ROADWORKS SUMMARY
Wolverhampton Road, WOLVERHAMPTON, WV10 7LY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Wolverhampton Road, WV10 7LY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Wolverhampton Road, WOLVERHAMPTON, WV10 7LY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wolverhampton Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Severn Trent Water logo
LONG TERM
Between
19 Mar 2023 and 19 Mar 2025
Details
View Map
Share
Stubby Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Stubby Lane, Wolverhampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 March 2023 and run through until 19 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 10:55.

Walsall Metropolitan Borough Council logo
LONG TERM
Between
2 Apr 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Norton Road

Walsall Metropolitan Borough Council are proposing to carry out Highway improvement works on Norton Road, Pelsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 23 Jan 2024 at 14:51.

Walsall Metropolitan Borough Council logo
LONG TERM
Between
14 May 2024 and 17 May 2025
Details
View Map
Share
Follow
New Road

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on New Road, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 17 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 20 Feb 2024 at 14:01.

City Of Wolverhampton Council logo
LONG TERM
Between
3 Jun 2024 and 16 Feb 2025
Details
View Map
Share
Follow
Somerford Place

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Somerford Place, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 16 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Wolverhampton Council on 26 Mar 2024 at 17:10.

Walsall Metropolitan Borough Council logo
LONG TERM
Between
24 Aug 2024 and 4 Sep 2025
Details
View Map
Share
New Road

Walsall Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on New Road, Willenhall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 August 2024 and run through until 4 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 14 Nov 2024 at 08:56.

City Of Wolverhampton Council logo
LONG TERM
Between
2 Sep 2024 and 29 Mar 2025
Details
View Map
Share
Willenhall Road

City Of Wolverhampton Council were proposing to carry out Highway improvement works on Willenhall Road, Wolverhampton.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 29 March 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by City Of Wolverhampton Council on 30 Jul 2024 at 13:43.

City Of Wolverhampton Council logo
LONG TERM
Between
7 Oct 2024 and 27 Jul 2025
Details
View Map
Share
Willenhall Road

City Of Wolverhampton Council were proposing to carry out Highway improvement works on Willenhall Road, Wolverhampton.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2024 and run through until 27 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by City Of Wolverhampton Council on 19 Sep 2024 at 11:32.

City Of Wolverhampton Council logo
LONG TERM
Between
4 Nov 2024 and 16 Feb 2025
Details
View Map
Share
Wolverhampton Road

City Of Wolverhampton Council were proposing to carry out Highway improvement works on Wolverhampton Road, Heath Town, Wolverhampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 16 February 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by City Of Wolverhampton Council on 24 Sep 2024 at 10:50.

Walsall Metropolitan Borough Council logo
LONG TERM
Between
18 Nov 2024 and 19 Sep 2025
Details
View Map
Share
Follow
Norton Road

Walsall Metropolitan Borough Council are proposing to carry out Highway improvement works on Norton Road, Pelsall.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 28 Nov 2024 at 15:52.

Cadent Gas logo
LONG TERM
Between
19 Nov 2024 and 20 Jan 2025
Details
View Map
Share
Littleworth Road

Cadent Gas were proposing to carry out Utility asset works on Littleworth Road, Cannock.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 20 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 08:59.

Staffordshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Straight Mile

Staffordshire County Council are carrying out Highway improvement works on Straight Mile, Calf Heath.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 15:32 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Dec 2024 at 10:08.

Staffordshire County Council logo
LONG TERM
Between
2 Dec 2024 and 6 Jun 2025
Details
View Map
Share
Follow
Gravelly Way

Staffordshire County Council are proposing to carry out Highway improvement works on Gravelly Way, Four Ashes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 14:28.

Staffordshire County Council logo
LONG TERM
Between
2 Dec 2024 and 6 Jun 2025
Details
View Map
Share
Follow
Gravelly Way

Staffordshire County Council are proposing to carry out Highway improvement works on Gravelly Way, Four Ashes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Staffordshire County Council on 22 Oct 2024 at 14:22.

Cadent Gas logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Leacroft Lane

Cadent Gas are proposing to carry out Utility asset works on Leacroft Lane, Great Wyrley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 7 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 08:49.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Cannock Road

Cadent Gas are proposing to carry out Utility asset works on Cannock Road, Chadsmoor, Cannock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 09:49.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Moreton Street

Cadent Gas are proposing to carry out Utility asset works on Moreton Street, Cannock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 14:46.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Moreton Street

Cadent Gas were proposing to carry out Utility asset works on Moreton Street, Cannock.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 10:30.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Walsall Road

Cadent Gas were proposing to carry out Utility asset works on Walsall Road, Churchbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 December 2024 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 15:23.

