ROADWORKS SUMMARY
Woodford Lane, WOLVERHAMPTON, WV5 8DS
Introduction

View current and future planned roadworks and road closures for Woodford Lane, WV5 8DS and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Woodford Lane, WOLVERHAMPTON, WV5 8DS
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Woodford Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
15 Jan and 28 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Mount Road, Penn, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.
15 Jan and 28 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Mount Road, Penn, Wolverhampton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 January 2025 and run through until 28 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Jan 2025 at 15:30.
18 Jul 2025
City Of Wolverhampton Council are carrying out Highway improvement works on Darlington Street, Wolverhampton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 07:30 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Wolverhampton Council on 20 Jan 2025 at 08:24.
20 Jan and 31 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Mercia Drive, Perton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 14 Nov 2024 at 16:05.
31 Mar 2025
Western Power Distribution (West Midlands) are carrying out Utility asset works on Mercia Drive, Perton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 09:48 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Jan 2025 at 17:21.
24 Mar 2025
Cadent Gas are carrying out Utility asset works on Enville Road, Wall Heath.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 08:00 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Feb 2025 at 08:04.
Friday
Severn Trent Water are proposing to carry out Utility asset works on Ounsdale Road, Wombourne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 12:01.
Friday
Severn Trent Water are proposing to carry out Utility asset works on Ounsdale Road, Wombourne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 08:51.
Friday
Cadent Gas are carrying out Utility asset works on Windmill Grove, Wall Heath.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 February 2025 at 09:00 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Feb 2025 at 09:03.
24 Feb and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Lilac Road, Dudley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 11:47.
Wednesday
Cadent Gas were proposing to carry out Utility asset works on Upper Ettingshall Road, Coseley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 19 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 15:09.
Friday
Cadent Gas were proposing to carry out Utility asset works on Upper Ettingshall Road, Coseley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 09:35.
4 Apr 2025
Cadent Gas are carrying out Utility asset works on Upper Ettingshall Road, Coseley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 February 2025 at 09:30 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Mar 2025 at 12:37.
24 Feb and 31 Mar 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on The Parkway, Perton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 14 Nov 2024 at 16:05.
31 Mar 2025
Western Power Distribution (West Midlands) are carrying out Utility asset works on The Parkway, Perton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 February 2025 at 17:30 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 25 Feb 2025 at 08:25.
3 Mar and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Forge Lane, Wall Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 15:07.
10 Apr 2025
Cadent Gas are carrying out Utility asset works on Forge Lane, Wall Heath.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 March 2025 at 10:00 and could run through until 10 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Mar 2025 at 10:13.
3 and 26 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Mander Street, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 09:17.
Friday
Cadent Gas are carrying out Utility asset works on Mander Street, Wolverhampton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 08:00 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Mar 2025 at 09:36.
4 and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Upper Ettingshall Road, Coseley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 11:03.
Friday
Cadent Gas were proposing to carry out Utility asset works on Belmont Road, Wolverhampton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 March 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 11:47.
28 Apr 2025
Cadent Gas are carrying out Utility asset works on Charterfield Drive, Kingswinford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 March 2025 at 14:45 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 14:57.
Tuesday
Severn Trent Water are carrying out Utility repair and maintenance works on Maxwell Road, Wolverhampton.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 March 2025 at 10:02 and could run through until 18 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 13 Mar 2025 at 13:20.
Thursday
Severn Trent Water are carrying out Utility repair and maintenance works on Woodthorne Road South, Wolverhampton.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 March 2025 at 08:05 and could run through until 20 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 15 Mar 2025 at 08:06.
Friday
Dudley Metropolitan Borough Council are proposing to carry out Section 50 on Hartland Street, Pensnett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 14 Feb 2025 at 14:39.
