ROADWORKS SUMMARY
Pear Tree Lane, YORK, YO19 5QQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Pear Tree Lane, YO19 5QQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Pear Tree Lane, YORK, YO19 5QQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Pear Tree Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

City Of York Council logo
LONG TERM
Until
31 Oct 2026
Details
View Map
Share
Follow
Piccadilly

City Of York Council are carrying out roadworks on Piccadilly, Guildhall, York.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 March 2026 at 18:00 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of York Council on 17 Mar 2026 at 14:53.

Northern Gas Networks logo
LONG TERM
Until
6 Oct 2026
Details
View Map
Share
Follow
Stockton Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Stockton Lane, Hopgrove, York.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 May 2026 at 09:00 and could run through until 6 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 21 Aug 2026 at 11:35.

City Of York Council logo
LONG TERM
Until
2 Oct 2026
Details
View Map
Share
Follow
Back Lane Claremont Terrace From Adjacent To 1 To Rear Of 16

City Of York Council are carrying out Highway repair and maintenance works on Back Lane Claremont Terrace From Adjacent To 1 To Rear Of 16, York.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 June 2026 at 08:30 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of York Council on 4 Aug 2026 at 11:35.

City Of York Council logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Eastfield Lane

City Of York Council are carrying out roadworks on Eastfield Lane, Dunnington, York.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 August 2026 at 08:00 and could run through until 25 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of York Council on 9 Sep 2026 at 09:01.

Yorkshire Water logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Storking Lane

Yorkshire Water are carrying out Utility repair and maintenance works on Storking Lane, Wilberfoss.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2026 at 08:00 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Sep 2026 at 13:38.

Northern Powergrid (Northeast) logo
LONG TERM
Until
25 Sep 2026
Details
View Map
Share
Follow
Kent Street

Northern Powergrid (Northeast) are carrying out New service connection on Kent Street, Guildhall, York.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 August 2026 at 08:30 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 17 Aug 2026 at 08:55.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Coney Street

Yorkshire Water are carrying out Utility repair and maintenance works on Coney Street, Guildhall, York.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 August 2026 at 12:29 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Sep 2026 at 07:50.

Yorkshire Water logo
LONG TERM
Until
5 Oct 2026
Details
View Map
Share
Follow
Landing Lane

Yorkshire Water are carrying out Utility asset works on Landing Lane, Beckfield, York.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 August 2026 at 10:00 and could run through until 5 October 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Yorkshire Water on 28 Aug 2026 at 14:12.

Northern Gas Networks logo
LONG TERM
Between
24 Aug and 12 Oct 2026
Details
View Map
Share
Follow
Tang Hall Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tang Hall Lane, Heworth, York.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2026 and could run through until 12 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 20 Aug 2026 at 12:06.

Northern Gas Networks logo
LONG TERM
Between
24 Aug and 12 Oct 2026
Details
View Map
Share
Follow
Tang Hall Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tang Hall Lane, Heworth, York.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2026 and could run through until 12 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 9 Apr 2026 at 13:54.

Northern Gas Networks logo
LONG TERM
Until
19 Oct 2026
Details
View Map
Share
Follow
Tang Hall Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Tang Hall Lane, Heworth, York.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 10:25 and could run through until 19 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 1 Sep 2026 at 12:24.

City Of York Council logo
LONG TERM
Between
5 Sep and 26 Nov 2026
Details
View Map
Share
Follow
Monks Cross Link

City Of York Council are proposing to carry out roadworks on Monks Cross Link, Huntington, York.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2026 and could run through until 26 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by City Of York Council on 30 Mar 2026 at 12:02.

City Of York Council logo
LONG TERM
Until
6 Nov 2026
Details
View Map
Share
Follow
Monks Cross Link

City Of York Council are carrying out Highway improvement works on Monks Cross Link, Huntington, York.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 September 2026 at 08:30 and could run through until 6 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by City Of York Council on 9 Sep 2026 at 08:31.

City Of York Council logo
LONG TERM
Between
5 Sep and 6 Nov 2026
Details
View Map
Share
Follow
Monks Cross Link

City Of York Council are proposing to carry out Highway improvement works on Monks Cross Link, Huntington, York.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2026 and could run through until 6 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by City Of York Council on 9 Apr 2026 at 14:07.