Staffordshire County Council logo
Until
14 Jan 2025
Details
View Map
Share
Follow
Gains Lane

Staffordshire County Council are carrying out Highway improvement works on Gains Lane, Cannock.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 December 2024 at 09:56 and could run through until 14 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Staffordshire County Council on 3 Jan 2025 at 15:30.

Cadent Gas logo
Between
31 Dec 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Walsall Road

Cadent Gas are proposing to carry out Utility asset works on Walsall Road, Churchbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 December 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 13:50.

Severn Trent Water logo
Between
2 and 19 Jan 2025
Details
View Map
Share
Follow
Park Lane

Severn Trent Water are proposing to carry out Utility asset works on Park Lane, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 13 Feb 2023 at 09:52.

Cadent Gas logo
Between
2 and 31 Jan 2025
Details
View Map
Share
High Hill

Cadent Gas were proposing to carry out Utility asset works on High Hill, Essington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 09:08.

Cadent Gas logo
Between
2 and 31 Jan 2025
Details
View Map
Share
High Hill

Cadent Gas were proposing to carry out Utility asset works on High Hill, Essington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 09:40.

Cadent Gas logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Walsall Road

Cadent Gas are proposing to carry out Utility asset works on Walsall Road, Churchbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 10:22.

South Staffordshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Central Avenue

South Staffordshire Water are carrying out Utility repair and maintenance works on Central Avenue, Cannock.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 January 2025 at 13:00 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 6 Jan 2025 at 14:16.

South Staffordshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Wrights Avenue

South Staffordshire Water are carrying out Utility repair and maintenance works on Wrights Avenue, Cannock.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 January 2025 at 13:00 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 6 Jan 2025 at 10:20.

South Staffordshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Abbey Street

South Staffordshire Water are carrying out Utility repair and maintenance works on Abbey Street, Cannock.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 January 2025 at 18:30 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 6 Jan 2025 at 10:20.

South Staffordshire Water logo
Finishing
Friday
Details
View Map
Share
Follow
Florence Street

South Staffordshire Water are carrying out Utility repair and maintenance works on Florence Street, Cannock.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 January 2025 at 18:30 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 6 Jan 2025 at 11:22.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
6 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Bushbury Lane

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Bushbury Lane, Wolverhampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 5 Dec 2024 at 09:31.

Western Power Distribution (West Midlands) logo
LONG TERM
Until
7 Mar 2025
Details
View Map
Share
Follow
Bushbury Lane

Western Power Distribution (West Midlands) are carrying out Utility asset works on Bushbury Lane, Wolverhampton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 09:00 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 6 Jan 2025 at 09:16.

Cadent Gas logo
Until
31 Jan 2025
Details
View Map
Share
Follow
High Hill

Cadent Gas are carrying out Utility asset works on High Hill, Essington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 12:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 13:20.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Long Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Long Lane, Springhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 11:36.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Anson Road

Staffordshire County Council are proposing to carry out Highway improvement works on Anson Road, Great Wyrley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 11:23.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Walsall Road

Staffordshire County Council are proposing to carry out Highway improvement works on Walsall Road, Norton Canes, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 14:48.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Railway Street

Staffordshire County Council are proposing to carry out Highway improvement works on Railway Street, Rumer Hill, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 12:20.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Hallcourt Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Hallcourt Lane, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 11:36.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Hemlock Way

Staffordshire County Council are proposing to carry out Highway improvement works on Hemlock Way, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 11:36.

Cadent Gas logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Cannock Road

Cadent Gas are proposing to carry out Utility asset works on Cannock Road, Chadsmoor, Cannock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 16:30.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Johnson Road

Staffordshire County Council are proposing to carry out Highway improvement works on Johnson Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 15:53.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Cecil Street

Staffordshire County Council are proposing to carry out Highway improvement works on Cecil Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 14:32.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Burgoyne Street

Staffordshire County Council are proposing to carry out Highway improvement works on Burgoyne Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Oct 2024 at 09:22.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Otherton Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Otherton Lane, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 16:06.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Pye Green Road

Staffordshire County Council are proposing to carry out Highway improvement works on Pye Green Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 12:20.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Blewitt Street

