ROADWORKS SUMMARY
Hutton Wandesley, YORK, YO26 7NA
Introduction
![Image of petrol pumps](https://streetguide.co.uk/assets/intro-image/roadworks/image1.jpg)
View current and future planned roadworks and road closures for YO26 7NA and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Hutton Wandesley, YORK, YO26 7NA
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
13 Apr 2022 and 13 Jun 2025
City Of York Council are proposing to carry out roadworks on Water End, Clifton, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 April 2022 and could run through until 13 June 2025. The works will impact the footway, carriageway, verge and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of York Council on 2 Feb 2023 at 08:43.
21 Mar 2025
City Of York Council are carrying out roadworks on Leeman Road, Beckfield, York.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 July 2023 at 08:00 and could run through until 21 March 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by City Of York Council on 7 Feb 2025 at 14:47.
14 Oct 2024 and 4 Apr 2025
Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Main Street, Colton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Yorkshire Water on 2 Sep 2024 at 16:13.
23 Oct 2024 and 4 Apr 2025
Yorkshire Water were proposing to carry out Statutory Infrastructure Works on Main Street, Colton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 October 2024 and run through until 4 April 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 14 Oct 2024 at 11:28.
4 Nov 2024 and 4 May 2025
Network Rail were proposing to carry out Works for Rail Purposes on Leeman Road, York.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 4 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 4 Oct 2024 at 12:48.
4 Nov 2024 and 4 May 2025
Network Rail are proposing to carry out Works for Rail Purposes on Leeman Road, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 4 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Network Rail on 22 May 2024 at 09:55.
23 May 2025
National Grid Electricity Transmission are carrying out Utility repair and maintenance works on All Saints Church To Healaugh Manor Cottages, Wighill.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 11:00 and could run through until 23 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by National Grid Electricity Transmission on 6 Jan 2025 at 12:00.
13 Jan and 24 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on The Green, Acomb, York.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 15:09.
20 Jan and 2 May 2025
National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on All Saints Church To Healaugh Manor Cottages, Wighill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 2 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by National Grid Electricity Transmission on 13 Dec 2024 at 11:07.
Tomorrow
National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Overton To District Boundary, Overton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by National Grid Electricity Transmission on 9 Jan 2025 at 16:19.
10 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Front Street, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 10:22.
10 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Front Street, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 10:49.
10 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Front Street, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 11:45.
10 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gale Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 08:49.
10 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gale Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 10:49.
10 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gale Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 10:21.
10 Feb and 3 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Askham Lane, Westfield, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 6 Dec 2024 at 14:33.
17 Feb and 10 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Askham Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 23 Apr 2024 at 12:04.
17 Feb and 7 Mar 2025
Harlaxton Energy Networks are proposing to carry out Utility asset works on Water End, Clifton, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Harlaxton Energy Networks on 16 Oct 2024 at 09:18.
17 and 28 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Front Street, Westfield, York.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Jan 2025 at 12:38.
17 and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Front Street, Westfield, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Jan 2025 at 08:25.
17 and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Front Street, Westfield, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Jan 2025 at 10:51.
22 and 28 Feb 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Main Street, Nether Poppleton, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 13 Jan 2025 at 16:34.
24 Feb and 7 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Askham Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 10:25.
24 Feb and 7 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Askham Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 11:44.
24 and 28 Feb 2025
National Grid Electricity Transmission were proposing to carry out Utility repair and maintenance works on Overton To District Boundary, Overton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by National Grid Electricity Transmission on 5 Feb 2025 at 11:42.
28 Feb and 14 Mar 2025
Harlaxton Energy Networks are proposing to carry out Utility asset works on Stamford Street East, Beckfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Harlaxton Energy Networks on 9 Jan 2025 at 09:24.
3 and 7 Mar 2025
Yorkshire Water are proposing to carry out Permanent reinstatement on Chapelfields Road, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 6 Dec 2024 at 14:30.
3 and 14 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Green, Acomb, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 7 Jan 2025 at 10:38.
3 and 14 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Green, Acomb, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 6 Jan 2025 at 12:08.
5 and 19 Mar 2025
Harlaxton Energy Networks are proposing to carry out Utility asset works on Stamford Street East, Beckfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Harlaxton Energy Networks on 24 Jan 2025 at 09:18.
10 Mar and 19 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ridgeway, Acomb, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 10:18.
10 Mar and 19 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ridgeway, Acomb, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Dec 2024 at 08:43.
10 Mar and 19 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ridgeway, Acomb, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 09:31.
10 and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ridgeway, Acomb, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 10:17.
10 and 25 Mar 2025
Harlaxton Energy Networks are proposing to carry out Utility asset works on Low Poppleton Lane, Beckfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Harlaxton Energy Networks on 17 Oct 2024 at 10:48.