City Of York Council logo
LONG TERM
Between
5 Sep and 26 Nov 2026
Details
View Map
Share
Follow
Monks Cross Link

City Of York Council are proposing to carry out Highway improvement works on Monks Cross Link, Huntington, York.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2026 and could run through until 26 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by City Of York Council on 30 Mar 2026 at 12:18.

City Of York Council logo
LONG TERM
Between
7 Sep and 25 Oct 2026
Details
View Map
Share
Follow
Little Stonegate

City Of York Council are proposing to carry out Highway improvement works on Little Stonegate, Guildhall, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 25 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of York Council on 20 Aug 2026 at 12:09.

City Of York Council logo
LONG TERM
Between
7 Sep and 15 Nov 2026
Details
View Map
Share
Follow
George Hudson Street

City Of York Council are proposing to carry out Highway improvement works on George Hudson Street, Bishophill, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 15 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of York Council on 5 Aug 2026 at 08:55.

City Of York Council logo
LONG TERM
Between
7 Sep and 15 Nov 2026
Details
View Map
Share
Follow
Rougier Street

City Of York Council are proposing to carry out Highway improvement works on Rougier Street, Bishophill, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 15 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of York Council on 5 Aug 2026 at 08:55.

City Of York Council logo
LONG TERM
Between
7 Sep and 15 Nov 2026
Details
View Map
Share
Follow
Tanner Row

City Of York Council are proposing to carry out Highway improvement works on Tanner Row, Bishophill, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 15 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of York Council on 5 Aug 2026 at 08:59.

City Of York Council logo
LONG TERM
Between
7 Sep and 15 Nov 2026
Details
View Map
Share
Follow
Toft Green

City Of York Council are proposing to carry out Highway improvement works on Toft Green, Bishophill, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 15 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of York Council on 5 Aug 2026 at 08:58.

City Of York Council logo
LONG TERM
Between
7 Sep and 15 Nov 2026
Details
View Map
Share
Follow
North Street

City Of York Council are proposing to carry out Highway improvement works on North Street, Bishophill, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 15 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of York Council on 5 Aug 2026 at 08:59.

City Of York Council logo
Finishing
Monday
Details
View Map
Share
Follow
Hull Road

City Of York Council are proposing to carry out Highway improvement works on Hull Road, Dunnington, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of York Council on 3 Sep 2026 at 11:10.

City Of York Council logo
LONG TERM
Between
7 Sep and 15 Nov 2026
Details
View Map
Share
Follow
Bar Lane

City Of York Council are proposing to carry out Highway improvement works on Bar Lane, Bishophill, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 15 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of York Council on 5 Aug 2026 at 08:58.

City Of York Council logo
LONG TERM
Between
7 Sep and 15 Nov 2026
Details
View Map
Share
Follow
Micklegate

City Of York Council are proposing to carry out Highway repair and maintenance works on Micklegate, Bishophill, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 15 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of York Council on 5 Aug 2026 at 08:57.

LONG TERM
Until
10 Oct 2026
Details
View Map
Share
Follow
Monks Cross Link

Open Fibre Networks are carrying out Utility asset works on Monks Cross Link, Huntington, York.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 11:30 and could run through until 10 October 2026. The works will impact the verge only.

This roadwork event was last updated by Open Fibre Networks on 7 Sep 2026 at 13:26.

Electricity Network Company logo
LONG TERM
Between
7 Sep and 10 Oct 2026
Details
View Map
Share
Follow
Monks Cross Link

Electricity Network Company are proposing to carry out Utility asset works on Monks Cross Link, Huntington, York.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 10 October 2026. The works will impact the verge only.

This roadwork event was last updated by Electricity Network Company on 27 Aug 2026 at 13:22.

Electricity Network Company logo
LONG TERM
Until
10 Oct 2026
Details
View Map
Share
Follow
Monks Cross Link

Electricity Network Company are carrying out Utility asset works on Monks Cross Link, Huntington, York.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 10:10 and could run through until 10 October 2026. The works will impact the verge only.