Staffordshire County Council are proposing to carry out Highway improvement works on Blewitt Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 12:20.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Blewitt Street

Staffordshire County Council are proposing to carry out Highway improvement works on Blewitt Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 13:03.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Whitfield Road

Staffordshire County Council are proposing to carry out Highway improvement works on Whitfield Road, Hednesford, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 12:33.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
6 Jan and 15 Mar 2025
Details
View Map
Share
Follow
Broadhurst Green

Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Broadhurst Green, Pye Green, Cannock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 29 Aug 2024 at 16:19.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
6 Jan and 15 Mar 2025
Details
View Map
Share
Follow
Broadhurst Green

Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Broadhurst Green, Pye Green, Cannock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Oct 2024 at 14:56.

Western Power Distribution (West Midlands) logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Broadhurst Green

Western Power Distribution (West Midlands) are carrying out Utility repair and maintenance works on Broadhurst Green, Pye Green, Cannock.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 15:00 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 6 Jan 2025 at 16:14.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
6 Jan and 15 Mar 2025
Details
View Map
Share
Follow
Broadhurst Green Service Road

Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Broadhurst Green Service Road, Cannock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 29 Aug 2024 at 16:19.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
6 Jan and 15 Mar 2025
Details
View Map
Share
Follow
Broadhurst Green Service Road

Western Power Distribution (West Midlands) are proposing to carry out Utility repair and maintenance works on Broadhurst Green Service Road, Cannock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Oct 2024 at 15:23.

Western Power Distribution (West Midlands) logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Broadhurst Green Service Road

Western Power Distribution (West Midlands) are carrying out Utility repair and maintenance works on Broadhurst Green Service Road, Cannock.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 15:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 6 Jan 2025 at 16:12.

Cadent Gas logo
LONG TERM
Between
7 Jan and 26 Feb 2025
Details
View Map
Share
High Hill

Cadent Gas were proposing to carry out Utility asset works on High Hill, Essington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 26 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 15:51.

Cadent Gas logo
Between
8 and 28 Jan 2025
Details
View Map
Share
Follow
Fifth Avenue

Cadent Gas are proposing to carry out Utility asset works on Fifth Avenue, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 11:57.

Cadent Gas logo
LONG TERM
Between
10 Jan and 3 Mar 2025
Details
View Map
Share
Follow
High Hill

Cadent Gas are proposing to carry out Utility asset works on High Hill, Essington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 15:15.

City Of Wolverhampton Council logo
LONG TERM
Between
13 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Somerford Place

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Somerford Place, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wolverhampton Council on 24 Dec 2024 at 12:37.

City Of Wolverhampton Council logo
LONG TERM
Between
13 Jan and 24 Aug 2025
Details
View Map
Share
Follow
Somerford Place

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Somerford Place, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wolverhampton Council on 19 Sep 2024 at 15:00.

City Of Wolverhampton Council logo
LONG TERM
Between
13 Jan and 5 Oct 2025
Details
View Map
Share
Follow
Willenhall Road

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Willenhall Road, Wolverhampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 5 October 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by City Of Wolverhampton Council on 4 Jan 2025 at 12:18.

City Of Wolverhampton Council logo
LONG TERM
Between
13 Jan and 25 Oct 2025
Details
View Map
Share
Follow
Willenhall Road

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Willenhall Road, Wolverhampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 25 October 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by City Of Wolverhampton Council on 24 Dec 2024 at 10:04.

City Of Wolverhampton Council logo
LONG TERM
Between
13 Jan and 25 Oct 2025
Details
View Map
Share
Follow
Willenhall Road

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Willenhall Road, Wolverhampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 25 October 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by City Of Wolverhampton Council on 16 Oct 2024 at 12:05.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Coverdale Way

Staffordshire County Council are proposing to carry out Highway improvement works on Coverdale Way, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 08:14.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Dorset Road

Staffordshire County Council are proposing to carry out Highway improvement works on Dorset Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 08:01.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Stafford Street

Staffordshire County Council are proposing to carry out Highway improvement works on Stafford Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 08:14.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Langholm Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Langholm Drive, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 14:15.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Otherton Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Otherton Lane, Penkridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 14:53.

Severn Trent Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Harper Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Harper Street, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 2 Oct 2024 at 08:17.

Severn Trent Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Harper Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Harper Street, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 15 Oct 2024 at 13:15.

