ROADWORKS SUMMARY
Wolverhampton Road, WOLVERHAMPTON, WV6 6SP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Wolverhampton Road, WV6 6SP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Wolverhampton Road, WOLVERHAMPTON, WV6 6SP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wolverhampton Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

City Of Wolverhampton Council logo
LONG TERM
Until
17 Dec 2027
Details
View Map
Share
Follow
Cleveland Street

City Of Wolverhampton Council are carrying out Works for road purposes on Cleveland Street, Wolverhampton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 November 2025 at 08:00 and could run through until 17 December 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wolverhampton Council on 18 Aug 2026 at 10:28.

City Of Wolverhampton Council logo
LONG TERM
Until
20 Nov 2026
Details
View Map
Share
Follow
High Street

City Of Wolverhampton Council are carrying out Works for road purposes on High Street, Wednesfield, Wolverhampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 January 2026 at 08:00 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wolverhampton Council on 26 Aug 2026 at 11:32.

City Of Wolverhampton Council logo
LONG TERM
Until
17 Jun 2027
Details
View Map
Share
Follow
Darlington Street

City Of Wolverhampton Council are carrying out Highway improvement works on Darlington Street, Wolverhampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 February 2026 at 08:00 and could run through until 17 June 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wolverhampton Council on 17 Jun 2026 at 14:32.

Staffordshire County Council logo
LONG TERM
Until
31 Dec 2026
Details
View Map
Share
Follow
High Green

Staffordshire County Council are carrying out Highway improvement works on High Green, Brewood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 March 2026 at 00:00 and could run through until 31 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Sep 2026 at 10:55.

Western Power Distribution (West Midlands) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Stafford Road

Western Power Distribution (West Midlands) are carrying out Utility asset works on Stafford Road, Wolverhampton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 June 2026 at 10:26 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Sep 2026 at 16:13.

City Of Wolverhampton Council logo
LONG TERM
Until
29 Dec 2027
Details
View Map
Share
Follow
Lichfield Street

City Of Wolverhampton Council are carrying out Highway improvement works on Lichfield Street, City Centre, Wolverhampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 June 2026 at 08:00 and could run through until 29 December 2027. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by City Of Wolverhampton Council on 18 Jun 2026 at 09:20.

City Of Wolverhampton Council logo
LONG TERM
Until
29 Dec 2027
Details
View Map
Share
Follow
Queen Square

City Of Wolverhampton Council are carrying out Highway improvement works on Queen Square, Wolverhampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 June 2026 at 08:00 and could run through until 29 December 2027. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by City Of Wolverhampton Council on 18 Jun 2026 at 09:21.

City Of Wolverhampton Council logo
LONG TERM
Until
16 Dec 2027
Details
View Map
Share
Follow
Lich Gates

City Of Wolverhampton Council are carrying out Highway improvement works on Lich Gates, Wolverhampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 08:00 and could run through until 16 December 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wolverhampton Council on 3 Aug 2026 at 17:19.

LONG TERM
Finishing
Thursday
Details
View Map
Share
Newport Road

Interoute (Formerly I-21 Holdings) were proposing to carry out Utility repair and maintenance works on Newport Road, Albrighton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 August 2026 and run through until 24 September 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Interoute (Formerly I-21 Holdings) on 27 Aug 2026 at 08:46.

LONG TERM
Finishing
Thursday
Details
View Map
Share
High Street

Interoute (Formerly I-21 Holdings) were proposing to carry out Utility repair and maintenance works on High Street, Albrighton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 August 2026 and run through until 24 September 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Interoute (Formerly I-21 Holdings) on 27 Aug 2026 at 08:46.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
31 Aug and 4 Oct 2026
Details
View Map
Share
Follow
Ring Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Ring Road, Wolverhampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2026 and could run through until 4 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 23 Aug 2026 at 17:05.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Severn Drive

Cadent Gas are carrying out Utility asset works on Severn Drive, Perton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 09:48 and could run through until 21 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 10:05.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Clive Road

Staffordshire County Council are proposing to carry out Highway improvement works on Clive Road, Pattingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Jun 2026 at 17:50.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Clive Road

Staffordshire County Council are proposing to carry out Highway improvement works on Clive Road, Pattingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Sep 2026 at 15:18.

