ROADWORKS SUMMARY
Catisfield Crescent, WOLVERHAMPTON, WV8 1XG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Catisfield Crescent, WV8 1XG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Catisfield Crescent, WOLVERHAMPTON, WV8 1XG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Catisfield Crescent are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Severn Trent Water logo
LONG TERM
Between
19 Mar 2023 and 19 Mar 2025
Details
View Map
Share
Follow
Stubby Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Stubby Lane, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2023 and could run through until 19 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 16:57.

Walsall Metropolitan Borough Council logo
LONG TERM
Between
14 May 2024 and 17 May 2025
Details
View Map
Share
Follow
Rose Hill

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Rose Hill, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 17 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 20 Feb 2024 at 13:53.

Walsall Metropolitan Borough Council logo
LONG TERM
Between
14 May 2024 and 17 May 2025
Details
View Map
Share
Follow
Bilston Street

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bilston Street, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 17 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 20 Feb 2024 at 14:00.

Walsall Metropolitan Borough Council logo
LONG TERM
Between
14 May 2024 and 17 May 2025
Details
View Map
Share
Follow
New Road

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on New Road, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 17 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 20 Feb 2024 at 14:01.

City Of Wolverhampton Council logo
LONG TERM
Between
3 Jun 2024 and 16 Feb 2025
Details
View Map
Share
Follow
Somerford Place

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Somerford Place, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 16 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Wolverhampton Council on 26 Mar 2024 at 17:10.

Severn Trent Water logo
LONG TERM
Until
5 Dec 2024
Details
View Map
Share
Follow
Langley Road

Severn Trent Water are carrying out Utility asset works on Langley Road, Lower Penn.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 August 2024 at 08:35 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Aug 2024 at 08:54.

Walsall Metropolitan Borough Council logo
LONG TERM
Between
24 Aug 2024 and 4 Sep 2025
Details
View Map
Share
Bilston Street

Walsall Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Bilston Street, Willenhall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 August 2024 and run through until 4 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 14 Nov 2024 at 08:56.

Walsall Metropolitan Borough Council logo
LONG TERM
Between
24 Aug 2024 and 4 Sep 2025
Details
View Map
Share
New Road

Walsall Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on New Road, Willenhall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 August 2024 and run through until 4 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 14 Nov 2024 at 08:56.

City Of Wolverhampton Council logo
LONG TERM
Between
2 Sep 2024 and 29 Mar 2025
Details
View Map
Share
Willenhall Road

City Of Wolverhampton Council were proposing to carry out Highway improvement works on Willenhall Road, Wolverhampton.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 29 March 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by City Of Wolverhampton Council on 30 Jul 2024 at 13:43.

Severn Trent Water logo
LONG TERM
Until
5 Dec 2024
Details
View Map
Share
Follow
Market Lane

Severn Trent Water are carrying out Utility asset works on Market Lane, Lower Penn.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2024 at 10:30 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 11 Sep 2024 at 11:17.

City Of Wolverhampton Council logo
LONG TERM
Between
7 Oct 2024 and 27 Jul 2025
Details
View Map
Share
Willenhall Road

City Of Wolverhampton Council were proposing to carry out Highway improvement works on Willenhall Road, Wolverhampton.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 27 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by City Of Wolverhampton Council on 19 Sep 2024 at 11:32.

Cadent Gas logo
LONG TERM
Between
21 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Springhill Lane

Cadent Gas are proposing to carry out Utility asset works on Springhill Lane, Lower Penn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jul 2024 at 10:17.

Severn Trent Water logo
LONG TERM
Between
21 Oct and 22 Dec 2024
Details
View Map
Share
Follow
Park Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Park Lane, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 3 Feb 2023 at 12:01.

Cadent Gas logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
Mountford Lane

Cadent Gas are proposing to carry out Utility asset works on Mountford Lane, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Aug 2024 at 20:25.

Cadent Gas logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Mountford Lane

Cadent Gas are carrying out Utility asset works on Mountford Lane, Wolverhampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 10:03.