Cadent Gas logo
Between
15 Jan and 5 Feb 2025
Details
View Map
Share
Upper Sneyd Road

Cadent Gas were proposing to carry out Utility asset works on Upper Sneyd Road, Essington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 5 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 12:40.

Cadent Gas logo
Between
15 Jan and 5 Feb 2025
Details
View Map
Share
Upper Sneyd Road

Cadent Gas were proposing to carry out Utility asset works on Upper Sneyd Road, Essington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 5 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 09:16.

Cadent Gas logo
Between
15 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Upper Sneyd Road

Cadent Gas are proposing to carry out Utility asset works on Upper Sneyd Road, Essington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 09:55.

Cadent Gas logo
Between
15 and 31 Jan 2025
Details
View Map
Share
Follow
Upper Sneyd Road

Cadent Gas are proposing to carry out Utility asset works on Upper Sneyd Road, Essington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 13:21.

Cadent Gas logo
LONG TERM
Between
15 Jan and 31 Dec 2025
Details
View Map
Share
Upper Sneyd Road

Cadent Gas were proposing to carry out Utility asset works on Upper Sneyd Road, Essington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 31 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 15:10.

Staffordshire County Council logo
Between
19 and 26 Jan 2025
Details
View Map
Share
Follow
Lodge Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Lodge Lane, Cheslyn Hay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Dec 2024 at 11:53.

City Of Wolverhampton Council logo
LONG TERM
Between
20 Jan and 19 Aug 2025
Details
View Map
Share
Follow
Somerford Place

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Somerford Place, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 19 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wolverhampton Council on 4 Dec 2024 at 14:39.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Noose Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Noose Lane, Willenhall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 10:36.

Severn Trent Water logo
LONG TERM
Between
20 Jan and 20 Apr 2025
Details
View Map
Share
Follow
Park Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Park Lane, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 3 Feb 2023 at 11:00.

South Staffordshire Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Croxstalls Road

South Staffordshire Water were proposing to carry out Utility repair and maintenance works on Croxstalls Road, Bloxwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 13 Nov 2024 at 14:43.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Wood Hayes Road

Staffordshire County Council are proposing to carry out Highway improvement works on Wood Hayes Road, Westcroft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 09:45.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Bognop Road

Staffordshire County Council are proposing to carry out Highway improvement works on Bognop Road, Essington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 10:11.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Anson Road

Staffordshire County Council are proposing to carry out Highway improvement works on Anson Road, Great Wyrley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 08:36.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Gorsey Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Gorsey Lane, Little Wyrley, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 09:13.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Saredon Road

Staffordshire County Council are proposing to carry out Highway improvement works on Saredon Road, Little Saredon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 10:28.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Brownhills Road

Staffordshire County Council are proposing to carry out Highway improvement works on Brownhills Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 09:13.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Windsor Road

Staffordshire County Council are proposing to carry out Highway improvement works on Windsor Road, Cheslyn Hay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Dec 2024 at 12:07.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Red Lion Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Red Lion Lane, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 09:13.

Severn Trent Water logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Walsall Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Walsall Road, Churchbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 11 Nov 2024 at 13:13.

Severn Trent Water logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Walsall Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Walsall Road, Churchbridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Dec 2024 at 16:55.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Poplar Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Poplar Lane, Hatherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Dec 2024 at 14:35.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Coverdale Way

Staffordshire County Council are proposing to carry out Highway improvement works on Coverdale Way, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 14:51.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Dorset Road

Staffordshire County Council are proposing to carry out Highway improvement works on Dorset Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 14:51.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Stafford Street

Staffordshire County Council are proposing to carry out Highway improvement works on Stafford Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 15:04.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Bank Street

Staffordshire County Council are proposing to carry out Highway improvement works on Bank Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 14 Oct 2024 at 14:51.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Water Eaton Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Water Eaton Lane, Water Eaton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 11:21.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Water Eaton Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Water Eaton Lane, Water Eaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 14:29.

Cadent Gas logo
LONG TERM
Between
21 Jan and 26 Feb 2025
Details
View Map
Share
Kestrel Way

Cadent Gas were proposing to carry out Utility asset works on Kestrel Way, Cheslyn Hay.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 26 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 10:53.

Cadent Gas logo
Between
22 Jan and 5 Feb 2025
Details
View Map
Share
Essington Road

Cadent Gas were proposing to carry out Utility asset works on Essington Road, Essington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 5 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 09:47.

Cadent Gas logo
Between
22 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Essington Road

Cadent Gas are proposing to carry out Utility asset works on Essington Road, Essington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 11:23.