Western Power Distribution (West Midlands) logo
LONG TERM
Until
5 Oct 2026
Details
View Map
Share
Follow
Ring Road

Western Power Distribution (West Midlands) are carrying out Utility asset works on Ring Road, Wolverhampton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 05:30 and could run through until 5 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Sep 2026 at 09:14.

Cadent Gas logo
Between
7 and 29 Sep 2026
Details
View Map
Share
Kingswood Road

Cadent Gas were proposing to carry out Utility asset works on Kingswood Road, Albrighton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 September 2026 and run through until 29 September 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Sep 2026 at 13:24.

Cadent Gas logo
Until
28 Sep 2026
Details
View Map
Share
Follow
Hawksmoor Drive

Cadent Gas are carrying out Utility asset works on Hawksmoor Drive, Perton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 16:00 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2026 at 08:26.

Cadent Gas logo
Until
28 Sep 2026
Details
View Map
Share
Follow
Edge Hill Drive

Cadent Gas are carrying out Utility asset works on Edge Hill Drive, Perton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2026 at 16:00 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2026 at 08:26.

National Highways logo
LONG TERM
Between
7 Sep 2026 and 28 Feb 2028
Details
View Map
Share
Follow
Dark Lane

National Highways are proposing to carry out Highway improvement works on Dark Lane, Featherstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2026 and could run through until 28 February 2028. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 17 Jul 2026 at 10:31.

National Highways logo
LONG TERM
Until
9 Oct 2026
Details
View Map
Share
Follow
Cannock Road

National Highways are carrying out Highway improvement works on Cannock Road, Featherstone.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 09:30 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 14 Sep 2026 at 14:05.

Cadent Gas logo
Until
28 Sep 2026
Details
View Map
Share
Follow
Lower Walsall Street

Cadent Gas are carrying out Utility repair and maintenance works on Lower Walsall Street, Wolverhampton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 08:33 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2026 at 10:45.

Cadent Gas logo
Between
21 Sep and 12 Oct 2026
Details
View Map
Share
Follow
Evans Street

Cadent Gas are proposing to carry out Utility asset works on Evans Street, Whitmore Reans, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 12 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2026 at 09:09.

Staffordshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Wood Road

Staffordshire County Council are proposing to carry out Highway improvement works on Wood Road, Codsall Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Jan 2026 at 16:24.

Cadent Gas logo
Between
21 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Avon Close

Cadent Gas are proposing to carry out Utility asset works on Avon Close, Perton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2026 at 16:31.

Cadent Gas logo
Between
21 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Churnet Grove

Cadent Gas are proposing to carry out Utility asset works on Churnet Grove, Perton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2026 at 16:31.

Cadent Gas logo
Between
21 Sep and 8 Oct 2026
Details
View Map
Share
Follow
Severn Drive

Cadent Gas are proposing to carry out Utility asset works on Severn Drive, Perton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 8 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2026 at 16:31.

ESP Electricity logo
Between
22 Sep and 18 Oct 2026
Details
View Map
Share
Snow Hill

ESP Electricity were proposing to carry out Utility asset works on Snow Hill, Wolverhampton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2026 and run through until 18 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 18 Sep 2026 at 15:08.

City Of Wolverhampton Council logo
Between
22 and 29 Sep 2026
Details
View Map
Share
Follow
Wobaston Road

City Of Wolverhampton Council are proposing to carry out Highway repair and maintenance works on Wobaston Road, Wolverhampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 29 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wolverhampton Council on 11 Sep 2026 at 11:55.

City Of Wolverhampton Council logo
Between
22 and 29 Sep 2026
Details
View Map
Share
Follow
Wobaston Road

City Of Wolverhampton Council are proposing to carry out Highway repair and maintenance works on Wobaston Road, Wolverhampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 29 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wolverhampton Council on 18 Sep 2026 at 16:32.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Lynton Avenue

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lynton Avenue, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2026 and could run through until 25 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 11 Aug 2026 at 10:47.

Western Power Distribution (West Midlands) logo
Between
26 Sep and 4 Oct 2026
Details
View Map
Share
Follow
Dudley Road

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Dudley Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2026 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 1 Sep 2026 at 16:11.