City Of Wolverhampton Council logo
LONG TERM
Between
4 Nov 2024 and 16 Feb 2025
Details
View Map
Share
Wolverhampton Road

City Of Wolverhampton Council were proposing to carry out Highway improvement works on Wolverhampton Road, Heath Town, Wolverhampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 16 February 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by City Of Wolverhampton Council on 24 Sep 2024 at 10:50.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
County Lane

Staffordshire County Council are proposing to carry out Highway improvement works on County Lane, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Aug 2024 at 16:22.

Staffordshire County Council logo
Finishing
Sunday
Details
View Map
Share
Follow
Cannock Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Cannock Road, Featherstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 29 Aug 2024 at 12:30.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Gravelly Way

Staffordshire County Council are proposing to carry out Highway improvement works on Gravelly Way, Four Ashes.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Oct 2024 at 17:08.

Severn Trent Water logo
LONG TERM
Between
11 Nov and 13 Dec 2024
Details
View Map
Share
Leasowes Drive

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Leasowes Drive, Wolverhampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 25 Oct 2024 at 08:11.

Cadent Gas logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Lennox Gardens

Cadent Gas are proposing to carry out Utility asset works on Lennox Gardens, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2024 at 12:35.

Cadent Gas logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Eastney Crescent

Cadent Gas are proposing to carry out Utility asset works on Eastney Crescent, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 11 Jul 2024 at 10:15.

Cadent Gas logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Eastney Crescent

Cadent Gas were proposing to carry out Utility asset works on Eastney Crescent, Wolverhampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:48.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
13 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Bilston Street

Transport for West Midlands (TfWM) are proposing to carry out Works for Rail Purposes on Bilston Street, Willenhall.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 16 Sep 2024 at 14:53.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Wergs Road

Cadent Gas are carrying out Utility repair and maintenance works on Wergs Road, Wolverhampton.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 November 2024 at 08:40 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 16:30.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Upper Zoar Street

Cadent Gas are carrying out Utility asset works on Upper Zoar Street, Wolverhampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 08:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 09:28.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Zoar Street

Cadent Gas are carrying out Utility asset works on Zoar Street, Wolverhampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 08:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 09:29.

Cadent Gas logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Fifth Avenue

Cadent Gas are carrying out Utility asset works on Fifth Avenue, Wolverhampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:32 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:32.

Staffordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lansdowne Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Lansdowne Avenue, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Aug 2024 at 09:16.

Staffordshire County Council logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
County Lane

Staffordshire County Council are proposing to carry out Highway improvement works on County Lane, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 29 Aug 2024 at 13:36.

Western Power Distribution (West Midlands) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Beamish Lane

Western Power Distribution (West Midlands) are carrying out Utility asset works on Beamish Lane, Albrighton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:09 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 18 Nov 2024 at 09:34.

Staffordshire County Council logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Gravelly Way

Staffordshire County Council are proposing to carry out Highway improvement works on Gravelly Way, Four Ashes.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 16:47.

Western Power Distribution (West Midlands) logo
Finishing
Monday
Details
View Map
Share
Follow
Sandy Lane

Western Power Distribution (West Midlands) are carrying out Utility repair and maintenance works on Sandy Lane, Brewood.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 15:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 20 Nov 2024 at 17:18.

Cadent Gas logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Merridale Street West

Cadent Gas are carrying out Utility asset works on Merridale Street West, Wolverhampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 08:32.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Wimborne Road

Cadent Gas are carrying out Utility repair and maintenance works on Wimborne Road, Wolverhampton.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 13:04 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 13:58.

Severn Trent Water logo
Finishing
Tomorrow
Details
View Map
Share
Bushbury Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Bushbury Lane, Wolverhampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 22 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 7 Oct 2024 at 10:13.

City Of Wolverhampton Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Noose Lane

City Of Wolverhampton Council are carrying out Works for Rail Purposes on Noose Lane, Wolverhampton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 10:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wolverhampton Council on 21 Nov 2024 at 12:17.

Cadent Gas logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Pinfold Lane

Cadent Gas are proposing to carry out Utility asset works on Pinfold Lane, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 12:25.

Cadent Gas logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Pinfold Lane

Cadent Gas are proposing to carry out Utility asset works on Pinfold Lane, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 16:43.

Cadent Gas logo
Between
25 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Ashland Street

Cadent Gas are proposing to carry out Utility asset works on Ashland Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 09:57.

Cadent Gas logo
Between
25 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Ashland Street

Cadent Gas are proposing to carry out Utility asset works on Ashland Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 09:54.