This roadwork event was last updated by Electricity Network Company on 7 Sep 2026 at 12:08.

Independent Water Networks logo
LONG TERM
Between
7 Sep and 10 Oct 2026
Details
View Map
Share
Follow
Monks Cross Link

Independent Water Networks are proposing to carry out Utility asset works on Monks Cross Link, Huntington, York.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 10 October 2026. The works will impact the verge only.

This roadwork event was last updated by Independent Water Networks on 27 Aug 2026 at 13:23.

Independent Water Networks logo
LONG TERM
Until
10 Oct 2026
Details
View Map
Share
Follow
Monks Cross Link

Independent Water Networks are carrying out Utility asset works on Monks Cross Link, Huntington, York.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 11:30 and could run through until 10 October 2026. The works will impact the verge only.

This roadwork event was last updated by Independent Water Networks on 7 Sep 2026 at 13:25.

LONG TERM
Between
7 Sep and 10 Oct 2026
Details
View Map
Share
Follow
Monks Cross Link

Open Fibre Networks are proposing to carry out Utility asset works on Monks Cross Link, Huntington, York.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 10 October 2026. The works will impact the verge only.

This roadwork event was last updated by Open Fibre Networks on 27 Aug 2026 at 13:23.

Yorkshire Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lansdowne Terrace

Yorkshire Water are carrying out Utility repair and maintenance works on Lansdowne Terrace, Guildhall, York.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 07:49 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Sep 2026 at 10:00.

City Of York Council logo
Finishing
Today
Details
View Map
Share
Follow
Queen Street

City Of York Council are carrying out Highway improvement works on Queen Street, Bishophill, York.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 20:00 and could run through until 16 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of York Council on 15 Sep 2026 at 08:39.

Northern Powergrid (Northeast) logo
Finishing
Monday
Details
View Map
Share
Follow
Willow Bank

Northern Powergrid (Northeast) are carrying out New service connection on Willow Bank, New Earswick, York.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:34 and could run through until 21 September 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 14 Sep 2026 at 08:57.

Yorkshire Water logo
LONG TERM
Until
13 Nov 2026
Details
View Map
Share
Follow
Main Street

Yorkshire Water are carrying out Utility repair and maintenance works on Main Street, Wilberfoss.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 08:20.

Yorkshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Ogleforth

Yorkshire Water are carrying out Utility repair and maintenance works on Ogleforth, Guildhall, York.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:52 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 10:23.

East Riding Of Yorkshire Council logo
Between
14 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Moorfield Way

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Moorfield Way, Wilberfoss.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 2 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by East Riding Of Yorkshire Council on 19 Aug 2026 at 09:42.

City Of York Council logo
Finishing
Monday
Details
View Map
Share
Follow
Hull Road

City Of York Council are proposing to carry out Highway improvement works on Hull Road, Kexby, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 21 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of York Council on 3 Sep 2026 at 11:11.

Yorkshire Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Wigginton Road

Yorkshire Water are carrying out Utility repair and maintenance works on Wigginton Road, Bootham, York.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 21:55 and could run through until 22 September 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2026 at 07:55.

Quickline Commucations logo
Finishing
Tomorrow
Details
View Map
Share
Follow
North Lane

Quickline Commucations are carrying out Utility asset works on North Lane, Huntington, York.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 22:09 and could run through until 17 September 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 16 Sep 2026 at 07:59.

Yorkshire Water logo
LONG TERM
Between
21 Sep and 22 Oct 2026
Details
View Map
Share
Follow
Monkgate

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Monkgate, Guildhall, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 22 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 13 Aug 2026 at 10:31.

Northern Gas Networks logo
Between
21 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Bad Bargain Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bad Bargain Lane, Heworth, York.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 9 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 1 Sep 2026 at 08:31.

Northern Gas Networks logo
LONG TERM
Between
21 Sep and 30 Oct 2026
Details
View Map
Share
Follow
Station Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Avenue, New Earswick, York.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 16 Jul 2026 at 14:03.

City Of York Council logo
Between
21 and 26 Sep 2026
Details
View Map
Share
Follow
Road A1237 From Wigginton Road Roundabout Up To And Including Haxby Road Roundabout

City Of York Council are proposing to carry out Highway improvement works on Road A1237 From Wigginton Road Roundabout Up To And Including Haxby Road Roundabout, New Earswick, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 26 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of York Council on 25 Jun 2026 at 10:49.