BT logo
Between
28 and 30 Sep 2026
Details
View Map
Share
Follow
Laches Lane

BT are proposing to carry out Utility repair and maintenance works on Laches Lane, Slade Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 30 September 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 18 Jun 2026 at 15:22.

Transport for West Midlands (TfWM) logo
Between
28 Sep and 13 Oct 2026
Details
View Map
Share
Follow
Ring Road

Transport for West Midlands (TfWM) are proposing to carry out Works for road purposes on Ring Road, Wolverhampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 13 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for West Midlands (TfWM) on 2 Sep 2026 at 14:26.

Shropshire Council logo
Between
28 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Worcester Road

Shropshire Council are proposing to carry out Highway improvement works on Worcester Road, Cosford, Albrighton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 15 Sep 2026 at 10:22.

Severn Trent Water logo
Between
29 Sep and 27 Oct 2026
Details
View Map
Share
Follow
School Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on School Lane, Stretton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 27 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 17 Sep 2026 at 08:26.

Staffordshire County Council logo
Between
1 and 2 Oct 2026
Details
View Map
Share
Follow
Old Hampton Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Old Hampton Lane, Westcroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Jul 2026 at 11:30.

Shropshire Council logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Woodhouse Lane

Shropshire Council are proposing to carry out Highway improvement works on Woodhouse Lane, Albrighton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 18 Sep 2026 at 08:00.

National Highways logo
Between
6 and 22 Oct 2026
Details
View Map
Share
Follow
Cannock Road

National Highways are proposing to carry out Highway improvement works on Cannock Road, Featherstone.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2026 and could run through until 22 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 4 Sep 2026 at 10:13.

ESP Electricity logo
Between
12 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Temple Street

ESP Electricity are proposing to carry out Utility asset works on Temple Street, City Centre, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 15 Sep 2026 at 16:25.

Staffordshire County Council logo
Between
14 and 16 Oct 2026
Details
View Map
Share
Follow
Keepers Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Keepers Lane, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2026 and could run through until 16 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Jul 2026 at 15:22.

Virgin Media logo
Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
Codsall Road

Virgin Media are proposing to carry out Utility repair and maintenance works on Codsall Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 30 Jul 2026 at 09:41.

Cadent Gas logo
Between
19 Oct and 13 Nov 2026
Details
View Map
Share
Follow
Brantley Avenue

Cadent Gas are proposing to carry out Utility asset works on Brantley Avenue, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 13 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2026 at 09:02.

Staffordshire County Council logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
East Road

Staffordshire County Council are proposing to carry out Highway improvement works on East Road, Featherstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Aug 2026 at 12:53.

Staffordshire County Council logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
East Road

Staffordshire County Council are proposing to carry out Highway improvement works on East Road, Featherstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Aug 2026 at 15:03.

Cadent Gas logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
Church Hill

Cadent Gas are proposing to carry out Utility asset works on Church Hill, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Aug 2026 at 13:36.

Cadent Gas logo
Between
19 and 30 Oct 2026
Details
View Map
Share
Follow
Sandy Lane

Cadent Gas are proposing to carry out Utility asset works on Sandy Lane, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Aug 2026 at 13:36.

ESP Electricity logo
Between
19 Oct and 12 Nov 2026
Details
View Map
Share
Temple Street

ESP Electricity were proposing to carry out Utility asset works on Temple Street, City Centre, Wolverhampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 October 2026 and run through until 12 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 9 Sep 2026 at 12:10.

Virgin Media logo
Between
20 and 23 Oct 2026
Details
View Map
Share
Follow
Oxley Moor Road

Virgin Media are proposing to carry out New service connection on Oxley Moor Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 23 Aug 2026 at 17:33.

Virgin Media logo
Between
20 and 23 Oct 2026
Details
View Map
Share
Follow
Aldersley Road

Virgin Media are proposing to carry out New service connection on Aldersley Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2026 and could run through until 23 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 23 Aug 2026 at 17:33.