City Of Wolverhampton Council logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Staveley Road

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Staveley Road, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wolverhampton Council on 1 Nov 2024 at 11:01.

City Of Wolverhampton Council logo
Between
25 Nov and 2 Dec 2024
Details
View Map
Share
Staveley Road

City Of Wolverhampton Council were proposing to carry out Highway improvement works on Staveley Road, Wolverhampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of Wolverhampton Council on 12 Nov 2024 at 11:22.

Staffordshire County Council logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Oaken Lanes

Staffordshire County Council are proposing to carry out Highway improvement works on Oaken Lanes, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 12:18.

Staffordshire County Council logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Wood Hayes Road

Staffordshire County Council are proposing to carry out Highway improvement works on Wood Hayes Road, Westcroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 12:18.

Staffordshire County Council logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Bognop Road

Staffordshire County Council are proposing to carry out Highway improvement works on Bognop Road, Essington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 12:18.

Staffordshire County Council logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Wood Road

Staffordshire County Council are proposing to carry out Highway improvement works on Wood Road, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 14:19.

Staffordshire County Council logo
Between
25 and 29 Nov 2024
Details
View Map
Share
New Road

Staffordshire County Council were proposing to carry out Highway improvement works on New Road, Slade Heath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Aug 2024 at 12:42.

Staffordshire County Council logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Saredon Road

Staffordshire County Council are proposing to carry out Highway improvement works on Saredon Road, Little Saredon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 12:18.

City Of Wolverhampton Council logo
Between
1 and 8 Dec 2024
Details
View Map
Share
Follow
Penn Road

City Of Wolverhampton Council are proposing to carry out Highway repair and maintenance works on Penn Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wolverhampton Council on 5 Nov 2024 at 13:16.

City Of Wolverhampton Council logo
Between
1 and 8 Dec 2024
Details
View Map
Share
Follow
Penn Road

City Of Wolverhampton Council are proposing to carry out Highway repair and maintenance works on Penn Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wolverhampton Council on 12 Nov 2024 at 12:49.

Staffordshire County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Showell Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Showell Lane, Orton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Jul 2024 at 09:40.

Cadent Gas logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Lytton Avenue

Cadent Gas are proposing to carry out Utility asset works on Lytton Avenue, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 09:21.

Cadent Gas logo
Between
2 and 9 Dec 2024
Details
View Map
Share
Follow
Woodhall Road

Cadent Gas are proposing to carry out Utility asset works on Woodhall Road, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 14:18.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Lime Street

Cadent Gas were proposing to carry out Utility asset works on Lime Street, Wolverhampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 13:28.

Cadent Gas logo
Between
2 and 9 Dec 2024
Details
View Map
Share
Follow
Kimberley Street

Cadent Gas are proposing to carry out Utility asset works on Kimberley Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 10:02.

Severn Trent Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Lynton Avenue

Severn Trent Water are proposing to carry out Remedial works on Lynton Avenue, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 24 Sep 2024 at 11:29.

Severn Trent Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Lynton Avenue

Severn Trent Water were proposing to carry out Remedial works on Lynton Avenue, Wolverhampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Sep 2024 at 12:55.

City Of Wolverhampton Council logo
Between
2 and 18 Dec 2024
Details
View Map
Share
Follow
Aldersley Road

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Aldersley Road, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wolverhampton Council on 1 Nov 2024 at 09:08.

Cadent Gas logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Faversham Close

Cadent Gas are proposing to carry out Utility asset works on Faversham Close, Wolverhampton.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Jul 2024 at 10:40.

Staffordshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Birches Park Road

Staffordshire County Council are proposing to carry out Highway improvement works on Birches Park Road, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Aug 2024 at 14:12.

Staffordshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Birches Park Road

Staffordshire County Council are proposing to carry out Highway improvement works on Birches Park Road, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 09:53.

Staffordshire County Council logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
County Lane

Staffordshire County Council are proposing to carry out Highway improvement works on County Lane, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 13:21.

Staffordshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
New Road

Staffordshire County Council were proposing to carry out Highway improvement works on New Road, Slade Heath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 30 Aug 2024 at 12:34.