Cadent Gas logo
Between
22 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Essington Road

Cadent Gas are proposing to carry out Utility asset works on Essington Road, Essington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:54.

Cadent Gas logo
Between
22 Jan and 5 Feb 2025
Details
View Map
Share
Sneyd Lane

Cadent Gas were proposing to carry out Utility asset works on Sneyd Lane, Essington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 5 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 10:35.

Cadent Gas logo
Between
22 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Sneyd Lane

Cadent Gas are proposing to carry out Utility asset works on Sneyd Lane, Essington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 12:03.

Cadent Gas logo
Between
22 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Sneyd Lane

Cadent Gas are proposing to carry out Utility asset works on Sneyd Lane, Essington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 15:07.

Walsall Metropolitan Borough Council logo
Between
23 and 28 Jan 2025
Details
View Map
Share
Follow
Elmore Row

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Elmore Row, Bloxwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 28 Nov 2024 at 15:21.

Severn Trent Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Bushbury Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Bushbury Road, Wolverhampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 27 Nov 2024 at 12:30.

Walsall Metropolitan Borough Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Croxdene Avenue

Walsall Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Croxdene Avenue, Bloxwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 16 Dec 2024 at 12:48.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Wyrley Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Wyrley Lane, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 09:15.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Elms Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Elms Lane, Shareshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 10:38.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Brewood Road

Staffordshire County Council are proposing to carry out Highway improvement works on Brewood Road, Coven.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Dec 2024 at 08:34.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Gains Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Gains Lane, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Oct 2024 at 16:04.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Bettys Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Bettys Lane, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 09:03.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Windsor Road

Staffordshire County Council are proposing to carry out Highway improvement works on Windsor Road, Cheslyn Hay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 11:20.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Washbrook Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Washbrook Lane, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Dec 2024 at 10:23.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Norton Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Norton Lane, Great Wyrley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 11:33.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Great Saredon Road

Staffordshire County Council are proposing to carry out Highway improvement works on Great Saredon Road, Great Saredon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Oct 2024 at 14:27.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Silver Birch Road

Staffordshire County Council are proposing to carry out Highway improvement works on Silver Birch Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 09:03.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Burntwood Road

Staffordshire County Council are proposing to carry out Highway improvement works on Burntwood Road, Norton Canes, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Dec 2024 at 12:20.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Chapel Street

Staffordshire County Council are proposing to carry out Highway improvement works on Chapel Street, Heath Hayes, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 11:45.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Pinewood Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Pinewood Avenue, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 12:52.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Bath Road

Staffordshire County Council are proposing to carry out Highway improvement works on Bath Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 11:45.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Belt Road

Staffordshire County Council are proposing to carry out Highway improvement works on Belt Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Oct 2024 at 11:48.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Heath Street

Staffordshire County Council are proposing to carry out Highway improvement works on Heath Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 09:41.

Severn Trent Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
High Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on High Road, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 Oct 2024 at 14:46.

Severn Trent Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
High Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on High Road, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 31 Oct 2024 at 13:56.

Severn Trent Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Stafford Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Stafford Street, Willenhall.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 7 Nov 2024 at 12:24.

Staffordshire County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Saredon Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Saredon Lane, Great Saredon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Oct 2024 at 11:06.

Staffordshire County Council logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Saredon Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Saredon Lane, Great Saredon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Oct 2024 at 14:01.

City Of Wolverhampton Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Powell Street

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Powell Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wolverhampton Council on 28 Nov 2024 at 09:41.

Severn Trent Water logo
Between
3 and 11 Feb 2025
Details
View Map
Share
Follow
Park Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Park Road, Bloxwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 27 Nov 2024 at 14:53.

Murphy Gas Networks logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Lichfield Road

Murphy Gas Networks are proposing to carry out Utility asset works on Lichfield Road, Bloxwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Gas Networks on 3 Jan 2025 at 14:34.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Wyrley Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Wyrley Lane, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Dec 2024 at 09:09.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Queen Street

Cadent Gas are proposing to carry out Utility asset works on Queen Street, Cheslyn Hay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 15:36.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Brownhills Road

Staffordshire County Council are proposing to carry out Highway improvement works on Brownhills Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Dec 2024 at 09:24.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Bettys Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Bettys Lane, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Dec 2024 at 09:09.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Red Lion Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Red Lion Lane, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 29 Nov 2024 at 15:58.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Silver Birch Road

Staffordshire County Council are proposing to carry out Highway improvement works on Silver Birch Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Dec 2024 at 09:09.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Blewitt Street

Staffordshire County Council are proposing to carry out Highway improvement works on Blewitt Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 11:11.