City Of York Council logo
Between
21 and 26 Sep 2026
Details
View Map
Share
Follow
Haxby Road

City Of York Council are proposing to carry out Highway improvement works on Haxby Road, New Earswick, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 26 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of York Council on 25 Jun 2026 at 10:48.

City Of York Council logo
Between
21 and 26 Sep 2026
Details
View Map
Share
Follow
Road A1237 From Haxby Road Roundabout Up To And Including Strensall Road Roundabout

City Of York Council are proposing to carry out Highway improvement works on Road A1237 From Haxby Road Roundabout Up To And Including Strensall Road Roundabout, New Earswick, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 26 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of York Council on 25 Jun 2026 at 10:47.

Yorkshire Water logo
LONG TERM
Between
21 Sep and 22 Oct 2026
Details
View Map
Share
Follow
Monkgate

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Monkgate, Guildhall, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 22 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 2 Sep 2026 at 08:31.

Yorkshire Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Dale Street

Yorkshire Water were proposing to carry out New service connection on Dale Street, Bishophill, York.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2026 and run through until 25 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Aug 2026 at 12:36.

Yorkshire Water logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Colliergate

Yorkshire Water were proposing to carry out New service connection on Colliergate, Guildhall, York.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 September 2026 and run through until 25 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Aug 2026 at 12:36.

Yorkshire Water logo
Between
21 and 27 Sep 2026
Details
View Map
Share
Follow
Kings Square

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Kings Square, Guildhall, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 1 Sep 2026 at 09:33.

Northern Gas Networks logo
Between
21 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Bad Bargain Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bad Bargain Lane, Heworth, York.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 9 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 Aug 2026 at 14:21.

City Of York Council logo
Between
28 Sep and 17 Oct 2026
Details
View Map
Share
Follow
Lingcroft Lane To Crockey Hill

City Of York Council are proposing to carry out Highway improvement works on Lingcroft Lane To Crockey Hill, Fulford, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 17 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of York Council on 24 Aug 2026 at 12:07.

City Of York Council logo
Between
28 Sep and 17 Oct 2026
Details
View Map
Share
Follow
Deighton To Crockey Hill

City Of York Council are proposing to carry out Highway improvement works on Deighton To Crockey Hill, Deighton, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 17 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of York Council on 24 Aug 2026 at 12:08.

City Of York Council logo
Between
28 Sep and 17 Oct 2026
Details
View Map
Share
Follow
Selby Road To Lingcroft Lane

City Of York Council are proposing to carry out Highway improvement works on Selby Road To Lingcroft Lane, Fulford, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 17 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of York Council on 24 Aug 2026 at 12:07.

City Of York Council logo
Between
28 Sep and 17 Oct 2026
Details
View Map
Share
Follow
Lingcroft Lane To Crockey Hill

City Of York Council are proposing to carry out Highway improvement works on Lingcroft Lane To Crockey Hill, Fulford, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 17 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of York Council on 29 Jul 2026 at 15:27.

Yorkshire Water logo
Between
28 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Kings Square

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Kings Square, Guildhall, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Sep 2026 at 12:56.

Yorkshire Water logo
Between
28 Sep and 3 Oct 2026
Details
View Map
Share
Follow
Kings Square

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Kings Square, Guildhall, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 3 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 09:33.

Yorkshire Water logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Mill Lane

Yorkshire Water were proposing to carry out New service connection on Mill Lane, Heworth, York.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 September 2026 and run through until 2 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Aug 2026 at 12:39.

City Of York Council logo
Between
5 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Mill Lane

City Of York Council are proposing to carry out Highway improvement works on Mill Lane, Heworth, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of York Council on 19 Aug 2026 at 13:31.

City Of York Council logo
Between
5 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Heworth Green

City Of York Council are proposing to carry out Highway improvement works on Heworth Green, Heworth, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 1 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of York Council on 15 Sep 2026 at 10:47.