Staffordshire County Council logo
LONG TERM
Between
2 Dec 2024 and 6 Jun 2025
Details
View Map
Share
Follow
Gravelly Way

Staffordshire County Council are proposing to carry out Highway improvement works on Gravelly Way, Four Ashes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 14:28.

Staffordshire County Council logo
LONG TERM
Between
2 Dec 2024 and 6 Jun 2025
Details
View Map
Share
Follow
Gravelly Way

Staffordshire County Council are proposing to carry out Highway improvement works on Gravelly Way, Four Ashes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 22 Oct 2024 at 14:22.

Severn Trent Water logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Lea Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lea Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 24 Sep 2024 at 09:31.

Severn Trent Water logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Lea Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lea Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 08:17.

Western Power Distribution (West Midlands) logo
Between
5 and 12 Dec 2024
Details
View Map
Share
Follow
Beamish Lane

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Beamish Lane, Albrighton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 23 Sep 2024 at 15:51.

Cadent Gas logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Lytton Avenue

Cadent Gas are proposing to carry out Utility asset works on Lytton Avenue, Wolverhampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 16:42.

Cadent Gas logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Woodhall Road

Cadent Gas are proposing to carry out Utility asset works on Woodhall Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 10:08.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Dirty Foot Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Dirty Foot Lane, Lower Penn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 12:18.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
The Greenway

Staffordshire County Council are proposing to carry out Highway improvement works on The Greenway, Pattingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 14:23.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
The Greenway

Staffordshire County Council were proposing to carry out Highway improvement works on The Greenway, Pattingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Sep 2024 at 09:10.

City Of Wolverhampton Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Raynor Road

City Of Wolverhampton Council are proposing to carry out Highway repair and maintenance works on Raynor Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wolverhampton Council on 12 Nov 2024 at 11:21.

City Of Wolverhampton Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Third Avenue

City Of Wolverhampton Council are proposing to carry out Highway repair and maintenance works on Third Avenue, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wolverhampton Council on 12 Nov 2024 at 11:20.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Westbeech Road

Staffordshire County Council are proposing to carry out Highway improvement works on Westbeech Road, Pattingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Sep 2024 at 16:03.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
New Road

Staffordshire County Council are proposing to carry out Highway improvement works on New Road, Slade Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 13:49.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Elms Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Elms Lane, Shareshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 13:57.

Severn Trent Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Tettenhall Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Tettenhall Road, Wolverhampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 24 Sep 2024 at 12:24.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
The Roughs

Staffordshire County Council are proposing to carry out Highway improvement works on The Roughs, Trescott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 14:36.

Cadent Gas logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Lennox Gardens

Cadent Gas are proposing to carry out Utility asset works on Lennox Gardens, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 15:11.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Kiddemore Green Road

Staffordshire County Council are proposing to carry out Highway improvement works on Kiddemore Green Road, Brewood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 14:36.

Cadent Gas logo
Between
19 Dec 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Retreat Street

Cadent Gas are proposing to carry out Utility asset works on Retreat Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 09:52.

Cadent Gas logo
Between
19 Dec 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Graiseley Street

Cadent Gas are proposing to carry out Utility asset works on Graiseley Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 09:52.

Cadent Gas logo
Between
19 Dec 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Williamson Street

Cadent Gas are proposing to carry out Utility asset works on Williamson Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 09:52.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Parkes Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Parkes Avenue, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 11:23.

Severn Trent Water logo
Between
2 and 19 Jan 2025
Details
View Map
Share
Follow
Park Lane

Severn Trent Water are proposing to carry out Utility asset works on Park Lane, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 13 Feb 2023 at 09:52.

Cadent Gas logo
Between
2 and 31 Jan 2025
Details
View Map
Share
High Hill

Cadent Gas were proposing to carry out Utility asset works on High Hill, Essington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 09:08.

Cadent Gas logo
Between
2 and 31 Jan 2025
Details
View Map
Share
High Hill

Cadent Gas were proposing to carry out Utility asset works on High Hill, Essington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 09:40.

Cadent Gas logo
Between
3 and 10 Jan 2025
Details
View Map
Share
Follow
Owen Road

Cadent Gas are proposing to carry out Utility asset works on Owen Road, Merridale, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 10:17.

