaxton Energy Networks are proposing to carry out Utility asset works on Boroughbridge Road, Beckfield, York.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Harlaxton Energy Networks on 17 Oct 2024 at 11:19.
14 Apr and 23 Jun 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Ridgeway, Acomb, York.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 23 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Oct 2024 at 09:17.
18 Jun 2025
Northern Powergrid (Northeast) are carrying out Utility asset works on Kirkcroft, Wigginton, York.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 April 2025 at 08:00 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 22 May 2025 at 13:37.
23 Apr and 19 Jun 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Kirkcroft, Wigginton, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Feb 2025 at 17:03.
5 May and 5 Aug 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Ridgeway, Acomb, York.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 May 2025 and run through until 5 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Oct 2024 at 12:48.
7 May and 2 Jul 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Kirkcroft, Wigginton, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 12 Feb 2025 at 15:41.
Friday
Northern Gas Networks are carrying out Utility repair and maintenance works on Front Street, Westfield, York.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 09:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 May 2025 at 09:26.
Friday
Northern Gas Networks are carrying out Utility repair and maintenance works on Linley Avenue, Haxby, York.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 May 2025 at 07:30 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 08:58.
Friday
Northern Gas Networks are carrying out Utility repair and maintenance works on Askham Lane, Westfield, York.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 09:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 May 2025 at 11:38.
Friday
Northern Gas Networks are carrying out Utility repair and maintenance works on Gale Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 08:30 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 12 May 2025 at 09:25.
National Grid Electricity Transmission carried out Utility repair and maintenance works on Overton Road, Overton.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 14 May 2025 and 3 Jun 2025 and were actually completed between 14 May 2025 (09:15) and 3 Jun 2025 (16:00). The works impacted the verge only.
This roadwork event was last updated by National Grid Electricity Transmission on 3 Jun 2025 at 16:26.
17 Jun 2025
City Of York Council are carrying out roadworks on Leeman Road, Beckfield, York.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 May 2025 at 06:00 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of York Council on 29 May 2025 at 08:10.
19 May and 16 Jun 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Towthorpe Road, Haxby, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 16 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 14 Jan 2025 at 14:38.
19 May and 16 Jun 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Towthorpe Road, Haxby, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 16 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 15 Jan 2025 at 09:05.
19 Jun 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Towthorpe Road, Haxby, York.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 May 2025 at 07:30 and could run through until 19 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 12:38.
Today
City Of York Council were proposing to carry out Highway improvement works on Doriam Drive, Huntington, York.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of York Council on 20 May 2025 at 13:19.
Today
City Of York Council were proposing to carry out Highway improvement works on Whitestone Drive, Huntington, York.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of York Council on 20 May 2025 at 13:19.
11 Jun 2025
City Of York Council are carrying out Highway improvement works on The Village, Wigginton, York.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 09:30 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of York Council on 2 Jun 2025 at 12:37.
Friday
North Yorkshire County Council are carrying out Highway repair and maintenance works on Newton On Ouse Church To Linton Woods Lane, Newton On Ouse.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:00 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 27 May 2025 at 13:57.
30 May and 12 Jun 2025
National Grid Electricity Transmission were proposing to carry out Utility repair and maintenance works on Overton To District Boundary, Overton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 May 2025 and run through until 12 June 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by National Grid Electricity Transmission on 2 Apr 2025 at 10:02.
2 and 27 Jun 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on West Nooks, Haxby, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Jan 2025 at 14:42.
2 and 27 Jun 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on West Nooks, Haxby, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 15 Jan 2025 at 09:10.
2 and 27 Jun 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on West Nooks, Haxby, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Apr 2025 at 13:46.
Tomorrow
City Of York Council are proposing to carry out Highway improvement works on Middlewood Close, Rufforth, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of York Council on 16 Jul 2024 at 12:15.
Friday
City Of York Council were proposing to carry out Highway improvement works on Middlewood Close, Rufforth, York.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of York Council on 28 Apr 2025 at 11:21.
9 Jun and 20 Jul 2025
National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Corban Lane To Newlands, Shipton By Beningbrough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by National Grid Electricity Transmission on 20 Dec 2024 at 13:49.