10 Mar and 4 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Askham Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 10:19.
10 Mar and 4 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Askham Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 28 Nov 2024 at 14:53.
10 and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Askham Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 09:32.
17 and 31 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gale Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Oct 2024 at 12:13.
17 and 31 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Front Street, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Oct 2024 at 12:14.
22 and 28 Mar 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Main Street, Nether Poppleton, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 14 Jan 2025 at 10:50.
22 and 28 Mar 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Main Street, Nether Poppleton, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 16 Jan 2025 at 10:25.
24 and 28 Mar 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Main Street, Nether Poppleton, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 23 Dec 2024 at 12:28.
24 Mar and 7 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Askham Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 08:48.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Cedar Drive, Tadcaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 16 Dec 2024 at 13:56.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Beech Walk, Tadcaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 17 Dec 2024 at 09:56.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Fairfield Road, Tadcaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 17 Dec 2024 at 13:36.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Edgerton Drive, Tadcaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 16 Dec 2024 at 13:48.
1 Apr and 30 Sep 2025
North Yorkshire County Council are proposing to carry out Highway repair and maintenance works on Edgerton Garth, Tadcaster.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by North Yorkshire County Council on 16 Dec 2024 at 13:53.
7 Apr and 23 Jun 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ridgeway, Acomb, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Oct 2024 at 12:15.
7 Apr and 20 Jun 2025
Harlaxton Energy Networks are proposing to carry out Utility asset works on Boroughbridge Road, Beckfield, York.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Harlaxton Energy Networks on 17 Oct 2024 at 11:19.
7 and 17 Apr 2025
Harlaxton Energy Networks are proposing to carry out roadworks on Manor Drive North, Beckfield, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Harlaxton Energy Networks on 31 Oct 2024 at 14:32.
7 and 17 Apr 2025
Harlaxton Energy Networks are proposing to carry out roadworks on Manor Drive North, Beckfield, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Harlaxton Energy Networks on 12 Nov 2024 at 14:38.
13 Apr and 4 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Front Street, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 April 2025 and could run through until 4 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 7 May 2024 at 10:52.
13 Apr and 4 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gale Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 April 2025 and could run through until 4 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 7 May 2024 at 10:52.
14 Apr and 23 Jun 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Ridgeway, Acomb, York.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 23 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Oct 2024 at 09:17.
14 and 29 Apr 2025
National Grid Electricity Transmission are proposing to carry out Utility asset works on Marston Lane, Moor Monkton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 29 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by National Grid Electricity Transmission on 29 Jan 2025 at 16:09.
14 Apr and 6 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Askham Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 14 Oct 2024 at 12:15.
17 Apr and 2 May 2025
Harlaxton Energy Networks are proposing to carry out roadworks on Malvern Avenue, Beckfield, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Harlaxton Energy Networks on 12 Nov 2024 at 14:37.
17 Apr and 2 May 2025
Harlaxton Energy Networks are proposing to carry out roadworks on Malvern Avenue, Beckfield, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Harlaxton Energy Networks on 31 Oct 2024 at 14:33.
22 Apr and 16 May 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Askham Lane, Westfield, York.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 April 2025 and run through until 16 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Oct 2024 at 09:21.
22 Apr and 30 Jun 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Pulleyn Drive, Micklegate, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 10 Feb 2025 at 10:52.
22 Apr and 15 Jul 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Pulleyn Drive, Micklegate, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 27 Jan 2025 at 10:33.
5 May and 5 Aug 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Ridgeway, Acomb, York.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 May 2025 and run through until 5 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Oct 2024 at 12:48.
12 May and 6 Jun 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gale Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Jan 2025 at 09:41.
12 May and 6 Jun 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Front Street, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Jan 2025 at 09:40.
12 May and 6 Jun 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Askham Lane, Westfield, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Jan 2025 at 09:40.
12 and 30 May 2025
North Yorkshire County Council are proposing to carry out Section 50 on New Street, Tadcaster.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by North Yorkshire County Council on 4 Feb 2025 at 15:27.
Roadworks Map near to Hutton Wandesley, YORK, YO26 7NA (Loading...)
![](https://a.tile.openstreetmap.org/13/4067/2632.png)
![](https://b.tile.openstreetmap.org/13/4068/2632.png)
![](https://c.tile.openstreetmap.org/13/4066/2632.png)
![](https://c.tile.openstreetmap.org/13/4069/2632.png)
![](https://b.tile.openstreetmap.org/13/4065/2632.png)
![](https://a.tile.openstreetmap.org/13/4070/2632.png)
![](marker-shadow.png)
![Marker](marker-icon.png)
![Marker](https://streetguide.co.uk/includes/images/purple-32.png)
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Hutton Wandesley, YORK, YO26 7NA (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.