Cadent Gas logo
Between
3 and 10 Jan 2025
Details
View Map
Share
Follow
Owen Road

Cadent Gas are proposing to carry out Utility asset works on Owen Road, Merridale, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 11:07.

Cadent Gas logo
Between
3 and 10 Jan 2025
Details
View Map
Share
Follow
Kimberley Street

Cadent Gas are proposing to carry out Utility asset works on Kimberley Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 10:14.

Cadent Gas logo
Between
3 and 10 Jan 2025
Details
View Map
Share
Follow
Ashland Street

Cadent Gas are proposing to carry out Utility asset works on Ashland Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 10:09.

Cadent Gas logo
Between
3 and 10 Jan 2025
Details
View Map
Share
Follow
Upper Zoar Street

Cadent Gas are proposing to carry out Utility asset works on Upper Zoar Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 09:57.

Cadent Gas logo
Between
3 and 10 Jan 2025
Details
View Map
Share
Follow
Zoar Street

Cadent Gas are proposing to carry out Utility asset works on Zoar Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 09:56.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Springhill Lane

Cadent Gas are proposing to carry out Utility asset works on Springhill Lane, Lower Penn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 09:24.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Grendon Gardens

Cadent Gas were proposing to carry out Utility asset works on Grendon Gardens, Wolverhampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 08:55.

Cadent Gas logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Lime Street

Cadent Gas are proposing to carry out Utility asset works on Lime Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 14:13.

Cadent Gas logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Lime Street

Cadent Gas are proposing to carry out Utility asset works on Lime Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:17.

Cadent Gas logo
LONG TERM
Between
6 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Lime Street

Cadent Gas are proposing to carry out Utility asset works on Lime Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:10.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Manlove Street

Cadent Gas are proposing to carry out Utility asset works on Manlove Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 14:06.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Cardiff Street

Cadent Gas are proposing to carry out Utility asset works on Cardiff Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 14:07.

City Of Wolverhampton Council logo
LONG TERM
Between
6 Jan and 4 Jul 2025
Details
View Map
Share
Follow
Darlington Street

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Darlington Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wolverhampton Council on 12 Nov 2024 at 11:11.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Ormes Lane

BT were proposing to carry out Utility asset works on Ormes Lane, Wolverhampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 18 Oct 2024 at 15:20.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Offas Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Offas Drive, Perton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 12:32.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
The Parkway

Staffordshire County Council are proposing to carry out Highway improvement works on The Parkway, Perton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 12:32.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
High Hill

Cadent Gas are proposing to carry out Utility asset works on High Hill, Essington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 13:21.

Cadent Gas logo
LONG TERM
Between
7 Jan and 26 Feb 2025
Details
View Map
Share
High Hill

Cadent Gas were proposing to carry out Utility asset works on High Hill, Essington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 26 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 15:51.

Cadent Gas logo
Between
8 and 28 Jan 2025
Details
View Map
Share
Follow
Fifth Avenue

Cadent Gas are proposing to carry out Utility asset works on Fifth Avenue, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 11:57.

Cadent Gas logo
LONG TERM
Between
10 Jan and 3 Mar 2025
Details
View Map
Share
Follow
High Hill

Cadent Gas are proposing to carry out Utility asset works on High Hill, Essington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 15:15.

Severn Trent Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
All Saints Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on All Saints Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 11:40.

Cadent Gas logo
Between
13 and 20 Jan 2025
Details
View Map
Share
Follow
Manlove Street

Cadent Gas are proposing to carry out Utility asset works on Manlove Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 08:40.

City Of Wolverhampton Council logo
LONG TERM
Between
13 Jan and 24 Aug 2025
Details
View Map
Share
Follow
Somerford Place

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Somerford Place, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wolverhampton Council on 19 Sep 2024 at 15:00.

City Of Wolverhampton Council logo
LONG TERM
Between
13 Jan and 25 Oct 2025
Details
View Map
Share
Follow
Willenhall Road

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Willenhall Road, Wolverhampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 25 October 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by City Of Wolverhampton Council on 6 Nov 2024 at 12:08.

City Of Wolverhampton Council logo
LONG TERM
Between
13 Jan and 25 Oct 2025
Details
View Map
Share
Follow
Willenhall Road

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Willenhall Road, Wolverhampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 25 October 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by City Of Wolverhampton Council on 16 Oct 2024 at 12:05.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
The Parkway

Staffordshire County Council are proposing to carry out Highway improvement works on The Parkway, Perton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 15:35.