ESP Electricity logo
Between
21 and 29 Oct 2026
Details
View Map
Share
Follow
Sharrocks Street

ESP Electricity are proposing to carry out Utility asset works on Sharrocks Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2026 and could run through until 29 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 14 Sep 2026 at 16:31.

Murphy Power Distribution logo
Between
24 Oct and 1 Nov 2026
Details
View Map
Share
Dale Street

Murphy Power Distribution were proposing to carry out roadworks on Dale Street, Merridale, Wolverhampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 October 2026 and run through until 1 November 2026. The works were due to impact the carriageway and footpath.

This roadwork event was last updated by Murphy Power Distribution on 10 Sep 2026 at 15:33.

ESP Electricity logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Worcester Street

ESP Electricity are proposing to carry out Utility asset works on Worcester Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 6 Aug 2026 at 16:52.

Severn Trent Water logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Temple Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Temple Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 14 Aug 2026 at 12:24.

Severn Trent Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Stubbs Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Stubbs Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 3 Sep 2026 at 15:28.

Severn Trent Water logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Stubbs Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Stubbs Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 25 Aug 2026 at 16:42.

Severn Trent Water logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Pattingham Road

Severn Trent Water are proposing to carry out Utility asset works on Pattingham Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 7 Sep 2026 at 15:41.

Severn Trent Water logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Pattingham Road

Severn Trent Water are proposing to carry out Utility asset works on Pattingham Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Aug 2026 at 13:29.

Severn Trent Water logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Tinacre Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Tinacre Hill, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 7 Sep 2026 at 15:46.

Severn Trent Water logo
Between
26 and 29 Oct 2026
Details
View Map
Share
Follow
Sandown Drive

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Sandown Drive, Perton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 29 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Jun 2026 at 15:43.

Severn Trent Water logo
Between
26 and 28 Oct 2026
Details
View Map
Share
Follow
Tinacre Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Tinacre Hill, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 28 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Aug 2026 at 13:28.

Network Rail logo
Between
1 and 20 Nov 2026
Details
View Map
Share
Wednesfield Road

Network Rail were proposing to carry out Works for Rail Purposes on Wednesfield Road, Wolverhampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2026 and run through until 20 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Sep 2026 at 10:33.

Network Rail logo
Between
1 and 20 Nov 2026
Details
View Map
Share
Follow
Wednesfield Road

Network Rail are proposing to carry out Works for Rail Purposes on Wednesfield Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Sep 2026 at 10:37.

Network Rail logo
Between
1 and 20 Nov 2026
Details
View Map
Share
Follow
Broad Street

Network Rail are proposing to carry out Works for Rail Purposes on Broad Street, City Centre, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Sep 2026 at 10:40.

ESP Electricity logo
Between
2 and 23 Nov 2026
Details
View Map
Share
Follow
Snow Hill

ESP Electricity are proposing to carry out Utility asset works on Snow Hill, Wolverhampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 31 Jul 2026 at 10:20.

City Of Wolverhampton Council logo
LONG TERM
Between
2 Nov 2026 and 29 Dec 2027
Details
View Map
Share
Follow
Dudley Street

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Dudley Street, City Centre, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 29 December 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wolverhampton Council on 19 Aug 2026 at 12:28.

BT logo
Between
4 and 6 Nov 2026
Details
View Map
Share
Follow
Middle Lane

BT are proposing to carry out Utility repair and maintenance works on Middle Lane, Oaken.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2026 and could run through until 6 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 5 Aug 2026 at 15:31.

ESP Electricity logo
Between
6 and 20 Nov 2026
Details
View Map
Share
Worcester Street

ESP Electricity were proposing to carry out Utility asset works on Worcester Street, Wolverhampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 November 2026 and run through until 20 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 9 Sep 2026 at 08:40.

ESP Electricity logo
Between
7 and 23 Nov 2026
Details
View Map
Share
Follow
Worcester Street

ESP Electricity are proposing to carry out Utility asset works on Worcester Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2026 and could run through until 23 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 17 Sep 2026 at 14:54.

Cadent Gas logo
Between
9 and 30 Nov 2026
Details
View Map
Share
Follow
Evans Street

Cadent Gas are proposing to carry out Utility asset works on Evans Street, Whitmore Reans, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2026 at 13:14.