BT logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Abbey Drive

BT are proposing to carry out Utility repair and maintenance works on Abbey Drive, Pelsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Nov 2024 at 11:39.

Walsall Metropolitan Borough Council logo
Between
5 and 10 Feb 2025
Details
View Map
Share
Follow
Elmore Row

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Elmore Row, Bloxwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 15 Nov 2024 at 13:19.

Walsall Metropolitan Borough Council logo
LONG TERM
Between
6 Feb 2025 and 16 Feb 2026
Details
View Map
Share
Follow
New Road

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on New Road, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 16 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 12 Dec 2024 at 10:36.

Cadent Gas logo
LONG TERM
Between
6 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Poplar Avenue

Cadent Gas are proposing to carry out Utility asset works on Poplar Avenue, Bentley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 14:38.

Severn Trent Water logo
Between
10 and 16 Feb 2025
Details
View Map
Share
Norton Hall Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Norton Hall Lane, Cannock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 16 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 9 Dec 2024 at 16:57.

Staffordshire County Council logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Burntwood Way

Staffordshire County Council are proposing to carry out Highway improvement works on Burntwood Way, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 09:07.

Staffordshire County Council logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Burntwood Way

Staffordshire County Council are proposing to carry out Highway improvement works on Burntwood Way, Burntwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Dec 2024 at 10:32.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
13 and 26 Feb 2025
Details
View Map
Share
Follow
Rookery Street

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out New service connection on Rookery Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 12 Dec 2024 at 11:20.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
13 and 26 Feb 2025
Details
View Map
Share
Follow
Rookery Street

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out New service connection on Rookery Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 13 Dec 2024 at 12:35.

Western Power Distribution (West Midlands) logo
Between
14 and 28 Feb 2025
Details
View Map
Share
Follow
Collingwood Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Collingwood Road, Wolverhampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 5 Dec 2024 at 10:40.

Western Power Distribution (West Midlands) logo
Between
14 and 28 Feb 2025
Details
View Map
Share
Follow
Collingwood Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Collingwood Road, Wolverhampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 17 Dec 2024 at 10:59.

Western Power Distribution (West Midlands) logo
Between
14 and 28 Feb 2025
Details
View Map
Share
Follow
Collingwood Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Collingwood Road, Wolverhampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 23 Dec 2024 at 10:07.

Western Power Distribution (West Midlands) logo
Between
14 and 28 Feb 2025
Details
View Map
Share
Follow
Collingwood Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Collingwood Road, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 2 Jan 2025 at 09:56.

Staffordshire County Council logo
Between
16 and 23 Feb 2025
Details
View Map
Share
Follow
Lodge Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Lodge Lane, Cheslyn Hay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Nov 2024 at 09:38.

Cadent Gas logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Bentley Lane

Cadent Gas are proposing to carry out Utility asset works on Bentley Lane, Walsall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 14:02.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Norton Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Norton Lane, Great Wyrley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Dec 2024 at 12:21.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Cannock Road

Staffordshire County Council are proposing to carry out Highway improvement works on Cannock Road, Chase Terrace.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 1 Oct 2024 at 09:05.

Severn Trent Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Hill Street

Severn Trent Water are proposing to carry out New service connection on Hill Street, Essington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 5 Dec 2024 at 15:17.

Severn Trent Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Hill Street

Severn Trent Water are proposing to carry out New service connection on Hill Street, Essington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 2 Jan 2025 at 09:23.

Cadent Gas logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Bentley Lane

Cadent Gas are proposing to carry out Utility asset works on Bentley Lane, Walsall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Dec 2024 at 10:08.

Staffordshire County Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Saredon Road

Staffordshire County Council are proposing to carry out Highway improvement works on Saredon Road, Little Saredon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Dec 2024 at 09:54.

Severn Trent Water logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Church Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Church Road, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Dec 2024 at 11:37.

Cadent Gas logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Union Street

Cadent Gas are proposing to carry out Utility asset works on Union Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 14:49.

Staffordshire County Council logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Hayes Way

Staffordshire County Council are proposing to carry out Highway improvement works on Hayes Way, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 10:30.