Friday
Dudley Metropolitan Borough Council are proposing to carry out Section 50 on Hartland Street, Pensnett.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 14 Feb 2025 at 14:39.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Six Ashes Road, Halfpenny Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 9 Jan 2025 at 12:38.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Wombourne Park, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Dec 2024 at 09:40.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on The Warings, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 08:58.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on The Warings, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 15:52.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Orton Lane, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 08:58.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Orton Lane, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 15:52.
Friday
Cadent Gas are proposing to carry out Utility asset works on Meadow Lane, Lanesfield, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 11:36.
Friday
Cadent Gas are proposing to carry out Utility asset works on Meadow Lane, Lanesfield, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 09:11.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Showell Lane, Orton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Dec 2024 at 09:44.
17 Mar and 4 Apr 2025
City Of Wolverhampton Council are proposing to carry out Highway repair and maintenance works on Hilton Road, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Wolverhampton Council on 16 Jan 2025 at 08:03.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Dene Road, Orton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Dec 2024 at 09:40.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Dene Road, Orton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Jan 2025 at 16:25.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Greyhound Lane, Lower Penn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Dec 2024 at 14:48.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Radford Lane, Lower Penn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Dec 2024 at 11:06.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Langley Road, Lower Penn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 15 Jan 2025 at 12:45.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Radford Lane, Lower Penn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Dec 2024 at 09:40.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Bridgnorth Road, Trescott.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 15:45.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Melrose Drive, Perton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 21 Jan 2025 at 12:57.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Sandown Drive, Perton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 21 Jan 2025 at 12:57.
21 Mar and 4 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Quilter Close, Coseley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 March 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 09:44.
21 Mar and 4 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Quilter Close, Coseley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 11:06.
21 Mar and 4 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Quilter Close, Coseley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 07:31.
21 Mar and 4 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Paul Street, Coseley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 11:06.
21 Mar and 4 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Paul Street, Coseley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 11:54.
21 Mar and 4 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Paul Street, Coseley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 March 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 09:43.
24 and 28 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Prestwood Drive, Stourton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 21 Feb 2025 at 11:07.
24 Mar and 7 Apr 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Maidensbridge Road, Wall Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 7 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 14 Jan 2025 at 15:01.
24 and 27 Mar 2025
Cadent Gas are proposing to carry out New service connection on Vicarage Road, Penn, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 13:01.
24 and 28 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Radford Lane, Lower Penn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 20 Dec 2024 at 09:54.
24 and 28 Mar 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Radford Lane, Lower Penn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 March 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Dec 2024 at 16:05.
24 Mar and 4 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Retreat Street, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 17:04.
24 Mar and 4 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Retreat Street, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 15:26.
24 and 28 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Melrose Drive, Perton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 12:16.
24 and 28 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Sandown Drive, Perton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 12:16.
28 and 31 Mar 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Cleveland Street, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 17 Jan 2025 at 11:41.
31 Mar and 4 Apr 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Ridgehill Road, Gorse Corner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 21 Feb 2025 at 15:26.
31 Mar and 2 Apr 2025
BT were proposing to carry out Utility asset works on Melrose Drive, Perton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 2 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 3 Jan 2025 at 08:07.
2 and 4 Apr 2025
Severn Trent Water were proposing to carry out New service connection on Ounsdale Road, Wombourne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 April 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 30 Jan 2025 at 13:12.
4 and 15 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Elm Dale Road, Wolverhampton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 April 2025 and run through until 15 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 11:47.
5 and 28 Apr 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Giggetty Lane, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Feb 2025 at 13:43.
5 and 28 Apr 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Brickbridge Lane, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Feb 2025 at 11:20.
5 and 28 Apr 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Rookery Road, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Feb 2025 at 13:57.
5 and 28 Apr 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Battlefield Hill, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Feb 2025 at 13:29.
5 and 28 Apr 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Withymere Lane, Lloyd Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Feb 2025 at 11:20.
7 and 9 Apr 2025
Cadent Gas are proposing to carry out New service connection on Planet Road, Brockmoor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Jan 2025 at 09:48.