Severn Trent Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Harper Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Harper Street, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 2 Oct 2024 at 08:17.

Severn Trent Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Harper Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Harper Street, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Oct 2024 at 13:15.

Staffordshire County Council logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Follow
Offas Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Offas Drive, Perton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 11:40.

Cadent Gas logo
LONG TERM
Between
15 Jan and 28 Apr 2025
Details
View Map
Share
Follow
Mount Road

Cadent Gas are proposing to carry out Utility asset works on Mount Road, Penn, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.

Cadent Gas logo
Between
15 Jan and 5 Feb 2025
Details
View Map
Share
Upper Sneyd Road

Cadent Gas were proposing to carry out Utility asset works on Upper Sneyd Road, Essington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 5 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 12:40.

Cadent Gas logo
Between
15 Jan and 5 Feb 2025
Details
View Map
Share
Upper Sneyd Road

Cadent Gas were proposing to carry out Utility asset works on Upper Sneyd Road, Essington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 5 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 09:16.

Cadent Gas logo
Between
15 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Upper Sneyd Road

Cadent Gas are proposing to carry out Utility asset works on Upper Sneyd Road, Essington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 09:55.

Cadent Gas logo
Between
15 and 31 Jan 2025
Details
View Map
Share
Follow
Upper Sneyd Road

Cadent Gas are proposing to carry out Utility asset works on Upper Sneyd Road, Essington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 13:21.

Cadent Gas logo
LONG TERM
Between
15 Jan and 31 Dec 2025
Details
View Map
Share
Upper Sneyd Road

Cadent Gas were proposing to carry out Utility asset works on Upper Sneyd Road, Essington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 31 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 15:10.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Dirty Foot Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Dirty Foot Lane, Lower Penn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 10:29.

Cadent Gas logo
Between
20 and 27 Jan 2025
Details
View Map
Share
Follow
Cardiff Street

Cadent Gas are proposing to carry out Utility asset works on Cardiff Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 08:50.

City Of Wolverhampton Council logo
LONG TERM
Between
20 Jan and 19 Aug 2025
Details
View Map
Share
Follow
Somerford Place

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Somerford Place, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 19 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wolverhampton Council on 6 Nov 2024 at 15:10.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Noose Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Noose Lane, Willenhall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 10:36.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
20 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Mercia Drive

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Mercia Drive, Perton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 14 Nov 2024 at 16:05.

Severn Trent Water logo
LONG TERM
Between
20 Jan and 20 Apr 2025
Details
View Map
Share
Follow
Park Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Park Lane, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 3 Feb 2023 at 11:00.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Oaken Lanes

Staffordshire County Council are proposing to carry out Highway improvement works on Oaken Lanes, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 09:45.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Wood Hayes Road

Staffordshire County Council are proposing to carry out Highway improvement works on Wood Hayes Road, Westcroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 09:45.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Bognop Road

Staffordshire County Council are proposing to carry out Highway improvement works on Bognop Road, Essington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 10:11.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Wood Road

Staffordshire County Council are proposing to carry out Highway improvement works on Wood Road, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 10:11.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Wood Road

Staffordshire County Council are proposing to carry out Highway improvement works on Wood Road, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 13:12.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Saredon Road

Staffordshire County Council are proposing to carry out Highway improvement works on Saredon Road, Little Saredon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 10:28.

Severn Trent Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Tyburn Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Tyburn Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 16:19.

Severn Trent Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Pattingham Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Pattingham Road, Perton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 28 Oct 2024 at 10:04.

Severn Trent Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Pattingham Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Pattingham Road, Perton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 29 Oct 2024 at 12:48.

Cadent Gas logo
Between
22 Jan and 5 Feb 2025
Details
View Map
Share
Essington Road

Cadent Gas were proposing to carry out Utility asset works on Essington Road, Essington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 5 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 09:47.

Cadent Gas logo
Between
22 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Essington Road

Cadent Gas are proposing to carry out Utility asset works on Essington Road, Essington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 11:23.

Cadent Gas logo
Between
22 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Essington Road

Cadent Gas are proposing to carry out Utility asset works on Essington Road, Essington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:54.