Staffordshire County Council logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Hayes Way

Staffordshire County Council are proposing to carry out Highway improvement works on Hayes Way, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Dec 2024 at 10:41.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
27 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Northwood Park Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Northwood Park Road, Wolverhampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 5 Dec 2024 at 11:40.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
27 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Northwood Park Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Northwood Park Road, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 6 Dec 2024 at 12:42.

Western Power Distribution (West Midlands) logo
Between
27 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Cromwell Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Cromwell Road, Wolverhampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 5 Dec 2024 at 11:53.

Cadent Gas logo
Between
3 and 14 Mar 2025
Details
View Map
Share
Park Street

Cadent Gas were proposing to carry out Utility asset works on Park Street, Cannock.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 14:16.

Western Power Distribution (West Midlands) logo
Between
3 and 31 Mar 2025
Details
View Map
Share
Follow
Norton East Road

Western Power Distribution (West Midlands) are proposing to carry out Remedial works on Norton East Road, Cannock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 20 Dec 2024 at 14:13.

Severn Trent Water logo
Between
3 and 11 Mar 2025
Details
View Map
Share
Follow
Burgoyne Street

Severn Trent Water are proposing to carry out Remedial works on Burgoyne Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Dec 2024 at 11:07.

Severn Trent Water logo
Between
3 and 11 Mar 2025
Details
View Map
Share
Follow
Burgoyne Street

Severn Trent Water are proposing to carry out Remedial works on Burgoyne Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 2 Jan 2025 at 11:11.

Walsall Metropolitan Borough Council logo
Between
6 and 18 Mar 2025
Details
View Map
Share
Follow
Walsall Road

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Walsall Road, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 12 Dec 2024 at 11:51.

Walsall Metropolitan Borough Council logo
Between
6 and 18 Mar 2025
Details
View Map
Share
Follow
Bloxwich Road North

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bloxwich Road North, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 12 Dec 2024 at 11:43.

Walsall Metropolitan Borough Council logo
Between
6 and 20 Mar 2025
Details
View Map
Share
Follow
Coltham Road

Walsall Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Coltham Road, Willenhall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Walsall Metropolitan Borough Council on 12 Dec 2024 at 11:34.

Severn Trent Water logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Hill Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Hill Street, Essington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 2 Jan 2025 at 12:13.

Staffordshire County Council logo
LONG TERM
Between
10 Mar and 11 May 2025
Details
View Map
Share
Follow
Clarion Way

Staffordshire County Council are proposing to carry out Highway improvement works on Clarion Way, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 11 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Jan 2025 at 15:23.

Cadent Gas logo
LONG TERM
Between
10 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Thornhill Road

Cadent Gas are proposing to carry out Utility asset works on Thornhill Road, Cannock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 16:30.

Cadent Gas logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Pye Green Road

Cadent Gas are proposing to carry out Utility asset works on Pye Green Road, Cannock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 13:52.

Cadent Gas logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Pye Green Road

Cadent Gas are proposing to carry out Utility asset works on Pye Green Road, Cannock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 16:30.

Severn Trent Water logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Nine Elms Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Nine Elms Lane, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Dec 2024 at 12:28.

Severn Trent Water logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Nine Elms Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Nine Elms Lane, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Dec 2024 at 08:40.

South Staffordshire Water logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Croxstalls Road

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Croxstalls Road, Bloxwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 17 Dec 2024 at 14:42.

South Staffordshire Water logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Leamore Lane

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Leamore Lane, Walsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Staffordshire Water on 24 Dec 2024 at 11:34.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Brewood Road

Staffordshire County Council are proposing to carry out Highway improvement works on Brewood Road, Coven.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Dec 2024 at 15:56.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Washbrook Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Washbrook Lane, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Dec 2024 at 09:54.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Burntwood Road

Staffordshire County Council are proposing to carry out Highway improvement works on Burntwood Road, Norton Canes, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 15:22.

Cadent Gas logo
Between
17 and 20 Mar 2025
Details
View Map
Share
Follow
North Street

Cadent Gas are proposing to carry out New service connection on North Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 09:00.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Poplar Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Poplar Lane, Hatherton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Dec 2024 at 11:40.

Staffordshire County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Cannock Road

Staffordshire County Council were proposing to carry out Highway improvement works on Cannock Road, Chadsmoor, Cannock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Dec 2024 at 13:34.

Severn Trent Water logo
Between
18 and 20 Mar 2025
Details
View Map
Share
Follow
Milton Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Milton Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 10 Dec 2024 at 11:03.