7 and 9 Apr 2025
Cadent Gas are proposing to carry out New service connection on Planet Road, Brockmoor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 09:36.
7 and 11 Apr 2025
Staffordshire County Council are proposing to carry out Highway improvement works on High Street, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 12:15.
7 and 9 Apr 2025
BT are proposing to carry out Utility repair and maintenance works on Ashford Bank, Claverley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 10 Jan 2025 at 15:12.
7 and 11 Apr 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Bratch Lane, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 12:15.
7 and 16 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Mobberley Road, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 12:22.
7 and 15 Apr 2025
City Of Wolverhampton Council are proposing to carry out Highway repair and maintenance works on Wolverhampton Road East, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Wolverhampton Council on 16 Jan 2025 at 09:50.
7 and 25 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Grendon Gardens, Wolverhampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 13:25.
7 and 11 Apr 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Langley Road, Lower Penn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Jan 2025 at 15:00.
7 and 13 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Owen Road, Merridale, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Jan 2025 at 11:12.
7 and 13 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Owen Road, Merridale, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Feb 2025 at 09:13.
7 and 25 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Merridale Street West, Wolverhampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Jan 2025 at 08:37.
7 and 25 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Merridale Street West, Wolverhampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 09:56.
7 and 18 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Owen Road, Merridale, Wolverhampton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 18 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 11:18.
7 and 9 Apr 2025
BT are proposing to carry out Utility asset works on Melrose Drive, Perton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Jan 2025 at 11:54.
7 and 9 Apr 2025
BT are proposing to carry out Utility asset works on Melrose Drive, Perton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 14 Mar 2025 at 12:24.
7 and 11 Apr 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Gainsborough Drive, Perton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 21 Feb 2025 at 15:26.
8 and 10 Apr 2025
South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Bent Street, Brierley Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South Staffordshire Water on 3 Feb 2025 at 11:30.
14 and 25 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Lawnswood Road, Wordsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 08:00.
14 and 25 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Lawnswood Road, Wordsley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 4 Feb 2025 at 07:56.
14 and 16 Apr 2025
South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Wallows Road, Brockmoor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by South Staffordshire Water on 4 Feb 2025 at 14:22.
14 and 18 Apr 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Six Ashes Road, Halfpenny Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 9 Jan 2025 at 11:39.
14 and 18 Apr 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Draycott, Claverley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 10 Jan 2025 at 15:57.
14 and 17 Apr 2025
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Draycott, Claverley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 7 Mar 2025 at 10:00.
14 and 16 Apr 2025
Severn Trent Water are proposing to carry out New service connection on Ounsdale Road, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 25 Feb 2025 at 09:25.
15 and 25 Apr 2025
City Of Wolverhampton Council are proposing to carry out Highway improvement works on Ettingshall Road, Lanesfield, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Wolverhampton Council on 21 Feb 2025 at 12:00.
15 and 25 Apr 2025
City Of Wolverhampton Council are proposing to carry out Highway improvement works on Ettingshall Road, Lanesfield, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Wolverhampton Council on 14 Mar 2025 at 10:43.
17 Apr and 5 May 2025
Staffordshire County Council were proposing to carry out Highway repair and maintenance works on Pool House Road, Wombourne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 April 2025 and run through until 5 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Feb 2025 at 12:47.
17 Apr and 5 May 2025
Staffordshire County Council were proposing to carry out Highway repair and maintenance works on Ounsdale Road, Wombourne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 April 2025 and run through until 5 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Feb 2025 at 12:48.
17 Apr and 5 May 2025
Staffordshire County Council were proposing to carry out Highway repair and maintenance works on School Road, Wombourne.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 April 2025 and run through until 5 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 3 Feb 2025 at 12:48.
21 and 25 Apr 2025
Staffordshire County Council are proposing to carry out Highway improvement works on School Road, Trysull.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Feb 2025 at 11:06.