Cadent Gas logo
Between
22 Jan and 5 Feb 2025
Details
View Map
Share
Sneyd Lane

Cadent Gas were proposing to carry out Utility asset works on Sneyd Lane, Essington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 5 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 10:35.

Cadent Gas logo
Between
22 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Sneyd Lane

Cadent Gas are proposing to carry out Utility asset works on Sneyd Lane, Essington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 12:03.

Cadent Gas logo
Between
22 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Sneyd Lane

Cadent Gas are proposing to carry out Utility asset works on Sneyd Lane, Essington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 15:07.

Severn Trent Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Wood Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Wood Road, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Oct 2024 at 14:16.

Severn Trent Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Wood Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Wood Road, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 28 Oct 2024 at 17:40.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
The Roughs

Staffordshire County Council are proposing to carry out Highway improvement works on The Roughs, Trescott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 11:58.

Severn Trent Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
All Saints Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on All Saints Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 10:02.

Severn Trent Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Vicarage Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Vicarage Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 11:38.

Severn Trent Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Vicarage Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Vicarage Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 16:31.

Cadent Gas logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Bristol Street

Cadent Gas are proposing to carry out Utility asset works on Bristol Street, Merridale, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 14:08.

Cadent Gas logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Bristol Street

Cadent Gas are proposing to carry out Utility asset works on Bristol Street, Merridale, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 09:34.

Cadent Gas logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Ashland Street

Cadent Gas are proposing to carry out Utility asset works on Ashland Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 14:08.

Cadent Gas logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Ashland Street

Cadent Gas are proposing to carry out Utility asset works on Ashland Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 08:09.

BT logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Ormes Lane

BT were proposing to carry out Utility asset works on Ormes Lane, Wolverhampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 19 Nov 2024 at 09:59.

Severn Trent Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Bushbury Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Bushbury Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 11:08.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Elms Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Elms Lane, Shareshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 10:38.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Great Saredon Road

Staffordshire County Council are proposing to carry out Highway improvement works on Great Saredon Road, Great Saredon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Oct 2024 at 14:27.

Cadent Gas logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Vicarage Road

Cadent Gas are proposing to carry out Utility asset works on Vicarage Road, Brewood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 17:13.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Kiddemore Green Road

Staffordshire County Council are proposing to carry out Highway improvement works on Kiddemore Green Road, Brewood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 11:58.

Cadent Gas logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Deansfield Road

Cadent Gas are proposing to carry out Utility asset works on Deansfield Road, Brewood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 17:13.

Severn Trent Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
High Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on High Road, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 Oct 2024 at 14:46.

Severn Trent Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
High Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on High Road, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 31 Oct 2024 at 13:56.

Severn Trent Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Stafford Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Stafford Street, Willenhall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 7 Nov 2024 at 12:24.

Severn Trent Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Nurton Bank

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Nurton Bank, Pattingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 17:30.

Severn Trent Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Nurton Bank

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Nurton Bank, Pattingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 29 Oct 2024 at 12:37.

Severn Trent Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Engleton Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Engleton Lane, Brewood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 09:18.

City Of Wolverhampton Council logo
Between
30 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Gorsebrook Road

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Gorsebrook Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wolverhampton Council on 6 Nov 2024 at 14:17.

Cadent Gas logo
Between
31 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Manor Road

Cadent Gas are proposing to carry out Utility asset works on Manor Road, Penn, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.

Cadent Gas logo
Between
31 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Hinstock Close

Cadent Gas are proposing to carry out Utility asset works on Hinstock Close, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.

Cadent Gas logo
Between
31 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Ashland Street

Cadent Gas are proposing to carry out Utility asset works on Ashland Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 09:40.

Cadent Gas logo
Between
3 and 23 Feb 2025
Details
View Map
Share
Follow
Grendon Gardens

Cadent Gas are proposing to carry out Utility asset works on Grendon Gardens, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 08:56.

Cadent Gas logo
Between
3 and 23 Feb 2025
Details
View Map
Share
Follow
Grendon Gardens

Cadent Gas are proposing to carry out Utility asset works on Grendon Gardens, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 08:51.

Transport for West Midlands (TfWM) logo
LONG TERM
Between
3 Feb and 4 Jul 2025
Details
View Map
Share
Follow
Bilston Street

Transport for West Midlands (TfWM) are proposing to carry out Works for Rail Purposes on Bilston Street, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 15 Nov 2024 at 12:33.