9 Jun and 20 Jul 2025
National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Corban Lane To Newlands, Shipton By Beningbrough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by National Grid Electricity Transmission on 20 May 2025 at 09:29.
16 and 20 Jun 2025
Northern Powergrid (Northeast) were proposing to carry out New service connection on South Back Lane, Tollerton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 25 Mar 2025 at 16:32.
30 Jun and 1 Aug 2025
City Of York Council are proposing to carry out Highway repair and maintenance works on York Road, Hessay, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by City Of York Council on 19 Nov 2024 at 13:32.
30 Jun and 1 Aug 2025
City Of York Council are proposing to carry out Highway repair and maintenance works on Red Lion To Shirbutt Lane, Upper Poppleton, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 1 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by City Of York Council on 19 Nov 2024 at 13:31.
6 Jul and 10 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Beckfield Lane, Acomb, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 28 May 2024 at 06:41.
7 Jul and 11 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Beckfield Lane, Acomb, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Dec 2024 at 08:43.
7 and 25 Jul 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Beckfield Lane, Acomb, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 14:38.
7 Jul and 1 Aug 2025
National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Overton Road, Overton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the verge only.
This roadwork event was last updated by National Grid Electricity Transmission on 13 May 2025 at 16:00.
7 Jul and 11 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Beckfield Lane, Acomb, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 10:51.
9 and 11 Jul 2025
Network Rail are proposing to carry out Works for Rail Purposes on York Road, Haxby, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 2 Jun 2025 at 12:03.
9 and 11 Jul 2025
Network Rail are proposing to carry out Works for Rail Purposes on York Road, Haxby, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 8 May 2025 at 08:31.
9 and 11 Jul 2025
Network Rail are proposing to carry out Works for Rail Purposes on York Road, Haxby, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 30 Apr 2025 at 08:55.
9 and 11 Jul 2025
Network Rail are proposing to carry out Works for Rail Purposes on Haxby Road, New Earswick, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 2 Jun 2025 at 11:56.
9 and 11 Jul 2025
Network Rail are proposing to carry out Works for Rail Purposes on Haxby Road, New Earswick, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 8 May 2025 at 08:29.
9 and 11 Jul 2025
Network Rail are proposing to carry out Works for Rail Purposes on Haxby Road, New Earswick, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 30 Apr 2025 at 08:54.
14 and 18 Jul 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Redwood Drive, Haxby, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 1 May 2025 at 15:58.
14 and 18 Jul 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Redwood Drive, Haxby, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 14 Apr 2025 at 13:29.
14 Jul and 11 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wetherby Road, Acomb, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 09:15.
15 and 28 Jul 2025
City Of York Council are proposing to carry out Section 50 on Shipton Road, Clifton, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 28 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of York Council on 29 May 2025 at 08:14.
15 and 29 Jul 2025
City Of York Council are proposing to carry out Section 50 on Shipton Road, Clifton, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 29 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of York Council on 14 May 2025 at 11:15.
21 Jul and 5 Aug 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Main Street, Linton-on-ouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 20 May 2025 at 11:26.
21 Jul and 5 Aug 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Linton Meadow, Linton-on-ouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 22 May 2025 at 11:09.
21 Jul and 5 Aug 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Newton On Ouse Church To Linton Woods Lane, Newton On Ouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 20 May 2025 at 10:31.
21 Jul and 5 Aug 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Beech Tree Court, Linton-on-ouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 20 May 2025 at 11:05.
21 Jul and 5 Aug 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Grange Garth, Linton-on-ouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 20 May 2025 at 11:35.
21 Jul and 5 Aug 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Main Street, Linton-on-ouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 20 May 2025 at 11:26.
21 Jul and 5 Aug 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Linton On Ouse To Aldwark Bridge, Linton On Ouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 20 May 2025 at 11:27.
28 Jul and 15 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Danebury Drive, Acomb, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 14 Jan 2025 at 09:03.
28 Jul and 15 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Danebury Drive, Acomb, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Jan 2025 at 08:44.
28 Jul and 29 Aug 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Danebury Drive, Acomb, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 09:14.
28 Jul and 15 Aug 2025
Harlaxton Energy Networks are proposing to carry out Utility asset works on Low Poppleton Lane, Beckfield, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Harlaxton Energy Networks on 20 May 2025 at 09:04.