East Riding Of Yorkshire Council logo
Between
7 and 12 Oct 2026
Details
View Map
Share
Follow
Lob Lane

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Lob Lane, Stamford Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 12 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 10 Aug 2026 at 11:24.

East Riding Of Yorkshire Council logo
Between
7 and 12 Oct 2026
Details
View Map
Share
Follow
The Crescent

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on The Crescent, Stamford Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 12 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 12 Aug 2026 at 08:26.

East Riding Of Yorkshire Council logo
Between
7 and 12 Oct 2026
Details
View Map
Share
Follow
Saxon Road

East Riding Of Yorkshire Council are proposing to carry out Highway improvement works on Saxon Road, Stamford Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 12 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by East Riding Of Yorkshire Council on 10 Aug 2026 at 11:30.

Yorkshire Water logo
Between
9 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Bishopthorpe Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bishopthorpe Road, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 9 Apr 2026 at 14:06.

Network Rail logo
Between
10 and 12 Oct 2026
Details
View Map
Share
Follow
York Road

Network Rail are proposing to carry out Works for Rail Purposes on York Road, Haxby, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Sep 2026 at 09:25.

Network Rail logo
Between
10 and 12 Oct 2026
Details
View Map
Share
Follow
York Road

Network Rail are proposing to carry out Works for Rail Purposes on York Road, Haxby, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 26 May 2026 at 11:21.

Network Rail logo
Between
10 and 12 Oct 2026
Details
View Map
Share
Follow
Haxby Road

Network Rail are proposing to carry out Works for Rail Purposes on Haxby Road, New Earswick, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Sep 2026 at 09:55.

Network Rail logo
Between
10 and 12 Oct 2026
Details
View Map
Share
Follow
Haxby Road

Network Rail are proposing to carry out Works for Rail Purposes on Haxby Road, New Earswick, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 26 May 2026 at 11:19.

Northern Gas Networks logo
Between
12 and 30 Oct 2026
Details
View Map
Share
Follow
Park Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Lane, Holgate, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Jun 2026 at 08:11.

Northern Powergrid (Northeast) logo
Between
12 and 19 Oct 2026
Details
View Map
Share
Follow
Link Avenue

Northern Powergrid (Northeast) are proposing to carry out Disconnection or alteration of supply on Link Avenue, Bootham, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 19 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 29 Jul 2026 at 10:47.

Northern Powergrid (Northeast) logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Grange Garth

Northern Powergrid (Northeast) are proposing to carry out New service connection on Grange Garth, Fishergate, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 14 Jul 2026 at 10:04.

Northern Gas Networks logo
Between
12 and 16 Oct 2026
Details
View Map
Share
Follow
Balmoral Terrace

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Balmoral Terrace, Knavesmire, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 29 Jul 2026 at 13:48.

City Of York Council logo
Between
23 and 30 Oct 2026
Details
View Map
Share
Follow
Philadelphia Terrace

City Of York Council are proposing to carry out Highway improvement works on Philadelphia Terrace, Knavesmire, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2026 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of York Council on 7 Sep 2026 at 09:33.

City Of York Council logo
Between
26 Oct and 9 Nov 2026
Details
View Map
Share
Follow
Hull Road

City Of York Council are proposing to carry out roadworks on Hull Road, Heslington, York.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 9 November 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by City Of York Council on 20 Aug 2026 at 14:13.

Northern Gas Networks logo
Between
26 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Albemarle Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Albemarle Road, Bishophill, York.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 20 Jul 2026 at 11:43.

Yorkshire Water logo
Between
26 Oct and 1 Nov 2026
Details
View Map
Share
Follow
Kings Square

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Kings Square, Guildhall, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 1 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 6 Aug 2026 at 11:49.

Northern Gas Networks logo
LONG TERM
Between
2 Nov and 24 Dec 2026
Details
View Map
Share
Follow
Stockton Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stockton Lane, Hopgrove, York.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 24 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 2 Jul 2026 at 10:41.

City Of York Council logo
Between
9 and 27 Nov 2026
Details
View Map
Share
Follow
North Moor Road

City Of York Council are proposing to carry out Highway improvement works on North Moor Road, Huntington, York.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 27 November 2026. The works will impact the verge only.

This roadwork event was last updated by City Of York Council on 14 Jul 2026 at 13:48.