City Of Wolverhampton Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Powell Street

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Powell Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wolverhampton Council on 6 Nov 2024 at 14:29.

Walsall Metropolitan Borough Council logo
LONG TERM
Between
6 Feb 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Bilston Street

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bilston Street, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 16 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 14 Nov 2024 at 08:43.

Walsall Metropolitan Borough Council logo
LONG TERM
Between
6 Feb 2025 and 16 Feb 2026
Details
View Map
Share
Follow
New Road

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on New Road, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 16 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 14 Nov 2024 at 08:49.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Langley Road

Staffordshire County Council were proposing to carry out Highway improvement works on Langley Road, Lower Penn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 15:22.

Western Power Distribution (West Midlands) logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Bridgnorth Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Bridgnorth Road, Wolverhampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 15 Nov 2024 at 16:24.

Severn Trent Water logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
St Giles Crescent

Severn Trent Water are proposing to carry out Utility repair and maintenance works on St Giles Crescent, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Nov 2024 at 16:04.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
The Parkway

Staffordshire County Council are proposing to carry out Highway improvement works on The Parkway, Perton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 15:09.

Severn Trent Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Oaken Lanes

Severn Trent Water are proposing to carry out Utility asset works on Oaken Lanes, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 14:05.

Severn Trent Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Moatbrook Lane

Severn Trent Water are proposing to carry out Utility asset works on Moatbrook Lane, Codsall Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 15:00.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
13 and 26 Feb 2025
Details
View Map
Share
Follow
Rookery Street

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out New service connection on Rookery Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 21 Nov 2024 at 13:42.

Cadent Gas logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Hilston Avenue

Cadent Gas are proposing to carry out Utility asset works on Hilston Avenue, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 10:30.

Severn Trent Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Malthouse Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Malthouse Lane, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 16:48.

Severn Trent Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Hill Street

Severn Trent Water are proposing to carry out New service connection on Hill Street, Essington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 12:14.


Roadworks Map near to Catisfield Crescent, WOLVERHAMPTON, WV8 1XG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 22:24
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Catisfield Crescent, WOLVERHAMPTON, WV8 1XG (8 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
MAJOR
  
EASTNEY CRESCENT 
(0.1 miles)
Cadent Gas
Utility asset works - Footway, Carriageway, Footpath - Multi-way signals
Planned
Scheduled: 11 Nov 2024 - 20 Dec 2024
0.1
Details
Share
Follow
2
Cadent Gas logo
MAJOR
  
EASTNEY CRESCENT 
(0.1 miles)
Cadent Gas
Utility asset works - Footway, Carriageway, Footpath - Multi-way signals
Cancelled
(Scheduled: 11 Nov 2024 - 20 Dec 2024)
0.1
Details
Share
3
BT logo
ALVERSTOKE CLOSE 
(0.4 miles)
BT
Utility repair and maintenance works - Carriageway - Give and take
Complete
19 Nov 2024 08:57 - 12:04
0.4
Details
Share
4
BT logo
HAYWAIN CLOSE 
(0.6 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 21 Nov 2024 - 25 Nov 2024
0.6
Details
Share
Follow
5
Severn Trent Water logo
URGENT
  
CODSALL ROAD 
(0.6 miles)
Severn Trent Water
Utility repair and maintenance works - Verge - No carriageway incursion
Complete
19 Nov 2024 08:02 - 09:22
0.6
Details
Share
6
Severn Trent Water logo
URGENT
  
CODSALL ROAD 
(0.7 miles)
Severn Trent Water
Utility repair and maintenance works - Footway, Footpath - Two-way signals
In Progress
Since: 21 Nov 2024 09:34
(Scheduled: 21 Nov 2024 - 26 Nov 2024)
0.7
Details
Share
Follow
7
Severn Trent Water logo
URGENT
  
ALDERSLEY ROAD 
(0.8 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
19 Nov 2024 12:47 - 16:18
0.8
Details
Share
8
Cityfibre Metro Networks logo
ALDERSLEY ROAD 
(0.9 miles)
Cityfibre Metro Networks
Remedial works - Footway - No carriageway incursion
Cancelled
(Scheduled: 21 Nov 2024 - 25 Nov 2024)
0.9
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.