South Staffordshire Water logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
Washbrook Lane

South Staffordshire Water are proposing to carry out Utility repair and maintenance works on Washbrook Lane, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the verge only.

This roadwork event was last updated by South Staffordshire Water on 19 Dec 2024 at 09:57.

Cadent Gas logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Church Street

Cadent Gas are proposing to carry out Utility asset works on Church Street, Bridgtown, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 09:40.

Cadent Gas logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Church Street

Cadent Gas are proposing to carry out Utility asset works on Church Street, Bridgtown, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 10:48.

Cadent Gas logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
New Street

Cadent Gas are proposing to carry out Utility asset works on New Street, Bridgtown, Cannock.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Dec 2024 at 11:19.

Cadent Gas logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
New Street

Cadent Gas are proposing to carry out Utility asset works on New Street, Bridgtown, Cannock.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jan 2025 at 11:11.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Langholm Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Langholm Drive, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 11:46.

Staffordshire County Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Cannock Road

Staffordshire County Council are proposing to carry out Highway improvement works on Cannock Road, Chadsmoor, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Dec 2024 at 12:43.

Cadent Gas logo
LONG TERM
Between
31 Mar and 2 May 2025
Details
View Map
Share
Follow
Harvesters Road

Cadent Gas are proposing to carry out Utility asset works on Harvesters Road, Willenhall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 10:30.

Cadent Gas logo
Between
31 Mar and 22 Apr 2025
Details
View Map
Share
Follow
Park Street

Cadent Gas are proposing to carry out Utility asset works on Park Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 11:17.

Cadent Gas logo
Between
31 Mar and 22 Apr 2025
Details
View Map
Share
Follow
Park Street

Cadent Gas are proposing to carry out Utility asset works on Park Street, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Dec 2024 at 11:30.

Staffordshire County Council logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Cannock Road

Staffordshire County Council are proposing to carry out Highway improvement works on Cannock Road, Chadsmoor, Cannock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 30 Dec 2024 at 12:07.


Roadworks Map near to Wolverhampton Road, WOLVERHAMPTON, WV10 7LY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 7 Jan 2025 01:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Wolverhampton Road, WOLVERHAMPTON, WV10 7LY (7 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Western Power Distribution (West Midlands) logo
MAJOR
  
WOLVERHAMPTON ROAD 
(0.0 miles)
Western Power Distribution (West Midlands)
Utility asset works - Footway, Carriageway, Verge - No carriageway incursion
In Progress
Since: 7 Oct 2024 17:30
(Scheduled: 7 Oct 2024 - 24 Jan 2025)
0.0
Details
Share
Follow
2
Western Power Distribution (West Midlands) logo
MAJOR
  
WARSTONE ROAD 
(0.2 miles)
Western Power Distribution (West Midlands)
Utility asset works - Footway, Carriageway, Verge - No carriageway incursion
In Progress
Since: 14 Oct 2024 17:45
(Scheduled: 14 Oct 2024 - 31 Jan 2025)
0.2
Details
Share
Follow
3
Western Power Distribution (West Midlands) logo
MAJOR
  
OLD WARSTONES LANE 
(0.5 miles)
Western Power Distribution (West Midlands)
Utility asset works - Footway, Carriageway, Verge - Some carriageway incursion
Planned
Scheduled: 6 Jan 2025 - 27 Jan 2025
0.5
Details
Share
Follow
4
South Staffordshire Water logo
KESTREL WAY 
(0.6 miles)
South Staffordshire Water
Utility repair and maintenance works - Footway - Give and take
In Progress
Since: 6 Jan 2025 08:54
(Scheduled: 6 Jan 2025 - 8 Jan 2025)
0.6
Details
Share
Follow
5
BT logo
HIGHFIELDS PARK 
(0.7 miles)
BT
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 7 Jan 2025 - 9 Jan 2025
0.7
Details
Share
Follow
6
Staffordshire County Council logo
LINK FOOTWAY FROM UPPER LANDYWOOD LANE TO MOONS LANE 
(0.7 miles)
Staffordshire County Council
Disconnection or alteration of supply - Footway - Some carriageway incursion
Planned
Scheduled: 8 Jan 2025 - 9 Jan 2025
0.7
Details
Share
Follow
7
South Staffordshire Water logo
ROSEMARY ROAD 
(1.0 miles)
South Staffordshire Water
Remedial works - Footway - No carriageway incursion
Complete
6 Jan 2025 13:10 - 14:10
1.0
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.