28 and 31 Jul 2025
Quickline Commucations are proposing to carry out Utility asset works on Moor Lane, Haxby, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 14 May 2025 at 09:20.
28 and 31 Jul 2025
Quickline Commucations are proposing to carry out Utility asset works on Moor Lane, Haxby, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 13 May 2025 at 11:06.
4 and 6 Aug 2025
Quickline Commucations are proposing to carry out Utility asset works on New Road, Newton-on-ouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 12 May 2025 at 11:54.
4 Aug and 12 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Green, Acomb, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Jan 2025 at 10:27.
4 Aug and 12 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Green, Acomb, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Jan 2025 at 09:02.
4 Aug and 12 Sep 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Green, Acomb, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 3 Jun 2025 at 15:24.
4 and 8 Aug 2025
Quickline Commucations are proposing to carry out Utility asset works on Beningbrough Lane, Beningbrough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 12 May 2025 at 11:47.
4 and 8 Aug 2025
City Of York Council are proposing to carry out Section 50 on The Village, Wigginton, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of York Council on 22 May 2025 at 10:18.
6 and 20 Aug 2025
City Of York Council are proposing to carry out roadworks on Burton Stone Lane, Clifton, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 20 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of York Council on 28 May 2025 at 14:18.
11 and 29 Aug 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Water Lane, Rawcliffe, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 14 May 2025 at 08:11.
16 and 18 Aug 2025
Network Rail are proposing to carry out Works for Rail Purposes on York Road, Haxby, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 13 May 2025 at 09:36.
16 and 18 Aug 2025
Network Rail are proposing to carry out Works for Rail Purposes on Haxby Road, New Earswick, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 13 May 2025 at 09:35.
18 Aug and 17 Oct 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Spalding Avenue, Clifton, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 14 May 2025 at 08:13.
18 Aug and 17 Oct 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Spalding Avenue, Clifton, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 22 May 2025 at 11:09.
18 and 20 Aug 2025
Network Rail are proposing to carry out Works for Rail Purposes on Wigginton Road, Bootham, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 13 May 2025 at 09:36.
18 and 20 Aug 2025
Network Rail are proposing to carry out Works for Rail Purposes on Wigginton Road, Bootham, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 15 May 2025 at 12:37.
18 and 20 Aug 2025
Network Rail are proposing to carry out Works for Rail Purposes on York Road, Haxby, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 13 May 2025 at 09:36.
18 and 20 Aug 2025
Network Rail are proposing to carry out Works for Rail Purposes on Haxby Road, New Earswick, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 13 May 2025 at 09:36.
20 and 22 Aug 2025
Network Rail are proposing to carry out Works for Rail Purposes on Towthorpe Road, Haxby, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 13 May 2025 at 09:37.
26 Aug and 14 Sep 2025
City Of York Council are proposing to carry out Highway improvement works on Nursery To Red Lion, Upper Poppleton, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 14 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of York Council on 11 Feb 2025 at 10:26.
26 Aug and 14 Sep 2025
City Of York Council are proposing to carry out Highway improvement works on Red Lion To Shirbutt Lane, Upper Poppleton, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 14 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of York Council on 11 Feb 2025 at 10:24.
26 Aug and 14 Sep 2025
City Of York Council were proposing to carry out Highway improvement works on Nursery To Red Lion, Upper Poppleton, York.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 14 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of York Council on 10 Feb 2025 at 10:11.
26 Aug and 14 Sep 2025
City Of York Council are proposing to carry out Highway improvement works on York Road, Hessay, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 14 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of York Council on 11 Feb 2025 at 10:27.
26 Aug and 14 Sep 2025
City Of York Council were proposing to carry out Highway improvement works on Red Lion To Shirbutt Lane, Upper Poppleton, York.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 14 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of York Council on 10 Feb 2025 at 10:12.
27 Aug and 9 Sep 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Jockey Lane, Huntington, York.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 18 Mar 2025 at 11:28.
27 Aug and 10 Sep 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Jockey Lane, Huntington, York.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Mar 2025 at 12:53.
Roadworks Map near to Station Lane, YORK, YO30 1BT (Loading...)








- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Station Lane, YORK, YO30 1BT (1 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.