21 Apr and 13 May 2025
Cadent Gas are proposing to carry out Utility asset works on Bhylls Lane, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Jan 2025 at 12:09.
22 and 24 Apr 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Perton Road, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 14:18.
23 and 25 Apr 2025
Cadent Gas are proposing to carry out New service connection on Beechfield Grove, Coseley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 08:47.
23 and 25 Apr 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Springfield Grove, Sedgley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 10 Feb 2025 at 12:44.
28 Apr and 26 May 2025
Cadent Gas are proposing to carry out Utility asset works on Lambert Court, Kingswinford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 26 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Mar 2025 at 15:10.
28 Apr and 2 May 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Jenks Road, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Mar 2025 at 16:10.
28 and 30 Apr 2025
Severn Trent Water are proposing to carry out New service connection on Ounsdale Road, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 17 Feb 2025 at 15:43.
28 Apr and 19 May 2025
Cadent Gas were proposing to carry out Utility asset works on Elmdale Road, Coseley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 19 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 14:02.
28 Apr and 9 May 2025
Murphy Power Distribution are proposing to carry out New service connection on Beacon Lane, Sedgley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 5 Feb 2025 at 11:04.
28 Apr and 2 May 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Furnace Grange Road, Trescott.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Feb 2025 at 14:56.
28 Apr and 2 May 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Dene Road, Orton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Jan 2025 at 10:23.
29 Apr and 13 May 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Giggetty Lane, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 13 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Feb 2025 at 14:18.
29 Apr and 13 May 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Rookery Road, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 13 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Feb 2025 at 14:18.
29 Apr and 13 May 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Battlefield Hill, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 13 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Feb 2025 at 12:33.
29 Apr and 13 May 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Withymere Lane, Lloyd Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 13 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Feb 2025 at 12:33.
30 Apr and 14 May 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Brickbridge Lane, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 14 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Feb 2025 at 14:18.
30 Apr and 21 May 2025
Cadent Gas were proposing to carry out Utility asset works on Elmdale Road, Coseley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 April 2025 and run through until 21 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 14:02.
30 Apr and 21 May 2025
Cadent Gas are proposing to carry out Utility asset works on Elmdale Road, Coseley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Jan 2025 at 16:01.
30 Apr and 2 May 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Orton Lane, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 7 Mar 2025 at 09:58.
5 May and 11 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Enville Road, Wall Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 12:47.
5 and 28 May 2025
Cadent Gas are proposing to carry out Utility asset works on Windmill Grove, Wall Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 28 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 12:49.
5 May and 11 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Forge Lane, Wall Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 12:48.
5 and 9 May 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Van Diemans Road, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Mar 2025 at 14:55.
5 and 9 May 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Planks Lane, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Mar 2025 at 14:55.
5 and 9 May 2025
Staffordshire County Council are proposing to carry out Highway improvement works on St Benedicts Road, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Mar 2025 at 14:55.
6 and 8 May 2025
Severn Trent Water are proposing to carry out Remedial works on Barnett Lane, Kingswinford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 5 Feb 2025 at 12:23.
6 and 8 May 2025
Severn Trent Water are proposing to carry out Remedial works on Barnett Lane, Kingswinford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 12 Feb 2025 at 11:18.
6 and 9 May 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Beechfield Grove, Coseley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 12:21.
6 and 9 May 2025
Cadent Gas were proposing to carry out New service connection on Crowesbridge Mews, Coseley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 May 2025 and run through until 9 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Feb 2025 at 15:42.
6 and 23 May 2025
Murphy Power Distribution are proposing to carry out New service connection on Beacon Lane, Sedgley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 11 Mar 2025 at 14:11.
6 and 23 May 2025
Murphy Power Distribution are proposing to carry out New service connection on Beacon Lane, Sedgley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 14 Mar 2025 at 15:03.
9 and 23 May 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Dibdale Street, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 12 Feb 2025 at 08:21.