Northern Gas Networks logo
LONG TERM
Between
16 Nov and 24 Dec 2026
Details
View Map
Share
Follow
Stockton Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stockton Lane, Hopgrove, York.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 24 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 14 Sep 2026 at 10:34.

City Of York Council logo
Between
23 Nov and 19 Dec 2026
Details
View Map
Share
Follow
Gerard Avenue

City Of York Council are proposing to carry out Highway improvement works on Gerard Avenue, Heworth, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 19 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of York Council on 21 Aug 2026 at 11:55.

Yorkshire Water logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Mill Lane

Yorkshire Water are proposing to carry out New service connection on Mill Lane, Heworth, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 1 Sep 2026 at 08:34.

Yorkshire Water logo
Between
30 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Back Lane Between Numbers 64 To 76 Nunthorpe Road

Yorkshire Water are proposing to carry out New service connection on Back Lane Between Numbers 64 To 76 Nunthorpe Road, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 4 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 15 Sep 2026 at 09:09.

Yorkshire Water logo
LONG TERM
Between
4 Dec 2026 and 24 Feb 2027
Details
View Map
Share
Garfield Terrace

Yorkshire Water were proposing to carry out Utility asset works on Garfield Terrace, Beckfield, York.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2026 and run through until 24 February 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 20 Aug 2026 at 11:27.

Yorkshire Water logo
LONG TERM
Between
4 Dec 2026 and 24 Feb 2027
Details
View Map
Share
Follow
Garfield Terrace

Yorkshire Water are proposing to carry out Utility asset works on Garfield Terrace, Beckfield, York.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2026 and could run through until 24 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Sep 2026 at 14:07.

Northern Gas Networks logo
LONG TERM
Between
7 Dec 2026 and 13 Jan 2027
Details
View Map
Share
Follow
Church Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Lane, Huntington, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 13 January 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Aug 2026 at 08:08.

Northern Gas Networks logo
LONG TERM
Between
7 Dec 2026 and 13 Jan 2027
Details
View Map
Share
Follow
The Old Village

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Old Village, Huntington, York.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 13 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Aug 2026 at 08:11.

Yorkshire Water logo
Between
14 and 17 Dec 2026
Details
View Map
Share
Follow
Kingsland Terrace

Yorkshire Water are proposing to carry out Remedial works on Kingsland Terrace, Beckfield, York.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 17 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Sep 2026 at 12:34.


Roadworks Map near to Pear Tree Lane, YORK, YO19 5QQ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Sep 2026 08:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Pear Tree Lane, YORK, YO19 5QQ (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
City Of York Council logo
EASTFIELD LANE, DUNNINGTON 
(0.5 miles)
City Of York Council
Section 50 - Footway, Carriageway, Verge - Multi-way signals
Planned
Scheduled: 14 Sep 2026 - 23 Sep 2026
0.5
Details
Share
Follow
2
City Of York Council logo
EMERGENCY
  
HOLLY TREE CROFT, DUNNINGTON 
(0.6 miles)
City Of York Council
Highway repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 17 Aug 2026 00:01
(Scheduled: 17 Aug 2026 - 2 Oct 2026)
0.6
Details
Share
Follow
3
City Of York Council logo
MAJOR
  
EASTFIELD LANE, DUNNINGTON 
(0.6 miles)
City Of York Council
Optional permit (no fee) e.g. for traffic management etc - Footway, Carriageway, Verge - Road closure
In Progress
Since: 10 Aug 2026 08:00
(Scheduled: 3 Aug 2026 - 25 Sep 2026)
0.6
Details
Share
Follow
4
City Of York Council logo
MAJOR
  
HULL ROAD, DUNNINGTON 
(0.8 miles)
City Of York Council
Highway improvement works - Carriageway - Road closure
Planned
Scheduled: 7 Sep 2026 - 21 Sep 2026
0.8
Details
Share
Follow
5
City Of York Council logo
MAJOR
  
HULL ROAD, KEXBY 
(0.9 miles)
City Of York Council
Highway improvement works - Carriageway - Road closure
Planned
Scheduled: 14 Sep 2026 - 21 Sep 2026
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.