Staffordshire County Council logo
Between
9 and 13 Nov 2026
Details
View Map
Share
Follow
Wergs Hall Road

Staffordshire County Council are proposing to carry out Highway improvement works on Wergs Hall Road, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2026 and could run through until 13 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Sep 2026 at 08:35.

Staffordshire County Council logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Wergs Hall Road

Staffordshire County Council are proposing to carry out Highway improvement works on Wergs Hall Road, Codsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Sep 2026 at 11:58.

Staffordshire County Council logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Paradise Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Paradise Lane, Slade Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Sep 2026 at 16:08.

Shropshire Council logo
Between
16 and 20 Nov 2026
Details
View Map
Share
Follow
Woodhouse Lane

Shropshire Council are proposing to carry out Highway improvement works on Woodhouse Lane, Albrighton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Shropshire Council on 7 Sep 2026 at 16:23.

City Of Wolverhampton Council logo
Between
17 and 24 Nov 2026
Details
View Map
Share
Follow
Dunstall Lane

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Dunstall Lane, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2026 and could run through until 24 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wolverhampton Council on 7 Jul 2026 at 16:05.

Severn Trent Water logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Temple Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Temple Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 15 Sep 2026 at 08:26.

Cadent Gas logo
Between
27 Nov and 23 Dec 2026
Details
View Map
Share
Follow
Clifton Road

Cadent Gas are proposing to carry out Utility asset works on Clifton Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2026 and could run through until 23 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 1 Sep 2026 at 10:30.

ESP Electricity logo
Between
2 and 16 Dec 2026
Details
View Map
Share
Follow
Worcester Street

ESP Electricity are proposing to carry out Utility asset works on Worcester Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 16 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 10 Sep 2026 at 12:14.

Western Power Distribution (West Midlands) logo
Between
3 and 30 Dec 2026
Details
View Map
Share
Follow
Bone Mill Lane

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Bone Mill Lane, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2026 and could run through until 30 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Sep 2026 at 08:55.

City Of Wolverhampton Council logo
Between
3 and 9 Dec 2026
Details
View Map
Share
Follow
Dunstall Lane

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Dunstall Lane, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2026 and could run through until 9 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wolverhampton Council on 14 Sep 2026 at 16:45.

Severn Trent Water logo
LONG TERM
Between
7 Dec 2026 and 22 Jan 2027
Details
View Map
Share
Station Road

Severn Trent Water were proposing to carry out Utility asset works on Station Road, Four Ashes.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 December 2026 and run through until 22 January 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 17 Sep 2026 at 09:57.

Severn Trent Water logo
LONG TERM
Between
7 Dec 2026 and 22 Jan 2027
Details
View Map
Share
Vicarage Road

Severn Trent Water were proposing to carry out Utility asset works on Vicarage Road, Calf Heath.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 December 2026 and run through until 22 January 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 17 Sep 2026 at 09:57.

BT logo
Between
8 and 10 Dec 2026
Details
View Map
Share
Follow
Thruxton Avenue

BT are proposing to carry out Utility asset works on Thruxton Avenue, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2026 and could run through until 10 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by BT on 7 Sep 2026 at 10:15.

ESP Electricity logo
Between
14 Dec 2026 and 9 Jan 2027
Details
View Map
Share
Follow
Snow Hill

ESP Electricity are proposing to carry out Utility asset works on Snow Hill, Wolverhampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 9 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 19 Sep 2026 at 06:09.


Roadworks Map near to Wolverhampton Road, WOLVERHAMPTON, WV6 6SP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 20 Sep 2026 14:23
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Wolverhampton Road, WOLVERHAMPTON, WV6 6SP (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
MILL GROVE 
(0.7 miles)
Cadent Gas
New service connection - Footway - No carriageway incursion
Cancelled
(Scheduled: 21 Sep 2026 - 25 Sep 2026)
0.7
Details
Share
2
Staffordshire County Council logo
EMERGENCY
  
JOEYS LANE 
(0.7 miles)
Staffordshire County Council
Highway improvement works - Footway, Footpath - No carriageway incursion
In Progress
Since: 21 Jul 2026 13:31
(Scheduled: 21 Jul 2026 - 25 Sep 2026)
0.7
Details
Share
Follow