9 and 23 May 2025
Dudley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Dibdale Street, Dudley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 May 2025 and run through until 23 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 5 Mar 2025 at 10:06.
9 and 23 May 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Dibdale Street, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 4 Mar 2025 at 10:04.
9 and 23 May 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Dibdale Street, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 5 Mar 2025 at 10:20.
12 and 15 May 2025
Cadent Gas are proposing to carry out New service connection on Catholic Lane, Sedgley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 21 Feb 2025 at 14:31.
12 and 16 May 2025
Staffordshire County Council are proposing to carry out Highway improvement works on The Roughs, Trescott.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Feb 2025 at 12:30.
13 and 15 May 2025
Western Power Distribution (West Midlands) are proposing to carry out Remedial works on Swancote Road, Dudley Metropolitan Borough Council, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 10 Feb 2025 at 12:44.
13 and 15 May 2025
Western Power Distribution (West Midlands) are proposing to carry out Remedial works on Swancote Road, Dudley Metropolitan Borough Council, Dudley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Feb 2025 at 11:26.
19 and 23 May 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Prestwood Drive, Stourton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 21 Feb 2025 at 10:18.
19 and 23 May 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Ridgehill Road, Gorse Corner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 20 Feb 2025 at 16:16.
19 and 23 May 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Wombourne Road, Wombourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 21 Feb 2025 at 10:18.
19 and 22 May 2025
Cadent Gas are proposing to carry out New service connection on Vicarage Road, Penn, Wolverhampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 22 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Feb 2025 at 11:30.
21 May and 23 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Charterfield Drive, Kingswinford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 May 2025 and run through until 23 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 12:26.
26 and 30 May 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Gainsborough Drive, Perton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 21 Feb 2025 at 10:37.
27 and 30 May 2025
Cadent Gas are proposing to carry out New service connection on Catholic Lane, Sedgley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 11:26.
27 and 30 May 2025
Cadent Gas are proposing to carry out New service connection on Catholic Lane, Sedgley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 16:30.
2 and 6 Jun 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Lutley Lane, Bobbington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Feb 2025 at 09:15.
3 and 30 Jun 2025
Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Church Street, Lower Gornal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Dudley Metropolitan Borough Council on 28 Feb 2025 at 08:38.
6 Jun and 16 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on Charterfield Drive, Kingswinford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 June 2025 and run through until 16 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 13:55.
6 Jun and 16 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Charterfield Drive, Kingswinford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 14:00.
6 Jun and 23 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on Charterfield Drive, Kingswinford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 June 2025 and run through until 23 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 11:18.
9 and 23 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Catesby Drive, Kingswinford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 14:45.
9 and 23 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Catesby Drive, Kingswinford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 14 Mar 2025 at 14:01.
9 Jun and 14 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on Charterfield Drive, Kingswinford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 14 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 14:21.
9 Jun and 14 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Charterfield Drive, Kingswinford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 14:30.
9 and 23 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Keyes Drive, Kingswinford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 14:44.
9 and 23 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Keyes Drive, Kingswinford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Mar 2025 at 14:02.
9 and 13 Jun 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Furnace Grange Road, Trescott.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Feb 2025 at 10:08.
10 Jun and 25 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Charterfield Drive, Kingswinford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 12:56.
11 Jun and 7 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Lambert Court, Kingswinford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Mar 2025 at 14:46.
11 and 25 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Garret Close, Kingswinford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Mar 2025 at 12:03.
Roadworks Map near to Woodford Lane, WOLVERHAMPTON, WV5 8DS
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Woodford Lane, WOLVERHAMPTON, WV5 8DS (12 Events)
(Scheduled Dates)
(miles)
(Scheduled: 10 Mar 2025 - 21 Mar 2025)
(Scheduled: 16 Mar 2025 - 21 Mar 2025)
Contains public sector information licensed under the Open Government Licence v3.0.